Loading...
HomeMy WebLinkAboutWPO201300022 Calculations 2013-03-27 (3) . TEMPORARY SEDIMENT BASIN COMPUTATIONS FOR Whittington Subdivision — Phase A March 15, 2011 Revised: August 10, 2011 Revised: November 3, 2011 LOCATION: Tax Map 89, Parcel 95 Tax Map 90, Parcels 3, 45,46,47,48 Samuel Miller District, Albemarle County, Virginia OWNER / DEVELOPER: Whittington, LLC 2421 Ivy Road Charlottesville, VA 22903 PREPARED BY: Dominion Engineering and Design, LLC 172 South Pantops Drive Charlottesville, VA 22911 P: 434.979.8121 F: 434.979.1681 1 TEMPORARY SEDIMENT BASIN PROJECT 90-3 I- PROJ NO. 7.0228 BASIN# SEDIMENT BASIN SB-1 DATE 2011-11-07 LOCATION BY CWS INPUT DRAINAGE AREA 12.20 ac BASIN VOLUME DESIGN WET STORAGE 1.MINIMUM REQUIRED VOLUME 817.40 cy 2.AVAILABLE BASIN VOLUME AVERAGE END AREA-BASIN VOLUME ESTIMATES ELEVATIOII AREA VOLUME I VOLUME I TOTAL ft I sf cf cy I cy 483.49 20.00 75.10 2.78 483.5 15,000.00 2.78 39,652.50 1,468.61 486 16,722.00 L 1,471.39 29,454.00 1,090.89 487.5 22,550.00 2,562.28 171,245.00 6,342.41 493.3 36,500.00 8,904.69 REQUIRED WET STORAGE VOLUME 817.40 cy APPROX.ELEVATION 485.58 3.EXCAVATE CUBIC YARDS 4.AVAILABLE VOLUME BEFORE CLEANOUT REQUIRED 402.60 cy 5.ELEVATION CORRESPONDING TO CLEANOUT LEVEL 486.00 6.DISTANCE FROM DEWATERING ORIFICE TO C/O LEVEL INVERT DEWATERING ORIFICE R'QD 485.58 INVERT DEWATERING ORIFICE USED 487.50 APPROX.VOLUME AT INVERT USED I 2823.11 cy DISTANCE FROM INVERT TO C/0 LEVEL 1.50 ft DISTANCE ACCEPTABLE WET STORAGE VOLUME ACCEPTABLE DRY STORAGE 7.MINIMUM REQUIRED VOLUME 817.40 _c_y I _L 8.TOTAL AVAILABLE VOLUME AT CREST OF RISER CREST OF RISER I 491.80 /APPROX.AVAILABLE TOTAL VOLUME 7292.13 cy IADEQUATE DRY STORAGE VOLUME 9.DIAMETER OF DEWATERING ORIFICE HT---C - 1.02 cfs 5.15 in USE d 3'in 10.DIAMETER OF FLEXIBLE TUBING 6 I in STANDARD SIZE PRELIMINARY DESIGN 11.PRELIMINARY DESIGN ELEVATIONS: CREST OF RISER 491.80 ft TOP OF DAM 493.30 ft DESIGN HIGH WATER 492.30 ft *design of high water assumes a peak flowrate UPSTREAM TOE OF DAM 483.50 ft of 19.50 cfs storage volume is not considered. Page 1 90-3 SB.XLS , . TEMPORARY SEDIMENT BASIN --- -- j PROJECT 90-3 PROJ NO. 7.0228 BASIN# -- BASIN SB-1 T DATE 2011-11-07 LOCATION L_ 1 BY CWS 1 i BASIN SHAPE 12.LENGTH OF FLOW/EFFECTIVE WIDTH: SURFACE AREA OF NORMAL POOL F.-- 22550 sf LENGTH OF FLOW PATH 200 ft EFFECTIVE WIDTH 100 ft LNVe 2.00 Baffles Not Required RUNOFF 1 IRATIONAL METHOD CALCULATION) USE MAXIMUM C VALUE DURING CONSTRUCTION AND MINIMUM Tc VALUE 13.FLOW FROM 2-YEAR STORM 1 C: 0.38 Tc: 30.01 I: 2.3 in/hr Q. 10.7 cfs 14.FLOW FROM 25-YEAR STORM C: 0.38 Tc: 30.0 I: 4.2 in/hr 4. 19.5 cfs i PRINCIPAL SPILLWAY DESIGN See Attached Calcs I I 15.REQUIRED SPILLWAY CAPACITY: EMERGENCY SPILLWAY?(YIN) y REQUIRED SPILLWAY CAPACITY: 10.7 CFS 16.ASSUMED AVAILABLE HEAD: -1- ELEV.OF CREST OF E.S.IF USED: 491.90 ASSUMED AVAILABLE HEAD,. 0.40 ft r 17.RISER DIMENSIONS: RISER DIAMETER: 48.00 (From Plate 3.14-8 or Calcs) 1 ACTUAL MAX.ELEV.: 492.30 ft (From Calcs if appropriate) ACTUAL HEAD: 0.50 ft (From Plate 3.14-8 or Calcs) 18.BARREL LENGTH: 1 1 1 BARREL LENGTH: 75.00 ft I- T BARREL INVERT OUT: 484.75 fFt- HEAD Ii ON BARREL:1 7.55 ft A_From Plate 3.14-7) 19.BARREL DIAMETER: 1 BARREL DIAMETER: 24 in (From Plate 3.14A or 3.145) ■ 20.TRASH RACK AND ANTI-VORTEX DEVICE: DIAMETER: 72 in (From Plate 3.14D) HEIGHT: 21 in EMERGENCY SPILLWAY DESIGN 1 I - 21.REQUIRED SPILLWAY CAPACITY: Qe=Q(25)-Qp fin 8.8 CFS 22.DIMENSIONS: 1 FTioTTOM WIDTH(b): 12.00 ft ----t- (From Table 3.14-C1 SLOPE OF EXIT CHANNEL(s): 0.04 ft/ft (From Table 3.14-C)I- MIN.LENGTH EXIT CHANNEL(x): 33.00 ft (From Table 3.14-C) F--- I_ ANTI-SEEP COLLAR DESIGN - -r 23.DIMENSIONS: DEPTH WATER @ CREST OF P.S.(Y): 8.30 ft -7-- SLOPE UPSTREAM FACE DAM(Z): 3.00 :1 1111 SLOPE P.S.BARREL(Sb): 1.67J% _I LENGTH BARREL IN SAT.ZONE(La): 38.00 ft (From Plate 3:14-11 24.NUMBER OF COLLARS: I 1 NUMBER REQUIRED: 2 (From Plate 3.14-12) I DIMENSIONS: 3.3IftA2 (From Plate 3.14-12t FINAL DESIGN ELEVATIONS ----= 25.ELEVATIONS: TOP OF DAM: 493.30 I ft T 1 DESIGN HIGH WATER: 492.30 ft ,, EMERGENCY SPILLWAY CREST: 491.90 ft 1 PRINCIPAL SPILLWAY CREST: 491.80 ft DEWATERING ORIFICE INVERT: 487.50 ft __i_ I CLEANOUT ELEVATION: 486.00 ft 1 I Page 2 90-3 SB.XLS . - TEMPORARY SEDIMENT BASIN PROJECT_ 90-3 1PROJ NO. 7.0228 BASIN# I SEDIMENT BASIN SB-2 DATE 2011-11-07 LOCATION - BY -.- CWS I INPUT DRAINAGE AREA I 1 BASIN VOLUME DESIGN WET STORAGE 1.MINIMUM REQUIRED VOLUME 807.35 cy 2.AVAILABLE BASIN VOLUME AVERAGE END AREA-BASIN VOLUME ESTIMATES - T ELEVATIOI AREA VOLUME VOLUME I_ TOTAL ft sf cf cy cy • 485.99 20.00 20.10 0.74 486 4,000.00 I 0.74 23,800.00 881.48 490 7,900.00 882.23 7--- 18400.00 681.48 492 10,500.00 1,563.71 I 40,203.00 1,489.00 495 16,302.00 3,052.71 ■ REQUIRED WET STORAGE VOLUME 807.35 cy APPROX.ELEVATION 489.13 3.EXCAVATE CUBIC YARDS 4.AVAILABLE VOLUME BEFORE CLEANOUT REQUIRED 397.65 cy 5.ELEVATION CORRESPONDING TO CLEANOUT LEVEL 1 490.00 I 1 1 1 6.DISTANCE FROM DEWATERING ORIFICE TO C/O LEVEL 7 I INVERT DEWATERING ORIFICE R'QD 1- 489.131 INVERT DEWATERING ORIFICE USED 491.50 APPROX.VOLUME AT INVERT USED 1625.08 cy DISTANCE FROM INVERT TO C/O LEVEL 1.50 ft _ DISTANCE ACCEPTABLE 1WET STORAGE VOLUME ACCEPTABLE 1 I DRY STORAGE L I 7.MINIMUM REQUIRED VOLUME I I 807.35 cy 8.TOTAL AVAILABLE VOLUME AT CREST OF RISER _ CREST OF RISER I 495.40 APPROX.AVAILABLE TOTAL VOLUME 2926.31 cy ADEQUATE DRY STORAGE VOLUME T I I 9.DIAMETER OF DEWATERING ORIFICE Q 1.01 cfs - d 5.25 in USE d 4 in 10.DIAMETER OF FLEXIBLE TUBING 6 in STANDARD SIZE 1 PRELIMINARY DESIGN 1----- 1 I 11.PRELIMINARY DESIGN ELEVATIONS: I CREST OF RISER 492.50 ft TOP OF DAM 495.00 ft I DESIGN HIGH WATER 494.00 ft *design of high water assumes a peak flowrate UPSTREAM TOE OF DAM 486.00 ft of 14.50 cfs storage volume is not considered. ----1 I I Page 1 90-3 SB.XLS . TEMPORARY SEDIMENT BASIN PROJECT 190-3 i T PROJ NO. 7.0228 ,BASIN# SEDIMENT BASIN SB-2 1DATE 2011-11-07 ,LOCATION I BY CWS BASIN SHAPE SURFACE AREA OF NORMAL POOL1 8300 sf LENGTH OF FLOW PATH I 100 ft __I_ EFFECTIVE WIDTH 90 ft _ L/We 1.11 BAFFLES REQUIRED (RATIONAL METHOD CALCULATION) ,USE MAXIMUM C VALUE DURING CONSTRUCTION AND MINIMUM Tc VALUE _L 13.FLOW FROM 2-YEAR STORM li_ 14.FLOW FROM 25-YEAR STORM _1_ C: 0.30 Q= 14.5 cfs PRINCIPAL SPILLWAY DESIGN 15.REQUIRED SPILLWAY CAPACITY: EMERGENCY SPILLWAY?(Y/N) Y REQUIRED SPILLWAY CAPACITY:, 8.31CFS .1- 16.ASSUMED AVAILABLE HEAD: ELEV.OF CREST OF E.S.IF USED: 493.50 _ ASSUMED AVAILABLE HEAD= 0.50 ft RISER DIAMETER:1 48.001 (From Plate 3.14-8 or Calcs) ACTUAL MAX.ELEV.: 494.00 ft From Calcs if a..ro.riate ACTUAL HEAD: 1.50 ft From Plate 3.14-8 or Calcs) 18.BARREL LENGTH: 1 1 BARREL LENGTH: 80.00 ft 1 BARREL INVERT OUT: 486.00 ft T HEAD H ON BARREL: 8.001ft From Plate 3.14-71_ 1 BARREL DIAMETER: 24 in From Plate 3.14A or 3.14B) 20.TRASH RACK AND ANTI-VORTEX DEVICE: 1 DIAMETER: 72 in From Plate 3.14D) EMERGENCY SPILLWAY DESIGN 21.REQUIRED SPILLWAY CAPACITY: 22.DIMENSIONS: I 1 BOTTOM WIDTH(b): 14.00 ft (From Table 3.14-C) SLOPE OF EXIT CHANNEL(s):1 0.04 ft/ft (From Table 3.14-C) MIN.LENGTH EXIT CHANNEL(x):1 30.00 ft (From Table 3.14-C) T ANTI-SEEP COLLAR DESIGN 23.DIMENSIONS: DEPTH WATER @ CREST OF P.S.(Y): 6.50 ft SLOPE UPSTREAM FACE DAM(Z): 3.00 :1 LENGTH BARREL IN SAT.ZONE(Ls): 30.00 ft _from Plate 3.14-111 24.NUMBER OF COLLARS: 1 NUMBER REQUIRED: 2 (From Plate 3.14-12) ___IL DIMENSIONS: 3.5 ft.2 (From Plate 3.14-12) FINAL DESIGN ELEVATIONS1 -I- -7- I 25.ELEVATIONS: TOP OF DAM: 495.00 ft _IL DESIGN HIGH WATER: 494.00 ft EMERGENCY SPILLWAY CREST: 493.50 ft PRINCIPAL SPILLWAY CREST: 492.50 ft DEWATERING ORIFICE INVERT: 491.50 ft ---7 Page 2 90-3 SB.XLS , TEMPORARY SEDIMENT BASIN PROJECT 1 90-3 1 PROJ NO. 7.0228 BASIN# F---- SEDIMENT BASIN SB-3 DATE 2011-11-07 ,LOCATION T BY CWS ,DRAINAGE AREA _L 4.29 1 ac BASIN VOLUME DESIGN --4 _i_. WET STORAGE 1 1.MINIMUM REQUIRED VOLUME 287.43 icy_ 2.AVAILABLEBASIN VOLUME 1 H 1 AVERAGE END AREA-BASIN VOLUME ESTIMATES i ELEVATIO AREA __I VOLUME VOLUME TOTAL 1 123.00 4.56 504 4,900.00 4.56 11,881.00 440.04 7,590.50 281.13 507 8,200.00 725.72 20,200.00 748.15 1 509 12,000.00 1,473.87 REQUIRED WET STORAGE VOLUME 287.43 1cy IAPPROX.ELEVATION 505.00 3.EXCAVATE CUBIC YARDSI _±7 4.AVAILABLE VOLUME BEFORE CLEANOUT REQUIRED 141.57'cy 15.ELEVATION CORRESPONDING TO CLEANOUT LEVE 504.301 6.DISTANCE FROM DEWATERING ORIFICE TO C/O LEVEL I INVERT DEWATERING ORIFICE USED 505.301 APPROX.VOLUME AT INVERT USED T 310.14Icy DISTANCE FROM INVERT TO C/O LEVEL 1.00;ft DISTANCE ACCEPTABLE 1 WET STORAGE VOLUME ACCEPTABLE 1 DRY STORAGE 1 1 7.MINIMUM REQUIRED VOLUME 287.43,cy 8.TOTAL AVAILABLE VOLUME AT CREST OF RISER 1 CREST OF RISER F.-- 506.40, APPROX.AVAILABLE TOTAL VOLUME 632.85 cy ADEQUATE DRY STORAGE VOLUME 9.DIAMETER OF DEWATERING ORIFICE 10 0.39 cfs 10.DIAMETER OF FLEXIBLE TUBING , 6'in 1STANDARD SIZE PRELIMINARY DESIGN i 11.PRELIMINARY DESIGN ELEVATIONS: I- I CREST OF RISER 506.40 ft 1 TOP OF DAM 509.00 ft T DESIGN HIGH WATER 508.00 ft *desi.n of hi.h water assumes a.eak flowrate UPSTREAM TOE OF DAM 504.00 ft of 6.60 cfs storage volume is not considered. Page 1 90-3 SB.XLS ' TEMPORARY SEDIMENT BASIN PROJECT 1 190-3 PROJ NO. 7.0228 BASIN# 1__ ISEDIMENT BASIN SB-3 DATE 2011-11-07 BASIN SHAPE 12.LENGTH OF FLOW/EFFECTIVE WIDTH: L L L_SURFACE AREA OF NORMAL POOL 6200 sf LENGTH OF FLOW PATH 85 ft EFFECTIVE WIDTH 131 ft RUNOFF 1 ARATIONAL METHOD CALCULATION) USE MAXIMUM C VALUE DURING CONSTRUCTION AND MINIMUM Tc VALUE 13.FLOW FROM 2-YEAR STORM 14.FLOW FROM 25-YEAR STORM PRINCIPAL SPILLWAY DESIGN 115.REQUIRED SPILLWAY CAPACITY: EMERGENCY SPILLWAY?(Y/N) Y REQUIRED SPILLWAY CAPACITY: 3.8 CFS ± 16.ASSUMED AVAILABLE HEAD: ASSUMED AVAILABLE HEAD= 0.60 ft 17.RISER DIMENSIONS: 1 RISER DIAMETER: 18.00 (From Plate 3.14-8 or Calcs) ACTUAL MAX.ELEV.: 508.00 ft (From Calcs if appropriate) 18.BARREL LENGTH: 1 BARREL LENGTH: 50.00 ft BARREL INVERT OUT: 504.00 ft I HEAD H ON BARREL: 4.00 ft (From Plate 3.14-7) 19.BARREL DIAMETER: I -1 BARREL DIAMETER: 12 in _From Plate 3.14A or 3.1 B) '20.TRASH RACK AND ANTI-VORTEX DEVICE: DIAMETER: 27 in (From Plate 3.14D). HEIGHT: 8 in EMERGENCY SPILLWAY DESIGN T- 21.REQUIRED SPILLWAY CAPACITY: , 22.DIMENSIONS: I I_ i BOTTOM WIDTH(b): 8.00 ft (From Table 3.14-C) L SLOPE OF EXIT CHANNEL(s): 0.041ft/ft (From Table 3.14-C) I MIN.LENGTH EXIT CHANNEL(x): 32.0011t_ (From Table 3.14-C) I I ANTI-SEEP COLLAR DESIGN 1 23.DIMENSIONS: - DEPTH WATER @ CREST OF P.S.(Y): 2.40 ft I SLOPE UPSTREAM FACE DAM(Z): 3.00 :1 1 LENGTH BARREL IN SAT.ZONE(Ls): 5.00 ft (From Plate 3.14-11) I 24.NUMBER OF COLLARS: I NUMBER REQUIRED: I(From Plate 3.14-12) DIMENSIONS: 2.0 ft^2 (From Plate 3.14-12) 1 FINAL DESIGN ELEVATIONS I 1 25.ELEVATIONS: _i_ DESIGN HIGH WATER: 508.00 ft I EMERGENCY SPILLWAY CREST: 507.40 ft 1 PRINCIPAL SPILLWAY CREST: 506.40 ft 1 i DEWATERING ORIFICE INVERT: 505.30 ft ._1_ i Page 2 90-3 SB.XLS .