HomeMy WebLinkAboutWPO201300037 Bond Estimates 2013-05-30Phase 2 of Willow Glen WPO file number: WPO201300037 Erosion and Sediment Control Bond Estimate Item Item No.Unit Unit Cost Cost Number (installed) stablization (PS, TS)22.0 acres $5,000.00 $110,000.00 silt fence (SF)2750.0 ft $5.00 $13,750.00 safety fence (SAF)688.0 ft $5.00 $3,440.00 diversion (DD, FD, RWD)2300 ft $13.00 $29,900.00 temporary slope drain (TSD)pipe length 230 ft pipe diameter 30 in $65.00 $15,450.00 1 temporary sediment trap (ST or CIP)Method for volume comp: height of dam at toe 3 ft cut at dam 1.5 ft (lenth) x (total width) x (average height) / 27 for cubic yards height of dam at face 1 ft cut at high side 3 ft assume face at 2:1, toe at 3:1 length of dam 100 ft length of cut 100 ft total width = 3x(toe height) + 2x(face height) + top width top width 2 ft width of cut 0 ft average height = (toe height + face height) / 2 (comp. fill vol)96.3 cy (cut vol)75.0 cy $13.00 length of spillway 17.3 ft (cy est)121.3 width of spillway 4 ft (spillway stone tons)7.68889 $50.00 $1,961.30 1 temporary sediment basin (SB) height of dam at toe 7 ft cut at dam 10 ft height of dam at face 4 ft cut at high side 10 ft length of dam 400 ft length of cut 100 ft top width 10 ft width of cut 60 ft (comp. fill vol)3177.8 cy (cut vol)3703.7 cy $13.00 length of spillway 0 ft (cy est)4763.0 width of spillway 0 ft (spillway stone tons)0 $50.00 $61,918.52 riser height 10 ft riser diameter 72 in (riser unit price)$0.00 barrel length 95 ft (price of base)$200 barrel diameter 24 in (barrel unit price)$50.00 barrel collars 1 baffle length 0 ft $5,150.00 silt fence inlet protection (IP)7 $100.00 $700.00 stone inlet protection (IP)43 $200.00 $8,600.00 outlet protection (OP)length 15 ft width 10 ft 2 $675.00 $1,350.00 channel (SCC, matted)length 0 ft width 0 ft $0.00 check dam depth in channel 0 ft channel width 0 ft 1 $0.00 $0.00 construction entrance (CE)0 $2,000.00 $0.00 wash rack 1 $2,000.00 $2,000.00 paved construction entrance 1 $3,500.00 $3,500.00 rip-rap, placed depth 2 ft length 200.0 ft width 10.0 (tons)300 $60.00 $18,000.00 survey and layout (price per 0.1 mi.)acres 1 traps and basins 2 $1,500.00 mobilization $500.00 stream crossing (computed independently) cost sum $277,719.81 proj mgmt $41,657.97 contingency $31,937.78 Total $351,320 6/26/2013 Phase 2 of Willow Glen WPO file number: WPO201300037 Stormwater Management Plan Bond Estimate Item Item No. Unit Unit Cost Cost Number (installed) site clearing permanent diversion or ditch 0 ft $13.00 $0.00 standard manhole frame top (not inlet) 0 ea $500.00 $0.00 manhole structure (per ft. rise) 10 ft $450.00 $4,500.00 pipe, rcp, cmp (15 to 48") 24.0 in d 1 ES-1,2 1 EC-1 95.0 ft $50.00 $5,750.00 aggregate base or drainage stone 0.0 in d 1.0 ft L 0.0 ft W 35.0 ton $35.00 $1,225.00 1 basin height of dam at toe 0 ft cut at dam 0 ft height of dam at face 0 ft cut at high side 0 ft length of dam 260 ft length of cut 0 ft top width 0 ft width of cut 0 ft (comp. fill vol) 0.0 cy (cut vol) 0.0 cy $13.00 length of spillway 0 ft (cy est) 0.0 width of spillway 0 ft (spillway stone tons) 0 $50.00 $0.00 (price of base) $0 barrel collars 0 baffle length 0 ft $0.00 trees 0 ea $150.00 $0.00 shrubs 0 ea $50.00 $0.00 seedlings 1018 ea $5.00 $5,090.00 underdrain (LF) 0 ft $5.00 $0.00 biofilter soil mix (CY) 0 cy $38.00 $0.00 trash rack/ anti vortex devices 1 ft $1,500.00 $1,500.00 maintenance access road (LF) 500 ft $50.00 $25,000.00 Timber Bulkhead depth 4 ft length 720 ft 2880 sq ft $10.00 $28,800.00 rip-rap, placed depth 2 ft length 30.0 ft width 30.0 (tons) 135 $60.00 $8,100.00 survey and layout (price per 0.1 mi.) acres 1 basins 2 $1,500.00 mobilization $500.00 as-built drawings (per facility) 1 ea $2,000.00 $2,000.00 materials testing (per facility) 1 ea $2,000.00 $2,000.00 compaction testing (per dam) 1 ea $5,000.00 $5,000.00 manufactured facilities (attach manufacturer's or contractor's price as a base) cost sum $90,965.00 proj mgmt $13,644.75 contingency $10,460.98 Total $115,080 6/26/2013 W/7/ 714°0 ID Date Recei. ee Paid: _ �+ �t�•.;.r yr.rft.It M 4--)c Reweis d by: dr p e Intake: Forward to Ana}r 19 an st `�°' N4+//?t' BOND ESTIMATE REQUEST APPROVED PROJECT PLAN TITLE: t Riede on the appru%e plan from%%hieh the estimate will he prepared. w 1i,VO W t, tJ All parcels in the project, including an oft-site r.+ork if easements are not provided.and current oi‘ners. Use a separate sheet it'more owners are required. O~vner and tax map information must be correct,and plans must he approved prior to bond estimates being prepared. VI1 2So? ?4De , c. (lo113�� TAX MAPS PARCL:Ls: 32:2_ OWNER'S NAME: SIGNATURE: date: S • 2AS- 13 TAX MAPS. PARCELs:'3 Cs' OWNER'S NAME: IAPli t .erg I&wIE,et.` Lto113 SIGNATURES date: 5•211; _ D e t. 6a110(13 TAX MAPS PARC_`ELs: 32- K15 OWNER'S NAME: - -- ' •'.. • SIGNATURE: `"" date S 'Z • f3 y� tUL-E�1 — (?mot b(lc�(13 TAX MAPS PARC'ELs: 32- �t'1 1- OWNER'S SIGNATURE: date: 5 5-• 13 FAX MAPS PARCELs: OWNER'S NAME: SIGNATURE: date: The requested estimates are: t rosion& Sediment Control per Water Protection Ordinance section 17-207 tormvkater Management per Water Protection Ordinance section 17-306 Subdivision (roads. drainage,etc.)per Subdivision Ordinance section 14-435: & Water& Suter per Subdivision Ordinance section 14-435: 5250 fee required The estimate must be sent to the(miter. Please provide contact information. EMAIL: gPt71f e \fl 1 iv\GS -V G . C t S'V!C'Y----- OR REGULAR MALI. ADDRESS: i1 L,C, .,e Ida 04),74,1 6t9 S RECEIVED 9 JUN IZ1013 COMMUiNFTY Rel i'.ed !f I /\ 'T)FT J'ELOPlU ENT G