Loading...
HomeMy WebLinkAboutWPO201400044 Bond Estimates 2014-05-12Project Name: AT &T Erosion & Sediment Control Plan WPO file number: WP0201400044 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number installed stabluation (PS, TS) 0.1 acres 55.000.00 $260.00 silt fan -(SF) 160.0 ft 85.00 $600.00 safety fan -(SAF) 0.0 ft $5.00 $0.00 diversion (DD, FD, RW D) 0 ft $13.00 $0.00 temporary slope drain(TSD) pipe length Oft pipe diameter Din $0.00 $0.00 earthwork for trap/basin height of dam at too 0 ft cut at high side 0 ft height of fili at face 0 It cut at face 0 ft length of dam 0 It length of cut 0 ft top width 0 It width of cut 0 It (area above transition) 0 sf (area below transition) 0 sf (total width of tlam) 0 It (total width of cut) 0 It (height below transition) 0 ft (depth below Imnsitor 0 ft c- below transition) 0 sr (area above transition) 0 sf i tolal FlII volume) 0.D cy length or spillway 0 it (TOAD CV estimate) 0 or $1100 $0.00 width of spillway 0 ft (spillway alone tons) 0 tons $50.00 $0.00 structures for basin deer height 0 it near diameter 0 in $0.00 $0.00 barrel length 0 ft base plate or fdn 0 $200.00 $0 barrel diameter 0 in $0.00 barrel collars 0 $200.00 $0 baffle length 0 ft $50.00 $0 sift fence inlet protection (F) 0 $100.00 $0.00 stone inlet protection (P) 0 $200.00 $0.00 outlet protection (OP) length O ft width O ft 0 $0.00 $0.00 channel (SCC, matted) length O ft width O ft 0 $0.00 check dam depth in channel 0 ft channel width 0 ft 0 $0.00 $0.00 onstmaim entrance (CE) 1 $2,000.00 $2,000.00 wash rack 0 $2,000.00 $0.00 paved construction entrance 0 $3,500.00 $0.00 rip -rap, placed depth 0 ft length 0.0 ft width 0.0 ins) 0 tons $60M $0.00 survey and layout (price par 0.1 mi.) acres 0 traps and basins 0 $0.00 mobilization $500.00 stream crossing (computed independently) $0.00 cost sum $3,550.00 prq mgmt $532.50 contingency $406.25 Total $4,500 8/5/2014 Internal Use Only Date Received: 'it v_Fce aid : / ^t �L rj'ly �� / / 'Ad-04d l ���r Received by: -'l, 27L - Intake: Forwa.. o agement Analyst 4c t!.� � / CAV 1 ri REQUEST TO ESTABLISH A BOND 72) , /71? APPROVED PLAN# SDP-201300046 9/C 20/'f- C e y PROJECT NAME: AT&T Gillenwater (As listed on the approved plan) All parcels in the project, including any off-site work if easements are not provided, and current owners. Use a separate sheet if more owners are required. Owner and tax map information must be correct,and plans must be approved prior to bond estimates being prepared. TAX MAPS/PARCELs: 57-49C OWNER'S NAME: Jay and Shirley Gillenwater SIGNATURE: date: TAX MAPS/PARCELs: 57-49C1 OWNER'S NAME:Ann Gillenwater Martin a • �� SIGNATURE: date: TAX MAPs/PARCELs: 73-32A OWNER'S NAME: John and Elizabeth Burch SIGNATURE: date: TAX MAPS/PARCELs: 5 7-4 9 OWNER'S NAME: Thomas and Kathr n Ke l s e SIGNATURE: date: TAX MAPs/PARCELs: OWNER'S NAME: SIGNATURE: date: NOTE: If ownership of the property is in the name of any type of legal entity or organization including,but not limited to the name of corporation,partnership, limited liability company, trust, association, etc., documents acceptable to the County must be submitted certifying that the person signing above has the authority to do so. The requested estimates are ® VESCP Erosion&Sediment Control per Water Protection Ordinance section 17-207; $0 fee ❑ VSMP Erosion and Sediment Control,Stormwater Management and Mitigation per Water Protection Ordinance section 17-208;$250 fee required ❑ Subdivision(roads, drainage, etc.)per Subdivision Ordinance section 14-435; &Water& Sewer per Subdivision Ordinance section 14-435;$250 fee required A bond estimate will be prepared by the plan reviewer. The estimate must be sent to the owner. Please provide contact information. EMAIL: jyg @jaygillenwater.us OR REGULAR MAIL ADDRESS: Jay Y. Gillenwater 648 Dry Bridge Road, Charlottesville, Revised 6/20/2014 VA 2 2 9 0 3