TEMPORARY SEDIMENT BASIN
PROJECT Hollymead Town Center PROJ NO. 1132
BASIN # SEDIMENT BASIN DATE 4/1/2004
LOCATION SWM #3 BY JDB
INPUT
DRAINAGE AREA 46.10 ac
BASIN VOLUME DESIGN
WET STORAGE
1. MINIMUM REQUIRED VOLUME 3088.70 cy
2. AVAILABLE BASIN VOLUME
AVFRAGF FNf) ARFA - BASIN VOl I lME FSTIMATFS
ELEVATION AREA VOLUME ` VOLUME TOTAL
ft sf cf I cy cy
471 20,260.00
21,815.00 807.96
472 23,370.00 807.96
54,174.00 2,006.44
474 30,804.00 2,814.41
68,909.00 2,552.19
476 38,105.00 5,366.59
91,491.00 3,388.56
478 45,632.00 8,755.15
99,018.00 3,667.33
480 53,386.00 12,422.48
114,752.00 4,250.07
482 61,366.00 16,672.56
130,942.00 4,849.70
484 68,576.00 21,522.26
147,581.00 5,465.96
486 78,005.00 26,988.22
REQUIRED WET STORAGE VOLUME 3,088.70 cy
APPROX. ELEVATION 474.01
3. EXCAVATE CUBIC YARDS
4. AVAILABLE VOLUME BEFORE CLEANOUT REQUIRED 1544.35 cy
5. ELEVATION CORRESPONDING TO CLEANOUT LEVEL 472.97
6. DISTANCE FROM DEWATERING ORIFICE TO C/O LEVEL
INVERT DEWATERING ORIFICE R'QD 474.01
INVERT DEWATERING ORIFICE USED 478.50
APPROX. VOLUME AT INVERT USED 9679.54 cy
DISTANCE FROM INVERT TO C/O LEVEL 5.53 ft
DISTANCE ACCEPTABLE
WET STORAGE VOLUME ACCEPTABLE
DRY STORAGE
7. MINIMUM REQUIRED VOLUME 3088.70 cy
8. TOTAL AVAILABLE VOLUME AT CREST OF RISER
CREST OF RISER 484.00
APPROX. AVAILABLE TOTAL VOLUME 17701.23 cy
ADEQUATE DRY STORAGE VOLUME
9. DIAMETER OF DEWATERING ORIFICE
0 10.03 cfs
d(1ST ITERATION) 15.18 in
d(2nd ITERATION) 16.20 in
d(3rd ITERATION) 16.29 in
d(4th ITERATION) 16.29 in
USE d 24 In
10. DIAMETER OF FLEXIBLE TUBING 26 in
NOT A STANDARD SIZE
Page 1 SWM3 Sediment Basin.xls
TEMPORARY SEDIMENT BASIN
PROJECT Hollymead Town Center PROJ NO. 1132
BASIN # SEDIMENT BASIN DATE 4/1/2004
LOCATION SWM #3 BY JDB
PRELIMINARY DESIGN
11. PRELIMINARY DESIGN ELEVATIONS:
CREST OF RISER 484.00 It
1 TOP OF DAM 486.90 ft
DESIGN HIGH WATER 478.50 ft _
UPSTREAM TOE OF DAM 475.00 ft
BASIN SHAPE
12. LENGTH OF FLOW / EFFECTIVE WIDTH:
SURFACE AREA OF NORMAL POOL 47570 sf
LENGTH OF FLOW PATH 290 ft
EFFECTIVE WIDTH 164 ft
LIWe 1.77 BAFFLES REOUIRED
RUNOFF
(RATIONAL METHOD CALCULATION)
USE MAXIMUM C VALUE DURING CONSTRUCTION AND MINIMUM Tc VALUE
13. FLOW FROM 2 -YEAR STORM
C: 0.50
Tc: 5.0 I: 5.5 in/hr
0= 126.8 cfs
14. FLOW FROM 25 -YEAR STORM
C: 0.50
Tc: 5.0 I: 8.1 in/hr
Q= 186.7 cfs
PRINCIPAL SPILLWAY DESIGN
15. REQUIRED SPILLWAY CAPACITY:
EMERGENCY SPILLWAY? (Y /N) N
REQUIRED SPILLWAY CAPACITY: 186.7 CFS
16. ASSUMED AVAILABLE HEAD:
ELEV. OF CREST OF E.S. IF USED: 485.00
ASSUMED AVAILABLE HEAD= -5.50 ft
17. RISER DIMENSIONS: 1
RISER DIAMETER: 72.00 in (From Plate 3.14 -8 or Calcs)
ACTUAL MAX. ELEV.: 478.50 ft (From Calcs if appropriate)
ACTUAL HEAD: -5.50 ft (From Plate 3.14 -8 or Cates)
18. BARREL LENGTH: 1
BARREL LENGTH: 100.00 ft
BARREL INVERT OUT: 475.00 ft
HEAD H ON BARREL: 3.50 ft (From Plate 3.14 -7)
19. BARREL DIAMETER:
BARREL DIAMETER: 48 in (From Plate 3.14A or 3.148)
20. TRASH RACK AND ANTI - VORTEX DEVICE:
DIAMETER: 102 in (From Plate 3.14D)
HEIGHT: 36 in
EMERGENCY SPILLWAY DESIGN
21. REQUIRED SPILLWAY CAPACITY:
Qe = 0(25) -Qp = N/A CFS
22. DIMENSIONS:
BOTTOM WIDTH (b): 10.00 ft (From Table 3.14 -C)
SLOPE OF EXIT CHANNEL (s): 2.60 ft/ft (From Table 3.14 -C)
MIN. LENGTH EXIT CHANNEL (x): 70.00 ft (From Table 3.14 -C)
FINAL DESIGN ELEVATIONS
25. ELEVATIONS:
TOP OF DAM: 486.90 ft
DESIGN HIGH WATER: 478.50 ft
EMERGENCY SPILLWAY CREST: N/A ft
PRINCIPAL SPILLWAY CREST: 484.00 ft
DEWATERING ORIFICE INVERT: 478.50 ft
CLEANOUT ELEVATION: 472.97 ft
Page 2 SWM3 Sediment Basin.xls
New NW'
Hollymead Town Center Regional Service area `B"
Max Greene March 17, 2004
The submittal dated March 12, 2004 is not a complete package. Official E &SC review is
not possible without the narrative. Please refer to VESCH.
Please note: "Areas of disturbance must include all previous /currently disturbed areas.
When the E &SC plan and Narrative are approved the Rough Grading permit for the
entire site will become null and void."
The following comments are cursory and not complete due to the lack of required
information.
Plan sheet:
1. The proposed disturbed area doesn't match the current site conditions. Much more of
the site is currently disturbed than is depicted on this submittal.
2. Proposed sediment basin #3 computations do not include the disturbed area above the
proposed cleanwater diversions. The basin shall be designed to capture the entire
drainage area, pre -, during or post- development (whatever's the larger).
3. The proposed cleanwater diversions shall be removed from E &SC plan sheet. They
are shown through the current disturbed area.
4. Plan sheet match lines for sheet ES3 are incorrect. Both match line references refer to
the same sheet ES3.
5. Match lines are not correct. When the sheets are cut and pasted together they overlap
significantly. Please correct the E &SC plans match lines.
6. The variance request for 3.5 -acre sediment traps is denied. The site conditions appear
to allow for substantially smaller sediment traps in order to remove the existing
sediment basins.
7. E &SC plan submittal appears to require more phasing sheets to clarify how the site
progression shall proceed within all local, State and federal laws.