Loading...
HomeMy WebLinkAboutWPO200500072 Bond Release 2005-09-13 ALi •11 8 �RGINZ COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 April 25, 2011 Post Office Land Trust Mr. Charles Hurt Post Office Box 8147 Charlottesville, VA 22904 Re: HTC Area C Block 5 WPO 2005 -00072 Bond Release Requirements Dear Mr. Hurt: An inspection was made on April 20, 2011 to determine the condition of the site and to address all repairs and modifications that will be necessary to reduce the Erosion and Sediment Control Performance Bond on this project. The Erosion and Sediment Control Bond will be reduced from $20,000 down to $5,000. The remaining bond(s) will remain in effect until the work is complete. Sincerely, Raym d Senior Engineering Inspector rlilly@albemarle.org 434.989.1534 of AL% ._‘ COUNTY OF ALBEMARLE Department of Community Development 40] MclntireRoad Charlottesville, Virginia 22902 -4596 Fax (434)972126 Phone (434) 296-5832 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: HoLu 73 ,4.0 c - I* J4 C 6Lxlc PLAN /PERMIT NO.: t»PO 2 - oft 2 DATE: This project has been satisfactorily completed and the Erosion Control Performance Bond may be released at this time if all Water Protection Ordinance inspection fees invoiced have been paid. &-A 4 61)4.) /42 , 541,/,‘D r , % Erosion Control Inspector 0, .)1,„,1 f •02-11/ a A UNTING DEPARTMENT � ` Vs21C4), 'a2.bUd / i6131 • All Water Protection Ordinance inspection fees invoiced on the above project have been 1' collected. a. • 1./ • / 1011+)2i) // Chief Accountant • Date Copy: Pam Shifflett, Engineering Assistant of' AL r c COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax(434)972 -4126 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: Hvt-L`(, ,4 ') j w-A) a im /4241) C.. 8c..octc. PLAN /PERMIT NO.: IPPO 2T - 0 0 01 Z DATE: 9 fib( This project has been satisfactorily completed and the Erosion Control Performance Bond may be released at this time if all Water Protection Ordinance inspection fees invoiced have been paid. li I,,, Erosion Control Inspector ACCOUNTING DEPARTMENT All Water Protection Ordinance inspection fees invoiced on the above project have been collected. Chief Accountant Date Copy: Pam Shifflett, Engineering Assistant .