Loading...
HomeMy WebLinkAboutWPO201300014 Bond Estimates 2013-02-15 Temporary City Walk Soil-Cinder Stockpile 5th Street Station Site WPO file number:WPO201300014 Erosion and Sediment Control Bond Estimate Item Item No.Unit Untt Cost Cost Number (installed) stabluation(PS,TS) 1.0 acres $5,000.00 $5,000.00 Wit fence(SF) 1000.0 ft $5.00 $5,000.00 safety fence(SAF) 0.0 ft $5.00 $0.00 construction entrance(CE) 1 $2,000.00 $2,000.00 wash rack 1 $2,000.00 $2,00000 paved construction entrance 0 $3,500.00 $0.00 survey and layout(price per 0.1 mi.) acres 1 traps and basins 0 $500.00 mabil¢abon $500.00 cost sum proj mgmt $2,250.00 contingency $1725.00 Total $18,980 3/15/2013