HomeMy WebLinkAboutWPO201400062 Bond Estimates 2014-07-29Project Name: Campbell Residents
WPO file number: WP0201400062
Erosion and Sediment Control Bond Estimate
Item Item
Number
stabluatim (PS, TS)
silt fencs(SF)
safety farm (SAF)
diversion (DD, FD, RW D)
temporary slope drain (TSD)
earthwork for trapbasin
structures for basin
sift fence inlet protection (IP)
stone inlet protection (IP)
pipe length
height of dam at fee
height of fill at face
length of dam
tap width
(area above transition)
(total witlth of dam)
(height below (mraltim)
(area below translhon)
length of spillway
width of spillway
near height
er diameter
barrel length
barrel diameter
outlet protection (OP)
length
channel (SCC, matted)
length
check dam
depth in channel
construction entrance (CE)
cut at high side
wash rack
0 It
paved construction entrance
0 ft
rip -rap, placed
depth
0 ft
width
survey and layout (prim par 0.1 mi.)
acres
mobilization
(area below transition)
stream crossing (computed independently)
0 ft
pipe diameter
0 in
0
(installed
0
0 It
cut at high side
0 ft
0 It
cut at face
0 ft
0 It
length of cut
0 ft
0 It
width of cut
0 ft
0 sf
(area below transition)
0 s
0 ft
(total witlth of cut)
0 ft
0 ft
(depth below Imnsilior
0 ft
0 s
(area above lmnsu -)
0 sf
(total fill volume)
O.D cy
0 ft
(TOAL Cy estimate)
0 cy
0 ft
(spillway alone tons)
0 tons
0 ft
$2,000.00
$0.00
0 in
se)
$0.00
0 ft
base plate or fdn
0
0 in
- -.
$000
barrel collars
0
barn, length
0 ft
0 ft
width
0 ft
0 ft
width
0 ft
0 ft
channel width
0 ft
0 ft
length
0.0 ft
0.0
(Ions)
0 ton.
0
traps and basins
0
No. Unit
Unit Cost
cost
(installed
$0.00
0.5 acres
$5.000.00
$2,500.00
400.0 ft
$5.D0
$2,000.00
0.0 ft
$5.00
$0.00
0 ft
$13A0
$0.00
$0.00
$0.00
Total $8,350
7/29/2014
$1100
$0.00
$50.00
$0.00
$0.00
$200.00
$0
$0.00
$200.00
$0
$50.00
$0
1
$100.00
$100.00
0
$200.00
$0.00
0
$0.00
$0.00
$0.00
0
$0.00
$0.00
1
$2,000.00
$2,000.00
0
$2,000.00
$0.00
0
$3,500.00
$0.00
$60.00
$0.00
$0.00
$0.00
$0.00
cast sum
$6,600.00
prq mgmt
$990.00
contingency
$759.00
Total $8,350
7/29/2014
Internal Use Only
Date Received: 2 I 1 Fee Paid:
Received by: JN2, r�{ Y
Intake: Forward to Management Analyst -
`a'rs
6 ?� P
REQUEST TO ESTABLISH A BOND
APPROVED PLAN
PROJECT NAME:
(As listed 66 the approved plan)
All parcels in the project, including any off -site work if easements are not provided, and current owners. Use a
separate sheet if more owners are required. Owner and tax map information must be correct, and plans must be
approved prior to bond estimates being prepared.
NOTE: If ownership of the property is in the name of any type of legal entity or organization
including, but not limited to the name of corporation, partnership, limited liability company,
trust, association, etc., documents acceptable to the County must be submitted certifying that
the person signing above has the authority to do so.
The requested estimates are;
X VESCP Erosion & Sediment Control per Water Protection Ordinance section 17 -207; $0 fee
❑ VSMP Erosion and Sediment Control, Stormwater Management and Mitigation per Water
Protection Ordinance section 17 -208; $250 fee required
❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance section 14 -435;
& Water & Sewer per Subdivision Ordinance section 14 -435; $250 fee required
A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide
contact information.
EMAIL:
OR REGULAR MAIL ADDRESS: 4)P1 14 1 FO x_ 220
1 �v
Revised 6/20/2014
i "
/AWNER'S
TAX MAPS / PARCELS:
' / NAM C e
�//
SIGNATURE:
date:
TAX MAPS / PARCELS:
E:
OWNER'S NA 4E:
SIGNATURE:
date:
TAX MAPS / PARCELS:
OWNER'S NAME:
SIGNATURE:
date:
TAX MAPS / PARCELS:
OWNER'S NAME:
SIGNATURE:
date:
TAX MAPS / PARCELS:
OWNER'S NAME:
SIGNATURE:
date:
NOTE: If ownership of the property is in the name of any type of legal entity or organization
including, but not limited to the name of corporation, partnership, limited liability company,
trust, association, etc., documents acceptable to the County must be submitted certifying that
the person signing above has the authority to do so.
The requested estimates are;
X VESCP Erosion & Sediment Control per Water Protection Ordinance section 17 -207; $0 fee
❑ VSMP Erosion and Sediment Control, Stormwater Management and Mitigation per Water
Protection Ordinance section 17 -208; $250 fee required
❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance section 14 -435;
& Water & Sewer per Subdivision Ordinance section 14 -435; $250 fee required
A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide
contact information.
EMAIL:
OR REGULAR MAIL ADDRESS: 4)P1 14 1 FO x_ 220
1 �v
Revised 6/20/2014