CALCULATIONS
SEMINOLE TRAIL
VOLUNTEER FIRE DEPARTMENT
ADDITION AND RENOVATIONS
rr
COUNTY OF ALBEMARLE
oY ALa FILE COPY
IMi ill * _ This copy of the approved plan is
..��.- �� reserved for the official files of
is•/ Albemarle County. Please do not
remove this plan from the file.
Wits001,
c"S C� S/ / 1
APRIL 17, 2013' the�'Iemarle Gounsy
Cr r �sr�ity �?ev�l ent Departrr��nr
DJG# 2130150 Date
File
ire
INC
ENGINEERS • ARCHITECTS • PLANNERS
rr 449 McLAWS CIRCLE • WILLIAMSBURG, VA • 23185
www.djginc.corn
Seminole Trail Fire Station Stormwater Calculations
This project consists of an approximate 4,600 SF addition on an existing 3,800 SF fire station. The
majority of the addition will be built upon the existing parking lot causing a net addition of only 3,025 SF
of additional impervious area to the 1.76 AC site.To reduce the proposed stormwater runoff to below
existing conditions a,3 200 gallon cistern will be used to collect half of the existing roof area as well as all
the proposed roof area.The water will run through a vortex filter before entering the cistern.Once in
the cistern the fire department will utilize this water to fill their trucks when ever feasible to minimize
the domestic water consumption.To compensate for water quality the vortex filter and two Filtera
boxes will be utilized reducing the pollutant runoff by 0.431bs/yr.
Within this calculations package you will find routing calculations for the proposed and existing 2yr,
10yr,and 100yr design storms for Albemarle County.The stormwater quality calculations can also be
found within this book.See below for a summary table of calculations.
a
Stormwater Quantity Calculations Summary
Storm/Developed Pre Developed Post Developed
2 Year Design storm 5.71 cfs 5.65 cfs
10 Year Design Storm 9.68 cfs 9.65 cfs
100 Year Design Storm 14.78 cfs 14.79 cfs
Stormwater Quality Summary
Required Removal 0.34 lbs/yr
Achieved Removal 0.43 lbs/yr
a
a
a
a
.s
..O
a
WATER QUALITY CALCULATIONS
a
a
a
a
a
PERFORMANCE-BASED WATER QUALITY CALCULATIONS APPENDIX 50
Worksheet 1
Page I of3 rrit
STEP 1 Determine the applicable area (A) and the post-developed impervious cover
(Ipos)• irr
Applicable area(A)* = 1 . 7 6 acres
Post-development impervious cover:
structures = 0 . 20 acres ■rt
parking lot = 0 .4 5 acres
airi
roadway = 0 .25 acres
other:
Sidewalk = 0.04 acres
acres
mai
Total = 0 . 94 acres
'post=(total post-development impervious cover_A) x 100= 53 %
* The area subject to the criteria may vary from locality to locality. Therefore,
consult the locality for proper determination of this value.
STEP 2 Determine the average land cover condition (Iwatershed) or the existing
impervious cover(I ) '
existing
Average land cover condition(Iwatershed).
If the locality has determined land cover conditions for individual watersheds within its +S
jurisdiction,use the watershed specific value determined by the locality as Iwatershed'
'watershed = % ea
Otherwise,use the Chesapeake Bay default value:
'watershed = 16%
5D-5
a
PERFORMANCE-BASED WATER QUALITY CALCULATIONS APPENDIX 513
a
Worksheet 1
Page 2 of 3
Existing impervious cover(Iexisting)
Determine the existing impervious cover of the development site if present.
'® Existing impervious cover:
structures = 0 • 0 9 acres
a
parking lot = 0. 56 acres
a roadway = 0 . 17 acres
other:
—a Sidewalk = 0.05 acres
acres
a
Total = 0 . 87 acres
a•• 'existing=(total existing impervious cover-A*) x 100 = 4 9
* The area should be the same as used in STEP 1.
a
STEP 3 Determine the appropriate development situation.
ar
The site information determined in STEP 1 and STEP 2 provide enough information to
determine the appropriate development situation under which the performance criteria will
a apply. Check( )the appropriate development situation as follows:
Situation 1: This consists of land development where the existing percent impervious
a
cover(Iexisting) is less than or equal to the average land cover condition
(Iwatershed) and the proposed improvements will create a total percent
a impervious cover(Ipost) which is less than or equal to the average land
cover condition('watershed)-
aar
I post % 'watershed 0
was
5D-6
a
a
rrir
PERFORMANCE-BASED WATER QUALITY CALCULATIONS APPENDIX SD.,:
Worksheet 1
Page 3 of 3
Ilik
Situation 2: This consists of land development where the existing percent impervious
cover(Iexisting) is less than or equal to the average land cover condition
('watershed) and the proposed improvements will create a total percent
impervious cover(Ipost) which is greater than the average land cover
condition(Iwatershed)•
'existing % 'watershed, %; and go
0 0
-'post Io 'watershed 0
x Situation 3: This consists of land development where the existing percent impervious
cover(Iexisting) is greater than the average land cover condition(Iwatershed)-
me
CIA
'existing o�� 'watershed o
Situation 4: This consists of land development where the existing percent impervious err
cover(Iexisting) is served by an existing stormwater management BMP(s)
that addresses water quality.
If the proposed development meets the criteria for development Situation 1,than the low
density development is considered to be the BMP and no pollutant removal is required.
The calculation procedure for Situation 1 stops here. If the proposed development meets
the criteria for development Situations 2,3, or 4, then proceed to STEP 4 on the
appropriate worksheet.
Mb
isi
5D-7
PERFORMANCE-BASED WATER QUALITY CALCULATIONS APPENDIX 5D
5D-8
am
PERFORMANCE-BASED WATER QUALITY CALCULATIONS APPENDIX 50
raw
Worksheet 3 : Situation 3
arrr
Page 1 of 5
Summary of Situation 3 criteria: from calculation procedure STEP 1 thru STEP 3,Worksheet 1:
Applicable area (A)* = 1 . 76 acres
tie
Ipost =(total post-development impervious cover-A) x 100= 53 %
_ o Go
(watershed 0 or (watershed = 16�0
"existing=(total existing impervious cover-A*) x 100 = 49 %
aro
'existing 49 %�0 > 'watershed 16 %
�o
a
STEP 4 Determine the relative pre-development pollutant load (Lpre).
1. Pre-development pollutant load based on the existing impervious cover:
Lpre(existing)= [0.05 + (0.009 x 'existing)] x A x 2.28 (Equation 5-17)
where: Lpre(existing) = relative pre-development total phosphorous load(pounds per year)
'existing = existing site impervious cover(percent expressed in whole
numbers) a
A = applicable area(acres)
Lpre(existing)= [0.05 + (0.009 x 49 )] x 1 . 76 x 2.28 in
= 1. 97 pounds per year
ara
w
rirw
5D-13
PERFORMANCE-BASED WATER QUALITY CALCULATIONS" APPENDIX 5D
�. Worksheet 3 : Situation 3
Page 2 of 5
2. Pre-development pollutant load based on the average land cover condition:
Lpre(watershed)= [0.05 + (0.009 x 'watershed)] x A x 2.28 (Equation 5-16)
rrr
where: Lpre(watershed) = relative pre-development total phosphorous load (pounds per year)
'watershed = average land cover condition for specific watershed or locality or
the Chesapeake Bay default value of 16% (percent expressed in
whole numbers)
A = applicable area(acres)
Lpre(watershed)= [0.05 +(0.009 x 16 )] x 1 . 76 x 2.28
= 0 . 79 pounds per year
STEP 5 Determine the relative post-development pollutant load (Lpost)•
Losst = [0.05 +(0.009 x Ipost)] x A x 2.28 (Equation 5-21)
�. where: Lpost = relative post-development total phosphorous load(pounds per
year)
'post = post-development percent impervious cover(percent expressed in
-� whole numbers)
A = applicable area(acres)
r• Lpost = [0.05 +(0.009 x 53 Ax 1. 76 x 2.28
= 2 . 11 pounds per year
STEP 6 Determine the relative pollutant removal requirement(RR).
RR = Lost (0.9 x Lpre(existing))
= 2 . 11 - (0.9 x 1 . 97 ) = 0 . 34 pounds per year
or
wr RR = Lpost Lpre(watershed)
= 2 . 11 - .79 = 1 . 32 pounds per year
5D-14
smi
a
PERFORMANCE-BASED WATER QUALITY CALCULATIONS APPENDIX 5D
�w
rr
Worksheet 3 : Situation 3
Page 3 of 5
The pollutant removal requirement(RR) for Situation 3 is the lesser of the two values calculated
above:
RR = 0 . 34 pounds per year
a
STEP 7 Identify best management practice (BMP)for the site.
a
1. Determine the required pollutant removal efficiency for the site:
EFF = (RR_L post) x 100 (Equation 5-22)
where: EFF = required pollutant removal efficiency(percent expressed in whole
numbers) •
RR = pollutant removal requirement(pounds per year)
Lpost = relative post-development total phosphorous load(pounds per
year) a
EFF = ( 0 .34 ± 2 . 11 ) x 100
a
= 0 . 16 %
2. Select BMP(s) from Table 5-15 and locate on the site: err
BMP 1: Filtera
BMp 2: Filtera
BMP 3: Vortex
a
w
5D-15
a
a
PERFORMANCE-EASED WATER QUALITY CALCULATIONS APPENDIX 5D
MIN
Worksheet 3 : Situation 3
Page 4 of 5
3. Determine the pollutant load entering the proposed BMP(s):
INS
LBMP = [0.05 +(0.009 x IBMP)] x A x 2.28 (Equation 5-23)
where: LBMP = relative post-development total phosphorous load entering
proposed BMP (pounds per year)
IBMP = post-development percent impervious cover of BMP drainage area
(percent expressed in whole numbers)
A = drainage area of proposed BMP (acres)
LBMPI = [0.05 +(0.009 x 10 0 )] x 0 . 15 x 2.28
= 0 . 32 pounds per year
AIM
LBMP2 = [0.05 +(0.009 x 80 )] x0 .25 x 2.28
y.. = 0 .44 pounds per year
LBMP3 = [0.05 +(0.009 x 10 0 )] x 0 . 14 x 2.28
= 0. 30 pounds per year
.r
4. Calculate the pollutant load removed by the proposed BMP(s):
-• Lremoved = EffBMP x LBMP (Equation 5-24)
where: Lremoved = Post-development pollutant load removed by proposed BMP
,,. (pounds per year)
EffBMP = pollutant removal efficiency of BMP (expressed in decimal form)
LBMP = relative post-development total phosphorous load entering
r
proposed BMP(pounds per year)
LremovedBMP1 = 0 . 5 x 0 . 32 = 0. 16 pounds per year
LremovedBMP2 = 0 • 5 x 0 .44 = 0 .22 pounds per year
j, = 0 . 15 x 0 . 30 = 0 . 05
removedBMP3 pounds per year
5D-16
tio
PERFORMANCE-BASED WATER QUALITY CALCULATIONS APPENDIX 50
Worksheet 3 : Situation 3
Page 5 of 5
5. Calculate the total pollutant load removed by the BMP(s): olio
Lremoved/total = Lremoved/BMP1 +Lremoved/BMP2+Lremoved/BMP3 + • • • (Equation 5-25)
where: Lremoved/total =total pollutant load removed by proposed BMPs
Lremoved/BMP1 =pollutant load removed by proposed BMP No. 1
Lremoved/BMP2 =pollutant load removed by proposed BMP No. 2
Lremoved/BMP3 =pollutant load removed by proposed BMP No. 3
L = 0 . 16 + 0 .22 + 0 . 05 + . . .
removed/total
= 0 .43 pounds per year
me
6. Verify compliance:
Lremoved/total RR
0 .43 > 0 . 34
IN
MO
sili
um
5D-17
rlr
IWO
MEI
EXISTING DRAINAGE MAP
iiie
a
a
a
err
a
mai
IOW
Mit
$mod
4
m
MU Ylll V,
w—I -
'Z r
n
o
eta S,
n
m
K
-c) 0(=N
1
k F1�
0111 aL\
x ,\s / h
F um t
,'// / fi c �/
IIIIF 4a �/ 1 I v,///%,'4,i',.-
/////,',04
�� ,° 1, , r I 1
�'I'll - gy,e,„/� i. 1 I 1 F i,- v�joh
p
/16I�l u �� ' i'$�4 , 1 \11 1\ 11 1 I ,1 1 1 ;11
or
/ l /I I 1 't. I ,a I + 'I I i l 1 ,I 1 1‘ 1// lllll ('' '.•
I I•�:v 1 1 p i ;f/,/f /,' ilt4 11 I , ,
% // //////�I15 i �I o '<,<-i/ i 1_ � 11 _)�'t-�` , l I-�yI I II I - ', j,- �.
' / / 1111 / ><, 1 1 y/, I% 1r , k I I 1 � 1 \.:_.
..� / / / // //// i/�ll ` I I I I '-?� �I,/L I I/ j I 11 I 1 :11 \,r��
/ / / / %141 s 1. r , y\ , I , 1
1 i , I w \ g I 1 \. . (\
c \w \ \ i, y, N I I r I s\ 1/I "I � \ 1i i \
A. l „,t , y 1 F b\ \\
\ ,; \O—o / � �\ s, \ •,<v +
NO
ON
Mill1
AM
fy'`i: gg m 3 e _-_ .— A Z 111111
OM s € d'+i1 w E m 4 O `� Z 2 n i�11l'�'
E �aiea:,i °5 - I
r13lE1s:a z 5 FT, O A ii ,. n m ?1Ii II�'
1 Mill", o > Z r m 3 :mum A —I A Ip�,cs,'Milli':is x --I JO
INS
MIN 2 YEAR EXISTING
EMI
INN
WOO
WM
WW
Autodesk® Storm and Sanitary Analysis 2012 - Version 6.4.29 (Build 6198)
******************* NW
Project Description
*******************
File Name existing conditions.SPF
UM
****************
Analysis Options
****************
Flow Units cfs
Subbasin Hydrograph MethodSCS TR-55 WM
Time of Concentration SCS TR-55
Link Routing Method Hydrodynamic
Storage Node ExfiltrationConstant rate, wetted area
Starting Date DEC-05-2012 00:00:00
Ending Date DEC-08-2012 00:00:00
Report Time Step 00:05:00
*************
Element Count -
*************
Number of rain gages 1
Number of subbasins 6
Number of nodes 4
Number of links 3 OW
****************
Raingage Summary
****************
Gage Data Data Recording
ID Source Type Interval
min
Rain Gage-01 TS-02 CUMULATIVE 6.00 WM
****************
Subbasin Summary
**************** WM
Subbasin Total
Area
ID acres
Sub-01 0.22 Wi
Sub-02 0.38
Sub-03 0.10
Sub-04 0.42
Sub-05 0.10
Sub-06 0.78
************
Node Summary
************ MO
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft2
Out-01 OUTFALL 520.00 524.25 0.00 WW
WW
Autodesk Storm and Sanitary Analysis
moo
.r
00
00
*************
Inlet Summary
*************
Inlet Inlet Manufacturer Inlet Number
imm
Catchbasin Inlet Ponded Initial Grate
ID Manufacturer Part Location of
Invert Rim Area Water Clogging
Number Inlets
. r Elevation Elevation Elevation Factor
ft ft ft' ft %
rim DI-01 NEENAH FOUNDRY R-1792-AG On Sag 1
533.88 537.78 10.00 533.88 0.00
DI-02 FHWA HEC-22 GENERIC N/A On Sag 1
527.63 532.01 10.00 527.63 0.00
DI-03 FHWA HEC-22 GENERIC N/A On Sag 1
r.. 526.23 529.15 10.00 526.23 0.00
**************************
Roadway and Gutter Summary
.r **************************
Inlet Roadway Roadway Roadway Gutter Gutter Gutter
ID Longitudinal Cross Manning's Cross Width Depression
Slope Slope Roughness Slope
..
ft/ft ft/ft ft/ft ft in
DI-01 - 0.0200 0.0160 0.0620 2.00 2.00
DI-02 - 0.0200 0.0160 0.0620 2.00 2.00
DI-03 - 0.0200 0.0160 0.0620 2.00 2.00
MO
************
Link Summary
************
Link From Node To Node Element Length Slope Manning's
A.. ID Type ft % Roughness
Pipe-02 DI-01 DI-02 CONDUIT 50.0 12.5000 0.0150
Pipe-03 DI-02 DI-03 CONDUIT 66.0 2.1212 0.0150
Pipe-04 DI-03 Out-01 CONDUIT 25.0 12.9200 0.0150
.r
*********************
Cross Section Summary
*********************
""' Link Shape Depth/ Width No. of Cross Full Flow
Design
ID Diameter Barrels Sectional Hydraulic
Flow
Area Radius
- Capacity
ft ft ft2 ft
cfs
mr
Pipe-02 CIRCULAR 1.25 1.25 1 1.23 0.31
19.79
Pipe-03 CIRCULAR 1.25 1.25 1 1.23 0.31
8.15
am Pipe-04 CIRCULAR 1.25 1.25 1 1.23 0.31
20.12
r.
Autodesk Storm and Sanitary Analysis
..
w.
MO
MO
************************** Volume Depth
Runoff Quantity Continuity acre-ft inches
**************************
Total Precipitation 0.676 4.053 MO
Surface Runoff 0.006 0.038
Continuity Error (%) -0.006
************************** Volume Volume OM
Flow Routing Continuity acre-ft Mgallons
**************************
External Inflow 0.000 0.000
External Outflow 0.378 0.123
Initial Stored Volume 0.000 0.000 OM
Final Stored Volume 0.000 0.000
Continuity Error (%) 0.000
Composite Curve Number Computations Report
******************************************
Subbasin Sub-01 MO
Area Soil
Soil/Surface Description (acres) Group CN
Paved parking & roofs 0.22 B 98.00
Composite Area & Weighted CN 0.22 98.00
Subbasin Sub-02
Area Soil
Soil/Surface Description (acres) Group CN
> 75% grass cover, Good 0.06 B 61.00
Paved parking & roofs 0.32 B 98.00 MO
Composite Area & Weighted CN 0.38 92.16
Subbasin Sub-03
MO
Area Soil
Soil/Surface Description (acres) Group CN
> 75% grass cover, Good 0.01 B 61.00
Paved parking & roofs 0.10 B 98.00 MO
Composite Area & Weighted CN 0.10 96.15
Subbasin Sub-04
Area Soil
Soil/Surface Description (acres) Group CN
Woods & grass combination, Good 0.18 B 58.00
Paved parking & roofs 0.24 B 98.00 OM
Composite Area & Weighted CN 0.42 80.86
Subbasin Sub-05
NO
Area Soil
Soil/Surface Description (acres) Group CN
Om
Autodesk Storm and Sanitary Analysis
WO
OW
WO
Paved parking & roofs 0.10 B 98.00
Composite Area & Weighted CN 0.10 98.00
Subbasin Sub-06
Area Soil
rir Soil/Surface Description (acres) Group CN
Paved parking & roofs 0.13 B 98.00
> 75% grass cover, Good 0.65 B 61.00
Composite Area & Weighted CN 0.78 67.17
moo
***************************************************
SCS TR-55 Time of Concentration Computations Report
***************************************************
rr
Sheet Flow Equation
Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4))
or
Where:
Tc = Time of Concentration (hrs)
n = Manning's Roughness
Lf = Flow Length (ft)
rr
P = 2 yr, 24 hr Rainfall (inches)
Sf = Slope (ft/ft)
Shallow Concentrated Flow Equation
rr
V = 16.1345 * (Sf^0.5) (unpaved surface)
V = 20.3282 * (Sf^0.5) (paved surface)
V = 15.0 * (Sf^0.5) (grassed waterway surface)
V = 10.0 * (Sf^0.5) (nearly bare & untilled surface)
— V = 9.0 * (Sf^0.5) (cultivated straight rows surface)
V = 7.0 * (Sf^0.5) (short grass pasture surface)
V = 5.0 * (Sf^0.5) (woodland surface)
V = 2.5 * (Sf^0.5) (forest w/heavy litter surface)
Tc = (Lf / V) / (3600 sec/hr)
r.
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
Channel Flow Equation
ma
V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n
R = Aq / Wp
Tc = (Lf / V) / (3600 sec/hr)
rrr Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
R = Hydraulic Radius (ft)
ow Aq = Flow Area (ft')
Wp = Wetted Perimeter (ft)
V = Velocity (ft/sec)
rrr
Autodesk Storm and Sanitary Analysis
rr
mr
r
Sf = Slope (ft/ft)
n = Manning's Roughness
Subbasin Sub-01 -
Sheet Flow Computations
MA
Subarea A Subarea B Subarea
C
Manning's Roughness: 0.01 0.00
0.00
Flow Length (ft) : 180.00 0.00
Mi
0.00
Slope (%): 10.00 0.00
0.00
2 yr, 24 hr Rainfall (in) : 4.00 4.00
4.00 a
Velocity (ft/sec) : 3.55 0.00
0.00
Computed Flow Time (minutes) : 0.84 0.00
0.00
Total TOC (minutes) : 0.84
a
Subbasin Sub-02
Shallow Concentrated Flow Computations
Subarea A Subarea B Subarea
C
Flow Length (ft) : 90.00 0.00
0.00
Slope (%): 0.75 0.00
0.00
Surface Type: Unpaved Unpaved
Unpaved
Velocity (ft/sec) : 1.40 0.00
0.00
Computed Flow Time (minutes) : 1.07 0.00
0.00
Total TOC (minutes) : 1.07
Subbasin Sub-03
NM
Sheet Flow Computations
Subarea A Subarea B Subarea
C
Manning's Roughness: 0.01 0.00
0.00 Y�
Flow Length (ft): 75.00 0.00
0.00
Autodesk Storm and Sanitary Analysis
OM
Ilse
oo
odo
Slope (%): 3.00 0.00
0.00
2 yr, 24 hr Rainfall (in): 4.00 4.00
4.00
�r Velocity (ft/sec) : 1.84 0.00
0.00
Computed Flow Time. (minutes) : 0.68 0.00
0.00
oto
Total TOC (minutes) : 0.68
mom
Subbasin Sub-04
r Sheet Flow Computations
Subarea A Subarea B Subarea
C
Manning's Roughness: 0.40 0.00
ono
0.00
Flow Length (ft) : 20.00 0.00
0.00
Slope (%) : 9.50 0.00
0.00
2 yr, 24 hr Rainfall (in) : 4.00 4.00
4.00
Velocity (ft/sec): 0.12 0.00
0.00
Computed Flow Time (minutes) : 2.84 0.00
oo 0.00
Channel Flow Computations
Subarea A Subarea B Subarea
"" C
Manning's Roughness: 0.03 0.00
0.00
Flow Length (ft) : 120.00 0.00
0.00
"mo Channel Slope (%): 5.00 0.00
0.00
Cross Section Area (ft') : 3.00 0.00
0.00
Wetted Perimeter (ft) : 2.00 0.00
"°r' 0.00
Velocity (ft/sec) : 16.17 0.00
0.00
Computed Flow Time (minutes): 0.12 0.00
0.00
MEI
Total TOC (minutes): 2.97
ore
Subbasin Sub-05
Sheet Flow Computations
Autodesk Storm and Sanitary Analysis
mom
00
AIMS
SS
S S
Subarea A Subarea B Subarea
C
Manning's Roughness: 0.01 0.00
0.00
NS
Flow Length (ft) : 210.00 0.00
0.00
Slope (8) : 10.00 0.00
0.00
2 yr, 24 hr Rainfall (in): 4.00 4.00
4.00
Velocity (ft/sec): 3.66 0.00
0.00
Computed Flow Time (minutes) : 0.95 0.00
0.00 Mil
Total TOC (minutes) : 0.95
Subbasin Sub-06
Sheet Flow Computations
Subarea A Subarea B Subarea
C OM
Manning's Roughness: 0.40 0.80
0.00
Flow Length (ft) : 70.00 60.00
0.00
Slope (%) : 12.50 10.00
0.00
2 yr, 24 hr Rainfall (in) : 4.00 4.00
4.00
Velocity (ft/sec): 0.17 0.09
0.00
Computed Flow Time (minutes) : 6.94 11.67 NO
0.00
Shallow Concentrated Flow Computations
Subarea A Subarea B Subarea MO
C
Flow Length (ft): 90.00 0.00
0.00
Slope (%) : 0.50 0.00
OM
0.00
Surface Type: Unpaved Unpaved
Unpaved
Velocity (ft/sec) : 1.14 0.00
0.00
Computed Flow Time (minutes) : 1.32 0.00
0.00
Total TOC (minutes) : 19.93
MO
***********************
Subbasin Runoff Summary
***********************
Autodesk Storm and Sanitary Analysis
om
woo
ow
Subbasin Total Total Peak Weighted Time of
ID Precip Runoff Runoff Curve Concentration
in in cfs Number days hh:mm:ss
Sub-01 4.00 3.76 1.14 98.000 0 00:05:00
Sub-02 4.00 3.13 1.79 92.160 0 00:05:00
Sub-03 4.00 3.55 0.52 96.150 0 00:05:00
Sub-04 4.00 2.11 1.42 80.860 0 00:05:00
NM
Sub-05 4.00 3.76 0.54 98.000 0 00:05:00
Sub-06 4.00 1.16 0.93 67.170 0 00:19:55
mm
******************
Node Depth Summary
******************
rr
Node Average Maximum Maximum Time of Max Total Total Retention
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
r
Out-01 0.00 0.00 520.00 0 00:00 0 0 0:00:00
*****************
ow Node Flow Summary
*****************
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
mili Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm
Out-01 OUTFALL 2.31 5.71 0 12:00 0.00
wo
*******************
Inlet Depth Summary
*******************
tas
Inlet Max Gutter Max Gutter Max Gutter Time of
ID Spread Water Elev Water Depth Maximum
during during during Depth
Peak Flow Peak Flow Peak Flow Occurrence
or ft ft ft days hh:mm
DI-01 55.17 539.09 1.31 0 12:00
DI-02 11.94 532.50 0.49 0 12:00
am
DI-03 3.88 529.36 0.21 0 12:00
******************
Inlet Flow Summary
******************
taw
Inlet Peak Peak Peak Peak Inlet Total
ma Total
ID Flow Lateral Flow Flow Efficiency Flooding
Time
up
Autodesk Storm and Sanitary Analysis
um
au
MO
OO
OM
Flow Intercepted Bypassing during
Flooded
by Inlet Inlet Peak Flow
cfs cfs cfs cfs acre-in
minutes MO
DI-01 1.14 1.14 - - - 0.000
0 OM
DI-02 1.79 1.79 - - - 0.000
0
DI-03 0.52 0.52 - - - 0.000
0
MM
***********************
Outfall Loading Summary
***********************
Outfall Node ID Flow Average Peak
Frequency Flow Inflow
(%) cfs cfs
MM
Out-01 32.86 0.34 5.71
System 32.86 0.34 5.71
*****************
Link Flow Summary
*****************
MO
Link ID Element Time of Maximum Length Peak Flow Design Ratio of
Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum
Maximum Time Condition
Occurrence Attained Analysis Capacity /Design
Flow Surcharged
days hh:mm ft/sec cfs cfs Flow
Depth minutes MO
Pipe-02 CONDUIT 0 12:00 3.36 1.00 1.11 19.79 0.06
0.32 0 Calculated OM
Pipe-03 CONDUIT 0 12:00 6.21 1.00 2.89 8.15 0.35
0.40 0 Calculated
Pipe-04 CONDUIT 0 12:00 10.60 1.00 3.40 20.12 0.17
0.31 0 Calculated
MO
********************************
Highest Flow Instability Indexes
********************************
All links are stable.
Analysis began on: Mon Jan 14 09:52:10 2013
Analysis ended on: Mon Jan 14 09:52:14 2013
Total elapsed time: 00:00:04 NO
MO
Autodesk Storm and Sanitary Analysis
ON
00
WON
6..
SIN
NNW
NNW
>NM
10 YEAR EXISTING
AIM
a
®.Y
IOWa
a
Mb
Mb
Mb
Autodesk0 Storm and Sanitary Analysis 2012 - Version 6.4.29 (Build 6198)
*******************
Project Description
*******************
File Name existing conditions.SPF
MS
****************
Analysis Options
****************
Flow Units cfs
US
Subbasin Hydrograph Method. SCS TR-55
Time of Concentration SCS TR-55
Link Routing Method Hydrodynamic
Storage Node ExfiltrationConstant rate, wetted area
Starting Date DEC-05-2012 00:00:00
Mb
Ending Date DEC-08-2012 00:00:00
Report Time Step 00:05:00
*************
WO
Element Count
*************
Number of rain gages 1
Number of subbasins 6
Number of nodes 4
Number of links 3 Mb
****************
Raingage Summary
****************
Gage Data Data Recording
ID Source Type Interval
min
Rain Gage-01 TS-02 CUMULATIVE 6.00 Mb
****************
Subbasin Summary
**************** Mb
Subbasin Total
Area
ID acres
Sub-01 0.22 MN
Sub-02 0.38
Sub-03 0.10
Sub-04 0.42
Sub-O5 0.10
Sub-06 0.78 Mb
************
Node Summary
************ Mb
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft'
Out-01 OUTFALL 520.00 524.25 0.00 11O
Autodesk Storm and Sanitary Analysis
`Ili
w.
.w
MO
*************
Inlet Summary
*************
Inlet Inlet Manufacturer Inlet Number
ww Catchbasin Inlet Ponded Initial Grate
ID Manufacturer Part Location of
Invert Rim Area Water Clogging
Number Inlets
Elevation Elevation Elevation Factor
mw
ft ft ft' ft 8
ml. DI-01 NEENAH FOUNDRY R-1792-AG On Sag 1
533.88 537.78 10.00 533.88 0.00
DI-02 FHWA HEC-22 GENERIC N/A On Sag 1
527.63 532.01 10.00 527.63 0.00
DI-03 FHWA HEC-22 GENERIC N/A On Sag 1
mw 526.23 529.15 10.00 526.23 0.00
**************************
Roadway and Gutter Summary
ow **************************
Inlet Roadway Roadway Roadway Gutter Gutter Gutter
ID Longitudinal Cross Manning's Cross Width Depression
Slope Slope Roughness Slope
ft/ft ft/ft ft/ft ft in
r
DI-01 - 0.0200 0.0160 0.0620 2.00 2.00
DI-02 - 0.0200 0.0160 0.0620 2.00 2.00
DI-03 - 0.0200 0.0160 0.0620 2.00 2.00
woo
************
Link Summary
************
Link From Node To Node Element Length Slope Manning's
mm ID Type ft % Roughness
Pipe-02 DI-01 DI-02 CONDUIT 50.0 12.5000 0.0150
Pipe-03 DI-02 DI-03 CONDUIT 66.0 2.1212 0.0150
Pipe-04 DI-03 Out-01 CONDUIT 25.0 12.9200 0.0150
mw
*********************
Cross Section Summary
*********************
MO Link Shape Depth/ Width No. of Cross Full Flow
Design
ID Diameter Barrels Sectional Hydraulic
Flow
Area Radius
mw Capacity
ft ft ft2 ft
cfs
ww
Pipe-02 CIRCULAR 1.25 1.25 1 1.23 0.31
19.79
Pipe-03 CIRCULAR 1.25 1.25 1 1.23 0.31
8.15
mw Pipe-04 CIRCULAR 1.25 1.25 1 1.23 0.31
20.12
we
Autodesk Storm and Sanitary Analysis
mill.
mill.
AIM
WO
MO
NO
************************** Volume Depth
Runoff Quantity Continuity acre-ft inches
**************************
Oli
Total Precipitation 1.013 6.080
Surface Runoff 0.011 0.066
Continuity Error (%) -0.005 `
SW
************************** Volume Volume
Flow Routing Continuity acre-ft Mgallons
**************************
External Inflow 0.000 0.000
External Outflow 0.662 0.216
SO
Initial Stored Volume 0.000 0.000
Final Stored Volume 0.000 0.000
Continuity Error (%) 0.000
****************************************** WO
Composite Curve Number Computations Report
******************************************
MO
Subbasin Sub-01
Area Soil
Soil/Surface Description (acres) Group CN
Paved parking & roofs 0.22 B 98.00 NS
Composite Area & Weighted CN 0.22 98.00
Subbasin Sub-02
MO
Area Soil
Soil/Surface Description (acres) Group CN
> 75% grass cover, Good 0.06 B 61.00
Paved parking & roofs 0.32 B 98.00 MS
Composite Area & Weighted CN 0.38 92.16
Subbasin Sub-03
SO
Area Soil
Soil/Surface Description (acres) Group CN
> 75% grass cover, Good 0.01 B 61.00
Paved parking & roofs 0.10 B 98.00 WM
Composite Area & Weighted CN 0.10 96.15
Subbasin Sub-04
US
Area Soil
Soil/Surface Description (acres) Group CN
Woods & grass combination, Good 0.18 B 58.00
Paved parking & roofs 0.24 B 98.00 SO
Composite Area & Weighted CN 0.42 80.86
Subbasin Sub-05
WO
Area Soil
Soil/Surface Description (acres) Group CN
MO
Autodesk Storm and Sanitary Analysis
WO
WO
.r.
r
r
Paved parking & roofs 0.10 B 98.00
Composite Area & Weighted CN 0.10 98.00
am
Subbasin Sub-06
Area Soil
Soil/Surface Description (acres) Group CN
r
Paved parking & roofs 0.13 B 98.00
> 75% grass cover, Good 0.65 B 61.00
Composite Area & Weighted CN 0.78 67.17
ow
***************************************************
SCS TR-55 Time of Concentration Computations Report
***************************************************
or Sheet Flow Equation
Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4) )
Where:
Tc = Time of Concentration (hrs)
n = Manning's Roughness
Lf = Flow Length (ft)
woo P = 2 yr, 24 hr Rainfall (inches)
Sf = Slope (ft/ft)
Shallow Concentrated Flow Equation
or
V = 16.1345 * (Sf-0.5) (unpaved surface)
V = 20.3282 * (Sf^0.5) (paved surface)
V = 15.0 * (Sf^0.5) (grassed waterway surface)
V = 10.0 * (Sf^0.5) (nearly bare & untilled surface)
V = 9.0 * (Sf^0.5) (cultivated straight rows surface)
V = 7.0 * (Sf^0.5) (short grass pasture surface)
V = 5.0 * (Sf^0.5) (woodland surface)
V = 2.5 * (Sf^0.5) (forest w/heavy litter surface)
Tc = (Lf / V) / (3600 sec/hr)
or
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
+ + V = Velocity (ft/sec)
Sf = Slope (ft/ft)
Channel Flow Equation
air
V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n
R = Aq / Wp
Tc = (Lf / V) / (3600 sec/hr)
rr Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
R = Hydraulic Radius (ft)
ma Aq = Flow Area (ft')
Wp = Wetted Perimeter (ft)
V = Velocity (ft/sec)
rrr
Autodesk Storm and Sanitary Analysis
r
rw
dem
OM
OW
MO
Sf = Slope (ft/ft)
n = Manning's Roughness
MO
Subbasin Sub-01
Sheet Flow Computations
Subarea A Subarea B Subarea Om
C
Manning's Roughness: 0.01 0.00
0.00
Flow Length (ft) : 180.00 0.00
0.00
ob
Slope (%) : 10.00 0.00
0.00
2 yr, 24 hr Rainfall (in): 4.00 4.00
4.00
Velocity (ft/sec) : 3.55 0.00 OW
0.00
Computed Flow Time (minutes) : 0.84 0.00
0.00
mm
Total TOC (minutes) : 0.84
Om
Subbasin Sub-02
Shallow Concentrated Flow Computations MO
Subarea A Subarea B Subarea
C
Flow Length (ft) : 90.00 0.00
0.00 OM
Slope (%) : 0.75 0.00
0.00
Surface Type: Unpaved Unpaved
Unpaved
Velocity (ft/sec) : 1.40 0.00 Mb
0.00
Computed Flow Time (minutes): 1.07 0.00
0.00
NO
Total TOC (minutes): 1.07
I�ffl
Subbasin Sub-03
Sheet Flow Computations mO
Subarea A Subarea B Subarea
C
Manning's Roughness: 0.01 0.00
0.00 -
Flow Length (ft) : 75.00 0.00
0.00
WO
Autodesk Storm and Sanitary Analysis
ire
Slope (%) : 3.00 0.00
0.00
2 yr, 24 hr Rainfall (in): 4.00 4.00
4.00
rr Velocity (ft/sec): 1.84 0.00
0.00
Computed Flow Time (minutes) : 0.68 0.00
0.00
Total TOC (minutes) : 0.68
NMI
Subbasin Sub-04
moo Sheet Flow Computations
Subarea A Subarea B Subarea
C
Manning's Roughness: 0.40 0.00
err 0.00
Flow Length (ft) : 20.00 0.00
0.00
Slope )%) : 9.50 0.00
0.00
'r 2 r, 24 hr Rainfall
y (in) : 4.00 4.00
4.00
Velocity (ft/sec) : 0.12 0.00
0.00
Computed Flow Time (minutes) : 2.84 0.00
am 0.00
Channel Flow Computations
Subarea A Subarea B Subarea
-
Manning's Roughness: 0.03 0.00
0.00
Flow Length (ft) : 120.00 0.00
0.00
MI6 Channel Slope (%): 5.00 0.00
0.00
Cross Section Area (ft') : 3.00 0.00
0.00
Wetted Perimeter (ft) : 2.00 0.00
im 0.00
Velocity (ft/sec) : 16.17 0.00
0.00
Computed Flow Time (minutes): 0.12 0.00
0.00
ter
Total TOC (minutes) : 2.97
wm
Subbasin Sub-05
Sheet Flow Computations
Autodesk Storm and Sanitary Analysis
rrr
MO
a
a
Subarea A Subarea B Subarea
C
Manning's Roughness: 0.01 0.00
0.00 OW
Flow Length (ft) : 210.00 0.00
0.00
Slope (%) : 10.00 0.00
0.00
2 yr, 24 hr Rainfall (in): 4.00 4.00
MO
4.00
Velocity (ft/sec) : 3.66 0.00
0.00
Computed Flow Time (minutes) : 0.95 0.00
0.00
MO
Total TOC (minutes) : 0.95
OW
Subbasin Sub-06
MO
Sheet Flow Computations
Subarea A Subarea B Subarea
C
Manning's Roughness: 0.40 0.80
0.00
Flow Length (ft) : 70.00 60.00
0.00
Slope (%) : 12.50 10.00
0.00 a
2 yr, 24 hr Rainfall (in) : 4.00 4.00
4.00
Velocity (ft/sec) : 0.17 0.09
0.00
Computed Flow Time (minutes) : 6.94 11.67 a
0.00
Shallow Concentrated Flow Computations
Subarea A Subarea B Subarea a
C
Flow Length (ft): 90.00 0.00
0.00
Slope (%): 0.50 0.00
0.00 MO
Surface Type: Unpaved Unpaved
Unpaved
Velocity (ft/sec): 1.14 0.00
0.00
Computed Flow Time (minutes): 1.32 0.00 r
0.00
Total TOC (minutes) : 19.93
MO
***********************
Subbasin Runoff Summary a
***********************
NO
Autodesk Storm and Sanitary Analysis
MO
a
Wm
WO
WM
Subbasin Total Total Peak Weighted Time of
ID Precip Runoff Runoff Curve Concentration
mu in in cfs Number days hh:mm:ss
Sub-01 6.00 5.76 1.71 98.000 0 00:05:00 .
Sub-02 6.00 5.09 2.83 92.160 0 00:05:00
Sub-03 6.00 5.54 0.80 96.150 0 00:05:00
.ir Sub-04 6.00 3.87 2.57 80.860 0 00:05:00
Sub-05 6.00 5.76 0.81 98.000 0 00:05:00
Sub-06 6.00 2.54 2.17 67.170 0 00:19:55
aw
******************
Node Depth Summary
******************
mg Node Average Maximum Maximum Time of Max Total Total Retention
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
'W Out-01 0.00 0.00 520.00 0 00:00 0 0 0:00:00
*****************
Node Flow Summary
ow *****************
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
■r Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm
Out-01 OUTFALL 4.46 9.68 0 12:00 0.00
+rr
*******************
Inlet Depth Summary
*******************
ow
Inlet Max Gutter Max Gutter Max Gutter Time of
ID Spread Water Elev Water Depth Maximum
during during during Depth
Peak Flow Peak Flow Peak Flow Occurrence
OW ft ft ft days hh:mm
DI-01 143.86 540.65 2.87 0 12:00
DI-02 11.64 532.61 0.60 0 12:00
DI-03 5.92 529.47 0.32 0 12:00
sr
******************
Inlet Flow Summary
******************
wag
Inlet Peak Peak Peak Peak Inlet Total
am Total
ID Flow Lateral Flow Flow Efficiency Flooding
Time
MIN
Autodesk Storm and Sanitary Analysis
rr
awl
MO
Flow Intercepted Bypassing during
Flooded
by Inlet Inlet Peak Flow
cfs cfs cfs cfs o acre-in
minutes
DI-01 1.71 1.71 - - - 0.000
0 OW
DI-02 2.83 2.83 - - - 0.000
0
DI-03 0.80 0.80 - - - 0.000
0
MM
***********************
Outfall Loading Summary
***********************
MM
Outfall Node ID Flow Average Peak
Frequency Flow Inflow
(%) cfs cfs
MM
Out-01 34.01 0.63 9.68
System 34.01 0.63 9.68
MM
*****************
Link Flow Summary
*****************
Link ID Element Time of Maximum Length Peak Flow Design Ratio of
Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum NO
Maximum Time Condition
Occurrence Attained Analysis Capacity /Design
Flow Surcharged
days hh:mm ft/sec cfs cfs Flow
Depth minutes MN
Pipe-02 CONDUIT 0 12:00 3.58 1.00 1.66 19.79 0.08
0.41 0 Calculated
Pipe-03 CONDUIT 0 12:00 6.70 1.00 4.45 8.15 0.55
0.53 0 Calculated
Pipe-04 CONDUIT 0 12:00 11.55 1.00 5.24 20.12 0.26
0.40 0 Calculated
OM
********************************
Highest Flow Instability Indexes
********************************
All links are stable. OO
Analysis began on: Mon Jan 14 09:51:31 2013
Analysis ended on: Mon Jan 14 09:51:34 2013
Total elapsed time: 00:00:03 MO
um
Autodesk Storm and Sanitary Analysis
MO
NO
AIM
IMO
MIN
100 YEAR EXISTING
NO
AMP
r
Autodesk® Storm and Sanitary Analysis 2012 - Version 6.4.29 (Build 6198)
******************* WO
Project Description
*******************
File Name existing conditions.SPF
****************
Analysis Options
****************
Flow Units cfs
Subbasin Hydrograph MethodSCS TR-55 go
Time of Concentration SCS TR-55
Link Routing Method Hydrodynamic
Storage Node ExfiltrationConstant rate, wetted area
Starting Date DEC-05-2012 00:00:00
Ending Date DEC-08-2012 00:00:00 W1
Report Time Step 00:05:00
*************
Element Count O1
*************
Number of rain gages 1
Number of subbasins 6
Number of nodes 4
Number of links 3 191
****************
Raingage Summary
Gage Data Data Recording
ID Source Type Interval
min
Rain Gage-01 TS-02 CUMULATIVE 6.00 WO
****************
Subbasin Summary
**************** WO
Subbasin Total
Area
ID acres
Sub-01 0.22 WO
Sub-02 0.38
Sub-03 0.10
Sub-04 0.42
Sub-05 0.10
Sub-06 0.78 1W
************
Node Summary
************ WO
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft'
Out-01 OUTFALL 520.00 524.25 0.00
Autodesk Storm and Sanitary Analysis
Oil
.r
OW
MO
*************
Inlet Summary
*************
or Inlet Inlet Manufacturer Inlet Number
Catchbasin Inlet Ponded Initial Grate
ID Manufacturer Part Location of
Invert Rim Area Water Clogging
Number Inlets
rru Elevation Elevation Elevation Factor
ft ft ft' ft o
aro
DI-01 NEENAH FOUNDRY R-1792-AG On Sag 1
533.88 537.78 10.00 533.88 0.00
DI-02 FHWA HEC-22 GENERIC N/A On Sag 1
527.63 532.01 10.00 527.63 0.00
DI-03 FHWA HEC-22 GENERIC N/A On Sag 1
am
526.23 529.15 10.00 526.23 0.00
**************************
war Roadway and Gutter Summary
**************************
Inlet Roadway Roadway Roadway Gutter Gutter Gutter
ID Longitudinal Cross Manning's Cross Width Depression
Slope Slope Roughness Slope
or ft/ft ft/ft ft/ft ft in
DI-01 - 0.0200 0.0160 0.0620 2.00 2.00
DI-02 - 0.0200 0.0160 0.0620 2.00 2.00
DI-03 - 0.0200 0.0160 0.0620 2.00 2.00
rr
************
Link Summary
************
Link From Node To Node Element Length Slope Manning's
two ID Type ft % Roughness
Pipe-02 DI-01 DI-02 CONDUIT 50.0 12.5000 0.0150
Pipe-03 DI-02 DI-03 CONDUIT 66.0 2.1212 0.0150
Pipe-04 DI-03 Out-01 CONDUIT 25.0 12.9200 0.0150
or
*********************
Cross Section Summary
*********************
wr Link Shape Depth/ Width No. of Cross Full Flow
Design
ID Diameter Barrels Sectional Hydraulic
Flow
Area Radius
was Capacity
ft ft ft' ft
cfs
ayrr
Pipe-02 CIRCULAR 1.25 1.25 1 1.23 0.31
19.79
Pipe-03 CIRCULAR 1.25 1.25 1 1.23 0.31
8.15
°r Pipe-04 CIRCULAR 1.25 1.25 1 1.23 0.31
20.12
es
Autodesk Storm and Sanitary Analysis
moo
wir
lb
NO
illik
************************** Volume Depth
Runoff Quantity Continuity acre-ft inches
**************************
Total Precipitation 1.435 8.613
Surface Runoff 0.017 0.104
Continuity Error (%) -0.003
************************** Volume Volume OW
Flow Routing Continuity acre-ft Mgallons
**************************
External Inflow 0.000 0.000
External Outflow 1.040 0.339
Initial Stored Volume 0.000 0.000
Final Stored Volume 0.000 0.000
Continuity Error (%) 0.000
****************************************** MN
Composite Curve Number Computations Report
******************************************
Subbasin Sub-01 MO
Area Soil
Soil/Surface Description (acres) Group CN
MO
Paved parking & roofs 0.22 B 98.00
Composite Area & Weighted CN 0.22 98.00
Subbasin Sub-02
MO
Area Soil
Soil/Surface Description (acres) Group CN
> 75% grass cover, Good 0.06 B 61.00
Paved parking & roofs 0.32 B 98.00 OM
Composite Area & Weighted CN 0.38 92.16
Subbasin Sub-03
Area Soil
Soil/Surface Description (acres) Group CN
> 75% grass cover, Good 0.01 B 61.00
Paved parking & roofs 0.10 B 98.00 M►
Composite Area & Weighted CN 0.10 96.15
Subbasin Sub-04
MO
Area Soil
Soil/Surface Description (acres) Group CN
Woods & grass combination, Good 0.18 B 58.00
Paved parking & roofs 0.24 B 98.00 W1
Composite Area & Weighted CN 0.42 80.86
Subbasin Sub-05
OM
Area Soil
Soil/Surface Description (acres) Group CN
OW
Autodesk Storm and Sanitary Analysis
MO
MO
rr
MIN
Paved parking & roofs 0.10 B 98.00
Composite Area & Weighted CN 0.10 98.00
r
Subbasin Sub-06 .
Area Soil
err
Soil/Surface Description (acres) Group CN
Paved parking & roofs 0.13 B 98.00
> 75% grass cover, Good 0.65 B 61.00
Composite Area & Weighted CN 0.78 67.17
rrr
***************************************************
SCS TR-55 Time of Concentration Computations Report
***************************************************
Sheet Flow Equation
Tc = (0.007 * on * Lf)^0.8)) / ((P^0.5) * (Sf^0.4))
Where:
Tc = Time of Concentration (hrs)
n = Manning's Roughness
Lf = Flow Length (ft)
rr P = 2 yr, 24 hr Rainfall (inches)
Sf = Slope (ft/ft)
Shallow Concentrated Flow Equation
ar
V = 16.1345 * (Sf^0.5) (unpaved surface)
V = 20.3282 * (Sf^0.5) (paved surface)
V = 15.0 * (Sf^0.5) (grassed waterway surface)
V = 10.0 * (Sf^0.5) (nearly bare & untilled surface)
tow V = 9.0 * (Sf^0.5) (cultivated straight rows surface)
V = 7.0 * (Sf^0.5) (short grass pasture surface)
V = 5.0 * (Sf^0.5) (woodland surface)
V = 2.5 * (Sf^0.5) (forest w/heavy litter surface)
Tc = (Lf / V) / (3600 sec/hr)
as
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
um V = Velocity (ft/sec)
Sf = Slope (ft/ft)
Channel Flow Equation
aer
V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n
R = Aq / Wp
Tc = (Lf / V) / (3600 sec/hr)
✓ Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
R = Hydraulic Radius (ft)
aims Aq = Flow Area (ft')
Wp = Wetted Perimeter (ft)
V = Velocity (ft/sec)
rr
Autodesk Storm and Sanitary Analysis
rr
rr
MO
WO
ON
Sf = Slope (ft/ft)
n = Manning's Roughness
Subbasin Sub-01 00
Sheet Flow Computations
Subarea A Subarea B Subarea 00
C
Manning's Roughness: 0.01 0.00
0.00
Flow Length (ft) : 180.00 0.00
0.00 OO
Slope (%) : 10.00 0.00
0.00
2 yr, 24 hr Rainfall (in) : 4.00 4.00
4.00
Velocity (ft/sec): 3.55 0.00
0.00
Computed Flow Time (minutes) : 0.84 0.00
0.00
O 0
Total TOC (minutes) : 0.84
Subbasin Sub-02
Shallow Concentrated Flow Computations 00
Subarea A Subarea B Subarea
C
Flow Length (ft) : 90.00 0.00
0.00 00
Slope (%) : 0.75 0.00
0.00
Surface Type: Unpaved Unpaved
Unpaved
Velocity (ft/sec) : 1.40 0.00 00
0.00
Computed Flow Time (minutes) : 1.07 0.00
0.00
O 0
Total TOC (minutes) : 1.07
Subbasin Sub-03
Sheet Flow Computations
Subarea A Subarea B Subarea
C
Manning's Roughness: 0.01 0.00
0.00 -
Flow Length (ft) : 75.00 0.00
0.00
N W
Autodesk Storm and Sanitary Analysis
O O
MO
ow
ow
w
Slope (%): 3.00 0.00
0.00
2 yr, 24 hr Rainfall (in) : 4.00 4.00
4.00
oo
Velocity (ft/sec): 1.84 0.00
. 0.00
Computed Flow Time (minutes) : 0.68 0.00
0.00
Total TOC (minutes) : 0.68
ow
Subbasin Sub-04
wr
Sheet Flow Computations
Subarea A Subarea B Subarea
C
Manning's Roughness: 0.40 0.00
0.00
Flow Length (ft) : 20.00 0.00
0.00
Slope (%): 9.50 0.00
w 0.00
2 yr, 24 hr Rainfall (in) : 4.00 4.00
4.00
Velocity (ft/sec): 0.12 0.00
0.00
w Computed Flow Time (minutes): 2.84 0.00
0.00
Channel Flow Computations
Subarea A Subarea B Subarea
C
Manning's Roughness: 0.03 0.00
0.00
Flow Length (ft) : 120.00 0.00
0.00
°w Channel Slope (%): 5.00 0.00
0.00
Cross Section Area (ft2): 3.00 0.00
0.00
Wetted Perimeter (ft) : 2.00 0.00
r�r 0.00
Velocity (ft/sec): 16.17 0.00
0.00
Computed Flow Time (minutes): 0.12 0.00
ow
0.00
Total TOC (minutes) : 2.97
w
Subbasin Sub-05
Sheet Flow Computations
or
Autodesk Storm and Sanitary Analysis
rr
rr
OS
Subarea A Subarea B Subarea
C
Manning's Roughness: 0.01 0.00
0.00
Flow Length (ft) : 210.00 0.00 OM
0.00
Slope (%) : 10.00 0.00
0.00
2 yr, 24 hr Rainfall (in) : 4.00 4.00
OM
4.00
Velocity (ft/sec): 3.66 0.00
0.00
Computed Flow Time (minutes): 0.95 0.00
0.00
Total TOC (minutes) : 0.95
NO
Subbasin Sub-06
MO
Sheet Flow Computations
Subarea A Subarea B Subarea
C
Manning's Roughness: 0.40 0.80 MO
0.00
Flow Length (ft) : 70.00 60.00
0.00
Slope (%) : 12.50 10.00
0.00 MO
2 yr, 24 hr Rainfall (in) : 4.00 4.00
4.00
Velocity (ft/sec): 0.17 0.09
0.00
Computed Flow Time (minutes) : 6.94 11.67 NO
0.00
Shallow Concentrated Flow Computations
Subarea A Subarea B Subarea OM
C
Flow Length (ft) : 90.00 0.00
0.00
Slope (%) : 0.50 0.00
0.00 NW
Surface Type: Unpaved Unpaved
Unpaved
Velocity (ft/sec): 1.14 0.00
0.00
Computed Flow Time (minutes) : 1.32 0.00 OM
0.00
Total TOC (minutes) : 19.93
NO
***********************
Subbasin Runoff Summary OM
***********************
MO
Autodesk Storm and Sanitary Analysis
ON
ON
mm
w
ow
Subbasin Total Total Peak Weighted Time of
ID Precip Runoff Runoff Curve Concentration
w in in cfs Number days hh:mm:ss
Sub-01 8.50 8.26 2.43 98.000 0 00:05:00
Sub-02 8.50 7.56 4.11 92.160 0 00:05:00
Sub-03 8.50 8.04 1.14 96.150 0 00:05:00
mw Sub-04 8.50 6.20 4.04 80.860 0 00:05:00
Sub-05 8.50 8.26 1.15 98.000 0 00:05:00
Sub-06 8.50 4.56 3.93 67.170 0 00:19:55
war
Node Depth Summary
..................
mm
Node Average Maximum Maximum Time of Max Total Total Retention
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
ow
Out-01 0.00 0.00 520.00 0 00:00 0 0 0:00:00
.................
Node Flow Summary
mw
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
mw Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm
Out-01 OUTFALL 7.38 14.78 0 12:00 0.00
mw
Inlet Depth Summary
we
Inlet Max Gutter Max Gutter Max Gutter Time of
ID Spread Water Elev Water Depth Maximum
during during during Depth
Peak Flow Peak Flow Peak Flow Occurrence
mo ft ft ft days hh:mm
DI-01 300.30 543.34 5.56 0 12:00
DI-02 25.09 532.76 0.75 0 12:00
DI-03 8.02 529.56 0.41 0 12:00
gm
Inlet Flow Summary
OW
Inlet Peak Peak Peak Peak Inlet Total
moo Total
ID Flow Lateral Flow Flow Efficiency Flooding
Time
um
Autodesk Storm and Sanitary Analysis
OW
OW
Flow Intercepted Bypassing during
Flooded
by Inlet Inlet Peak Flow
cfs cfs cfs cfs % acre-in
minutes OM
DI-01 2.43 2.43 - - - 0.000
0
DI-02 4.10 4.10 - - - 0.000
0
DI-03 1.14 1.14 - - - 0.000
0 a
***********************
Outfall Loading Summary
***********************
MI
Outfall Node ID Flow Average Peak
Frequency Flow Inflow
(%) cfs cfs
WO
Out-01 34.77 1.06 14.78
System 34.77 1.06 14.78
O
*****************
Link Flow Summary
*****************
MO
Link ID Element Time of Maximum Length Peak Flow Design Ratio of
Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum MO
Maximum Time Condition
Occurrence Attained Analysis Capacity /Design
Flow Surcharged
days hh:mm ft/sec cfs cfs Flow
Depth minutes OW
Pipe-02 CONDUIT 0 12:00 3.70 1.00 2.34 19.79 0.12
0.52 0 Calculated MO
Pipe-03 CONDUIT 0 12:00 7.03 1.00 6.37 8.15 0.78
0.69 0 Calculated
Pipe-04 CONDUIT 0 12:00 12.29 1.00 7.49 20.12 0.37
0.50 0 Calculated
Mb
********************************
Highest Flow Instability Indexes
********************************
All links are stable. MO
Analysis began on: Mon Jan 14 09:52:44 2013
Analysis ended on: Mon Jan 14 09:52:47 2013
Total elapsed time: 00:00:03 MO
WM
Autodesk Storm and Sanitary Analysis
MO
MM
WIN
INN
MIN
IWO
PROPOSED DRAINAGE MAP
IMO
Mei
WO
dal
.
9
\\ \ caa1
88 gggg 0 `\ .L, a
/ _
\ g
@ \lla 4 \
� �' � `� £i
O \ ? I
0 ( -- N N, muds Ifilisioot ,,1,
L
■._4 g.. 41 0 ',1
f I ' �. ! --'t R v e
_ " y i i k\ =�I ( - 8� `Y^\ c \� e � 11�, '\gy p°
° \ , 5 W �2\ I. ! /,,a g. el' ', .rC I /-,-p,'41 w-/_ ; f" �— €•
q' / ,- � -. pii s . /A.w O avA� ®�
OM o ; _ _ .� ,gp�lkl� nalig8p-g1-11-1:i111111. 6 //y p
yt I it/■ // i ,/ //1 , ,
1
1 / vIf
\I.. r r f ,/ % I -r Pp,
/ � _ / 10- / / i i1 ' / tit wis i \ k , , ...,s
MI
NM I/ 11 1 1g 1 IT
NIB
i ;ga aila 1'Ell'ii$ 11441;; M gg 1111
Orr 14/i111 5; F �V $ 31 1 °� ! l - 9$ $R
Y
A
�ita 1 I1 $ m 3 r A Z Z � "1
I
1I f 1g �Nil -1a V m Z
yO y . - D = n III
a 1a11/1:. R c c, _ '71 I111,111111 1si }III; `"E C z C i - m !"1 m I
MO
2 YEAR PROPOSED
Sal
a
w
a
Autodesk® Storm and Sanitary Analysis 2012 - Version 6.4.29 (Build 6198)
*******************
Project Description
*******************
File Name propconditions.SPF
a
****************
Analysis Options
****************
Flow Units cfs
Subbasin Hydrograph MethodSCS TR-55
Time of Concentration SCS TR-55
Link Routing Method Hydrodynamic
Storage Node ExfiltrationConstant rate, wetted area
Starting Date JAN-14-2013 00:00:00
Ending Date JAN-17-2013 00:00:00 MO
Report Time Step 00:05:00
*************
Element Count
*************
Number of rain gages 1
Number of subbasins 7
Number of nodes 8
Number of links 7
****************
Raingage Summary
Gage Data Data Recording
ID Source Type Interval
min
Rain Gage-01 TS-01 CUMULATIVE 6.00 ma
****************
Subbasin Summary
**************** MO
Subbasin Total
Area
ID acres
Sub-01 0.16 OM
Sub-02 0.24
Sub-03 0.08
Sub-04 0.08
Sub-05 0.14
Sub-06 0.77 MO
Sub-07 0.53
************
Node Summary MO
************
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft'
■N
MH-01 JUNCTION 521.33 524.50 0.00
Out-01 OUTFALL 522.25 523.50 0.00
MO
Autodesk Storm and Sanitary Analysis
MO
MO
r.
mu
um
Out-02 OUTFALL 520.75 522.00 0.00
Pond-01 STORAGE 531.17 536.62 0.00
Inlet Summary .
*************
Inlet Inlet Manufacturer Inlet Number
Catchbasin Inlet Ponded Initial Grate
um ID Manufacturer Part Location of
Invert Rim Area Water Clogging
Number Inlets
Elevation Elevation Elevation Factor
um ft ft ft2 ft s
DI-1 FHWA HEC-22 GENERIC N/A On Sag 1
ma 534.25 539.75 10.00 534.25 0.00
DI-2 FHWA HEC-22 GENERIC N/A On Grade 1
527.78 536.78 - 527.78 0.00
DI-3 FHWA HEC-22 GENERIC N/A On Sag 1
524.65 529.15 10.00 524.65 0.00
EMI DI-4 FHWA HEC-22 GENERIC N/A On Sag 1
522.75 529.15 10.00 522.75 0.00
**************************
mu Roadway and Gutter Summary
**************************
Inlet Roadway Roadway Roadway Gutter Gutter Gutter
ID Longitudinal Cross Manning's Cross Width Depression
Slope Slope Roughness Slope
r ft/ft ft/ft ft/ft ft in
DI-1 - 0.0200 0.0160 0.0620 2.00 2.00
DI-2 0.0100 0.0200 0.0160 0.0620 2.00 2.00
DI-3 - 0.0200 0.0160 0.0620 2.00 2.00
✓ DI-4 - 0.0200 0.0160 0.0620 2.00 2.00
************
Link Summary
Link From Node To Node Element Length Slope Manning's
ID Type ft % Roughness
DI-3 BYPASS DI-2 MH-01 CHANNEL 190.0 6.7263 0.1300
mm From DI-1 TO DI-2DI-1 DI-2 CONDUIT 32.0 3.0313 0.0150
FROM DI-2 TO DI-3DI-2 DI-3 CONDUIT 24.0 8.8750 0.0150
FROM DI-3 TO DI-4DI-3 DI-4 CONDUIT 90.0 2.1111 0.0150
Pipe-04 DI-4 Out-01 CONDUIT 25.0 2.0000 0.0150
Pipe-05 MH-01 Out-02 CONDUIT 25.0 2.3200 0.0150
mu Pipe-06 Pond-01 DI-3 CONDUIT 14.0 5.2143 0.0150
*********************
Cross Section Summary
- *********************
Link Shape Depth/ Width No. of Cross Full Flow
Design
ID Diameter Barrels Sectional Hydraulic
Flow
mm Area Radius
Capacity
ft ft ft2 ft
mu
Autodesk Storm and Sanitary Analysis
ms
rw
1
OM
MN
MM
cfs
DI-3 BYPASS IRREGULAR 0.50 10.00 1 2.67 0.26 Ili
3.19
From DI-1 TO DI-2 CIRCULAR 1.25 1.25 1 1.23 0.31
9.75
FROM DI-2 TO DI-3 CIRCULAR 1.25 1.25 1 1.23 0.31
16.68 MO
FROM DI-3 TO DI-4 CIRCULAR 1.25 1.25 1 1.23 0.31
8.13
Pipe-04 CIRCULAR 1.25 1.25 1 1.23 0.31
7.92
Pipe-05 CIRCULAR 1.25 1.25 1 1.23 0.31 MO
8.53
Pipe-06 CIRCULAR 0.67 0.67 1 0.35 0.17
2.39
MM
*.**************
Transect Summary
*******.***.****
Transect XS-01 WM
Area:
0.0002 0.0009 0.0020 0.0036 0.0056
0.0081 0.0110 0.0143 0.0181 0.0224
0.0271 0.0322 0.0378 0.0439 0.0504
0.0573 0.0647 0.0731 0.0829 0.0942 N
0.1070 0.1213 0.1371 0.1544 0.1731
0.1934 0.2151 0.2383 0.2630 0.2892
0.3169 0.3460 0.3767 0.4088 0.4424
0.4775 0.5141 0.5514 0.5888 0.6261
0.6635 0.7008 0.7382 0.7756 0.8130 MO
0.8504 0.8878 0.9252 0.9626 1.0000
Hrad:
0.0182 0.0364 0.0546 0.0727 0.0909
0.1091 0.1273 0.1455 0.1637 0.1819
0.2001 0.2182 0.2364 0.2546 0.2728 N
0.2910 0.3092 0.2944 0.2888 0.2891
0.2934 0.3005 0.3098 0.3206 0.3327
0.3457 0.3596 0.3740 0.3891 0.4045
0.4203 0.4365 0.4529 0.4696 0.4865
0.5035 0.5207 0.5580 0.5952 0.6323 MO
0.6694 0.7064 0.7433 0.7802 0.8170
0.8537 0.8904 0.9270 0.9635 1.0000
Width:
0.0120 0.0239 0.0359 0.0479 0.0598
0.0718 0.0838 0.0957 0.1077 0.1196 11x1
0.1316 0.1436 0.1555 0.1675 0.1795
0.1914 0.2034 0.2431 0.2828 0.3225
0.3622 0.4019 0.4416 0.4813 0.5210
0.5607 0.6004 0.6401 0.6798 0.7195
0.7592 0.7989 0.8386 0.8783 0.9180 11rr1
0.9577 0.9974 0.9976 0.9978 0.9980
0.9982 0.9984 0.9986 0.9988 0.9990
0.9992 0.9994 0.9996 0.9998 1.0000
N
************************** Volume Depth
Runoff Quantity Continuity acre-ft inches
**************************
Total Precipitation 0.676 4.053
Surface Runoff 0.006 0.037 N
Continuity Error (%) -0.006
N
Autodesk Storm and Sanitary Analysis
N
x111
mm
mm
mm
************************** Volume Volume
Flow Routing Continuity acre-ft Mgallons
**************************
mm External Inflow 0.000 0.000
External Outflow . 0.359 0.117
Initial Stored Volume 0.000 0.000
Final Stored Volume 0.010 0.003
Continuity Error (%) -0.000
ms
******************************************
Composite Curve Number Computations Report
******************************************
mm
Subbasin Sub-01
mm Area Soil
Soil/Surface Description (acres) Group CN
0.16 - 98.00
Composite Area & Weighted CN 0.16 98.00
mm
Subbasin Sub-02
Area Soil
Soil/Surface Description (acres) Group CN
mm
0.24 - 90.29
Composite Area & Weighted CN 0.24 90.29
mm Subbasin Sub-03
Area Soil
Soil/Surface Description (acres) Group CN
ma 0.08 - 98.00
Composite Area & Weighted CN 0.08 98.00
Subbasin Sub-04
rr
Area Soil
Soil/Surface Description (acres) Group CN
0.08 - 98.00
ow Composite Area & Weighted CN 0.08 98.00
Subbasin Sub-05
1m Area Soil
Soil/Surface Description (acres) Group CN
0.14 - 98.00
Composite Area & Weighted CN 0.14 98.00
err
Subbasin Sub-06
Area Soil
row Soil/Surface Description (acres) Group CN
0.77 - 64.36
ma
Autodesk Storm and Sanitary Analysis
err
eerr
OM
Composite Area & Weighted CN 0.77 64.36
Subbasin Sub-07
Area Soil
Soil/Surface Description (acres) Group CN
0.53 - 82.64
• Composite Area & Weighted CN 0.53 82.64 MO
***************************************************
SCS TR-55 Time of Concentration Computations Report
*************************************************** OM
Sheet Flow Equation
Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4))
Where:
Tc = Time of Concentration (hrs)
n = Manning's Roughness MO Lf = Flow Length (ft)
P = 2 yr, 24 hr Rainfall (inches)
Sf = Slope (ft/ft)
Shallow Concentrated Flow Equation MO
V = 16.1345 * (Sf^0.5) (unpaved surface)
V = 20.3282 * (Sf^0.5) (paved surface)
V = 15.0 * (Sf^0.5) (grassed waterway surface) MS
V = 10.0 * (Sf^0.5) (nearly bare & untilled surface)
V = 9.0 * (Sf^0.5) (cultivated straight rows surface)
V = 7.0 * (Sf^0.5) (short grass pasture surface)
V = 5.0 * (Sf^0.5) (woodland surface)
V = 2.5 * (Sf^0.5) (forest w/heavy litter surface) MA
Tc = (Lf / V) / (3600 sec/hr)
Where:
Tc = Time of Concentration (hrs) MO
Lf = Flow Length (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
Channel Flow Equation MO
V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n
R = Aq / Wp
Tc = (Lf / V) / (3600 sec/hr) MO
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft) MO
R = Hydraulic Radius (ft)
Aq = Flow Area (ft2)
Wp = Wetted Perimeter (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft) OM
n = Manning's Roughness
N O
Autodesk Storm and Sanitary Analysis
MO
MM
oo
a.a
or
Subbasin Sub-01
oo
User-Defined TOC override (minutes) : 5.00
Subbasin Sub-02
oo
User-Defined TOC override (minutes) : 5.00
aar
Subbasin Sub-03
User-Defined TOC override (minutes) : 5.00
aar Subbasin Sub-04
User-Defined TOC override (minutes) : 5.00
aar
Subbasin Sub-05
AM
User-Defined TOC override (minutes) : 5.00
Subbasin Sub-06
_a User-Defined TOC override (minutes) : 19.93
Subbasin Sub-07
ore
User-Defined TOC override (minutes) : 5.00
***********************
Subbasin Runoff Summary
oo ***********************
Subbasin Total Total Peak Weighted Time of
ID Precip Runoff Runoff Curve Concentration
in in cfs Number days hh:mm:ss
Sub-01 4.00 3.76 0.84 98.000 0 00:05:00
Sub-02 4.00 2.95 1.10 90.290 0 00:05:00
Sub-03 4.00 3.76 0.44 98.000 0 00:05:00
v'aa Sub-04 4.00 3.76 0.44 98.000 0 00:05:00
Sub-05 4.00 3.76 0.74 98.000 0 00:05:00
Sub-06 4.00 0.99 0.75 64.360 0 00:19:55
Sub-07 4.00 2.26 1.90 82.640 0 00:05:00
woo
******************
Node Depth Summary
******************
au
Node Average Maximum Maximum Time of Max Total Total Retention
lira
Autodesk Storm and Sanitary Analysis
liar
air
m
MI
MI
MI
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
MM
MH-01 0.02 0.49 521.82 0 12:00 0 0 0:00:00
Out-01 0.03 0.58 522.83 0 12:00 0 0 0:00:00
Out-02 0.02 0.41 521.16 0 12:00 0 0 0:00:00
Pond-01 4.04 4.87 536.04 0 12:00 0 0 0:00:00
MO
*****************
Node Flow Summary
*****************
MO
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm
MM
MH-01 JUNCTION 1.90 1.94 0 12:00 0.00
Out-01 OUTFALL 0.73 3.75 0 12:00 0.00
Out-02 OUTFALL 0.00 1.94 0 12:00 0.00
Pond-01 STORAGE 0.74 0.74 0 11:59 0.00
ME
*******************
Inlet Depth Summary
MM
Inlet Max Gutter Max Gutter Max Gutter Time of
ID Spread Water Elev Water Depth Maximum
during during during Depth
MM
Peak Flow Peak Flow Peak Flow Occurrence
ft ft ft days hh:mm
DI-1 6.49 540.09 0.34 0 12:00
DI-2 6.41 536.99 0.21 0 12:00
DI-3 3.38 529.33 0.18 0 12:00 MI
DI-4 3.38 529.33 0.18 0 12:00
******************
Inlet Flow Summary Me
******************
Mm
Inlet Peak Peak Peak Peak Inlet Total
Total
ID Flow Lateral Flow Flow Efficiency Flooding
Time
Flow Intercepted Bypassing during km
Flooded
by Inlet Inlet Peak Flow
cfs cfs cfs cfs % acre-in
minutes
MM
DI-1 0.84 0.84 - - - 0.000
0
DI-2 1.10 1.10 1.05 0.05 95.73 0.000 MO
0
DI-3 0.43 0.43 - - - 0.000
Mb
Autodesk Storm and Sanitary Analysis
rr
rift
a.
rom
moo
0
DI-4 0.43 0.43 - - - 0.000
0
ar
********************
Storage Node Summary
********************
ma
Storage Node ID Maximum Maximum Time of Max Average Average Maximum
aar Maximum Time of Max. Total
Ponded Ponded Ponded Ponded Ponded Storage Node
Exfiltration Exfiltration Exfiltrated
Volume volume Volume Volume Volume Outflow
Rate Rate Volume
gar 1000 ft' (%) days hh:mm 1000 ft' (%) cfs
cfm hh:mm:ss 1000 ft'
Pond-01 0.474 85 0 12:00 0.400 72 0.72
or
0.00 0:00:00 0.000
***********************
am Outfall Loading Summary
***********************
Outfall Node ID Flow Average Peak
MN
Flow Inflow
(%) cfs cfs
Out-01 33.03 0.25 3.75
Out-02 24.22 0.14 1.94
or System 28.62 0.39 5.65
*****************
Link Flow Summary
urn *****************
ar Link ID Element Time of Maximum Length Peak Flow Design Ratio of
Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum
Maximum Time Condition
Occurrence Attained Analysis Capacity /Design
"o Flow Surcharged
days hh:mm ft/sec cfs cfs Flow
Depth minutes
re
DI-3 BYPASS CHANNEL 0 12:00 0.91 1.00 0.05 3.19 0.01
0.22 0 Calculated
From DI-1 TO DI-2 CONDUIT 0 12:00 4.51 1.00 0.83 9.75 0.09
0.21 0 Calculated
rem FROM DI-2 TO DI-3 CONDUIT 0 12:00 8.01 1.00 1.88 16.68 0.11
0.25 0 Calculated
FROM DI-3 TO DI-4 CONDUIT 0 12:00 4.75 1.00 3.04 8.13 0.37
am
Autodesk Storm and Sanitary Analysis
mo
ar
1111
Mk
Mk
0.52 0 Calculated
Pipe-04 CONDUIT 0 12:00 5.32 1.00 3.46 7.92 0.44
0.52 0 Calculated
Pipe-05 CONDUIT 0 12:00 4.92 1.00 1.94 8.53 0.23
0.36 0 Calculated UM
Pipe-06 CONDUIT 0 12:00 5.22 1.00 0.72 2.39 0.30
0.42 0 Calculated
******************************** MI
Highest Flow Instability Indexes
********************************
All links are stable.
UM
WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height
dimensions for Node MH-01.
Analysis began on: Mon Jan 14 08:48:39 2013
Analysis ended on: Mon Jan 14 08:48:43 2013
Total elapsed time: 00:00:04 MO
WM
ilik
11111
UM
MO
Autodesk Storm and Sanitary Analysis
ION
IMP
rap
MIN
NINO
Mal
10 YEAR PROPOSED
MOP
MN
ryr
ON
Autodesk© Storm and Sanitary Analysis 2012 - Version 6.4.29 (Build 6198)
Project Description
*******************
File Name propconditions.SPF
****************
Analysis Options
****************
Flow Units cfs
Subbasin Hydrograph MethodSCS TR-55
Time of Concentration SCS TR-55
Link Routing Method Hydrodynamic
Storage Node ExfiltrationConstant rate, wetted area
Starting Date JAN-14-2013 00:00:00
Ending Date JAN-17-2013 00:00:00 bb
Report Time Step 00:05:00
*************
Element Count
*************
Number of rain gages 1
Number of subbasins 7
Number of nodes 8
Number of links 7 Oft
****************
Raingage Summary
**************** Mb
Gage Data Data Recording
ID Source Type Interval
min
Rain Gage-01 TS-01 CUMULATIVE 6.00 OM
****************
Subbasin Summary
**************** Mb
Subbasin Total
Area
ID acres
Sub-01 0.16 Mb
Sub-02 0.24
Sub-03 0.08
Sub-04 0.08
Sub-05 0.14
Sub-06 0.77 MO
Sub-07 0.53
************
Node Summary so
************
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft2
OM
MH-01 JUNCTION 521.33 524.50 0.00
Out-01 OUTFALL 522.25 523.50 0.00
OM
Autodesk Storm and Sanitary Analysis
NM
NM
MOW
till
+r.
Out-02 OUTFALL 520.75 522.00 0.00
Pond-01 STORAGE 531.17 536.62 0.00
mi. ************.
Inlet Summary _
*************
Inlet Inlet Manufacturer Inlet Number
Catchbasin Inlet Ponded Initial Grate
Mill ID Manufacturer Part Location of
Invert Rim Area Water Clogging
Number Inlets
Elevation Elevation Elevation Factor
or
ft ft ft' ft o
DI-1 FHWA HEC-22 GENERIC N/A On Sag ✓ 1
mw 534.25 539.75 10.00 534.25 0.00
DI-2 FHWA HEC-22 GENERIC N/A On Grade 1
527.78 536.78 - 527.78 0.00
DI-3 FHWA HEC-22 GENERIC N/A ' On Sag •� 1
524.65 529.15 10.00 524.65 0.00
- DI-4 FHWA HEC-22 GENERIC N/A On Sag 1
522.75 529.15 10.00 522.75 0.00
**************************
'w Roadway and Gutter Summary
**************************
Inlet Roadway Roadway Roadway Gutter Gutter Gutter
ID Longitudinal Cross Manning's Cross Width Depression
Slope Slope Roughness Slope
5 ft/ft ft/ft ft/ft ft in
DI-1 - 0.0200 0.0160 0.0620 2.00 2.00
DI-2 0.0100 0.0200 0.0160 0.0620 2.00 2.00
DI-3 - 0.0200 0.0160 0.0620 2.00 2.00
ow DI-4 - 0.0200 0.0160 0.0620 2.00 2.00
************
Link Summary
Yfw ************
Link From Node To Node Element Length Slope Manning's
ID Type ft % Roughness
DI-3 BYPASS DI-2 MH-01 CHANNEL 190.0 6.7263 0.1300
5 From DI-1 TO DI-2DI-1 DI-2 CONDUIT 32.0 3.0313 0.0150
FROM DI-2 TO DI-3DI-2 DI-3 CONDUIT 24.0 8.8750 0.0150
FROM DI-3 TO DI-4DI-3 DI-4 CONDUIT 90.0 2.1111 0.0150
Pipe-04 DI-4 Out-01 CONDUIT 25.0 2.0000 0.0150
Pipe-05 MH-01 Out-02 CONDUIT 25.0 2.3200 0.0150
mil Pipe-06 Pond-01 DI-3 CONDUIT 14.0 5.2143 0.0150
*********************
Cross Section Summary
am *********************
Link Shape Depth/ Width No. of Cross Full Flow
Design
ID Diameter Barrels Sectional Hydraulic
Flow
on Area Radius
Capacity
ft ft ft' ft
S
Autodesk Storm and Sanitary Analysis
aim
S
OM
OM
OM
cfs
DI-3 BYPASS IRREGULAR 0.50 10.00 1 2.67 0.26 OM
3.19
From DI-1 TO DI-2 CIRCULAR 1.25 1.25 - 1 1.23 0.31
9.75
FROM DI-2 TO DI-3 CIRCULAR 1.25 1.25 1 1.23 0.31
16.68 MO
FROM DI-3 TO DI-4 CIRCULAR 1.25 1.25 1 1.23 0.31
8.13
Pipe-04 CIRCULAR 1.25 1.25 1 1.23 0.31
7.92
Pipe-05 CIRCULAR 1.25 1.25 1 1.23 0.31 MO
8.53
Pipe-06 CIRCULAR 0.67 0.67 1 0.35 0.17
2.39
OM
****************
Transect Summary
****************
Transect XS-01 MO
Area:
0.0002 0.0009 0.0020 0.0036 0.0056
0.0081 0.0110 0.0143 0.0181 0.0224
0.0271 0.0322 0.0378 0.0439 0.0504
0.0573 0.0647 0.0731 0.0829 0.0942 MO
0.1070 0.1213 0.1371 0.1544 0.1731
0.1934 0.2151 0.2383 0.2630 0.2892
0.3169 0.3460 0.3767 0.4088 0.4424
0.4775 0.5141 0.5514 0.5888 0.6261
0.6635 0.7008 0.7382 0.7756 0.8130 WO
0.8504 0.8878 0.9252 0.9626 1.0000
Hrad:
0.0182 0.0364 0.0546 0.0727 0.0909
0.1091 0.1273 0.1455 0.1637 0.1819
0.2001 0.2182 0.2364 0.2546 0.2728 II Pi
0.2910 0.3092 0.2944 0.2888 0.2891
0.2934 0.3005 0.3098 0.3206 0.3327
0.3457 0.3596 0.3740 0.3891 0.4045
0.4203 0.4365 0.4529 0.4696 0.4865
0.5035 0.5207 0.5580 0.5952 0.6323 MO
0.6694 0.7064 0.7433 0.7802 0.8170
0.8537 0.8904 0.9270 0.9635 1.0000
Width:
0.0120 0.0239 0.0359 0.0479 0.0598
0.0718 0.0838 0.0957 0.1077 0.1196 MO
0.1316 0.1436 0.1555 0.1675 0.1795
0.1914 0.2034 0.2431 0.2828 0.3225
0.3622 0.4019 0.4416 0.4813 0.5210
0.5607 0.6004 0.6401 0.6798 0.7195
0.7592 0.7989 0.8386 0.8783 0.9180 OM
0.9577 0.9974 0.9976 0.9978 0.9980
0.9982 0.9984 0.9986 0.9988 0.9990
0.9992 0.9994 0.9996 0.9998 1.0000
MO
************************** Volume Depth
Runoff Quantity Continuity acre-ft inches
**************************
Total Precipitation 1.013 6.080
Surface Runoff 0.011 0.065 MO
Continuity Error (%) -0.005
OW
Autodesk Storm and Sanitary Analysis
MO
00
WO
OW
************************** Volume Volume
Flow Routing Continuity acre-ft Mgallons
**************************
mob
External Inflow 0.000 0.000
External Outflow 0.638 0.208
Initial Stored Volume 0.000 0.000
Final Stored Volume 0.010 0.003
Continuity Error (%) -0.000
******************************************
Composite Curve Number Computations Report
******************************************
Subbasin Sub-01
Area Soil
ww
Soil/Surface Description p (acres) Group CN
0.16 - 98.00
Composite Area & Weighted CN 0.16 98.00
win
Subbasin Sub-02
Area Soil
Soil/Surface Description (acres) Group CN
rr
0.24 - 90.29
Composite Area & Weighted CN 0.24 90.29
Subbasin Sub-03
Area Soil
Soil/Surface Description (acres) Group CN
mos - 0.08 - 98.00
Composite Area & Weighted CN 0.08 98.00
Subbasin Sub-04
NW
Area Soil
Soil/Surface Description (acres) Group CN
0.08 - 98.00
Composite Area & Weighted CN 0.08 98.00
Subbasin Sub-05
Area Soil
Soil/Surface Description (acres) Group CN
0.14 - 98.00
Composite Area & Weighted CN 0.14 98.00
ire
Subbasin Sub-06
Area Soil
Soil/Surface Description (acres) Group CN
0.77 - 64.36
Autodesk Storm and Sanitary Analysis
rr
arr
Armor
MO
MO
ON
Composite Area & Weighted CN 0.77 64.36
Subbasin Sub-07
MO
Area Soil
Soil/Surface Description - (acres) Group CN
0.53 - 82.64
Composite Area & Weighted CN 0.53 82.64 OW
***************************************************
SCS TR-55 Time of Concentration Computations Report
*************************************************** NO
Sheet Flow Equation
Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4)) MS
Where:
Tc = Time of Concentration (hrs)
n = Manning's Roughness MO
Lf = Flow Length (ft)
P = 2 yr, 24 hr Rainfall (inches)
Sf = Slope (ft/ft)
Shallow Concentrated Flow Equation
V = 16.1345 * (Sf^0.5) (unpaved surface)
V = 20.3282 * (Sf^0.5) (paved surface)
V = 15.0 * (Sf^0.5) (grassed waterway surface) MO
V = 10.0 * (Sf^0.5) (nearly bare & untilled surface)
V = 9.0 * (Sf^0.5) (cultivated straight rows surface)
V = 7.0 * (Sf^0.5) (short grass pasture surface)
V = 5.0 * (Sf^0.5) (woodland surface)
V = 2.5 * (Sf^0.5) (forest w/heavy litter surface) MO
Tc = (Lf / V) / (3600 sec/hr)
Where:
Tc = Time of Concentration (hrs) MO
Lf = Flow Length (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
Channel Flow Equation ro
V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n
R = Aq / Wp
Tc = (Lf / V) / (3600 sec/hr) no
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft) ma
R = Hydraulic Radius (ft)
Aq = Flow Area (ft2)
Wp = Wetted Perimeter (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft) MO
n = Manning's Roughness
MO
Autodesk Storm and Sanitary Analysis
mo
mw
mm
ma
Subbasin Sub-01
rr
User-Defined TOC override (minutes) : 5.00
Subbasin Sub-02
rr
User-Defined TOC override (minutes) : 5.00
Subbasin Sub-03
User-Defined TOC override (minutes) : 5.00
arr Subbasin Sub-04
User-Defined TOC override (minutes) : 5.00
Subbasin Sub-05
User-Defined TOC override (minutes) : 5.00
Subbasin Sub-06
User-Defined TOC override (minutes) : 19.93
Subbasin Sub-07
User-Defined TOC override (minutes) : 5.00 v-
***********************
Subbasin Runoff Summary
***********************
Subbasin Total Total Peak Weighted Time of
ID Precip Runoff Runoff Curve Concentration
rr in in cfs Number days hh:mm:ss
Sub-01 6.00 5.76 1.26 98.000 0 00:05:00
Sub-02 6.00 4.88 1.78 90.290 0 00:05:00
Sub-03 6.00 5.76 0.66 98.000 0 00:05:00
— Sub-04 6.00 5.76 0.66 98.000 0 00:05:00
Sub-05 6.00 5.76 1.11 98.000 0 00:05:00
Sub-06 6.00 2.29 1.90 64.360 0 00:19:55
Sub-07 6.00 4.05 3.37 .- 82.640 0 00:05:00
rr
******************
Node Depth Summary
******************
Orr
Node Average Maximum Maximum Time of Max Total Total Retention
rr
Autodesk Storm and Sanitary Analysis
. •
wr
Olik
MO
OW
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
MH-01 0.03 0.73 522.06 0 12:00 0 0 0:00:00 lb
Out-01 0.04 0.73 522.98 0 12:00 0 0 0:00:00
Out-02 0.03 0.57 521.32 0 12:00 0 0 0:00:00
Pond-01 4.16 4.96 536.13 0 12:00 0 0 0:00:00
OO
*****************
Node Flow Summary
MO
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm
OO
MH-01 JUNCTION 3.36 3.64 0 12:00 0.00
Out-01 OUTFALL 1.89 6.08 0 12:00 0.00
Out-02 OUTFALL 0.00 3.64 0 12:00 0.00
Pond-01 STORAGE 1.11 1.11 0 12:00 0.00
Ili
*******************
Inlet Depth Summary
*******************
WO
Inlet Max Gutter Max Gutter Max Gutter Time of
ID Spread Water Elev Water Depth Maximum
during during during Depth
Peak Flow Peak Flow Peak Flow Occurrence SO
ft ft ft days hh:mm
DI-1 8.72 540.18 0.43 0 12:00
DI-2 8.04 537.02 0.24 0 12:00
DI-3 5.09 529.41 0.26 0 12:00 NO
DI-4 5.09 529.41 0.26 0 12:00
******************
Inlet Flow Summary MO
******************
_ MO
Inlet Peak Peak Peak Peak Inlet Total
Total
ID Flow Lateral Flow Flow Efficiency Flooding
Time
Flow Intercepted Bypassing during UM
Flooded
by Inlet Inlet Peak Flow
cfs cfs cfs cfs % acre-in
minutes
O
DI-1 1.26 1.26 - - - 0.000
0
DI-2 1.78 1.78 1.49 0.28 84.00 0.000 UM
0
DI-3 0.66 0.66 - - - 0.000
no
Autodesk Storm and Sanitary Analysis
fir
MO
S
MN
NO
0
DI-4 0.66 0.66 - - - 0.000
0
oo
Storage Node Summary
aa-
Storage Node ID Maximum Maximum Time of Max Average Average Maximum
Maximum Time of Max. Total
r Ponded Ponded Ponded Ponded Ponded Storage Node
Exfiltration Exfiltration Exfiltrated
Volume Volume Volume Volume Volume Outflow
Rate Rate Volume
1000 ft' (%) days hh:mm 1000 ft' (%) cfs
ow cfm hh:mm:ss 1000 ft'
Pond-01 0.484 87 0 12:00 0.411 74 1.09
ow 0.00 0:00:00 0.000
Outfall Loading Summary
r ********************
Outfall Node ID Flow Average Peak
Frequency Flow Inflow
a (%) cfs cfs
Out-01 34.45 0.46 6.08
Out-02 27.48 0.25 3.64
r System 30.97 0.71 9.65
Link Flow Summary
NW *.+*.+++*******+:
ow Link ID Element Time of Maximum Length Peak Flow Design Ratio of
Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum
Maximum Time Condition
Occurrence Attained Analysis Capacity /Design
ow Flow Surcharged
days hh:mm ft/sec cfs cfs Flow
Depth minutes
r
DI-3 BYPASS CHANNEL 0 12:00 0.88 1.00 0.28 3.19 0.09
0.51 0 Calculated
From DI-1 TO DI-2 CONDUIT 0 12:00 5.00 1.00 1.26 9.75 0.13
0.26 0 Calculated
- FROM DI-2 TO DI-3 CONDUIT 0 12:00 8.71 1.00 2.74 16.68 0.16
0.30 0 Calculated
FROM DI-3 TO DI-4 CONDUIT 0 12:00 5.06 1.00 4.48 8.13 0.55
r
Autodesk Storm and Sanitary Analysis
or
ow
MM
MO
MO
0.68 0 Calculated
Pipe-04 CONDUIT 0 12:00 5.77 1.00 5.11 7.92 0.65
0.68 0 Calculated
Pipe-05 CONDUIT 0 12:00 5.66 1.00 3.64 8.53 0.43
0.52 0 Calculated Mk
Pipe-06 CONDUIT 0 12:00 5.66 1.00 1.09 2.39 0.45
- 0.54 0 Calculated
******************************** ■L
Highest Flow Instability Indexes
********************************
All links are stable.
WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height MO
dimensions for Node MH-01.
Analysis began on: Mon Jan 14 08:49:17 2013
Analysis ended on: Mon Jan 14 08:49:21 2013
Total elapsed time: 00:00:04 MO
MW
MO
OW
MO
MO
MO
MO
MO
OM
Autodesk Storm and Sanitary Analysis
ow
um
.r.
Wite 100 YEAR PROPOSED
Iwo
aro
IMO
IND
tie
MOW
Ma
NO
NO
Autodesk® Storm and Sanitary Analysis 2012 - Version 6.4.29 (Build 6198)
******************* NI
Project Description
*******************
File Name propconditions.SPF
OM
****************
Analysis Options
****************
Flow Units cfs
Subbasin Hydrograph MethodSCS TR-55 MO
Time of Concentration SCS TR-55
Link Routing Method Hydrodynamic
Storage Node ExfiltrationConstant rate, wetted area
Starting Date JAN-14-2013 00:00:00
Ending Date JAN-17-2013 00:00:00 MO
Report Time Step 00:05:00
*************
Element Count NM
*************
Number of rain gages 1
Number of subbasins 7
Number of nodes 8
Number of links 7 OM
****************
Raingage Summary
**************** MO
Gage Data Data Recording
ID Source Type Interval
min
Rain Gage-01 TS-01 CUMULATIVE 6.00 NM
****************
Subbasin Summary
**************** MO
Subbasin Total
Area
ID acres
Sub-01 0.16 MO
Sub-02 0.24
Sub-03 0.08
Sub-04 0.08
Sub-05 0.14
Sub-06 0.77 NO
Sub-07 0.53
************
Node Summary Oil
************
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft'
OW
MH-01 JUNCTION 521.33 524.50 0.00
Out-01 OUTFALL 522.25 523.50 0.00
OW
Autodesk Storm and Sanitary Analysis
ma
ma
w.
ow
ww
Out-02 OUTFALL 520.75 522.00 0.00
Pond-01 STORAGE 531.17 536.62 0.00
ow
Inlet Summary
*************
Inlet Inlet Manufacturer Inlet Number
Catchbasin Inlet Ponded Initial Grate
wo
ID Manufacturer Part Location of
Invert Rim Area Water Clogging
Number Inlets
Elevation Elevation Elevation Factor
we ft ft ft' ft %
DI-1 FHWA HEC-22 GENERIC N/A On Sag 1
am
534.25 539.75 10.00 534.25 0.00
DI-2 FHWA HEC-22 GENERIC N/A On Grade • 1
527.78 536.78 - 527.78 0.00
DI-3 FHWA HEC-22 GENERIC N/A On Sag 1
524.65 529.15 10.00 524.65 0.00
rr DI-4 FHWA HEC-22 GENERIC N/A On Sag 1
522.75 529.15 10.00 522.75 0.00
**************************
OM
Roadway and Gutter Summary
**************************
Inlet Roadway Roadway Roadway Gutter Gutter Gutter
ID Longitudinal Cross Manning's Cross Width Depression
Slope Slope Roughness Slope
ww ft/ft ft/ft ft/ft ft in
DI-1 - 0.0200 0.0160 0.0620 2.00 2.00
DI-2 0.0100 0.0200 0.0160 0.0620 2.00 2.00
DI-3 - 0.0200 0.0160 0.0620 2.00 2.00
ow DI-4 - 0.0200 0.0160 0.0620 2.00 2.00
************
Link Summary
woo ************
Link From Node To Node Element Length Slope Manning's
ID Type ft 8 Roughness
DI-3 BYPASS DI-2 MH-01 CHANNEL 190.0 6.7263 0.1300
ow From DI-1 TO DI-2DI-1 DI-2 CONDUIT 32.0 3.0313 0.0150
FROM DI-2 TO DI-3DI-2 DI-3 CONDUIT 24.0 8.8750 0.0150
FROM DI-3 TO DI-401-3 DI-4 CONDUIT 90.0 2.1111 0.0150
Pipe-04 DI-4 Out-01 CONDUIT 25.0 2.0000 0.0150
Pipe-05 MH-01 Out-02 CONDUIT 25.0 2.3200 0.0150
tag Pipe-06 Pond-01 DI-3 CONDUIT 14.0 5.2143 0.0150
*********************
Cross Section Summary
- *********************
Link Shape Depth/ Width No. of Cross Full Flow
Design
ID Diameter Barrels Sectional Hydraulic
Flow
WO Area Radius
Capacity
ft ft ft' ft
ow
Autodesk Storm and Sanitary Analysis
alo
mr
Ar.
bil
NI
Olt
cfs
DI-3 BYPASS IRREGULAR 0.50 10.00 1 2.67 0.26 ii
3.19
From DI-1 TO DI-2 CIRCULAR 1.25 1.25 1 1.23 0.31
9.75
FROM DI-2 TO DI-3 CIRCULAR 1.25 1.25 1 1.23 0.31
16.68 Iii
FROM DI-3 TO DI-4 CIRCULAR 1.25 1.25 1 1.23 0.31
8.13
Pipe-04 CIRCULAR 1.25 1.25 1 1.23 0.31
7.92
Pipe-05 CIRCULAR 1.25 1.25 1 1.23 0.31 Mb
8.53
Pipe-06 CIRCULAR 0.67 0.67 1 0.35 0.17
2.39
ilii
****************
Transect Summary
****************
Transect XS-01 OW
Area:
0.0002 0.0009 0.0020 0.0036 0.0056
0.0081 0.0110 0.0143 0.0181 0.0224
0.0271 0.0322 0.0378 0.0439 0.0504
0.0573 0.0647 0.0731 0.0829 0.0942 MI
0.1070 0.1213 0.1371 0.1544 0.1731
0.1934 0.2151 0.2383 0.2630 0.2892
0.3169 0.3460 0.3767 0.4088 0.4424
0.4775 0.5141 0.5514 0.5888 0.6261
0.6635 0.7008 0.7382 0.7756 0.8130 Mb
0.8504 0.8878 0.9252 0.9626 1.0000
Hrad:
0.0182 0.0364 0.0546 0.0727 0.0909
0.1091 0.1273 0.1455 0.1637 0.1819
0.2001 0.2182 0.2364 0.2546 0.2728 1M
0.2910 0.3092 0.2944 0.2888 0.2891
0.2934 0.3005 0.3098 0.3206 0.3327
0.3457 0.3596 0.3740 0.3891 0.4045
0.4203 0.4365 0.4529 0.4696 0.4865
0.5035 0.5207 0.5580 0.5952 0.6323 MI
0.6694 0.7064 0.7433 0.7802 0.8170
0.8537 0.8904 0.9270 0.9635 1.0000
Width:
0.0120 0.0239 0.0359 0.0479 0.0598
0.0718 0.0838 0.0957 0.1077 0.1196 Mb
0.1316 0.1436 0.1555 0.1675 0.1795
0.1914 0.2034 0.2431 0.2828 0.3225
0.3622 0.4019 0.4416 0.4813 0.5210
0.5607 0.6004 0.6401 0.6798 0.7195
0.7592 0.7989 0.8386 0.8783 0.9180 Mb
0.9577 0.9974 0.9976 0.9978 0.9980
0.9982 0.9984 0.9986 0.9988 0.9990
0.9992 0.9994 0.9996 0.9998 1.0000
MM
************************** Volume Depth
Runoff Quantity Continuity acre-ft inches
**************************
Total Precipitation 1.435 8.613
Surface Runoff 0.017 0.102 IM
Continuity Error (%) -0.003
MN
Autodesk Storm and Sanitary Analysis
Om
or
MO
MO
MO
************************** Volume Volume
Flow Routing Continuity acre-ft Mgallons
**************************
Ira
External Inflow 0.000 0.000
External Outflow 1.013 0.330
Initial Stored Volume 0.000 0.000
Final Stored Volume 0.010 0.003
we Continuity Error (%) -0.000
******************************************
Composite Curve Number Computations Report
******************************************
Subbasin Sub-01
Area Soil
Soil/Surface Description (acres) Group CN
0.16 - 98.00
Composite Area & Weighted CN 0.16 98.00
or
Subbasin Sub-02
Area Soil
Soil/Surface Description (acres) Group CN
moo
0.24 - 90.29
Composite Area & Weighted CN 0.24 90.29
+rr
Subbasin Sub-03
Area Soil
Soil/Surface Description (acres) Group CN
him
- 0.08 - 98.00
Composite Area & Weighted CN 0.08 98.00
war
Subbasin Sub-04
Area Soil
Soil/Surface Description (acres) Group CN
- 0.08 - 98.00
Composite Area & Weighted CN 0.08 98.00
Subbasin Sub-05
tar
Area Soil
Soil/Surface Description (acres) Group CN
0.14 - 98.00
ar
C-omposite Area & Weighted CN 0.14 98.00
Subbasin Sub-06
air Area Soil
Soil/Surface Description (acres) Group CN
0.77 - 64.36
rr
Autodesk Storm and Sanitary Analysis
4101
4141
MO
WO
MO
Composite Area & Weighted CN 0.77 64.36
Subbasin Sub-07
MO
Area Soil
Soil/Surface Description (acres) Group CN -
0.53 - 82.64
Composite Area & Weighted CN 0.53 82.64 MO
***************************************************
SCS TR-55 Time of Concentration Computations Report
*************************************************** MS
Sheet Flow Equation
Tc = (0.007 * on * Lf)^0.8)) / ((P^0.5) * (Sf^0.4)) UM
Where:
Tc = Time of Concentration (hrs)
n = Manning's Roughness MO
Lf = Flow Length (ft)
P = 2 yr, 24 hr Rainfall (inches)
Sf = Slope (ft/ft)
Shallow Concentrated Flow Equation OM
V = 16.1345 * (Sf^0.5) (unpaved surface)
V = 20.3282 * (Sf^0.5) (paved surface)
V = 15.0 * (Sf^0.5) (grassed waterway surface) ■1
V = 10.0 * (Sf^0.5) (nearly bare & untilled surface)
V = 9.0 * (Sf^0.5) (cultivated straight rows surface)
V = 7.0 * (Sf^0.5) (short grass pasture surface)
V = 5.0 * (Sf^0.5) (woodland surface)
V = 2.5 * (Sf^0.5) (forest w/heavy litter surface) /O
Tc = (Lf / V) / (3600 sec/hr)
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
Channel Flow Equation OW
V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n
R = Aq / Wp
Tc = (Lf / V) / (3600 sec/hr) MO
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft) NO
R = Hydraulic Radius (ft)
Aq = Flow Area (ft*)
Wp = Wetted Perimeter (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft) MO
n = Manning's Roughness
MO
Autodesk Storm and Sanitary Analysis
NO
OW
r.
or
mm
Subbasin Sub-01
mm
User-Defined TOC override (minutes) : 5.00
Subbasin Sub-02
wr
User-Defined TOC override (minutes) : 5.00
err Subbasin Sub-03
User-Defined TOC override (minutes) : 5.00
rrr Subbasin Sub-04
User-Defined TOC override (minutes) : 5.00
mw
Subbasin Sub-05
User-Defined TOC override (minutes) : 5.00
ow
Subbasin Sub-06
mom User-Defined TOC override (minutes) : 19.93
Subbasin Sub-07
✓r
User-Defined TOC override (minutes) : 5.00
***********************
Subbasin Runoff Summary
rr ***********************
Subbasin Total Total Peak Weighted Time of
ID Precip Runoff Runoff Curve Concentration
err in in cfs Number days hh:mm:ss
Sub-01 8.50 8.26 1.79 98.000 0 00:05:00
Sub-02 8.50 7.33 2.61 90.290 0 00:05:00
Sub-03 8.50 8.26 0.93 98.000 0 00:05:00
or Sub-04 8.50 8.26 0.93 98.000 0 00:05:00
Sub-05 8.50 8.26 1.57 98.000 0 00:05:00
Sub-06 8.50 4.23 3.58 64.360 0 00:19:55
Sub-07 8.50 6.41 5.21 82.640 0 00:05:00
o w
******************
Node Depth Summary
******************
+r
Node Average Maximum Maximum Time of Max Total Total Retention
me
Autodesk Storm and Sanitary Analysis
.rr
wf
M.
NI
ON
NW
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
MH-01 0.05 1.04 522.37 0 12:00 0 0 0:00:00 ON
Out-01 0.05 0.92 523.17 0 12:00 0 0 0:00:00
Out-02 0.04 0.77 521.52 0 12:00 0 0 0:00:00
Pond-01 4.25 5.09 536.26 0 12:00 0 0 0:00:00
UN
*****************
Node Flow Summary
*****************
NO
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm
NIN
MH-01 JUNCTION 5.21 5.91 0 12:00 0.00
Out-01 OUTFALL 3.56 9.05 0 12:03 0.00
Out-02 OUTFALL 0.00 5.90 0 12:00 0.00
Pond-01 STORAGE 1.57 1.57 0 12:00 0.00
NO
*******************
Inlet Depth Summary
*******************
ON
Inlet Max Gutter Max Gutter Max Gutter Time of
ID Spread Water Elev Water Depth Maximum
during during during Depth
Peak Flow Peak Flow Peak Flow Occurrence NM
ft ft ft days hh:mm
DI-1 10.66 540.21 0.46 0 12:00
DI-2 9.58 537.06 0.28 0 12:00
DI-3 7.23 529.53 0.38 0 12:00 illy
DI-4 7.23 529.53 0.38 0 12:00
******************
Inlet Flow Summary OO
******************
Inlet Peak Peak Peak Peak Inlet Total
Total
ID Flow Lateral Flow Flow Efficiency Flooding
Time
Flow Intercepted Bypassing during NO
Flooded
by Inlet Inlet Peak Flow
cfs cfs cfs cfs % acre-in
minutes
ON
DI-1 1.79 1.79 - - - 0.000
0
DI-2 2.60 2.60 1.91 0.70 73.22 0.000 NI
0
DI-3 0.93 0.93 - - - 0.000
OS
Autodesk Storm and Sanitary Analysis
iir
iiii
SW
WO
WO
0
DI-4 0.93 0.93 - - - 0.000
0
MO
********************
Storage Node Summary
********************
rr
Storage Node ID Maximum Maximum Time of Max Average Average Maximum
Maximum Time of Max. Total
'w Ponded Ponded Ponded Ponded Ponded Storage Node
Exfiltration Exfiltration Exfiltrated
Volume Volume Volume Volume Volume Outflow
Rate Rate Volume
1000 ft' (%) days hh:mm 1000 ft' (%) cfs
MS cfm hh:mm:ss 1000 ft'
Pond-01 0.500 89 0 12:00 0.421 75 1.53
ove 0.00 0:00:00 0.000
***********************
Outfall Loading Summary
o r ***********************
Outfall Node ID Flow Average Peak
Frequency Flow Inflow
o w (%) cfs cfs
Out-01 35.75 0.76 9.05
Out-02 30.31 0.40 5.90
w System 33.03 1.16 14.79
*****************
Link Flow Summary
ri *****************
ow Link ID Element Time of Maximum Length Peak Flow Design Ratio of
Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum
Maximum Time Condition
Occurrence Attained Analysis Capacity /Design
nr Flow Surcharged
days hh:mm ft/sec cfs cfs Flow
Depth minutes
too
DI-3 BYPASS CHANNEL 0 12:00 0.89 1.00 0.70 3.19 0.22
0.65 0 Calculated
From DI-1 TO DI-2 CONDUIT 0 12:00 5.44 1.00 1.78 9.75 0.18
0.31 0 Calculated
rr FROM DI-2 TO DI-3 CONDUIT 0 12:00 9.26 1.00 3.68 16.68 0.22
0.36 0 Calculated
FROM DI-3 TO DI-4 CONDUIT 0 12:00 5.31 1.00 6.10 8.13 0.75
o r
Autodesk Storm and Sanitary Analysis
r
mo
MO
MO
0.89 0 Calculated
Pipe-04 CONDUIT 0 12:00 6.21 1.00 7.02 7.92 0.89
0.87 0 Calculated
Pipe-05 CONDUIT 0 12:00 6.23 1.00 5.90 8.53 0.69
0.72 0 Calculated OM
Pipe-06 CONDUIT 0 12:00 5.99 1.00 1.53 2.39 0.64
0.69 0 Calculated
****.*************************** MO
Highest Flow Instability Indexes
********************************
All links are stable.
WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height MO
dimensions for Node MH-01.
Analysis began on: Mon Jan 14 08:50:01 2013
Analysis ended on: Mon Jan 14 08:50:05 2013
Total elapsed time: 00:00:04 MO
MI
Mi
MO
OM
MO
IMO
MO
MO
titiy
Autodesk Storm and Sanitary Analysis
NM
PROJECT . riinele Ira:, C5
ilr.,-."4"'w ENGINEERS•ARCHITECTS • PLANNERS
JIM DATE 3/29 15-0
� 449 McLaws Circle•Williamsburg,VA 23185 �n3 COMM NO. ,2130
•■ '41v ■• ' Phone 757.253.0673 • Fax 757.253.2319
Amor- we www.djginc.com CAL -Sc_ CKD PAGE#
TITLE " 5;r1 ,a,. (0/(1,,
Q= L,o
(> 0,9
U6,1 s
46 ' (, *9;s j o:13 6.6
0,04
0.ly ckS
Ree C4ga641
P n= o,( 1 14= 1,117 V42 R- O, 313-Q s = 0.oq3
G)=- A ( 11 N$ ,?1323 ". O.0L12 112.
a.0i?
Ck,ct ( t 4—v
Q=
13, 116 ck5 >
Jnie4 TktoA4
(0.034) �( �=�,6
0,09a)
I,2y3 99)6,3c) 1,g7'
�.y�
LT •C ( 0.3
o (0 2q) d, � (1/(0.0,r• avc33) . _ �, 9 ',04,1 ( .re.
•
PROJECT r,..., i
ENGINEERS • ARCHITECTS • PLANNERS
ma, aw 449 McLaws Circle •Williamsburg,VA 23185 DATE 1-i-I COMM NO. 2.13QI 5O
Phone 757.253.0673 • Fax 757.253.2319
"" sue/ ivc. www.djginc.com CAL TC.- CKD PAGE#
TITLE -G
441.004
1 ,4e1 .0e9.
2:7 4r,ss 0,104C L= O,bS
T.,CS 0,0 fl/.0
+rr
(vt►T o. t
.. L10 " yL f95 = 4 , 67A
(54- 5i5)O?3
mit
fr/ ac
Q = 2.27 cis
KIM
fhf0A� tcv (s tom la)
G2= Cw L d ''s
... 2,27 = 3 (L) 3
L = O, IS
Use i o -r aT-2 Si
0t,+ Leh544-, 2 1-2. .. ( ' 11.34 At),:I1.1��
Wit
—
1992 3.18
Mill
laaj 'azis de,adiH OSP
V M N
o
- o ac, rL
1. �� 4-: _. _
h ° p a
o
i 4- MEE= -?-s-- - 7-%P.--41Ellan MI
s
\XVI 111111MYIIIIEME
N
MIIII
o
IL 0
c MEd-°` ' . - z=\4'4� _ ° .
i _ - „ -,_
tea• °
O
-N. 0 mammon w w 6 �.,.,
SaIlll 0-I-
q
A y,,
:: —dr
�° II V Gad ____: __- _S-s \4 �
to
Z Z 3—� 3 ( --��� �,s---...s
I - ---- _ .4..7.--�--
v,, _- � a-_:
I--• ' i N Si M ____--� _4 .• ..-2—......ew ®_ to
41 0
ex o r _ =_°_=======-B• ====....---_=
ar. F_w r =�__ —7-... -- mi -
1.1 M 0 J3 o =SS S0�=SSSS - -F-
O J . O M O M
L N
Krt a,
U.
I-
CD .4r 4.
CU CI)
WO Z: 5 ±-+ d b C
c.D vrZ oa0 E
of
v
C
MO
0w
V II
h
aN v
NM
Source: USDA-SCS Plate 3.18-3
III - 164
MB
Short Version BMP Computations
Albemarle County Water Protection Ordinance: Modified Simple Method
W• Plan: Seminole Trail Fire Station Water Resources Area: Development Area
Preparer Jerry Connolly Date: 29-Mar-13
WI i
Project Drainage Area Designation Site
.. L storm pollutant export in pounds, L=[P(Pj)Rv/12 J[C(A)2.72 J
Rv mean runoff coefficient, Rv=0.05+0.009(1) .
Pj small storm correction factor,0.9
1 percent imperviousness
- P annual precipitation,43"in Albemarle
A project area in acres in subject drainage area, A= 1.76
C pollutant concentration, mg/I or ppm target phosphorus
f factor applied to RR
"+ V required treatment volume in cy,0.5"over imperv.area= A(1)43560(0.5/12)/27
RR required removal , L(post)-f x L(pre)
%RR removal efficiency, RR100/L(post)
"- Impervious Cover Computation(values in feet&square feet)
Item
pre-development Area post-development Area
Roads Length Width subtotal Length Width subtotal
0 0 0 0
0 0 0 0 0 0
0 0 0 0
0 7405 0 10890
411111 Driveways Length Width no. subtotal Length Width no. subtotal
and walks 0 0 0 0 0 0 0 0
0 0 0 0 0 0 0 0
0 2178 0 1742
0.
Parking Lots 1 2 3 4 1 2 3 4
24394 24394 19602 0 19602
Gravel areas Area Area
r x0.70= 0 x0.70= 0
Structures Area no. subtotal Area no. subtotal
3920 1 3920 8712 1 8712
0 0 0 0 0 0
..ii 0 0 0 3920 0 8712
Actively-grazed pasture& Area Area
yards and cultivated turf 0 x 0.08= 0 0 x 0.08= 0
Active crop land Area Area
.. x0.25= 0 x0.25= 0
Other Impervious Areas
0 0
Impervious Cover 49% 53%
""" l(pre) ((post)
Rv(post) V
0.53 63.2
"" New Development(For Development Areas,existing impervious cover<=20%)
C f I(pre)* Rv(pre) L(pre) L(post) RR %RR Area Type
0.70 1.00 20% 0.49 5.35 5.73 0.39 7% Development Area
0.35 1.00 0% 0.49 2.67 2.87 0.19 7% Drinking Water Watersheds
.r 0.40 1.00 1% 0.49 3.06 3.28 0.22 7% Other Rural Land
*min.values
.. Redevelopment(For Development Areas,existing impervious cover>20%)
C f I(pre)* Rv(pre) L(pre) L(post) RR %RR Area Type
0.70 0.90 20% 0.49 5.35 5.73 0.92 16% Development Area
0.35 0.85 0% 0.49 2.67 2.87 0.59 21% Drinking Water Watersheds
.. 0.40 0.85 1% 0.49 3.06 3.28 0.68 21% Other Rural Land
Mill
,•,,, Darren Curtis
DJG Inc.
449 McLaws Circle
Williamsburg, VA. 23185
T 1 tie ira
April 9, 2013 Orminv,Id,: t1),D■nim rITPrdu,n.
Plan Review of Filterra®
Seminole Trail Fire Station, Albemarle, VA
Dear Sirs
Thank you for submitting the revised plans on 08 April 2013 for our review of the
Seminole Trail Fire Station project.
Filterra® structures FT1(6x4), FT2 (6x6) were studied for;
• Planned Filterra® box size
• Filterra®contributing drainage area meeting project's regional sizing specification
• Filterra® invert elevations are higher than effluent invert elevations
• The bypass is lower than the Filterra®elevation (spot elevations)
• The grading pattern encourages cross linear flow and not head-on flow
• The Filterra® outlet drain pipe is sized correctly and exits perpendicular to the wall
• For any conflicting structures such as storm drain pipes below Filterra®
• For most efficient placement of Filterra® units
• 4-6" opening throat detail and standard notes on plans
The plan review concluded that the Filterra® structures listed above is sited and sized
appropriately to treat stormwater to our published specifications.
Operational consistency with these specifications is contingent upon the stormwater unit
being installed correctly and according to the plans, as well as regular maintenance being
performed. Installation Help documents will be forwarded to the Buyer at time of order.
The Filterra® Installation, Operation and Maintenance Manual will be made available
upon request.
Yours sincerely
"` Duane Vincent
Engineer Support �(
Filterra® Bioretention Systems �V
Manufactured by Americast T: (804)798-6068 " A M E R 1 c 8 I
11352 Virginia Precast Road F: (804)798-8400 not just concrete.concrete solutions.
Ashland, VA 23005 E: design @filterra.com www.filterra.com
RAINWATER MANAGEMENT SOLUTIONS INC
1260 West Riverside Drive
Salem, VA 24153
(540) 375-6750
April 18. 201 3
Larry Slaughter
Senior Designer
DJG, Inc
449 McLaws Circle
Williamsburg VA 23185
Dear Mr Slaughter;
Rainwater Management Solutions RMS has reviewed the site plan for the rainwater
harvesting storage tank.at Seminole Fire Station. Based on the information you have
provided the tandem tank design is an acceptable practice that is used throughout the
industry and the design you provided.meets RMS approval for this project.
Should you have additional questions or need more information please do not hesitate to
contactmne. 'hanks you the opportunity to assist with this project.
Sinicertly.
�j
lick Flat i
RMS
OW
WOO
N
miaN
N
wlir
+�r
RECEIVED
APR 19 2013
COMMUNITY ,