Loading...
HomeMy WebLinkAboutWPO201300016 Calculations 2013-03-01 The Westlake Hills Phase I Channel Adequacy Report & Calculations Overview The following channel adequacy calculations were analyzed by dividing the watershed into five major sections. Drainage areas#1A(SWM#1), #1B, and#3 flow to the channel along the northern boundary of the site. Drainage areas#2A (SWM #2) & 2B encompass the Lickinghole Creek watershed. Summaries of these sections are described below and further clarification can be found in the attached sheet entitled Channel Adequacy Exhibit. Drainage Area, D.A. #1A: This section consists of drainage flowing to the proposed retention basin(SWM#1). This watershed has the following characteristics: D.A.= 31.76 ac. CN= 77.9 (69.0 in the Pre-Development Scenario) Type II distribution P= 3.7 inches (2-year event) Tc= 0.30 hours Drainage Area, D.A. #1B: This watershed is predominantly undisturbed with the proposed development. This drainage area contains the following characteristics: D.A.= 148.39 ac. CN= 62.4 Type II distribution P= 3.7 inches (2-year event) Tc= 1.02 hours Drainage Area, D.A. #2A: This section consists of drainage flowing to the proposed bioretention basin(SWM#2). This watershed has the following characteristics: D.A.= 6.76 ac. CN= 79.5 (57.1 in the Pre-Development Scenario) Type II distribution P= 3.7 inches (2-year event) Tc= 0.18 hours Drainage Area, D.A. #2B This watershed is undisturbed with the proposed development. This drainage area contains the following characteristics: D.A.= 8,000 ac. (DA#2A is less than 1% of this area) Drainage Area, D.A. #3: This watershed is undisturbed with the proposed development, but drains to the channel being analyzed. This watershed has the following characteristics: D.A.= 34.93 ac. CN= 55 Type II distribution P= 3.7 inches (2-year event) Tc=0.37 hours The pre-development onsite ground cover is predominately forest. The detailed soils information is provided on the E&S Sheets 30 & 31 and the majority is soil group B. The ground cover for the soil was analyzed as being in good condition. Summary of Calculations Drainage area#1A was routed through SWM#1 and generated a peak 2-year flow of 7.25 cfs. The calculations showing this can be viewed in the attached documents. The calculations resulting from drainage areas #1B and#3 created 2-year peak flows of 48.97 cfs and 7.71 cfs, respectfully. The combined flows from drainage areas#1A, 1 B and 3 generate a maximum 2-year flow of 63.93 cfs draining to channel along the northern boundary. This is a worst case scenario because it assumes all three peak flows occur simultaneously, despite the fact the time of peak flow being released from SWM#1 is much later than that of drainage area#1B. The combined flow of 63.93 cfs was used during the analysis of cross sections#1-4. Further downstream channel adequacy has previously been approved by the County within the Foothills WPO 201200047 plans, which demonstrate capacity with a higher flow rate. Drainage area#2A was routed through SWM#2 and generated a peak 2-year flow of 3.98 cfs and a peak 10-year flow of 12.51. It flows into a proposed riprap channel and then directly into Lickinghole Creek. The 10 year flow of 12.51 was used during the analysis of the proposed riprap channel cross section#5. Since 1% of the upstream drainage area#2B is larger than the drainage area of 2A, no further downstream analysis was required. Calculations supporting this are also shown in the attached documents. The five cross sections analyzed are representative of their respective channels. MS-19 Cross Section#1: Note: Loam & cobbles mixture within channel banks) f _ �9 �` `� * `r • - _ \Lid;,.. The channel at cross section 1, which has a 1.3 percent slope, contains the following characteristics: Within the Channel Banks: Description: (loam& cobbles mixture) value for channel bottom: 0.055* Permissible Velocity: 5.0 ft/s** *Manning's `n'values are in accordance with Tables 5-16 through 5-21 of the VESCH. **Permissible Velocities are in accordance with Table 5-22 of the VESCH Maximum Computed Depth=1.71' Maximum Computed Velocity=4.04 ft/s (within channel banks) Complex Channel-Cross Section#1 Input: Slope 0.013 Flow(given) 63.930 line x y n 0 0.000 584.000 0.055 (first n value not used) 1 2.000 582.000 0.055 2 8.000 581.600 0.055 3 12.000 582.000 0.055 4 14.000 584.000 0.055 Output: Depth 1.706 (y) ( 583.306) Channel bed segment output: line Q V A P 1 1.57 1.84 0.85 1.85 2 36.50 4.04 9.03 6.01 3 24.29 4.03 6.02 4.02 4 1.57 1.84 0.85 1.85 Fri Nov 15 12:37:19 EST 2013 MS-19 Cross Section#2: Note: Loam & cobbles mixture within channel banks) ,,,,-.......-4--- •{YRt.4 r ° - R 4♦ ,- �w ��' '_. '" a v.��� mss► � t... S .k r h . inc /.'sr Ali t.1 6 4 1t ! p Y "A''' r V�� ,i. F�r- y + t i ..*Fife .a...„, s ,y J .,w ' .: ff yam+. y' :..� The channel at cross section 2, which has a 1.3 percent slope, contains the following characteristics: Within the Channel Banks: Description: (loam& cobbles mixture) `n' value for channel bottom: 0.060* Permissible Velocity: 5.0 ft/s** *Manning's `n'values are in accordance with Tables 5-16 through 5-21 of the VESCH. ***Permissible Velocities are in accordance with Table 5-14 of the VESCH Maximum Computed Depth=1.70' Maximum Computed Velocity=3.77 ft/s (within channel banks) Complex Channel-Cross Section#2 Input: Slope 0.013 Flow(given) 63.930 line x y n 0 0.000 582.000 0.060(first n value not used) 1 4.000 580.000 0.060 2 8.500 579.700 0.060 3 14.000 580.000 0.060 4 16.000 582.000 0.060 Output:. Depth 1.695 (y) ( 581.395) Channel bed segment output: line Q V A P 1 4.01 2.06 1.94 3.12 2 26.19 3.77 6.95 4.51 3 32.02 3.77 8.50 5.51 4 1.71 1.76 0.97 1.97 Fri Nov 15 12:37:35 EST 2013 MS-19 Cross Section#3: Note: Loam & cobbles mixture within channel banks) . K - - -.A 1 @ a aE le .,. . - ♦ +� "`'`' < 9 t-*, „a y ,,,, . t ' .fib , :O¢ . ,. . - � .. 4'1' !CV".0. ' t„„ . * �... 1 —; The channel at cross section 3, which has a 1.2 percent slope, contains the following characteristics: Within the Channel Banks: Description: (loam& cobbles mixture) `n' value for channel bottom: 0.055* Permissible Velocity: 5.0 ft/s** *Manning's `n'values are in accordance with Tables 5-16 through 5-21 of the VESCH. ***Permissible Velocities are in accordance with Table 5-14 of the VESCH Maximum Computed Depth=1.60' Maximum Computed Velocity=3.70 ft/s (within channel banks) Complex Channel-Cross Section #3 Input: Slope 0.012 Flow(given) 63.930 line x y n 0 0.000 578.000 0.055 (first n value not used) 1 1.000 576.000 0.055 2 7.000 575.600 0.055 3 13.000 576.000 0.055 4 15.000 578.000 0.055 Output: Depth 1.602 (y) ( 577.202) Channel bed segment output: line Q V A P 1 0.45 1.23 0.36 1.34 2 31.14 3.70 8.41 6.01 3 31.14 3.70 8.41 6.01 4 1.21 1.67 0.72 1.70 Fri Nov 15 12:38:39 EST 2013 MS-19 Cross Section#4 Note: Loam & cobbles mixture within channel banks) J 4 V . 4 y- ' ` Yi 4.- 3 4.4.,..-, r air t + v .• jr !:� y 0 4 , p'h .� a ? s!_, +'.p• a!i.. ✓ �s` , 1 y i 'F ' Ala The channel at cross section 4, which has a 1.3 percent slope, contains the following characteristics: Within the Channel Banks: Description: (loam& cobbles mixture) `n' value for channel bottom: 0.07* Permissible Velocity: 5.0 ft/s** *Manning's `n'values are in accordance with Tables 5-16 through 5-21 of the VESCH. ***Permissible Velocities are in accordance with Table 5-14 of the VESCH Maximum Computed Depth=2.18' Maximum Computed Velocity=3.73 ft/s (within channel banks) Complex Channel-Cross Section #4 Input: Slope 0.013 Flow(given) 63.930 line x y n 0 0.000 576.000 0.070 (first n value not used) 1 2.000 574.000 0.070 2 5.500 573.500 0.070 3 10.000 574.000 0.070 4 13.000 576.000 0.070 Output: Depth 2.178 (y) ( 575.678) Channel bed segment output: line Q V A P 1 2.40 1.71 1.41 2.37 2 25.12 3.72 6.75 3.54 3 32.38 3.73 8.67 4.53 4 4.02 1.90 2.11 3.02 Fri Nov 15 12:39:27 EST 2013 MS-19 Cross Section#5 (Note: Proposed Riprap Channel from SWM#2 outfall pipe) The proposed channel at cross section 5, which has a 8.0 percent slope, contains the following characteristics: Within the Channel Banks: Description: (proposed riprap) `n' value for channel bottom: 0.033* Permissible Velocity: 6.0 ft/s** *Manning's 'n'values are in accordance with Tables 5-16 through 5-21 of the VESCH ***Permissible Velocities are in accordance with Table 5-14 of the VESCH Maximum Computed Depth=0.218' Maximum Computed Velocity-4.62 ft/s (within channel banks) Complex Channnel-Cross Section#5 Input: Slope 0.080 Flow (given) 12.511 line x y n 0 0.000 550.000 0.033 (first n value not used) 1 3.000 549.000 0.033 2 15.000 549.000 0.033 3 18.000 550.000 0.033 Output: Depth 0.218 (y) ( 549.218) Channel bed segment output: line Q V A P 1 0.20 2.81 0.07 0.69 2 12.11 4.62 2.62 12.00 3 0.20 2.81 0.07 0.69 Wed Nov 13 16:38:34 EST 2013 24-Hour SCS Method Calculations U.S.Department of Agriculture FL-ENG-21A Natural Resources Conservation Service 06/04 TR 55 Worksheet 2:Runoff Curve Number and Runoff Project: Westlake Hills Designed By: KKW,PE Date: 5/14/2013 Location: Crozet along Future Connector Road Checked By: KKW,PE Date: 5/14/2013 Check One: Present X Developed X 1.Runoff curve Number(CN) Cover description Drainage Soil name and CN(weighted)= (Cover type,treatment,and hydrologic condition; Area Product of CN Calculated'5' Area hydrologic group CN total product/ Description (Appendix A) percent impervious;unconnected/connected (Acres) x Area Value impervious area ratio) total area D.A#1 Impervious Areas 98 7.10 695.8 (Present) B Woods in Good Condition 55 6.10 335.5 69.0 4.50 Lawns in Good Condition(75%+Groundcover) 61 15.15 924.2 D.A.#1 Impervious Areas 98 14.77 1447.5 (Developed) B Woods in Good Condition 55 1.36 74.8 77.9 2.83 Lawns in Good Condition(75%+Groundcover) 61 15.63 953.4 D.A#2 Impervious Areas 98 0.00 0.0 (Present) B Woods in Good Condition 55 4.06 223.3 57.1 7.52 Lawns in Good Condition(75%+Groundcover) 61 2.14 130.5 D.A.#2 Impervious Areas 98 3.34 327.3 (Developed) B Woods in Good Condition 55 0.00 0.0 79.5 2.57 Lawns in Good Condition(75%-i-Groundcover) 61 3.33 203.1 2.Runoff 2-Year Storm 10-Year Storm Drainage Area Description Frequency-years 2 10 n/a Rainfall,P(24 hour)-inches 3.7 5.6 n/a Runoff,0-inches 1.07 2.40 D.A#1(Present) Runoff,Q-inches 1.65 3.22 D.A.#1(Developed) Runoff,Q-inches 0.50 1.44 D.A#2(Present) Runoff,4-inches 1.76 3.38 D.A.#2(Developed) Runoff,0-inches Runoff,0-inches Runoff,0-inches Runoff,0-inches U.S.Department of Agriculture FL-ENG-21A Natural Resources Conservation Service 06/04 TR 55 Worksheet 3:Time of Concentration(T,)or Travel Time(T,) Project: Westlake Hills Designed By: KKW,PE Date: 5/14/2013 Location: Crozet along Future Connector Road Checked By: KKW,PE Date: 5/14/2013 Check One: Present X Developed X Check One: T, X T, Through subarea n/a D.A#1 D.A.#1 D.A#2 D.A.#2 Segment ID: (Present) (Developed) (Present) (Developed) Sheet Flow:(Applicable to T,only) Dense Grass Dense Grass Dense Grass Dense Grass 1 Surface description(Table 3-1) 2 Manning's roughness coeff.,n(Table 3-1 0.24 0.24 0.24 0.24 3 Flow length,L(total L<100)(ft) 100 100 100 100 4 Two-year 24-hour rainfall,P2(in.) 3.7 3.7 3.7 3.7 5 Land slope,s(ft/ft) 0.02 0.02 0.06 0.06 6 Compute Tr=[0.007(n*L)08]/P20.5 504 I 0.22 I 0.22 I 0.14 I 0.14 Shallow Concentrated Flow: 7 Surface description(paved or unpaved) Unpaved Unpaved Unpaved Unpaved 8 Flow Length,L(ft) 486 486 680 709 9 Watercourse slope,s(ft/ft) 0.038 0.038 0.138 0.082 10 Average velocity,V(Figure 3-1)(ft/s) 5.3 5.3 5.75 5 11 Tr=L/3600*V I 0.03 I 0.03 I 0.04 I 0.04 Channel Flow: a. o LL o N/A J J N a) 12 Cross sectional flow area,a(ft2) o n o n o Tg > c > E 13 Wetted perimeter,P„,(ft) o m ■ ego' 0 14 Hydraulic radius,r=a/P„,(ft) v ° 0 iu E 0 c r o v =_ Q •15 Channel Slope,s(ft/ft) E c E ° 16 Manning's Roughness Coeff,n Y 2/3 O S y CO .. 17V=[1.49r s' ]/n m w ,�', w 18 Flow length,L(ft) ~ a ~ a 19"it=L/3600*V I 0.05 I 0.05 I I 20 Watershed or subarea T,or Tr (Add T,in steps 6,11 and 19) I 0.30 ' 0.30 ' 0.18 I 0.18 I U.S.Department of Agriculture FL-ENG-21C Natural Resources Conservation Service 06/04 TR 55 Worksheet 4:Graphical Peak Discharge Method Project: Westlake Hills Designed By:KKW,PE Date: 5/14/2013 Location: Crozet along Future Connector Road Checked By:KKW,PE Date: 5/14/2013 Check One: Present X Developed X Drainage Area Drainage Area Drainage Area Drainage Area Drainage Area Drainage Area Drainage Area Drainage Area 1.Data Description Description Description Description Description Description Description Description D.A#1. D.A.#1 D.A#2 D.A.#2 (Present) (Developed) (Present) (Developed) Drainage Area(Am)in miles'= 0.0443 0.0496 0.0097 0.0104 Runoff curve number CN= 69.0 77.9 57.1 79.5 Time of concentration(Tc)= 0.30 0.30 0.18 0.18 Rainfall distribution type= II II II II Pond and swamp areas spread 0 0 0 0 throughout the watershed= 2.Frequency-years 2 1.0 2 10 2 10 2 10 3.Rainfall,P(24 hour)-inches 3.7 5.6 3.7 5.6 3.7 5.6 3.7 5.6 4.Initial Abstraction,la-inches 0.900 0.900 0.566 0.566 1.504 1.504 0.515 0.515 5.Compute la/P 0.24 0.16 0.15 0.10 0.41 0.27 0.14 0.09 6.Unit peak discharge,Qu-csm/in 600 650 655 680 600 760 800 1000 7.Runoff,Q from Worksheet 2-inches 1.07 2.40 1.65 3.22 0.50 1.44 1.76 3.38 8.Pond and Swamp adjustment factor,Fp 1 1 1 1 1 1 1 1 9.Peak Discharge,Qp-cfs Routed through Routed through Routed through where Qp=Qu Am Q Fp SWM facility SWM facility 2.88 10.63 SWM facility Summary of Watersheds Pre-Development 2-Yr Flow 10-Yr Flow Post-Development 2-Yr Flow 10-Yr Flow D.A.#1 28.35 ac. 9.77 13.92 D.A.#1 31.76 ac. 7.25 11.98 D.A.#2 15.35 ac. 2.88 10.63 D.A.#2 17.13 ac. 3.98 12.51 = 26.88 ac. 12.65 24.55 r= 26.62 ac. 11.23 24.49 U.S.Department of Agriculture FL-ENG-21A Natural Resources Conservation Service 06/04 TR 55 Worksheet 2:Runoff Curve Number and Runoff Project: Westlake Hills Phase I Designed By:JSN,EIT Date: 11/13/2013 Location: Albemarle County Checked By: FGM,PE Date: 11/13/2013 Check One:Present X Developed X 1.Runoff curve Number(CN) Soil name and Cover description Drainage Area CN(weighted)= g (Cover type,treatment,and hydrologic condition; Area Product of CN Calculated'S' hydrologic group CN total p roduct/ Description percent impervious;unconnected/connected (Acres) x Area Value (Appendix A) total area impervious area ratio) D.A.#3 (Undisturbed) B Woods in Good Condition 55 34.93 1921.2 55.0 8.18 D.A.#18 1/4ac.Lots 75 40.00 3000.0 (Undisturbed) B Woods in Good Condition 55 59.86 3292.3 62.4 6.04 Lawns in Good Condition(75%+Groundcover) 61 48.53 2960.3 2.Runoff 2-Year Storm 10-Year Storm Drainage Area Description Frequency-years 2 10 n/a Rainfall,P(24 hour)-inches 3.7 5.6 n/a Runoff,Q-inches 0.42 1.29 D.A.#3(Undisturbed) Runoff,0-inches 0.73 1.85 D.A.#1B(Undisturbed) Runoff,CI-inches Runoff,Q-inches Runoff,Q-inches Runoff,Q-inches Runoff,0-inches Runoff,Q-inches U.S.Department of Agriculture FL-ENG-21A Natural Resources Conservation Service 06/04 TR 55 Worksheet 3:Time of Concentration(T0)or Travel Time(T5) Project: Westlake Hills Phase I Designed By:JSN,EIT Date: ######### Location: Albemarle County Checked By: FGM,PE Date: ######### Check One: Present X Developed X Check One: TO X Tt Through subarea n/a D.A.#3 D.A.#1B Segment ID: (Undisturbed) (Undisturbed) Sheet Flow:(Applicable to TO only) 1 Surface description(Table 3-1) Woods(light brush) Woods(light brush) 2 Manning's roughness coeff.,n(Table 3-1 0.4 0.4 3 Flow length,L(total L<100)(ft) 100 100 4 Two-year 24-hour rainfall,P2(in.) 3.7 3.7 5 Land slope,s(ft/ft) 0.025 0.045 6 Compute Tt=[0.007(n*L)°'8]/P,°5 s0.4 I 0.30 I 0.24 I I I I Shallow Concentrated Flow: 7 Surface description(paved or unpaved) Unpaved Unpaved 8 Flow Length,L(ft) 875 450 9 Watercourse slope,s(ft/ft) 0.067 0.082 10 Average velocity,V(Figure 3-1)(ft/s) 4.2 4.5 11 T=L/3600°V I 0.06 I 0.03 I I I I I I I Channel Flow: E + E 12 Cross sectional flow area,a(ft2) v 0 0 — a c Iv o 3 5) c 3 v 13 Wetted perimeter,Pw(ft) o o .. L 14 Hydraulic radius,r=a/Pw(ft) c 3 o Y -0 c 3 15 Channel Slope,s(ft/ft) E CU o d c o d 16 Manning's Roughness Coeff,n - c - 2/3° j > 17V=( 1.49r s'5]/n o ro 18 Flow length,L(ft) it 19 Tt=L/3600*V I 0.01 I 0.75 I I I I I I I 20 Watershed or subarea T,or Tt (Add Tt in steps 6,11 and 19) I 0.37 I 1.02 I I I I I I I U.S.Department of Agriculture FL-ENG-21C Natural Resources Conservation Service 06/04 TR 55 Worksheet 4:Graphical Peak Discharge Method Project: Westlake Hills Phase I Designed By:15N,EIT Date: 11/13/2013 Location: Albemarle County Checked By:FGM,PE Date: 11/13/2013 Check One: Present X Developed X Drainage Area Area Drainage Area Drainage Area Drainage Area Drainage Area 1.Data Drainage Area Description Description Description Description Description Description Description D.A.#3 D.A.#1B (Undisturbed) (Undisturbed) Drainage Area(Am)in miles= 0.0546 0.2319 Runoff curve number CN= 55.0 62.4 Time of concentration(Tc)= 0.37 1.02 Rainfall distribution type= II II Pond and swamp areas spread 0 0 throughout the watershed= 2.Frequency-years 2 10 2 10 3.Rainfall,P(24 hour)-inches 3.7 5.6 3.7 5.6 4.Initial Abstraction,la-inches 1.636 1.636 1.208 1.208 5.Compute la/P 0.44 0.29 0.33 0.22 6.Unit peak discharge,Qu-csm/in 340 500 290 325 7.Runoff,Q from Worksheet 2-inches 0.42 1.29 0.73 1.85 8.Pond and Swamp adjustment factor,Fp 1 1 1 1 9.Peak Discharge,Qp-cfs where Qp=Qu Am Q Fp 7.71 35.30 48.97 139.39 Routing Calculations Existing Pond C-Retention Basin - Pond 1 BasinFlow printout INPUT: Basin: Westlake Hills - Existing Pond C SWM#1 9 Contour Areas Elevation(ft) Area(sf) Computed Vol . (cy) 598.00 595.00 0.0 600.00 4349.00 161.8 602.00 10712.00 702.2 604.00 17982.00 1753.4 606.00 25792.00 3366.0 608.00 34715.00 5598.8 610.00 45866.00 8573.7 612.00 61084.00 12521.4 614.00 78078.00 17662.7 Start_Elevation(ft) 606.00 Vol . (cy) 3365.97 4 Outlet Structures Outlet structure 0 Curve name: Anti-Vortex Device multiple 1 Invert (ft) 612.000 discharge into riser file: sixty.txt Outlet structure 1 Culvert name: Barrel multiple 1 discharge out of riser D (in) 30.000 h (in) 0.000 Length (ft) 71.800 Slope 0.017 Manning's n 0.013 Inlet coeff. Ke 0.500 Equation constant set 0 Invert (ft) 595.140 Outlet structure 2 Wei r name: Notched weir length (ft) 1. 500 side angle 0.000 coefficient 3.000 invert (ft) 610.000 multiple 1 discharge into riser Outlet structure 3 Orifice name: Mid-Flow Orifice area (sf) 0.196 diameter or depth (in) 6.000 width for rect. (in) 0.000 coefficient 0.600 invert (ft) 606.000 multiple 5 discharge into riser Page 1 Existing Pond C-Retention Basin - Pond 1 3 Inflow Hydrographs Hydrograph 0 sCs name: 2-Yr 24-Hour SCS storm event Area (acres) 31.760 CN 77.900 Type 2 rainfall , P (in) 3.700 time of conc. (hrs) 0.3000 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 49.378 peak time (hrs) 12.010 volume (cy) 7010.917 Hydrograph 1 SCS name: 10-Yr 24-Hour SCS storm event Area (acres) 31.760 CN 77.900 pe rainfall , PT(in) 2 5.600 time of conc. (hrs) 0.3000 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 96.672 peak time (hrs) 12.010 volume (cy) 13725.915 Hydrograph 2 SCS name: 100-Yr 24-Hour SCS storm event Area (acres) 31.760 CN 77.900 pe rainfall , PT(in) 2 9.100 time of conc. (hrs) 0.3000 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 192.346 peak time (hrs) 12.010 volume (cy) 27310.236 OUTPUT: Routing Method: storage-indication Hydrograph 0 Routing Summary of Peaks: 2-Yr 24-Hour SCS storm event inflow (cfs) 49.092 at 12.02 (hrs) discharge (cfs) 7.246 at 12. 54 (hrs) water level (ft) 608.602 at 12.56 (hrs) storage (cy) 6407.780 Hydrograph 1 Routing summary of Peaks: 10-Yr 24-Hour SCS storm event Page 2 Existing Pond C-Retention Basin - Pond 1 inflow (cfs) 96.112 at 12.02 (hrs) discharge (cfs) 11.982 at 12.62 (hrs) water level (ft) 610.606 at 12.62 (hrs) storage (cy) 9650.982 Hydrograph 2 Routing summary of Peaks: 100-Yr 24-Hour SCS storm event inflow (cfs) 191.232 at 12.02 (hrs) discharge (cfs) 63.091 at 12.30 (hrs) water level (ft) 612.895 at 12.30 (hrs) storage (cy) 14666.598 Thu Feb 07 15:22:42 EST 2013 Page 3 Westlake Phase 1 Biofilter BasinFlow printout INPUT: Basin: Bioretention Basin 2 7 Contour Areas Elevation(ft) Area(sf) Computed vol . (cy) 553.00 679.00 0.0 554.00 7291.00 125.9 555.00 8285.00 414.1 556.00 9338.00 740.3 557.00 10578.00 1108.8 558.00 11492.00 1517.4 559.00 12435.00 1960.4 Start_Elevation(ft) 553.00 vol . (cy) 0.00 4 Outlet Structures outlet structure 0 Orifice name: Low-Flow orifices area (sf) 0.196 diameter or depth (in) 6.000 width for rect. (in) 0.000 coefficient 0.600 invert (ft) 555.000 multiple 4 discharge into riser Outlet structure 1 culvert name: Barrel multiple 1 discharge out of riser D (in) 24.000 h (in) 0.000 Length (ft) 46.700 Slope 0.005 Manning's n 0.013 Inlet coeff. Ke 0.500 Equation constant set 3 Invert (ft) 550.200 Outlet structure 2 Curve name: Riser multiple 1 Invert (ft) 556.930 discharge into riser file: thirty.txt Outlet structure 3 weir name: Emergency Spillway length (ft) 7.000 side angle 63.000 coefficient 3.000 invert (ft) 557.550 multiple 1 discharge through dam 3 Inflow Hydrographs Page 1 Westlake Phase 1 Biofilter Hydrograph 0 SCS name: 2-Yr 24-Hour SCS storm event Area (acres) 6.670 CN 79.500 pe rainfall , PT(in) 2 3.700 time of conc. (hrs) 0.1800 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 13.092 peak time (hrs) 11.970 volume (cy) 1576.292 Hydrograph 1 SCS name: 10-Yr 24-Hour SCS storm event Area (acres) 6.670 CN 79.500 Type 2 rainfall , P (in) 5.600 time of conc. (hrs) 0.1800 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 25.101 peak time (hrs) 11.970 volume (cy) 3022.221 Hydrograph 2 SCS name: 100-Yr 24-Hour SCS storm event Area (acres) 6.670 CN 79. 500 pe rainfall , PT(in) 2 9.100 time of conc. (hrs) 0.1800 time increment (hrs) 0.0200 time limit (hrs) 30.000 fudge factor 1.00 routed true peak flow (cfs) 49.121 peak time (hrs) 11.970 volume (cy) 5914.122 OUTPUT: Routing Method: storage-indication Hydrograph 0 Routing Summary of Peaks: 2-Yr 24-Hour SCS storm event inflow (cfs) 13.092 at 11.96 (hrs) discharge (cfs) 3.982 at 12.18 (hrs) water level (ft) 556.360 at 12.18 (hrs) storage (cy) 867.488 Hydrograph 1 Routing Summary of Peaks: 10-Yr 24-Hour SCS storm event inflow (cfs) 25.101 at 11.96 (hrs) discharge (cfs) 12.512 at 12.12 (hrs) Page 2 westlake Phase 1 Biofilter water level (ft) 557.474 at 12.12 (hrs) storage (cy) 1298.193 Hydrograph 2 Routing Summary of Peaks: 100-Yr 24-Hour SCS storm event inflow (cfs) 49.120 at 11.96 (hrs) discharge (cfs) 42.635 at 12.04 (hrs) water level (ft) 558.231 at 12.04 (hrs) storage (cy) 1616.519 Mon Jul 29 16:00:03 EDT 2013 SCI% :mss i' f' e;3 s. 1 IP �r_�S_ `3�?, 7 S vi. JP, 3 Qom. Page 3