HomeMy WebLinkAboutWPO201400035 Bond Estimates 2014-04-18Project Name: Water Protection Ordinance Plan - Phase 1 - Amendment 1 for 5th Street Station
WPO file number: WP0201400035
Erosion and Sediment Control Bond Estimate
Item Item No. Unit Unit Cost cost
Number installed
stabluatioo (PS, TS)
45.0 acres
55.000.00
$225,000.00
silt fan -(SF)
4700.0 ft
$5M
$23,500.00
safety fence(SAF)
0.0 R
$5.00
$0.00
diversion (DD, FD, RW D)
3700 ft
$13.00
$48,100.00
temporary slope drain(TSD)
pipe length
Oft
pipe diameter
Din
$0.00
$0.00
earthwork for trap #ST1
height of dam at too
ft
cut at high side
4 It
height of fill st face
0 ft
but at face
2 ft
length of dam
0 If
length of cut
162 ft
tap width
2.5 ft
width of cut
10 ft
(area above transition)
0 of
(area balm transition)
28 sf
(total witlth of tlam)
0 ft
(total width of cut)
22 k
(height below Iransition)
0 ft
(depth below Iransilior
2 ft
(area below bansllmn)
0 of
(area above Iransition)
18 sf
i
0.0 cy
(total FlII volume)
276.0 by
length of spillway
60 ft
(TOAL CY estimate)
276 cy
$1100
$3,588.00
width of spillway
10 ft
(spillway alone tons)
34.5 tons
$50.00
$1,725.00
earthwork for trap #ST2
height of dam at toe
6 ft
cut st high side
6 ft
height of fill st face
3 ft
cut at face
3 ft
length of dam
50 If
length of cut
30 ft
lap width
2.5 ft
width of but
40 It
(area above Iransition)
25.5 of
(area below tmnalfion)
138 sf
(total width of tlam)
12 ft
(total witlth of cut)
58 k
(height below transition)
3 ft
(depth below Iransilior
3 ft
(area below transition)
9 of
(area above lmnsition)
78 sf
(total fill volume)
63.9 cy
(total FlII volume)
240.0 by
length of spillway
12 R
(TOAL CV estimate)
261 by
$13.00
$3,39100
width of spillway
25 It
(spillway stone tons)
173 tons
$50.00
$865.00
earthwork for trap #ST4
height of dam at toe
6 ft
cut st high side
4 It
height of fill st face
4 ft
cut at face
4 ft
length of dam
100 ft
length of cut
100 It
top width
3 ft
width of cut
30 ft
(area above Ira-tion)
44 at
(area below transition)
152 sf
Dotal width of dam)
12 It
(total width of cut)
46 ft
(height below transition)
2 ft
(depth below transilior
0 ft
(area below transition)
8 st
(area above transition)
0 sf
(total fill volume)
1926 cy
(total fill volume)
563.0 by
length of spillway
0 ft
(TOAL CV estimate)
627 cy
$13.00
$8,151.00
width of spillway
0 ft
(spillway stone tons)
0 tons
$50.00
$0.00
earthwork for trap #MT1
height of dam at toe
1.5 ft
cut st high side
0 ft
height of fill at face
1.5 ft
cut at face
0 ft
length of dam
120 ft
length of cut
0 ft
top witlth
20 ft
width of cut
0 ft
(area above transition)
34.5 sf
(area below transition)
0 at
Dotal width of dam)
3 It
(total width of cut)
0 ft
(height below transition)
0 ft
(depth below transilior
0 ft
(area below transition)
0 of
(area above transition)
0 sf
(total fill volume)
1533 cy
(total fill volume)
0.0 cy
length of spillway
6 It
(TOAL CV estimate)
153 cy
$13.00
$1,989.00
width of spillway
12 ft
(spillway stone tons)
41 tons
$50.00
$205.00
earthwork for trap #MT2
height of dam at tae
2 ft
cut at high side
0 ft
height of fill at face
2 ft
cut at face
0 ft
length of dam
60 ft
length of cut
0 It
top width
22 ft
width of cut
0 ft
(area above transition)
52 sf
(area Leis: , transition)
0 sf
(total width of dam)
4 ft
(total width of cut)
0 ft
(height below transition)
0 ft
(depth below transitior
0 ft
(area below transition)
0 of
(area above transition)
0 sf
(total fill volume)
115.6 by
(total fill volume)
0.0 cy
length of spillway
6 It
(TOAL CV estimate)
116 cy
$13.00
$1,508.00
width of spillway
12 It
(spillway stone tons)
41 tons
$50.00
$205.00
earthwork for basin #1
height of dam at tae
12 ft
cut at high side
10 ft
height of fill at face
6 It
cut at face
6 A
length of dam
50 It
length of cut
130 ft
top width
8 It
width of cut
40 ft
..i , = nsitnn)
120 at
(area below transition)
312 sf
(total width of dam)
24 ft
(total width of cut)
72 ft
(height below Irenstiipn)
6 It
(depth below Iransilior
4 ft
r:n)
36 sf
(area above transition)
128 sf
288.9 cy
(total fill volume)
2118.5 by
length of spillway
0 It
(TOAL CV estimate)
2215 by
$13.00
$28,795.00
width of spillway
0 It
(spillway stone tons)
0 tons
$50.00
$0.00
structures for basin #1
riser height
6.5 ft
er diameter
42 in
$75.00
$487.50
barrel length
90 It
base plate or fdn
1
$200.00
$200
barrel diameter
24 in
$50.00
$4,500.00
barrel collars
3
$200.00
$600
baffle length
4.8 R
$50.00
$240
earthwork for basin #2
height of dam at tae
0 ft
cut A high side
14 ft
height of fill at face
0 It
cut 9 face
8 It
length of dam
50 It
length of cut
150 ft
top witlth
8 It
width of cut
50 It
(area above Iransition)
0 sf
(area below transition)
528 sf
(total width of dam)
0 ft
(70181 width of cup
94 ft
(height below transition)
0 ft
(depth bebw Iransilior
6 ft
(area below transition)
0 sf
(area above transition)
246 sf
(total fill volume)
0.0 cy
(total fill volume)
4300.0 by
length of spillway
0 ft
(TOAL CV estimate)
4300 cy
$13.00
$55,900.00
width of spillway
0 ft
(spillway stone tons)
0 tons
$50.00
$0.00
7/23/2014
Project Name: Water Protection Ordinance Plan - Phase 1 - Amendment 1 for 5th Street Station
WPO file number: WP0201400035
Erosion and Sediment Control Bond Estimate
Item Item No. Unit Unit Cost cost
Number installed
almamr�masutinsx
er height
riter diameter
barrel length
barrel diameter
earthwork for basin #3
height of dam at too
height of fill at face
length of dam
tap width
(area above transition
(Intel wdp of dam)
(height below transitic
(area below transition
length of spillway
width of spillway
structures for basin #3
star height
riter diameter
barrel length
barrel diameter
sift fence inlet protection (IP)
stone inlet protection (IP)
outlet protection (OP)
length
channel (SCC, matted)
length
check dam
depth in channel
construction entrance (CE)
base plate or Me
wash rack
30 in
paved construction entrance
$65.00
rip -rap, placed
depth
1
width
survey and layout (price par 0.1 mi.)
acres
mobilization
out at high side
stream crossing (computed independently)
4
$13.00
$144,443.00
42 in
(riser civil pu"l
$7500
70 It
base plate or Me
1
30 in
(ball nit pr, ,,
$65.00
barrel collars
1
baffle length
6 ft
20 ft
out at high side
0 It
20 ft
cut at face
0 ft
300 ft
length of cut
0 It
10 ft
width of cut
0 ft
1000 sf
(area below harsh-)
0 sf
40 ft
(total widen of cup
0 it
0 fi
(depth below Iransitior
O ft
0 sf
(area have transition)
0 at
11111.1 cy
(total fill volume)
a 0 cy
0 It
(TOAL GV estimate)
11111 cy
0 ft
(spillway stone tons)
0 tons
8 I
$500.00
48 in
$0.00
110 ft
base plate or f In
1
30 in
$65.00
barrel collars
3
baffle length
5.5 ft
15 it
width
10 ft
0 it
width
0 ft
0 ft
channel width
0 If
0 ft
length
1.0 If
00
1 tons
45
traps and basins
6
$300.00
$200.00 $200
$4,550.00
$200.00 $200
$50.00 $300
Ttingency $69,327.12
otal $762,600
7/23/2014
$13.00
$144,443.00
$50.00
$0.00
$1,200.00
$200.00
$200
$7,150.00
$200.00
$600
$50.00
$275
1
$100.00
$100.00
1
$20000
$200.00
1
$675.00
$675.00
$0.00
1
$0.00
$0.00
1
$2,00000
$2,000.00
1
$2,000.00
$2,000.00
1
$3,500.00
$3,500.00
$6000
$0.00
$25,500.00
$500.00
$0.00
cost sum
$602,844.50
prq mgmt
$90,426.68
Ttingency $69,327.12
otal $762,600
7/23/2014
se j �/ / / A
Date Received: At / Fee Paid: �`C..'_ `"✓
Received by: VII rtzdvaiii
Intake: Po rd Management Analyst
BOND ESTIMATE REQUEST
APPROVED PROJECT PLAN TITLE:(Title on the approve plan from which the estimate will be prepared.)
5th Street Station
All parcels in the project,including any ofd site work if easements are not provided,and current owners. Use a
separate sheet if more owners are required.Owner and tax map information must be correct,and plans must be
approved prior to bond estimates being prepared.
TAX MAPs/PARCELs:007700-00-00-011 EO OWNER'S N• ' : Av• Alit•- • LLC
SIGNATURE: date: a WlY
TAX MAPs/PARCELs:0076M1-00-00-002A0 OWNER'S N E: N ra rrop_erties, LLC
SIGNATURE: date: ...)/of (.2:4/7
TAX MAPs/PARCELsP076M1-00-00-002B0 OWNER'S to E -..Pro•erties LLC
SIGNATURE: date: a1-J0
TAX MAPs/PARCELs:0076M1-o0-0o-OO4AOOWNER'S N E• N w Era Properties, LLC '
SIGNATURE: date: -7/47;-- °1 Y
TAX MAPs/PARCELs: OWNER'S NAME:
SIGNATURE: date:
The requested estimates are;
IB Erosion&Sediment Control per Water Protection Ordinance section 17-207
❑ Stormwater Management per Water Protection Ordinance section 17-306
❑ Subdivision(roads,drainage,etc.)per Subdivision Ordinance section 14-435;
&Water&Sewer per Subdivision Ordinance section 14-435;$250 fee required
The estimate must be sent to the owner. Please provide contact information.
EMAIL: alan.taylorCa7redlightmanagement.cam
OR REGULAR MAIL ADDRESS:
x
Revised 11/1/2011