Loading...
HomeMy WebLinkAboutWPO201300039 Bond Release 2013-06-10 �0VAL �AII_II lll% NGtNIV COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434) 972-4126 EROSION CONTROL PERFORMANCE BOND RELEASE PROJECT NAME: / —,/vs SSQc'O1S A2,,r,/ - Dreo&".9 i01 r-vi PLAN/PERMIT NO. 2 0/3 000 37 DATE: iv ©c,- /t This project has been satisfactorily completed and the erosion control performance bond may be released at this time if all erosion control inspection fees invoiced have been paid. Erosion Control Inspector Community Development Department All erosion control Inspection fees invoiced on the above project have been collected. Director of Community Development/County Engineer Date Accounting Department All erosion control inspection fees invoiced on the above project have been collected. Chief Accountant Date Cc: Ana Kilmer 15DEPTICommunily DevelopmenN omis\Inspegions\EROSION CONTROL PERFORMANCE BOND RELEASE REVISED 5 29 2012.AOc Shoe AL , /R(11.;∎ Erosion & Sediment Control Preconstruction Conference Checklist L Name of Plan: 4,1.-1—• SQG,con_< /&0i ' 0r y Plan No.: 10i3 --C?da3c Date: a 3 1) Copies of approved plan given to: Owner or Authorized Agent / Contractor 2) Have all the conditions been met? / 3) Responsible Land Disturber: /dc—h 4''f Cer Cert./Lic.No.: 36"3361 ) / Type: !< (_. Address/ Phone/ Mobil Phone: 10_34 L?,' f(/) Ave,, < u^/ +, -idle , v4- z 7 9o- y3y -5-3 ,- 306c- 4) Name of Prime Contractor: D ys �nc_ Address/ Phone/ Mobil Phone: SCR oL5- el-4O ye Name of Subcontractor: 5) Persons in Attendance: Name Firm .7Y) -‘11 11 /4/0 -/ (--1727- !c �k (A/ ,4/J r1* A/TA Timm 0,2-5 /1') --. t(f/-� ;ys Brook woo( D' J (6) Date Permit Issued: \ lo `-` (7) ✓ Notification has been given that the owner/contactor is responsible for obtaining a VSMP permit from DCR. DCR has requested the County to check for the site posting. (8) Article II, section 17-207 B. Each permit shall also be subject to the following: 1. The permitted land disturbing activity shall be deemed to have commenced on the date the permit was issued, provided that the program authority may establish another date of commencement 1 of 2 Revised 11/29/2011 based on docuilletation submitted by the owner that clear demonstrates that the land disturbing activity commenced on that date. 2. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced, except for areas that the program authority finds are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non-erosive surface. For the purposes of this section, a "non-erosive surface" includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete; trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures; and such other surfaces that the program authority determines would adequately provide a permanent barrier to erosion. 3. The time limit for installing permanent vegetation as required by paragraph (B)(2) may be extended by either the program authority or the board of supervisors, or both, as follows: a. The program authority may extend the time limit for installing permanent vegetation up to an additional six (6) months, provided the owner submits a written request to the program authority no less than one (1) month prior to the deadline for installing the permanent vegetation. The program authority may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In granting an extension, the program authority may impose reasonable conditions. b. The board of supervisors may extend the time limit for installing permanent vegetation for duration it determines to be appropriate, provided the owner submits a written request to the clerk of the board of supervisors no less than two (2) months prior to the deadline for installing the permanent vegetation. The program authority shall provide its opinion to the board as to the condition of the property with respect to compliance with this chapter and an estimate of the minimum time needed to complete grading and install permanent vegetation for the land disturbance covered by this permit. The board may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has plans to effectively control or has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In granting an extension, the board shall set a time limit and may impose other reasonable conditions. Notes: 2 oft Revised 11/29/2011 I:\DEPT\Community Development\Forms\Inspections\Erosion Preconstruction Conf Checklist 11 29 201 1.doc