HomeMy WebLinkAboutWPO201300014 Bond Estimates 2013-02-15 Temporary City Walk Soil-Cinder Stockpile 5th Street Station Site
WPO file number:WPO201300014
Erosion and Sediment Control Bond Estimate
Item Item No.Unit Untt Cost Cost
Number (installed)
stabluation(PS,TS) 1.0 acres $5,000.00 $5,000.00
Wit fence(SF) 1000.0 ft $5.00 $5,000.00
safety fence(SAF) 0.0 ft $5.00 $0.00
construction entrance(CE) 1 $2,000.00 $2,000.00
wash rack 1 $2,000.00 $2,00000
paved construction entrance 0 $3,500.00 $0.00
survey and layout(price per 0.1 mi.) acres 1 traps and basins 0 $500.00
mabil¢abon $500.00
cost sum
proj mgmt $2,250.00
contingency $1725.00
Total $18,980
3/15/2013