Loading...
HomeMy WebLinkAboutSP200500028 Action Letter ~ .' 4> L COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Fax (434) 972-4012 Phone (434) 296-5832 April 18, 2008 Scott Collins Collins Engineering 800 East Jefferson Street, Suite 300 Charlottesville, VA 22902 RE: PROJECT: SP 2005-00028 / Biscuit Run #2 (Mid) - Sign # 3, 6, and 22. TAX MAP/PARCEL: 90-5, 90-60 AND PROJECT: SP 2006-00001 / Biscuit Run #3 (Southern) - Sign # 3, 6, and 22 TAX MAP/PARCEL: 90-60 AND PROJECT: SP 2006-00002 / Biscuit Run Stream Crossing #1 (Northern) - Sign # 3, 6, and 22 TAX MAP/PARCEL: 90-A-3 and 90-A1-1 Dear Mr. Collins: On April 9, 2008, the Albemarle County Board of Supervisors took action on each of the above referenced special use permits. Each of these special use permits were approved based on the following conditions: 1. The applicant must obtain a map revision, letter of revision, or letter of amendment as required from the Federal Emergency Management Agency (FEMA) and copy the County Engineer on all correspondence; 2. Army Corp of Engineers, Virginia Department of Environmental Quality, and other necessary state and federal agency approvals must be obtained prior to issuance of grading permits for construction of the new stream crossing and approaches; 3. County approval of road and bridge plans for the crossing to be in accord with the application plan, as determined by the County Engineer; 4. County approval of a grading and an erosion and sediment control plan prior to the issuance of a grading permit for construction of the new stream crossing and approaches; 5. County approval of a stream buffer mitigation plan prior to the issuance of a grading permit for construction of the new stream crossing and approaches; 6. Grading within floodplain shall be confined to the minimum necessary to construct the bridge. Changes in final design of the bridge, such as use of a longer span, are 7. acceptable if the changes reduce impacts to the floodplain, in the opinion of the County Engineer; Construction of the new crossing shall commence on or before April 9, 2013, or this special use permit shall be deemed abandoned and the authority granted hereunder shall thereupon terminate; VDOT approval shall be required for the stream crossing to ensure that the roads and the bridges meet VDOT standards; and The approval of this special use permit does not supersede or modify any proffer or provision of the Code of Development related to ZMA-2005-00017 or any subsequent amendments thereto. . -', .. 8. 9. Please be advised that although the Albemarle County Board of Supervisors took action on the project noted above, no uses on the property as approved above may lawfully begin until all applicable approvals have been received and conditions have been met. This includes: · compliance with conditions of the SPECIAL USE PERMIT; and · approval of a ZONING COMPLIANCE CLEARANCE. In the event that the use, structure or activity for which each of these special use permits are issued is not commenced within sixty (60) months from the date of Board approval, it shall be deemed abandoned and the permit terminated. The term "commenced" means "construction of any structure necessary to the use of the permit." If you have questions or comments regarding the above-noted action, please do not hesitate to contact Sherri Proctor at 296-5832. Sincerely, _ UlAJar ~. V. Wayne Cilimberg Director of Planning Cc: Forest Lodge LL POBox 5509 Charlottesville, Va 22905