WPO201400012 Bond Estimates 2014-02-19
Project Name WPO file number: Erosion and Sediment Control Bond Estimate ItemItem No.Unit Unit Cost Cost Number (installed) stablization (PS, TS)3.0acres $5,000.00 $14,950.00 silt fence (SF)1425.0ft $5.00 $7,125.00 safety fence (SAF)0.0ft $5.00 $0.00 diversion (DD, FD, RWD)850ft $13.00 $11,050.00 temporary slope drain (TSD)pipe length0ftpipe diameter0in $0.00 $0.00 earthwork for trap/basin height of dam at toe10ftcut at high side10ft height of fill at face6ftcut at face6ft length of dam50ftlength of cut60ft top width 2ftwidth of cut20ft (area above transition)84sf (area below transition)192sf (total width of dam)20ft(total width of cut)52ft (height below transition)4ft (depth below transition)4ft (area below transition)24sf (area above transition)88sf (total fill volume)200.0cy(total fill volume)622.2cy length of spillway18ft (TOAL CY estimate)689cy $13.00$8,957.00 width of spillway30ft (spillway stone tons)31.1tons $50.00$1,555.00 structures for basin riser height0ft riser diameter0in (riser unit price)$0.00 $0.00 barrel length0ftbase plate or fdn0$200.00$0 barrel diameter0in (barrel unit price)$0.00 $0.00 barrel collars0$200.00$0 baffle length0ft$50.00$0 silt fence inlet protection (IP)0 $100.00 $0.00 stone inlet protection (IP)0 $200.00 $0.00 outlet protection (OP)length0ftwidth0ft0 $0.00 $0.00 channel (SCC, matted)length0ftwidth0ft $0.00 check damdepth in channel0ftchannel width0ft0 $0.00 $0.00 construction entrance (CE)1 $2,000.00 $2,000.00 wash rack $2,000.00 paved construction entrance 0 $3,500.00 $0.00 rip-rap, placeddepth 0ftlength 0.0ft width0.0 (tons)0tons$60.00 $0.00 survey and layout (price per 0.1 mi.)acres3traps and basins1 $2,000.00 mobilization $500.00 stream crossing (computed independently)$0.00 cost sum$48,137.00 proj mgmt$7,220.55 contingency$5,535.76 Total$60,900 4/11/2014