Loading...
HomeMy WebLinkAboutWPO202000043 Other 2022-11-04AIRPORT ROAD SHEETZ WPO/VSMP AS -BUILT PLANS WPO NO. WPO-2020-00043 ALBEMARLE COUNTY, VIRGINIA SCOPE OF WORK: THE SCOPE OF WORK GENERALLY CONSISTS OF COMBINING THREE PARCELS AT THE INTERSECTION OF S.R. 29 AND AIRPORT ROAD, DEMOLISHING THE EXISTING STRUCTURES, AND GRADING AND PREPARING THE SITE FOR A NEW GAS STATION, CONVENIENCE STORE, CAR WASH, AND ALL ASSOCIATED INFRASTRUCTURE SUPPORTING THIS WORK. PROJECT SUMMARY NAME OF PROJECT: AIRPORT ROAD SHEETZ PROJECT LOCATION: 3510 SEMINOLE TRAIL ALBEMARLE COUNTY, VIRGINIA DEVELOPMENT TYPE: BY -RIGHT CONTACT: ANDREW BALDWIN AIRPORTAUTO INVESTMENTS, LLC ADDRESS: 600 EAST WATER STREET, SUITE H CHARLOTTESVILLE, VA 22902 PHONE: (434)422-5050 EMAIL' ANDREW@CORECVILLE.COM ENGINEER OF RECORD: CONTACT: LINE AND GRADE CIVIL ENGINEERING DANIEL C. HYER, PE ADDRESS: 1134TH STREET NE; STE 100 CHARLOTTESVILLE, VA 22902 PHONE: 434-262-0169 EMAIL DHYER@LINE-GRADE.COM SOURCE OF SURVEY AND TOPOGRAPHY: SOURCE: ACTUALGROUND SURVEY (SEE SHEETXI.O FOR SIGNED SURVEY) CONTACT: ROUDABUSH, GALE&ASSOCIATES BRIAN JAMISON, LS ADDRESS: 914 MONTICELLO ROAD CHARLOTTESVILLE, VA 22902 PHONE: 434-977-0205 EMAIL' BIAMISON@ROUDABUSH.COM PARCELS: TMP 32-38 OWNER: AIRPORT AUTO INVESTMENTS PHASE 2, LLC CONTACT: SEE APPLICANT INFO PARCEL ID: 03200-00-00-0380D ZONED: Cl COMMERCIAL OVERLAYS: AIRPORT I IMPACT; ENTRANCE CORRIDOR PROFFERS: VETERI NARY OFFICE AN D HOSPITAL (ref. SP-1996-00008 for conditions) LEGALAREA: 0.627 AC 27,304 SF TMP 32-39 OWNER: AIRPORT AUTO INVESTMENTS PHASE 2, LLC PARCEL ID: 03200-00-00-03900 ZONED: CICOMMERCIAL OVERLAYS: AIRPORT IMPACT; ENRANCE CORRIDOR; MANAGED STEEP SLOPES LEGALAREA: 1.666 AC 72,556 SF TMP 32-39A OWNER: AIRPORT AUTO INVESTMENTS PHASE 2, LLC PARCEL ID: 03200-00-00-039AO ZONED: CICOMMERCIAL OVERLAYS: AIRPORT IMPACT; ENTRANCE CORRIDOR LEGALAREA: 0.061 AC 2,654SF TOTAL LEGAL AREA: 2.353 AC MAGISTERIAL DISTRICT: RIO PROPOSED SITE PLAN REQUIREMENTS ALLOWED OR REQ'D BUILDING HEIGHT: PER 21.4 MAX HEIGHT ALLOWED = 65 FT EXISTING BUILDING HEIGHT= 12 FT PROPOSED BUILDING HEIGHT= 24.33 FT SETBACKS: Per 4.20 PRIMARY STREET(RTE 29; PRINCIPAL ARTERIAL) MIN FRONT BUILDING SETBACK= 10 FT' PRIMARY STREET(RTE 29; PRINCIPAL ARTERIAL) MAX FRONT BUILDING SETBACK= NONE REQUIRED SECONDARY STREET (AIRPORT RD; MINOR ARTERIAL) MIN FRONT BUILDING SETBACK= 10 FT' SECONDARY STREET (AIRPORT RD; MINOR ARTERIAL)MAX FRONT BUILDINGSETBACK= NONE REQUIRED 51DE AND REAR BUILDING SETBACK (ADJACENTTO COMMERCIAL) = NONE REQUIRED PARKING SETBACK= 10 FT 'WHENPUBUCSIDEWALK 15 OUTSIDE RIGHT OF WAY, SETBACK DISTANCESHALL BE MEASURED FROM BACK OFSIDEWALK. SCREENING: ADIACENTTO COMMERCIAL NONE REQUIRED PER32.7.9.7 SEE LANDSCAPESHEETS FOR SPECIFIC SITE ELEMENTS TO BESCREENED FROM PUBLICSTREETS BUILDING FOOTPRINTS: EXISTING BUILDINGS AIRPORT PLAZA STORES 5,721 SF 1 STORY FRAME & CINDERBLOCK 3,513 SF 25TORY FRAME 1,394 SF 1 STORY CINDERBLOCK 794 SF METAL CANOPY 190 SF FRAME SHED 1 303 SF FRAME SHED 2 101 SF FRAME SHED 3 282 SF EXISTING BUILDINGSTOTAL= 12,298 SF PROPOSED BUILDINGS PROPOSED CONVENIENCE STORE FOOTPRINT 6,077 SF PROPOSED CAR WASH FOOTPRINT 1,024 SF PROPOSED FUELCANOPY FOOTPRINT 4,538 SF PROPOSED BUILDINGSTOTAL= 11,639 SF LAND USE: PER22.2.1c CONVENIENCE STORE= CAR WASH (DRIVE THRU TYPE) _ FUEL STATION (CANOPY) _ PARKING REQUIRED: Per4.12.6 MIXED USES (SEE PARKING TABULATION TABLE ON SHEET C0.2) TOTAL REQUIRED PARKING = PerADA Std. 208 HANDICAP SPACES REQUIRED= TREE CANOPY COVER: 6,077 SF 1,024 SF 4,538 SF .° 09 o a0 a O Q O P o o a ,o se e o a eo a a e Q � e o ° B O m ° e °o 0 aP ;d. a• • 04 PROJECT LOCATI0IN n Cry/OJ �� i V '0 o� a of �6 a 9 d n'1'ti:•n, � '0 2F T • 0 9PROFFj k •: o �o ��:8° ° �;�!i®gym � �®: ° ° ° •.: •ire aPa �e°°g p O� �P •°o^ ADDITIONAL SITE INFORMATION: DISTURBANCE AREA: 2.59 AC (113,016 SF) EXISTING IMPERVIOUS AREA: 1.11 AC (48,444 SF) PROPOSED IMPERVIOUS AREA: 1.60 AC (69,667 SF) PERCENT INCREASE IN IMPERVIOUS AREA: 43.8% MISS UTILITY TICKET NO.: B003400793-OOB 12 DIGIT HUC CODE: 0208-0204-0303 (NORTH FORK RIVANNA RIVER - JACOB'S RUN) NOTE: THE SUBJECT PROPERTIES ARE ALL WITHIN FEMA ZONE X (AREA OF MINIMAL FLOOD HAZARD) AND ARE NOT WITHIN THE FLOOD HAZARD OVERLAY DISTRICT. SHEET LIST TABLE SHEET NUMBER SHEET TITLE WPO/VSMP AB-1 CO.0 TITLE SHEET - FSP CO.0 TITLE SHEET- WPO VSMP C0.1 GENERAL CONSTRUCTION NOTES CO.2 ZONING, PARCEL, AND SITE CALCULATIONS C1.0 EXISTING CONDITIONS, SOILS MAP, AND DEMOLITION PLAN C2.0 EROSION AND SEDIMENT CONTROL NARRATIVE C2.1 EROSION AND SEDIMENT CONTROL PLAN - PHASE 1 C2.2 EROSION AND SEDIMENT CONTROL PLAN - PHASE 2 C2.3 EROSION AND SEDIMENT CONTROL PLAN - PHASE 3 C2.4 EROSION AND SEDIMENT CONTROL DETAILS C2.5 EROSION AND SEDIMENT CONTROL DETAILS C3.0 TRAFFIC PLAN C3.1 SIGHT DISTANCE C3.2 TEMPORARY TRAFFIC CONTROL DETAILS C3.3 TEMPORARY TRAFFIC CONTROL DETAILS C4.0 SITE PLAN C4.1 SITE DETAILS C4.2 SITE DETAILS C4.3 SITE DETAILS C4.4 CARWASH DETAILS C5.0 GRADING AND DRAINAGE PLAN C6.0 UTILITY PLAN C6.1 UTILITY PROFILES C6.2 UTILITY PROFILES C6.3 UTILITY DETAILS C6.4 UTILITY DETAILS C7.0 PRE -DEVELOPMENT STORMWATER MANAGEMENT PLAN C7.1 POST -DEVELOPMENT STORMWATER MANAGEMENT PLAN C7.2 VRRM TABULATIONS C7.3 DRAINAGE MAP C7.4 HYDRAULIC CALCULATIONS C7.5 BMP PLAN AND PROFILE C7.6 BMP DETAILS C7.7 SWM C PLAN AND DETAILS C7.8 STORMTANK DETAILS C8.0 LANDSCAPE LAYOUT AND MATERIALS PLAN C8.1 LANDSCAPE PLAN C8.2 LANDSCAPE DETAILS C9.0 PHOTOMETRY C9.1 PHOTOMETRIC RENDERINGS C9.2 LUMINAIRE DETAILS A1.0 ARCHITECTURAL ELEVATIONS A1.1 ARCHITECTURAL ELEVATIONS X.AB AS -BUILT SURVEY 44 TOTAL SHEETS 33 8 A 1 /'1Tr. ORIGINALLY APPROVED SHEETS THAT ARE NOT INCLUDED HEREIN HAVE NO SIGNIFICANT CHANGES FROM APPROVED DESIGN. SUBMITTAL LOG SUBMISSION NO. DESCRIPTION RECIPIENT SUBMITTAL DATE AB-1 WPO/VSMPAS-BUILTS ALBEMARLE CO. DEPT. OF 10/12/2022 COMMUNITY DEVELOPMENT uj ta z uj �z z uj W z J N w U) Q w J Z Cn m > Qrr^I V/ � Q Q Z O 0 U LLJ in J OQ :5 LLJ ` m J Q i 2 TH OF-� DANIEL C. HYER 9 LIC. No. 45596, L°IONAL Era APPROVED DCH SUBMISSIONI NI' AB-1 PROJECI 1903600 T H E W O R K . L I N E + G R A D L 43 SPACES VICINITY MAP ;� LOCATION MAP N 2 SPACES SCALE: 1" = 25,000' SCALE: 1" = 2,000' J C0.0 SEE LANDSCAPE PIAN N EW V B EYF M 1 1 - RIM NEW ACCESS EASEMENT D.B.5293 P.78) SD-1 A 5, VDOT L RIM:536.1 EX. STM MH Tl?l_. -1-1 INV. IN: 531.53 (SD-18) RIM: 535.67 wv ajT'F�5-5 INV.. IN: (SD INV. IN: 528.17 (SD-1) Aspholti INV. OUT: 528.38 _X2 EX, SV� _f NEW TEMPORARY CONSTRUCTION MH TOID. TOE EASEMENT (D.B.5293 P.78) INV. /A� �,26, (Z-A T) 11VV. 5'�"�525 72 INV. "A' � "H'J'_ ` (S/v' INV, OU�_. 525,67 INV. //V. 5­51.78 (S) INV. OUT, 527,83 (A) SM RAIN 2'158 AREA OF EX. SWIM ESMT TO BE VACATED / i DUE TO REALIGNED STORM PIPE -8 SD DI-3B, L6' / DB_ PG_ ARV RI RIM: 53:7.84 SD-B INV. IN: 533. 6 INV. IN: 48" DIA CONCRETE RISER WITH TRASH RACK ADDITIONAL SWM ESMT AREA FOR REALIGNED STORM PIPE "'T RIM: 538.5C) INV. OUT: 53 INV. OUT: 11 11.1� DB_ PG_ RIM: 538.63 --INV. IN: 533.67 (C�_O-131) INV. IN: 58a.64 (G�19 Bl:)' / ( NATO „I NV. I N - 533.67 32) INV. IN: F5�;2.6-z �G,'19 r OT MH-2,4'1.D. WITH WEIR \� / I I INV. OUT: 533.65 1 M: 537.17 RIM: 537.26 1E IN: 53E).±E) (swm e-eu:F� INV. IN: 530.12 (SWM C-OUT) 53e.E)E) (41N Pveb E)t INV. IN: 530.10 (41 N PVC U D) .�� ': SO 13 UT: 529.9E) INV. OUT: 529.92 V A� IIVV IIN V DI-3BB, L4' 538- RIM: 547.26 RIM: 547.28 INV. IN: 539.60 (SD-14) INV. IN: 539.94 (SID 4:4) CONTRACTOR TO RELOCATE COMM NEW SWM FACILITY ESMT CHANNEL SHEET C_ (D.B.5551 P.265-272 & SD-c FOR DETAIL` LINES AROUND PROPOSED MANHOLE INV. OUT: 539.53 INV. OUT: 5��8.94 VDOT ES-1 15 D.B. 5559 P.744 751) INIA/ INI - SD-19 SAN. SEWER CONNECTION INV. IN: 538.43 (SD-10) 53e SD-7 0 INV. OUT: 536.00 INV. OUT: 536.32 "x6" SADDLE og.4,5' 539 DI-313, L12' WITH 8 RIM: 537.84 RIM-- 7. i-- E/V, Z,," SEI E,�IMIT 70�35` bAA INV. IN: Zl'. P, 559�7 F. 1162- /�-,g SD-12 542 INV. OUT: 532.94 1 UT: 533.10 vEly Elvo) 29 rEX. CUL T VDOT ES-1 ( 15 VV 11V 536.10 SD-14 4 6-1 91vivi INV. IN: 538.1E) (SB-13)_ DERGR `� \' VDOT MH-2, 4'I.D. SD-18 q N LI) RIM: 548.66 RIM: 547.93 DETEN VDOT MH-2,4'1.D.ti INV. IN: 540.14 (SD -Al INV. IN: 539 A 5 (SPA) E_ SD-10 RIM: 548.21 RIM- 539.42 NEW CONSERVATION ESMT -4Nk --540.j�o AS -BUILT SANITARY LINE (TYP) DI-313, L10' - INV. OUT: 539.35 > INV. IN: 535.46 (5B-±9) INV. IN: 535.66904Ib4 ti RIM: 544.26 RIM: A INV. IN: 535.36 (X-213) INV. IN: 535.62 D':I!M INV. IN: 539.78 (SE) 4:1) INV. IN: 539.58 (SD D.B. 5559 P.744-751) (S Nl ll� ll� 1.5\ INV. OUT: 535.36 INV. OUIT: 535.5EW (D.B.5551 P.265-272 & - 1-54424 INV. OUT: .53 SDR-26 0 SD-26 c)) INV. OUT: 537.96 7 LIGHT POLE i I BMPA 1 (4) 4" SHED. 40 PVC ELECTRICAL CONDUITS TO BUILDING occ OU17177 C7.5 (TYP) J P" PVC LATERAL (2) 4" SHED 40 PVC ELECTRICAL CONDUITS TO R WASH 133 1 FOR DETAILS SSMH, 4'I.D. INV @ BLD: 544. SD-2 ° I RIM: 547.85 1, OEL VDOT DI-1 ENCASE GAS LINE INV. IN: 537.76 (SS-2) SEE SHEET C7,.5 FOR DETAILS INV. IN: 537.76 (SS-4) 540.47 RIM: 548.58 INVAN:5 .32(SD-3)INV.IN:534.33(S9-S) 0 549- yN INV. OUT: 537.66 SD -A 48" DIA CONCRETE RISER WITH TRASH RACK -SD-16 RIM: 545.37 RIM: 544.75 VDOT DI-3A (CUSTOM SHALLOW) AS -BUILT STORM ALIGNMENT (TYP) SD- ,1 INV. IN: RIM:547.7ERIM: 547.73 INV. 1N:32� -710 1) INV. IN: 544.75 (C/ INV. OUT: 540.72 INV. OUT: 589.82 C/o 1 INV. IN: 544.74: (C RIM: 544-S5 RIM: 5­ INV. OUT: 544.6± INV. OUT: 544.63 j INV. OUT: 548.12 INV. OL 1 9 1 4" PVC LATERALS INV @ BLD: 544.33 ti SS-2 cp I@ cp VID SSMH, 4'I.D. SAS cl:l INV. IN, M AbN N: 54 D 6) I NV.: IN:43.79V. OUT: 538.85 FUEL CANOPY cn 7 A lo,R T /TL 'p 00 (2) 1500 GAL Fl-,AS52, LIGHT POLE S MATION TANKS SHEETZ STORE 5551 1-,265-27 rpL"T; (TYP) J Z-7 RIM: 548.65 6,077 SF I Q0 I INV. IN: 545.00 F14: 548.50 2 olvF0. C/A Lo 1 '0 GAL GREASE in EASE at INTERCEPTOR VDOT MH-2,4'1.E AS -BUILT GAS LINE (TYP) CAR WASH 41F PVCRIM: 46.68 RIM: 546.6 INV:543. FEE: 549.60 INV. IN: 8.88(SD-5) INV. 1 CHANNELA I NV. I N: 53 .64 1' 3/0-5) 1 NV. I N: Os INV. UT: 138.85 INV. OUT: (5� > 0 10 1 5" HOPE CjQ 3: co A SD-6 D-3 74,4' Q) VDOT DI-3A SD-5 DI-313, L6' AS -BUILT WATER TWO 2-INCH TYPE "K" COPFIRK? 548.83 RIM: 548.96 VDOT DI-3A RIM: 546.24: RIM: 546.2 SERVICE LINE (TYP) WATER SERVlCky.�h§544.31 (C/0-3) INV. IN: s A 4.1-:7 (6/0 3) RIM: 548.88 RIM: 548.09 EX SIDR11VTICENTEL 3 OVP INV. IN: 538.63 (SE)--i INV. IN: 53 (SD-4) UT: 544.22 INV. OUT: 54445 INV. IN: 543.66 (613 6) INV. IN: 543.68 (SD-6) /o/YOJ. #064 9-002 159 kvo' INV. IN: E544.44: (G719 4) INV. IN: 544.41 (C/0-4) INV. OUT: 538.53 INV. OUT: 5 .56 ADDITIONAL ACSA ESMT AREA FOR WATER METERS INV. OUT: 543.56 INV. OUT: 543.65 FUEL TANK I Story INSTR# 202200006392 -/1,) UNDERGROUND FUEL VENT PAD 070 Welol Bift - ----- 00 0 11791 Zi I" WATER METER STORAGE TANKS 00 i (IRRIGATION) NEW PUBLIC UTILITY ESMT t (D.B.5551 P.265 272)i St 1.5" WATER METER (CAR WASH) CONNECT TO EX. i- IU BUILDING/PARKING GAS SERVICE LINE PARKING SETBACK LINE - Asphalt kmiIol - - 1.5 WATER VB-2 CONVERT EX. INLET X 8 TO a T F_ (STORE) R 45* VERTICAL BEND� MANHOLE AND DOGHOUSE VB-1 53 5 SD-17 ON EX. STORM PIPE 6" DIP (W/L "A") 4 45o VERTICAL BEND IV 4 7' ,V 55O3957" W 126.99' SD-17 45* HORIZONTAL BEND DI-313, L8'_ RIM: 557.35 RIM: SS;E.23 A4 A2 I" CORP. STOP N 55oO2'36 W 17. /J Al 6"X4" TEE, 4" VALVE A3 TOo. 546.60 INV. our 542_35 /All _)/D 556,85 SD-X8 WET TAP ON RWSA LINE WITH 12"1 TS& X7O9 554 6"X4" TEE, 4" VALVE S TA TE 17OLI 7_f7 6 4 9 (4 NFL�W'7_ RO) VDOT MH-2, 5'I.D. F .45 SEE RWSA NOTES ON SHEET CO.1 INV. OUT: 5,50.98 /AV A_ RIM: 556mz:7 RIM: 556.73 � 6,00 AD UTILITY PLAN 1" = 20': 0 20 40 :CT TO EX. POWER POLE WITH 50 kVA GROUND MOUNTED FORMER Lu fa z tL ui z z ui N LLJ < w J Z in co 5; < < 0 O > LIJ < 0 :5 ui co < 2 '.O�A'TH OF 0 DANIEL C. HYER LIC. No. 45596 -ZONAL Sne APPROVED DCH SUBMISSIONI NI' AB-1 PROJECI 1903600 T HE W OR K . L IN E + G R AD L C6.0 555 550 545 m• 535 530 AB NOTE: EX. MH X-2 WAS NOT REPLACED WITH SD-1. SD-1 CHANGED TO A NEW MH UPSTREAM OF EX. MH X-2 U � p M M M - M CV VMOD W OD cI M N ci N (M +o = co rn rnr 1 L0ZZo oo�»> o>Fzzz 10- I I ^ ELEV: 534.93 I�IJ W I 28.20LF OF 18" HDPE @ 5.2 - OF 18" RCP @ 1.38% 3.60' CLEAR Zoo) p O� U > Z p V N r - � ��0) NOO M ox �r-��r U r Z Z O LoZ Z O Z Z Z Z Z Z 0> E R FWM C UNDERGROUN DETENTION SYSTEM Ia:1yoafla .'II�CI9I09co I:s 1.6&% SEE SHEET C7.7 FOR UNDERDRAIN CONNECTION FX. 811PVC CROSSING (XI-OUTFALL) -J I (6) PROP. 4" PVC CONDUIT CROSSING 10" OBSERVATION PORTS 30' O.C. FEND TO LOWER STACK 0 DIRECTLY ABUT SD-2 TO :SYSTEM PER DETAIL 7/C7.8 ENCASE STONE AND MODULES WITH LINERS PER STORMTANK DETAILS EBRIS ROW AT INLET ES WIDE, 30' LONG 10-YR HGL Lu ta Z uj z re z uj (D NOTE: uj ALL PROPOSED STORM DRAIN STRUCTURES AND EXISTING INLETS RECEIVING PROPOSED PIPE CONNECTIONS SHALL RECEIVE INLET SHAPING PER VDOT DETAIL 4 ON SHEET C6.4 z 555 O � 60 d Wz� U�Z.. NNrpZ o O V ��) (O W COV (+) M N O N r (+)V M� � F(O LC) H x ��zZzZ�Z• � CO LC) In F +(!) IIJ �gggp.p rn - Fod LL p + ap -p r00L O O pn--o pzp OO p't — 2: OUZOZR Mp �••Z p>—FZZ �ZZZv�ZZrZnEM > Z�M+ /-X EXT 7.48LF OF 15" HDPE @ 0.56% / L41-F OF 15" HDPE @ 5.41% 2.63COVER HDPE @ 0.7711 NOTE: ALL PIPE AND STRUCTURE CONNECTIONS SHALL BE WATERTIGHT. 0+00 0+50 1+00 1+50 2+00 2+50 3+00 3+50 4+00 4+50 5+00 O1 SD-1 TO SD-6 H: 1" = 20': 0 20 40 V: 1" = 2': 0 2 4 550 545 540 535 530 N F- W W z W Cn m > J 0 o z or 0 o I..L C�C G W J 0 W or Q E ll TH OF� >0�>2�2022 �1 DANIEL C. HYER Y LIC. No. 45596, TONAL APPROVED DCH SUBMISSION NO. AB-1 PROJECT 1903600 T H E W 0 R K O F L I N E + G R A D E C6ml 550 545 PROP. 2" COPPER W/L CROSSING 540 PROP. 15" HDPE CROSSING (13-14) 535 RV m A m 0 m 7 V�000MM UM �v�(n(nr i=nZZ0 nu�i» > n(n�zz z (2) PROP. 4" PVC CONDUIT CROSSING PROP. 1" GAS CROSSING ( I co m oLo O O) W 1­ 00 Lsi 0(0Itm + O ,t � m H II = m Z O N (nM>> (n (n OC Z Z L52.54LF OF 6" SDR-26 PVC @ 2.07` 0.49LF OF 6" SDR-26 PVC @ 5.52% 450 VERT. BEND F OF 6" SDR-26 PVC @ 1C' -EX. 8"PVC SA1V/TAPYSEN 55C ---{535 0+00 0+50 1+00 1+10 O1 PROPOSED SANITARY PROFILE H: 1" = 20': 0 20 40 V: 1" = 2': 0 2 4 c-I 0 rn� U) 11LO � O+ V Lw zULnz 00 >> (n> F? 550 PROP.GRADE (2) PROP. 4" PVC CONDUIT CROSSING PROP. BUILDING Cl CO 0 (1) U D ul b O M Un (.0 UOn, m. +Q� �V It Om0 Z)m� r('U)r0 >2> 0 p J 9 0 V 0 U Z O ? 0 0: Z Z 0 ¢ �o=�»�» 550 540 ZZ n>(n 0.75' CLEAR BMPA 545 — 20.78LF OF 6" PVC @ 1.83%' 535 L 2P�>�r92� 259 91 E, OE 1 G" HnpF a 0 cif o/ 0 C 10-YR HGL LO 00 ri PROP. 2" COPPER W/L CROSSING GRAVEL FLOW SPREADER SEE 1/C7.6 FOR DETAILS 540 540 530 560 5551 3.50' COVET K. 12" WATERLIN CROSSINI 550 I HC 545 560 555 550 545 q+T 0+50 1+00 1+15 O2 WATERLINE A PROFILE H: 1" = 20': 0 20 40 V: 1" = 2': 0 2 4 OD m w c-1 N m m 0c (n0 0 (n� 66 UU Un �wC' O+ cV . m`iM `ccYYYYii��' cQ M m 00 + O Zr (() `��((((444YY1����'' (MYl ( O C�0 (EOM (0 M M (M o i F-MU) 0CJ9 _ �r Unr 0U� 00cy) UM Lr) tim zoUnzo mm z��zo m�2..ZZ0�ZZp p co >: 2m »2» o�r�»> »> (noEZZFEZZ (no�zz�Zz nZZEZZZ PROP.GRADE 0 545 m — ci N O TO—) 66 (n (n m LO N O - W (0 N M 0 V It (O (0 m N (O + 0 N (MM U(O 0� VUM 11 Z Z Z =mZ 00� �� _ o _ o �m oL00 oo�»>�»> 0(!m2>2> (n>�zzz�zzz Co. pFrZFEZ PROP. GRADE 5-40 11 10-YR HGI 89LF OF 15" HDPE @ 4.74% 545 54(' 535 O3H: SD-18 TO SD-19 PROFILE 1" = 20': 0 20 40 545 540 535 530 () 0000 N m M mV V UM 00 m a0 ci N +02(O Un0r 11 F ;EZ =O 11 6 cc, (n>�ZZZ LF OF 15" HDPE @ 10.86, EX. 61?4DE / V (0NLq 0mWL q )0 v (0 (0 u) pN of O� rl (,- VMMUM ±MLOUn1.- UM II UnZZ0 II W 7Dr mr0 � > > > p > n>�zzz (n>Z SD-1 TO SD-213 PROFILE O H: 1" = 20': 0 20 40 � v 0 ci Q O- 1'- O N 00 (0 C0 0 U() (n m 0 V - .-I ci 0 o� 01M r 0� ci NM �(V mIf m N Ul.l Z Un Z II J V j II Z0UnZO 00 Un o c-10 DD �_>�_> mz�Z �ml Oi ��U7Z �Z Z�ZZ 00 oL0 �Z Z�ZZ M0 m_ _OC_ _ M> K_ _0__ _ 550 O c-I PROP.GRADE M v m � m L2 (n rl aZ o Noi� o_ mA�m�o I m VH II 00 F H> PoIM ?o�� m m ono >oi> _ m 2i>o no EEEZZ (no FrZFEZ 540 545 545 545 PROP.GRADE 71 PROP. 1" GAS CROSSING HDPE @ 0.87%� 2.00' COVER 3.08' (CLEAR M Q � Q MQ � Q 45 15 z J N (� W z W w (n a '^ m CC d v' UJ 0 9�[e U ) 0 p� Q Q z z L^L (j � UIt O I..L 0< F-V D ;E 0 LL G Lij 00 niZZEZz55C J O w Q Q BMPA 48.31LF OF 10" TH OF — — - 2.00' COVER 535 540 540 540 69.98LF OF 1 1 BMP B _ 540 10 DANIEL C. HYER 9 — 10-YR HGL LTC. No. 45596 16.04LF OF 15" HDPE @ 6.86% p 1.52' CLEAR?� SIONAL ENG APPROVED DCH GRAVEL FLOW SPREADER OUTLET PROTECTION O PROP. 6" SDR-26 SUBMISSION( NI' AB-1 SEE 1/C7.6 FOR DETAILS SEE 1/C2.5 FOR DETAILS PVC CROSSING (EX. TO SS-1) PROJECI 1903600 530 535 535 535 535 T H E W 0 R h . L I N E + G R A D E 0+00 0+75 0+00 0+50 1+00 0+00 1+00 1+15 1+00 1+50 2+00 2+10 SD-15 TO SD-16 PROFILE SWM C TO SD-B PROFILE SD-9 TO SD-11 PROFILE SD-12 TO SD -A PROFILE C602 O H: 1" = 20': 0 20 40 O H: 1" = 20': 0 20 40 O H: 1 = 20': 0 20 40 pO H: 1 = 20': 0 20 40 V: 1 -2: 0 2 4 V: 1 -2: 0 2 4 V: 1 -2: 0 2 4 O V: 1 -2: 0 2 4 2.77' COVER 10-YR STORM PIPE COMPUTATIONS 2-YR STORM 10-YR HYDRAULIC GRADE LINE COMPUTATIONS Line ID Drainage Area Runoff Coeff. Tc Intensity (1) Incremental Q Known Q Inv. Down Inv. Up Pipe Length Pipe Slope Pipe Size Flow Rate Pipe Capacity Velocity Velocity HGL Down HGL Up Minor Loss HGL Junction Vel. Hd Down Vel. Hd Up Hw Upstream Upstream Inlet Throat (Ac) (C) (min) (in/hr) (cfs) (cfs) (ft) (ft) (ft) (%) (in) (cfs) (cfs) (ft/s) (ft/s) (ft) (ft) (ft) (ft) (ft) (ft) (ft) Inlet ID Elev.* SD-1 to SD-C 0.00 0.00 5.0 0.00 9.03 9.03 529.33 529.90 45.270 1.26 18 9.03 11.78 6.05 2.26 530.53 531.06 n/a 531.06 0.59 0.59 1.16 SD-C 537.17 SD-2 to SD-3 0.10 0.53 5.0 6.67 0.35 0.00 534.33 538.53 118.92 3.53 15 3.15 15.78 4.85 4.64 534.93 539.24 0.38 539.24 0.29 0.29 0.71 SD-3 545.71 SD-3 to SD-4 0.00 0.00 5.0 0.00 0.62 0.62 538.63 538.95 53.256 0.60 15 2.83 6.51 3.74 3.55 539.45 539.63 n/a 539.63 0.27 0.27 0.68 SD-4 546.65 SD-4 to SD-5 0.14 0.82 5.0 6.67 0.77 0.00 539.05 543.56 90.417 4.99 15 2.25 18.75 3.30 3.05 539.85 544.16 n/a 544.16 0.23 0.23 0.60 SD-5 547.50 SD-5 to SD-6 0.21 0.77 5.0 6.67 1.53 0.45 543.66 544.15 80.267 0.61 15 1.53 6.56 2.78 2.67 544.37 544.64 n/a 544.64 0.18 0.18 0.49 SD-6 547.56 SWM C to SD-7 0.12 0.89 5.0 6.67 0.71 0.00 532.50 532.94 4.730 9.30 15 5.59 25.60 4.56 2.90 534.93 534.95 0.16 535.11 0.32 0.32 2.17 SD-7 537.34 SD-7 to SD-8 0.03 0.86 5.0 6.67 0.17 0.00 533.04 533.38 33.440 1.02 15 4.89 8.47 3.99 2.46 535.19 535.30 0.12 535.43 0.25 0.25 2.05 SD-8 537.34 SD-8 to SD-B 0.00 0.00 5.0 0.00 4.72 4.72 533.48 533.57 14.600 0.62 15 4.72 6.59 3.85 2.35 535.44 535.49 0.23 535.72 0.23 0.23 2.15 SD-B 538.50 SD-9 to SD-10 0.17 0.85 5.0 6.67 0.96 0.00 538.17 539.60 28.536 5.01 15 2.95 18.79 4.77 3.99 538.75 540.29 0.14 540.29 0.28 0.28 0.69 SD-10 543.76 SD-10 to SD-11 0.36 0.85 5.0 6.67 2.04 0.00 539.70 540.12 68.990 0.61 15 2.04 6.55 3.06 2.83 540.53 540.69 n/a 540.69 0.22 0.22 0.57 SD-11 543.85 SD-12to SD-13 0.03 0.70 5.0 6.67 0.14 0.00 538.10 538.94 73.647 1.14 15 2.63 8.97 3.29 2.20 539.10 539.59 n/a 539.59 0.26 0.26 0.65 SD-13 546.78 SD-13to SD-14 0.00 0.00 5.0 0.00 0.00 0.00 539.04 539.35 50.862 0.61 15 2.49 6.55 3.64 2.85 539.78 539.98 n/a 539.98 0.25 0.25 0.63 SD-14 547.93 SD-14to SD -A 0.00 0.00 5.0 0.00 2.49 2.49 539.45 539.82 61.100 0.61 15 2.49 6.53 3.71 2.95 540.17 540.45 n/a 540.45 0.25 0.25 0.63 SD -A 544.75 SD-15 to SD-16 0.06 0.82 5.0 6.67 0.76 0.43 544.42 544.61 32.310 0.59 15 0.76 6.44 2.25 2.13 544.91 544.95 n/a 544.95 0.12 0.12 0.34 SD-16 547.20 S- t 5- 9 0 7 8 5 0 4 6 3. 5. 2. 5 -10 .63 3 24 4. 36 6 5 53 .87 0.87 5- SD-X2 to SD-1 0.00 0.00 5.0 0.00 0.00 0.00 528.17 528.38 15.25 1.38 18 15.28 16.02 8.65 7.85 530.53 530.72 0.92 531.64 1.16 1.16 3.26 SD-1 536.18 SD-1 to SD-18 0.00 0.00 5.0 0.00 0.00 0.00 531.53 535.58 62.25 6.51 15 6.30 21.41 6.45 6.56 532.39 536.59 0.55 536.59 0.55 0.55 1.01 SD-18 539.42 SD-18to SD-26 0.39 0.66 5.0 6.67 1.72 0.00 535.62 537.96 21.50 10.88 15 1.72 27.69 2.48 2.19 537.11 538.48 n/a 538.48 0.03 0.20 0.52 X-26 537.96 *THROAT ELEVATION REFERS TO THE ELEVATION AT WHICH RUNOFF ENTERS THE INLET, WHETHER 0.5' BELOW THE TOP ELEVATION FOR CURB INLETS, OR AT THE TOP ELEVATION FOR GRATE INLETS. IT DOES NOT INCLUDE LOCAL DEPRESSION ADJUSTMENTS. Cl) PI PE CAPACITY AND HGL COMPUTATIONS NEW AS -BUILT NOTES: 1. "NEW" PIPES SHOWN HERE WERE NECESSARY TO REPLACE A PORTION OF THE EXISTING STORM SEWER NETWORK THAT WAS FOUND TO BE IN DISREPAIR. THESE PIPES ARE WITHIN THE VDOT ROUTE 29 RIGHT-OF-WAY, AND VDOT REVIEWED AND APPROVED THESE CHANGES DURING THE PERMITTING PROCESS FOR THE RTE 29 ENTRANCE. 2. THE ENGINEER OF RECORD HAS REVIEWED THE CAPACITY OF ALL PIPES IN THE INSTALLED CONDITION. PIPES WITH LESS CAPACITY THAN THE APPROVED DESIGN WERE RE-EVALUATED, AND ALL WERE FOUND TO BE ADEQUATE. THE EFFECT OF THESE PIPES ON 10-YEAR HGL ELEVATIONS WAS ALSO EVALUATED FOR ALL UPSTREAM PIPES. THE HGL DID NOT SIGNIFICANTLY DEVIATE FROM DESIGN IN ANY LOCATION. 3. SEE PLAN AND PROFILES SHEETS FOR AS -BUILT PIPE SLOPES AND LENGTHS. 4. VIDEO INSPECTION OF INSTALLED PIPES ACCOMPANIES THIS SUBMISSION. INLET COMPUTATIONS Inlet ID Inlet Type Throat Length Drainage Area RunoffCoeff. Intensity(I)z Qtolnlet QCarryover QCaptured QBypass Inlet Efficiency Longitudinal g Slope Road Cross Slope (Sx) Inlet Spread PondingDepth Throat Height Local Depression Grate Area 3 Top Elev. Structure Inner Dimensionss (ft) (ac) (C) (in/hr) (cfs) (cfs) (cfs) (cfs) M (ft/ft) (ft/ft) (ft) (ft) (in) (in) (sgft) (ft) SD-1 VDOT MH-2 .... 0.00 0.00 0.00 9.06 .... .... 535.63 7DIA SD-C VDOT MH-2 (CONTROL STRC) .... 0.00 0.00 0.00 9.06 .... .... .... .... .... .... .... .... .... .... .... 537.17 4' DIA SD-2 VDOT DI-1 .... 0.09 0.32 6.67 0.19 0.00 0.19 0.00 100 Sag 0.150 4.46 0.03 .... 3.13 540.50 4' DIA SD-3 VDOT DI-3B 6.00 0.10 0.53 6.67 0.35 0.00 0.35 0.01 99 0.020 0.010 1.72 0.14 5.0 0.0 546.21 4' DIA SD-4 VDOT MH-2 .... 0.00 0.00 0.00 0.62 .... .... 546.65 4' DIA SD-5 VDOT DI-3A 2.50 0.14 0.82 6.67 0.77 0.00 0.77 0.00 100 Sag 0.045 3.19 0.22 5.0 0.0 548.00 4' DIA SD-6 VDOT DI-3A 2.50 0.21 0.77 6.67 1.53 0.00 1.53 0.00 100 Sag 0.034 6.70 0.33 5.0 0.0 548.06 4' DIA SD-7 VDOT DI-3B 12.00 0.12 0.89 6.67 0.71 0.00 0.70 0.01 99 0.075 0.020 1.74 0.14 5.0 0.0 537.84 4' DIA SD-8 VDOT DI-3B 6.00 0.03 0.86 6.67 0.17 0.00 0.17 0.01 96 0.071 0.020 1.04 0.09 5.0 0.0 357.84 4' DIA SD-B CONCRETE RISER .... 0.00 0.00 0.00 4.72 .... .... 538.50 4' DIA SD-10 VDOT DI-3B 10.00 0.17 0.85 6.67 0.96 0.00 0.96 0.00 100 0.021 0.040 2.98 0.21 5.0 0.0 544.26 4' DIA SD-11 VDOT DI-3B 8.00 0.36 0.85 6.67 2.04 0.01 2.04 0.00 100 Sag 0.020 9.01 0.31 5.0 0.0 544.35 4' DIA SD-13 VDOT DI-3BB 4.00 0.03 0.70 6.67 0.14 0.00 0.14 0.00 99 0.017 0.032 1.25 0.10 5.0 0.0 547.28 4' DIA SD-14 VDOT MH-2 .... 0.00 0.00 0.00 0.00 .... 547.93 4' DIA SD -A CONCRETE RISER .... 0.00 0.00 0.00 2.49 .... .... .... .... .... .... .... .... .... .... .... 544.75 4' DIA SD-16 VDOT DI-3A 2.50 0.06 0.82 6.67 0.76 0.00 0.76 0.00 100 Sag 0.036 3.97 0.24 5.0 0.0 547.70 4' DIA SD-17 VDOT DI-36 8 0.26 0.77 4.00 0.80 0.00 0.78 0.02 98 0.021 0.020 3.47 0.20 5.0 0.0 557.23 4' DIA SD-18 VDOT MH-2 .... 0.00 0.00 0.00 0.00 .... .... .... .... .... 539.66 4' DIA SD-19 VDOT DI-36 14.00 0.79 0.88 4.00 2.78 0.00 2.67 0.12 96 0.032 0.040 4.71 0.32 5.0 0.5 540.25 4' DIA CC-1A CURB CUT 4 0.08 0.49 6.67 0.25 0.00 0.25 0.00 100 0.020 0.020 1.55 0.13 6.0 1.0 .... 551.34 .... CC-16 CURB CUT 6 0.10 0.49 6.67 0.31 0.00 0.31 0.00 100 0.059 0.030 1.37 0.11 6.0 1.0 .... 549.92 .... CC-2 CURB CUT 4 0.09 0.81 6.67 0.49 0.00 0.49 0.00 100 Sag 0.020 4.61 0.22 6.0 1.0 .... 548.07 .... X-2A1 EX. DI-1 .... 0.52 0.70 6.67 2.42 0.12 2.54 2.42 100 Sag 0.050 1 10.21 0.19 .... .... 3.13 533.94 .... X-213 EX. ES-1 .... 0.39 0.66 6.67 1.72 0.00 1.72 0.00 100 Sag 0.333 4.37 0.52 .... .... .... 537.35 .... X-2C1 EX. DI-36 6 1 0.24 1 0.87 4.00 0.84 0.01 0.46 0.38 1 55 1 0.039 0.023 2.57 0.18 5.0 0.0 .... 546.60 .... X-31 EX. DI-1 .... 1.57 0.44 3.70 2.56 2.63 5.19 0.00 100 Sag 0.333 4.38 0.31 .... .... 3.13 534.55 .... X-91 EX. DI-36 8 0.20 0.87 1 4.00 0.70 0.02 0.73 0.01 98 0.021 0.020 3.21 0.19 1 5.0 0.0 .... 554.73 .... SD-X8 CONVERT EX. INLET TOMH .... 0.00 0.00 1 0.00 .... .... .... .... .... .... .... I I .... .... .... 556.62 4'DIA 1EXISTING INLETS SHOWN CONSIDER POST -DEVELOPMENT FLOWS. ALL POST -DEVELOPMENT FLOWS TO EXISTING INLETS ARE LESS THAN EXISTING FLOWS. SEE PRE -DEVELOPMENT STORMWATER MANANGEMENT MAP FOR EXISTING FLOW VALUES. zA 10-YEAR DESIGN STORM INTENSITY HAS BEEN USED FOR ALL ON -SITE CURB INLETS TO ENSURE 10-YEAR PEAK FLOWS ARE ACTUALLY CONVEYED TO SWM FACILITIES ON SITE AS INTENDED. THE VDOTSTANDARD 41N/HR INTENSITY HAS BEEN USED FOR CURB INLETS IN THE RIGHT -OF WAY. 3AN EFFECTIVE GRATE AREA OF HALF THE ACTUAL GRATE AREA HAS BEEN USED TO SIMULATE A 50% CLOGGED CONDITION. °TOP ELEVATION REFERS TO TOPMOST PART OF STRUCTURE. ALLSTRUCTURES(INCLUDING EXISTING STRUCTURES RECEIVING PROPOSED PIPES) SHALL HAVE IN LET SHAPING PER VDOT DETAIL IS-1. INLET COMPUTATIONS U Elev (ft) CHAN N EL A Depth (ft) Elev (ft) CHAN N EL B Depth (ft) Elev (ft) 547.00 1.25 550.00 1 3.08 539.00 546.50 546.00 545.50 545.00 549.00 0.75 548.00 0.25 547.00 -0.25 546.00 -0.75 545.00 0 1 2 3 4 5 6 7 8 9 10 11 DESIGN CHANNEL CROSS SECTION ANALYSIS - 10 YR STORM ------------ ------------ ----------- - ------------ ------------ ------------ ------------ ------------ ----------- ----------- r r CHANNEL B2 Depth (ft) 2.13 LU ta Z Z Z ru 1 W Z J W, N z O LL ] g = J Fj J U) m > D � Q z J LLJ O LLJ DO a Q Q ■■ 538.50 2.08 538.00 1.08 537.50 0.08,537.00 536.50 1.63 1.13 0.63 0.13Z9-0.92 -0.37 C�ELC. -1.92 536.00 -2 0 2 4 6 8 10 12 14 16 18 20 22 Cross -Section Friction Channel Invert Slope n Discharge Normal WSEL Flow Area Velocity Wetted Critical Top Hydraulic Critical Velocity Permissible Specific Froude Label Depth Perimeter Depth Width Radius Slope Head Velocity Energy Flow Type Shape Method Lining Elevation M Value (ft3/a) (ft) (ft2) (ft/s) Number (ft) (ft) (ft) (ft) (ft) (ft/ft) (ft) (ft/s) (ft) CHANNELA Trapezoidal Mannings Grass 545.75 7.50% 0.035 0.56 0.07 545.82 0.30 1.90 4.44 0.09 4.42 0.07 16.40% 0.06 3.20 0.13 1.30 Supercritical CHANNEL B Parabolic Mannings Grass 546.92 6.50% 0.035 2.57 0.19 547.11 0.93 2.76 6.63 0.22 6.60 0.14 12.84% 0.12 3.20 0.31 1.30 Supercritical CHANNEL B2 Parabolic Manning's Grass 536.87 5.75% 0.035 5.19 0.26 537.13 1.88 2.76 12.19 0.29 12.16 0.15 11.33% 0.12 3.20 0.38 1.24 Supercritical O CHANNEL CROSS SECTIONS AND COMPUTATIONS TONAL -0.87 APPROVED DCH SUBMISSION1 NIV AB-1 PROJECI 1903600 T HE W OR K . L IN E + G R AD E C7A f f a CG-6 SPILL CURB (TYP) / \ \ 1" GAS SERVICE LINES / 4&:r BMP A �- CG-6(TYP) LEVEL 1 BIORETENTION FILTER PER DEQ. SPEC. NO. 9 PROVIDED SOIL MEDIA S.A. = 635 SF 552 �552/ SEE SIZING CALCS THIS SHEET 0 z ac m ni z AS -BUILT CONTOURS (TYP) 551, / / SEE FOR PLANTINGS 14 D.B559 P. 744751) \ #� 4' WIDE VEE DI ICH TO HA NEL A TRAP. ANNEL A / / `AWAIT 5 / / / / / X 536. 5 30J / 537- LINED WITH 6" DIA. STO TOM WI , S A `/ / /��� X \� I� CURB CUT 1A U 1 / 4' WIDE, 1" LOCAL I / GRASS L D OPE 546 8' DIA CONCRE�ACK5 M: 7 / 7 CDEPRESSION / X551.37 I I :�r39940.7 (C/ b 53T.599.82,40. 2 �� / h �� _ �FR 44.25- NEW 20' PUBLIC SWM ' / I I D 8 538 / cS MAINTENANCE ESMT /;' M 0 % 6, SGN (D.B. 5551 P.265-272 & ��� 1------ `c / 6 O CLEAN I- - I D.B. 5559 P. 744751 - / R IIgS 7. 9 RIM: �� RIM: RIM °53 �O 34 I � 544.2° � 9 � 538.1 -jb INV. IN: 33,46 D- )INV. 544.25 C/O/Al r 53 .7 - INV. UT: 534.04 IN . 0 • 5 11NV. 0 T:683.3B LU 5y 6 1N CLEANOUT 5- \� - T I 5 /5 S49 \ : 5 RI :fir 544.25- 9 / CHANNEL B 5 .01 GRAVEL FLOW SPREADER 39 549.94 I UT: N \ 6 539.50 SEE 1/C7.6 FOR DETAIL \ CURB CUT 1B 548.50 E IPA �--------------- - -- - 6' WIDE, 1" LOCAL 4' WIDE, 6' LONG, 6" DIA. STONE WITH 4' WIDE VEE DITCH 538.35 ° B / IA CONCRETE RISER W H TRAS�I RACK 544.00 , 6" DIA. STONE LINING 3a 50 PIE)"'� GRAVEL FLOW SPREADER � M 538 R 8 63 - - --- w 5 4 5 � -- ,1 5 . IN: ��� �� `.. _ IN 33 7 (C � _ izl------- - ------ _ 549.60 �_ - - - ,� 548.01 \ � ; (i ,' �_, 1. _� -Q 5 ,_-'-'j-- - A � , �--.538.' 8�'98.17 V. OUT: �4 If�V. IN: �4 65 /-- 1 _ -- 0 v ENCASE GAS LINE WITH SCHED. 40 PVC M8 \ I a I \ C/0-132 5�0 �. N WHERE GAS LINE IS WITHIN 5' OF FACILITY q \CURB CUT LEANOUT / L -N (20' MIN. ENCASEMENT LENGTH) I GRAVEL FLOW SPREADER 4' WIDE, 1" OCAL \ \ n 54 M' 39.96 RIM: SEE 1/C7.6 FOR DETAIL DEPRESS10 S� DUMPSTER PAD I r - _542 : 533.79 INV. OUT: 54 --� I � � • � ' a r . , 3 I ' I CAR WASH I li �I I 1 5 =--J- -_ Tf�V-fN� 1 IVVDOT ES-1S15 IN0"38.43 (SD (2) EL CTRIC/COMM CONDUITS � O- - CG-6 (TYP) -YP) : 16)INV. IN SQ7 FOR CA WASH SERVICE - - - CAR WASH RECLAMATION TANKS I RET. WALL (SEE GRADING PLAN) � \� \ SD-10 / \ - - 549 S \ MH-2, �1D. ° ° ° a ° o a \ ° / \ Dh3B, L10' % L RIM:4 �Rl',0.24 Q / • �� IN: RIM: A > a \\ INV. IN: E _ 9 1 1 ''INV IN:539.58 O } % �po� INV. OUT: INV 0�7T• 539.53 SD-16 INV. OUT: A 7� o rn_ VDOT DI-3A (CU 0 A RIM: 548 ° RI RIM: I 14 -A) a\ \ INV. IN:544. INV. IN: INV. 09- 5 .6 INV. BMP A PLAN �� BMP B PLAN N J 1" = 10': 0 10 20 1" = 10': 0 10 20 LL LLIJJ z 0 w - -� - BMP A (LEVEL 1) BMP B (LEVEL 1) J of L ad VA DEQ Spec. No. 9 VA DEQ Spec. No. 9 v / :D co co r- ' i 'i w ¢ v � SizingSi jnp 545 m co 545 0 Q o+ oz M � rn z = r � a Required Tv = 1104 CF From VRRM spreadsheet Required Tv = 1879 CF from VRRM spreadsheet d b p Q Q Z u w � r °+'o¢ . Maw ��� 10 �� o o z > > o < �'n'nr O� o r•�o cow a- Q Q O o U) o ¢_ v CN � v (o o C+i v Cl) rr z L0 z Storage Depth = 1.76 see below Storage Depth = 1.76 see below + o v m N z co Cn rn o'm U O z 2E> M> Q p X: O O Z O to 'n c fn to M M LO CURB CUTIB ���z�z p=�2»2» Cna ��z zFrz z LEVEL 1 550 CHANNELA BIORETENTION FILTER 550 BMPA i BMP B LEVEL 1 BIORETENTION FILTER I PER DEQ. SPEC. NO. 9 PROVIDED SOIL MEDIA S.A. = 1083 SF AS BUILT CONTOURS (T) 5�g SEE SIZING CALCS THIS SHEET SEE LANDSCAPE PLAN FOR PLANTINGS \ k i 1' WIDE BEI Min Depths Max Depths N/A 1 2 4 0.33 0.5 N/A N/A w Min Depths Max Depths LU 00 U)� r or I- L > W z N/A 1 m Z o'Mo azo�zZ) O J �Mz� oO i Z Q 2 4 O> z�>� Co p���»>�»> Z�ZZZ Cb pC?�»�» Z�ZZ Q 0.33 0.5 U O�Z�Z ����ZZ Op �Z O O LLI N/A N/A > DO r Provided Surface Area = 635 SF Provided Surface Area = 1083 SF 1' WIDE BERM (TYP) LEVEL 1 G PROP. GRADE SEE 2/C7.6 Q nnnn Additional PondingVolume= 0 CF Outside soil media footprint AdditionalPondingVolurn = 0 CF Outside soil media footprint BIORETENTION FILTER ly Provided Tv= 1115 CF Surface Area*Storage Depth +Additional Ponding Provided Tv= 1901 CF Surface Area*Storage Depth +Additional Ponding 540 - BMPB 540 10 YR POND ELEV: SIZING CALCULATIONS PROP. GRADE - - 538.88 STONE ENERGY DISSIPATER (TYP) � O 12" DEPTH, 6" DIA. STONE 10-YR POND ELEV. 545.53 y SEE PLAN FOR DIMENSIONS UNDERLAY WITH GEOTEXTILE / 1 AS -BUILT CERTIFICATION. FABRIC PER DETAIL 1/C2.5. 'R POND ELEV: 54 1 k 545 54, 1. BOTH BMP A AND B ARE IN GENERAL CONFORMANCE WITH THE DESIGN INTENT, AND MEET y EE ETAIL 4/C7.6 FOR BMP M AYER DEPTHS AND MATERIALS MINIMUM REQUIREMENTS IDENTIFIED IN THE SPECIFICATIONS AND APPROVED PLANS. THE o SEE DETAIL 4 C7.6 FOR BMP ENGINEER OF RECORD HAS REVIEWED 3RD PARTY INSPECTION REPORTS AND HAS DETERMINED m '` ' LAYER DEPTHS AND MATERIALS THE TREATMENT VOLUMES IN THE INSTALLED CONDITION EXCEED THE APPROVED DESIGN CONDITION. 3RD PARTY INSPECTION REPORTS ACCOMPANY THIS SUBMISSION. 535 535 PROP. 1" GAS CROSSING 58.48LF OF 15" HDPE @ 1.00% OVERLAP WITH BMP " GEOTEXTILE FABRIC 12" MIN. SURROUNNER WS DE GEOTEXTILEBMP WITH IMPERMEABLE FABRIC _ SD-14 540 540 31.67LF OF 6" PVC @ 0.66% U NOTE: ALL PIPE AND STRUCTURE CONNECTIONS SHALL BE WATERTIGHT. 0+0- 1+00 1+50 O2 BMP A AND CHANNEL A PROFILE H: 1" = 20': 0 20 40 V: 1" = 2': 0 2 4 TO SD-7 37.41LF OF 6" PVC @. /O 9.65LF OF 15" HDPE @ 2.04% SURROUND BMP WITH IMPERMEABLE LINER INSIDE GEOTEXTILE FABRIC NOTE: ALL PIPE AND STRUCTURE CONNECTIONS SHALL BE WATERTIGHT. 0+00 0+50 1+00 1+10 O4 BMP B PROFILE H: 1" = 20': 0 20 40 V: 1" = 2': 0 2 4 PtiTH OF U DANIEL C. HYER 9 Lic. No. 45596 ON AL ENG` APPROVED DCH SUBMISSION N' AB-1 PROJECI 1903600 T H E W 0 R K O F L I N E + G R A D E C7m5 GENERAL CONSTRUCTION NOTES FOR STORMWATER MANAGEMENT PLANS 1. ALL DAMS AND CONSTRUCTED FILL TO BE WITHIN 95% OF MAXIMUM DRY DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT. ALL FILL MATERIAL TO BE APPROVED BY A GEOTECHNICAL ENGINEER. A GEOTECHNICAL ENGINEER IS TO BE PRESENT DURING CONSTRUCTION OF DAMS. 2. PIPE AND RISER JOINTS ARE TO BE WATERTIGHT WITHIN STORMWATER MANAGEMENT FACILITIES. 3. FOR TEMPORARY SEDIMENT TRAPS OR BASINS WHICH ARE TO BE CONVERTED TO PERMANENT STORMWATER MANAGEMENT FACILITIES; CONVERSION IS NOT TO TAKE PLACE UNTIL THE SITE IS STABILIZED, AND PERMISSION HAS BEEN OBTAINED FROM THE COUNTY EROSION CONTROL INSPECTOR. 4. OWNER IS RESPONSIBLE FOR PROVIDING DOCUMENTATION THAT CERTIFY STORMWATER MANAGEMENT FACILITIES HAVE BEEN CONSTRUCTED IN ACCORDANCE WITH THE APPROVED PLANS. A LICENSED ENGINEER SHALL INSPECT AND CERTIFY FACILITIES DURING CONSTRUCTION AT THE INSPECTION MILESTONES LISTED ON THE PLANS. IF A FACILITY CANNOT BE VERIFIED TO HAVE BEEN CONSTRUCTED PER THE PLANS, THE COUNTY MAY REQUIRE CCTV INSPECTION, TEST PITS, OR EXCAVATION TO VERIFY THE FACILITY AT THE OWNER'S SOLE EXPENSE. 5. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS TO THE DESIGN ENGINEER FOR APPROVAL PRIOR TO ORDERING FACILITY STRUCTURES AND PARTS. 6. A GEOTECHNICAL ENGINEER SHALL VERIFY BEARING CAPACITY OF SOIL PROFILE BELOW ALL STORMWATER FACILITIES. INSTALLATION PROCEDURE AND INSPECTION MILESTONES NOTE: CONTRACTOR SHALL READ AND ADHERE TO ALL MANUFACTURER INSTALLATION GUIDES, SPECIFICATIONS, DETAILS, AND INSTRUCTIONS. ENSURE ALL APPLICABLE DOCUMENTATION IS OBTAINED FROM MANUFACTURER AT THE TIME OF PURCHASE. NOTE: STORAGE OF MATERIALS SUCH AS CONSTRUCTION MATERIALS, EQUIPMENT, SOIL STOCKPILES, ETC. OVER THE MODULE SYSTEM AT ANY TIME IS STRICTLY PROHIBITED. 1. EXCAVATION 1.1. STAKE OUT AND EXCAVATE IN ACCORDANCE WITH OSHA REGULATIONS TO ELEVATION REQUIRED TO INSTALL SYSTEM AS SHOWN ON PLANS. EXCAVATION MUST EXTEND A MINIMUM OF 12" BEYOND MODULE FOOTPRINT IN EVERY DIRECTION. 1.2. REMOVE OBJECTIONABLE MATERIAL WITHIN WALLS AND BOTTOM OF EXCAVATION. 1.3. PREPARE SUBGRADE PER STORMTANK DESIGN MANUAL TO PROVIDE MINIMUM BEARING CAPACITY REQUIRED. 1.4. INSPECTION: GEOTECHNICAL ENGINEER SHALL VERIFY BEARING CAPACITY AT BOTTOM OF EXCAVATION. ENGINEER OF RECORD SHALL VERIFY EXCAVATION DIMENSIONS. 2. LINERS AND LEVELING BED 2.1. PLACE GEOTEXTILE AND IMPERMEABLE LINERS PER STORMTANK DETAILS. 2.2. PLACE AND CONNECT SYSTEM UNDERDRAIN PER PLANS. 2.3. PLACE STONE BASE LEVELING BED AND COMPACT. ENSURE MINIMUM STONE DEPTH AND LEVEL TOP SURFACE. 3. STORMTANK MODULES 3.1. ASSEMBLE MODULES PER MANUFACTURER SPECIFICATIONS. 3.2. PLACE GEOTEXTILE FABRIC ON TOP OF LEVELING BED TO ALLOW FOR MODULES TO BE FULLY WRAPPED ONCE INSTALLED. 3.3. NOTING ANY MODULES REQUIRING MODIFICATION (INLETS, OUTLETS, DEBRIS ROW, OBSERVATION PORTS), PLACE BOTTOM COURSE OF MODULES PER MANUFACTURER SPECIFICATIONS. 3.4. INSERT STACKING PINS IN BOTTOM COURSE. DO NOT INSTALL TOP COURSE UNTIL INSPECTION IS PERFORMED. 3.5. INSPECTION: ENGINEER OF RECORD SHALL VERIFY STONE BASE DEPTH, UNDERDRAIN INSTALLATION, AND THE ELEVATION, MODIFICATIONS, AND DIMENSIONS OF THE BOTTOM COURSE OF MODULES PRIOR TO PLACING TOP COURSE OF MODULES. 3.6. WITH APPROVAL OF INSPECTING ENGINEER, PLACE TOP MODULES, ENGAGING PINS AND ALIGNING MODULES WITH THE BOTTOM COURSE. WRAP MODULES IN GEOTEXTILE LINER PER PLANS, ENSURING NO DAMAGE TO LINERS. 3.7. INSPECTION: ENGINEER OF RECORD SHALL INSPECT GEOTEXTILE AND IMPERMEABLE LINERS PRIOR TO BACKFILLING. 4. BACKFILL 4.1. WITH APPROVAL, BEGIN BACKFILLING SIDES OF SYSTEM. BACKFILL PERIMETER EVENLY TO AVOID LATERAL LOADS FROM UNEVEN FILL, WHICH CAN CAUSE RACKING OF SYSTEM. LIFTS SHALL NOT EXCEED 12". 4.2. PLACE BACKFILL MATERIAL WITH EXCAVATOR, DOZER, OR CONVEYOR BOOM FROM NATIVE SOIL SURROUNDING THE EXCAVATION. DO NOT DIRECTLY ACCESS THE SYSTEM DURING SIDE BACKFILLING. DO NOT DUMP DIRECTLY FROM TRUCK. 4.3. COMPACT EACH LIFT OF BACKFILL MATERIAL UNTIL SIDE BACKFILL IS EVEN WITH THE MODULE TOPS. 4.4. PLACE TOP BACKFILL MATERIAL WITH LOW GROUND PRESSURE EQUIPMENT, OR PREFERRABLY CONVEYOR BOOM. DO NOT DUMP DIRECTLY FROM TRUCKS. DO NOT DRIVE ON MODULES WITHOUT A MINIMUM OF 12" COVER. 4.5. PLACE BACKFILL IN 12" LIFTS. COMPACT EACH LIFT WITH STATIC ROLLER PRODUCING LESS THAN 10 PSI PER ROLLER. 4.6. INSTALL METALLIC TAPE AROUND SYSTEM PERIMETER FOR FUTURE UTILITY DETECTION. 4.7. INSPECTION: ENGINEER OF RECORD TO INSPECT STONE BACKFILL ONCE COMPLETE, PRIOR TO BRINGING TO FINAL GRADE. 4.8. BACKFILL WITH SUITABLE FILL TO FINAL GRADE. APPLY LANDCOVER AS SHOWN ON PLANS. 4.9. FLUSH SYSTEM CLEAN AS SHOWN IN CLEANING NOTES BELOW. STORMTANK SYSTEM MAINTENANCE INSPECTION: 1. INSPECT ALL OBSERVATION PORTS, INFLOW AND OUTFLOW CONNECTIONS, AND THE DISCHARGE AREA. 2. IDENTIFY AND LOG ANY SEDIMENT AND DEBRIS ACCUMULATION, SYSTEM BACKUP, OR DISCHARGE RATE CHANGES. 3. IF THERE IS A SUFFICIENT NEED FOR CLEANOUT, CONTACT A LOCAL CLEANING COMPANY FOR ASSISTANCE. CLEANING: 1. IF PRETREATMENT DEVICE IS INSTALLED, FOLLOW MANUFACTURER RECOMMENDATIONS. 2. USING A VACUUM PUMP TRUCK, EVACUATE DEBRIS FROM THE INFLOW AND OUTFLOW POINTS. 3. FLUSH THE SYSTEM WITH CLEAN WATER, FORCING DEBRIS FROM THE SYSTEM. 4. REPEAT STEPS 2 AND 3 UNTIL NO DEBRIS IS EVIDENT. AS -BUILT CERTIFICATION: THE INSTALLED SYSTEM IS IN GENERAL CONFORMANCE WITH THE DESIGN INTENT. THE ENGINEER OF RECORD HAS REVIEWED 3RD PARTY INSPECTION REPORTS FOR SWM C INSTALLATION AND HAS DETERMINED THE HYDRAULIC CONDITION OF THE INSTALLED SYSTEM MEETS OR EXCEEDS THE APPROVED DESIGN CONDITION. 9 ig \ \ S39 \ EX. MANHOLE NOT REPLACED � I-3B, L14' RIM:540.- INV n IT, iNV. OUT: 5 6.3 PROP. 13.89 OF 15" HDPEE @H 4.74%� _ EX. PIPE WAS FOUND TO BE ( PROP. 21.50 OF 15" HDPE X-2 I STRUCTURALLY DEFICIENT AND WAS cp G n .9. EX. STAR MH \ REPLACED AT THE ALIGNMENT SHOWN h RIM: 5A5.67 SD-2B IN, IN: 5b387.17 (SD-1 s 1` , 3.1 (15 S �I �- SDt1 �m ��.aCW�91�J:�iimmmmmmmm roa.rl� �. ,; �rvOTnMH 2' NEW. PUBLIC SWM I 0HA0 - V. I \ 0 w '-" RIM:539.42 RI �4B.2± - - IN . IN: 535.66 (SD-19) INV. IN:� �' MAINTENANCE EASEMENT ,ROP. 15.24 OF 18" RCP @ 1.38% FE @ 6.51 0 IN IN: 535.62 (SD-2B V. IN�r+ (D.B. 5551 P.265-272 & I \ D-1t \ VDOT MH-2, 4 D. RIM:536. 8 \SJNV.IN: 528.43 (SD- �5$8.38 \ -op. 62•. r r 1'WIDE STONEDETAIL •• • STORIVITANK • •. 538.1 SEE pj�t•� :•-c`�KLai�l-�A:�'.0 ,�.it_'.- �,All er- "I ' ,• -t..� • .�� :•.,.� q-S.;•_._., • •., • , 'sue;., "mmmmimmm c \ \ \ OT H-2, ' I.D. WITH WEFR� IM:bam�.44RIM7IN: .2 537.35 \ \ \ IN .I INV30. UT) INV 1 : INV30.� (4 0 .INV53 .12 \ \ \ EE DET)�L THIS SHEET / I 1 � I r INV. I I V, SWM C (UNDERGROUND DETENTION) PLAN '20 1" = 10': 0 10 20 SEE VDOT MH-1 DETAIL FOR STRUCTURE DIMENSIONS CONNECT UNDERDRAIN UPSTREAM OF WEIR \\ UNDERDRAIN INFLOW WEIR INV: 1 VDOT ST-1 STEPS "' GALVANIZED STEEL WEIR PLATE VDOT SWM-DR ORIFICE TRASH RACK VDOT SWM-DR ORIFICE TRASH RACK z 6" DIA ORIFICE INV: 530.00 0 P 534.25 - VDOT ST-1 STEPS - WEIR PLATE MOUNT TO MANHOLE WITH GALVANIZED STEEL BRACKETS (4) OUTFLOW PIPE (BEHIND) PLAN SECTION A -A SD-C CONTROL STRUCTURE 10-YR WSEL: 534.93 4' 2-YR WSEL: 533.83 1-YR WSEL: 532.93 11 r L12' -1W OBSERVATION PORTS -� ,j SEE76ETAAI L , / DEBRIS ROW / I I SEE DETAIL 4/C7.8 I / SD-2 / VDOT DI-1 I RIM:�8 RIM: 40.4 INV. IN: 684.6 (69 8) INV/IN: 53 .32 S - SD-11- I RIM:544.34/ RIM' OUT: 540.15 INV. 01 OUT:5 3.101 V. -2-94 RI :538.63 NOTE: FOR SYSTEM PROFILE AND ADDITIONAL DETAILS, SEE PROFILE ON SHEET C6.1. jj'/i 2 /2'x1'/�' BOLT N" DIA . f'/i' METAL PLATE R-LAX J' P „ SIDE VIEW OF BOLT WELDED ON TO METAL PLATE SIDE VIEW DETAIL FOR DEBRIS RACK HOLDER TOP VIEW TOP TO BE HINGED TO ALLOW ACCESS TO WATER QUALITY ORIFICE (SEE HOLDER DETAIL ABOVE) FRONT VIEW SWM-DR 1. COST OF DEBRIS RACK, METAL PLATE, AND DEBRIS RACK HOLDER TO BE INCLUDED IN THE BID PRICE FOR THE SWM DRAINAGE STRUCTURE. 2. EBRIS RACK MAY BE FIRICATED FROM WELDED DIAMETER BARS OR %¢ THICK HIGH DENSITY LYETHYLENE. METAL COMPONENTS OF DEBRIS RACK MUST NOT BE GALVANIZED. 3. DEBRIS RACK TO BE HINGED AS SHOWN OR CONTRACTOR MAY SUBSTITUTE A COMPARABLE DESIGN AS APPROVED BY THE ENGINEER. 4. THE LOCATION OF THE DEBRIS RACK HOLDER MAY BE ADJUSTED FOR VARIABLE CONDITIONS. WHEN HOLDER BOLT IS LOCATED ON THE METAL PLATE THF, %z" DIA BOLT LENGTH IS TO BE REDUCED /4 LG. AND WELDED TO THE PLATE. DEBRIS RACK HOLDER AND ALL HARDWARE IS TO BE GALVINIZED. ------ fir}• TOP TO BE HINGED TO ALLOW ACCESS TO WATER QUALITY ORIFICE (SEE NOTE 3) DIA BARS 2E NOT SEE NOTE�IZED ❑ y ❑❑� o 000 0000 3" DIA HOLES OR ❑ ❑ ❑ ❑ ❑ 1 E NOTE 2) ❑❑❑❑❑❑� 1'-O" MIN. 1'-0�/2' MIN. -I FRONT VIEW SIDE VIEW HIGH DENSITY POLYETHYLENE METAL DETAIL FOR DEBRIS RACK (FOR WATER QUALITY ORIFICE) SPECIFICATION STORMWATER MANAGEMENT (SWM) DETAILS tVD`� REFERENCE DEBRIS RACK, METAL PLATE, WATER QUALITY ORIFICE, CONCRETE CRADLE ROAD AND BRIDGE STANDARDS 302 (FOR SWM DRAINAGE STRUCTURES, SWM RISER PIPES AND SWM DAMS) REVISION DATE SHEET 2 OF 5 VIRGINIA DEPARTMENT OF TRANSPORTATION 114.05 OSWM-DR (ORIFICE DEBRIS RACK) w 0 Q W z J N LLJ (n Q w J Z_ 2 � co % 0 6 �7_ Q Q Z O O 00-0 U Lu (n cJ 0 O G a LU m N J L.L Q i 0 z ttC W uj Z Z uj J LLI 0 z Q z ^Q m CU G TH OF� DANIEL C. HYER Y LIC. N0. 45596• /ONAL En APPROVED DCH SUBMISSION NO. AB-1 PROJECT 1903600 T H E W 0 R K O F L I N E + G R A D E C7m7 SURVEY CONTROL A NAME NORTH EAST ELEVATION T-166022 3936052.27700 115012B2.56200 548.46 T-166278 3936084.95400 11501369.41800 548.03 T-166280 3936174.40300 11501195.48100 555.26 T-166681 3936219.78200 11501418.79700 546.49 T-235001 3935919.30100 11501452.63200 545.87 TMP 32-39 SULLY RIZ, LLC INST.02022-2718 D.B. 5493 P. 309 D.B. 5551 P. 265 PLAT H.W.P.B. XIV P. 200 PLAT D.B. 1639 P. 566 PLAT D.B. 2777 P. 317 D.B. 2284 P. 385 H.W.P.B. XIV P. 200-207 PLAT H.W.P.B. XIV P. 176 PLAT D.B. 629 P. 101, 104 PLAT D.B. 2427 P. 585 D.B. 326 P. 78 INST.I 2022-6392 ACSA INST.I 2022-4408 VEPCO D.B. 5559 P. 744 SWM D.B. 5551 P. 265 D.B. 5515 P. 258 SWM D.B. 5293 P. 78 D.B. 3597 P. 162 ACSA D.B. 2777 P. 317 D.B. 2427 P. 585 D.B. 1600 P. 75 ACSA D.B. 898 P. 335 WATERLINE D.B. 326 P. 78 D.B. 272 P. 632 VEPCO LEGEND: AIR COMPRESSOR = BUSH BSL = BUILDING SETBACK LINE CO CLEAN OUT EM = ELECTRIC METER FH FIRE HYDRANT FP = FLAG POLE FFE = FINISHED FLOOR ELEVATION GV = GAS VALVE GM = GAS METER A GROUND LIGHT HDPE POLYETHYLENE HCR HANDICAP RAMP IF = IRON FOUND IS = IRON SET MF = MONUMENT FOUND NS = MAG NAIL FOUND LIGHT POLE 11E = PLANT ® PIPE BOLLARD 0 = SIGN SS = SANITARY MANHOLE SO = STORM DRAIN MANHOLE TD = TRENCH DRAIN TR = TRANSFORMER TW = TOP OF WALL TREE = UNKNOWN SPECIES WM = WATER METER WV = WATER VALVE WMV = WATER METER VAULT .548.50 = SPOT ELEVATION 12TREE25 = 12" TREE 25' CROWN SPREAD 6 = GAS LINE S = SEWER LINE = STORM DRAINAGE LINE w = WATERLINE -xx- = FENCE VDOT DRAINAGE EASEMEN- VDOT PROJ. /0649-002-158 TMP 32-40 AIRPORT AUTO INVESTMENTS, LLC D.B. 5189 P. 548 HWPB. XIV P. 200 PLAT D.B. 715 P. 634 PLAT THIS PHYSICAL SURVEY WAS PREPARED FOR: SHEETZ THIS SURVEY WAS PREPARED WITHOUT THE BENEFIT OF A TITLE REPORT. SOME EASEMENTS OTHER THAN THOSE SHOWN HEREON MAY EXIST. IIuI�YII��If•�SrLI�aZK�rlrlulul�.Alls7� TMP 32-39 IS IN THE RIO MAGISTERIAL DISTRICT THIS PROPERTY LIES IN AN AREA DESIGNATED AS ZONE X (UNSHADED) (AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN) AS SHOWN ON MAPS BY THE FEDERAL EMERGENCY MANAGEMENT AGENCY. MAP 51003CO145D DATED: FEBRUARY 4, 2005 THIS PHYSICAL SURVEY WAS COMPLETED UNDER THE DIRECT AND RESPONSIBLE CHARGE OF CHRISTOPHER B. KEAN FROM AN ACTUAL GROUND SURVEY MADE UNDER MY SUPERVISION; THAT THE IMAGERY AND/OR ORIGINAL DATA WAS OBTAINED ON SEPTEMBER 30, 2022; AND THAT THIS PLAT, MAP, OR DIGITAL GEOSPATIAL DATA INCLUDING METADATA MEETS MINIMUM ACCURACY STANDARDS UNLESS OTHERWISE NOTED. I HEREBY CERTIFY THAT THIS PHYSICAL SURVEY, TO THE BEST OF MY PROFESSIONAL KNOWLEDGE AND BELIEF, IS CORRECT AND COMPLIES WITH THE MINIMUM PROCEDURES AND STANDARDS ESTABLISHED BY THE VIRGINIA STATE BOARD OF ARCHITECTS, PROFESSIONAL ENGINEERS, LAND SURVEYORS, CERTIFIED LANDSCAPE ARCHITECTS AND INTERIOR DESIGNERS. I ALSO CERTIFY THAT THE BOUNDARY SHOWN HEREON IS BASED ON A CURRENT FIELD SURVEY. NOTE: THE LOCATION OF EXISTING UNDERGROUND UTILITIES IS SHOWN IN AN APPROXIMATE WAY ONLY. UTILITIES ARE LOCATED USING UTILITY COMPANY LOCATIONS, CITY/COUNTY UTILITY MAPS, AND FIELD VERIFICATION.THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. THEY AGREE TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES. 557.35 18.95 LF 15"RCP ■2.57% TMP 32-39B COMMONWEALTH OF VIRGINIA DEPARTMENT OF TRANSPORTATION D.B. 2777 P. 317 D.B. 2284 P. 385 HWPB. XIV P. 200-207 PLAT SWM FACILITY EASEMENT D.B. 5559 P. 744 D.B. 5551 P. 265 i INV 534.20 EWEa D-14 PPCSEME9 NS P 1g2 b48�� i S -1 / i EP SS-1 3 5 647.78 i CONSERVATION i v EASEMENT i D.B. 5559 P. 744 �/ OypQ O� D.B. 5551 P. 265 yy'.'t' / b CG /•� I55 .51 ONO.. / 549.57 .' 549- I .99 L SD-16 yb0 �[ II \ 15"HDPE 547.73 r�\ r 160.51 �m O/54637 UT: "PV r CO' x• v I }1 BIORET@NTION I MH -2 r I '� �•1 FILTgp A sa8.e5 6 7.69 11\ 11 544.52 II r I 4 MH H \ + II \ H 648.84 5pl 7.67 / \ / 194 8.62 ® CSREASE \ I Iril I�/ RECL TION ® • (TRAP / \ \546 11 45.01 MH MH T / w 5 .6 CO 552,08 \ \ \ \ yII fp1, 647. 648.88 C7 6 CO O 1C VC 54 553.34 ! I 2TREEQ •'�'':�.f:.'A#3'... YV:.*�..:.:. 1 \ \ d CO0. u \ \ R1P\ 86 01' \ R P (� 30. 5' CONC. \ JdO\I 549.58- • • wz i SD-13 \ \ \ \ SWM FACILITY % EASEMENT D.B. 5559 P. 744 D.B. 5651 P. 265 VDOT DRAINAGE EASEMENT::-'': •: TMP 32-38A � 6 VDOT PROJ. 0649=0QZ-1 8'' •;. �, .'•'•- "., :..:'• :• ,: ;... ��-X :"2' JOSEPH M. TERRY, JR. 8 JUNE K. TERRY -"' D.B. 4574 P. 676 ' •• '�•• D.B. 629 P. 104 PLAT - _ ` • . ' - 535.31 .I'.'. ',•'A'CO'ESl;�EA$EMENT;. :} •.�•-���.�� ��'�i.• •. 28.23-LF . D'.Bs52f13.pr.�8" - '... 18"RCP55 �.'. :: ' • a/ �3 - 538.28 Y . IF °' '� .• 02:8 - SD-C II 537.26 co • �/' �� � �53 � m .''30,111.F'•.•$D-',. ' : ifi' • HDP1= :'¢97.66 Ij10:$.d,%-;..' BOO TOP OF 63883 - _8 IF /�637.86 BANK � 11 ' S 78 I S48.55-39"E - RIP .,,IS o / / i BIORETENTION &o ': i•,;-','•r' .:. f1AP /� �b1r CO. G FILTER B o/ "• ` INV o J + 537.82 1 �. ,° ASPHAL`f. z C I 538.27 a CONC. WALL 537.98 n �0o I i �' RIP 6 �b4✓ 1•� n�pm 539.5 RAP i4rr#PrQ ;r� �R �Z03 I Oo 40� Z43d�"( ��L -545' ':I :'•. ozzz I - 0 j \�1� / ENCLOSURE N Tw =_ \��10. ASH - �•42_07 OCO / / 54573 ` _x-x-.,: ^N' 44.44 i- 544.3T J 4 6\4.24 ✓/ '' A9 645.89 552.11 MEG VEPCO EASEMENT Eo CONC. CONC. FFE 548.46 a>] 551.40 ' _t'IF 548.72 166280 ' ' ' " " ' m ;,,_' ' -asPrlpct" ' AS`PHAUT- CD .. - _ 555.02 553. fir' F I4jI _:•- +•'•�''.•-~,•'••'•'••_. WV i' _CON .-.-- _. - _ _._ r' _ _ _ _ __.- ._ _._ T-16 22 548.4 --------- .�:•t7'-_._; : •� ..•,':%'.: ;...; ' L' � WMV Mid BSL /PARKING SET BACK - 10' - WV WV 243.29' N55039'57"W HCR SD-X8 554.86 556.73 _____ 664.94 C ACSA UTILITY E INST.02022-6392 5551 P. 265 AIRPORT ROAD STATE ROUTE 649 VARIABLE WIDTH R/W 15 tiPPE., CONC. ®547.20 .:5:45.51•' ': •-�: •'•. OCO ; . �B ' SD-2 540.47 42 i 544.49 \ \ SD-11 544.34 II IISIGN II ® II FUEL r FP I( 0 CANOPY z ::5551•.f: 2B5: •'f I R l I O CONC. / 549.85 � CONC. TELEPHONE 8 ELECTRIC EASEMENT VDOT PROJ. 00649-002-158 TELEPHONE 8 ELECTRIC EASEMENT VDOT PROJ. f0649-002-158 IFS N55002'36"W 17.11' LIfNC(�)LN ' SURVEYING Innovation. Integrity. Vision. 632 BERKMAR CIRCLE CHARLOTTESVILLE, VIRGINIA 22901 OFFICE: 434-974-1417 FAX: 434-974-1776 www.lincolnsurveying.com I I 6. ' 101.3$6..•:. .. .. .. . At 'EASE T g. N lo' 11; • III, F 11°` t5"NAPE pa,7 aN• U) II SD-9) 11 w 540.47 m Ao 11 1 SD-18 ' \\539.42 r I INV. 5 96 C330 :: : i�}1;O , 0� 0 I I 0 0 I 0 0 x "i 0 0 :.:•;�rR::,•. II ��..'. 0�0 0 0 0 0 0 0 I O00 I I I 542.29 MF / e ' W 0 T-235001 p 545.87 VICINITY MAP 1" = 1500' STORM SCHEDULE: SD-16 547.73 IN:6"PVC 544.75(EAST) OUT:15"HDPE 544.631WESTI SD -A 545.37 IN:6"PVC 540.79 (CO) OUT:15"HDPE 540.72 (SD-14) SD-B 538.63 IN:6"PVC 533.72 (CO) IN:6"PVC 533.83 (CO) OUT:15"HDPE 533.65 (SD-8) SD-17 557.35 IN:15"RCP 549.291WEST) OUT:15"RCP 549.04(SD-X8) SD-X8 556.73 CL:549.06 IN:15"RCP 548.561SD-17) IN:15"RCP 549.62(EAST) OUT:30"RCP 548.481X-61 SD-14 548.66 IN:15"HDPE 540.14(SD-A) OUT:15"HDPE 540.10 SD-13 1 I SD-13 547.26 IN:15"HDPE 539.60 SD-14 1 I OUT:15"HDPE 539.53(INV) SD-10 544.24 IN:15"HDPE 539.58(SD-11) OUT:15"HDPE 539.53(INV) SD-8 537.89 IN:15"HDPE 533.46(SD-8) OUT:15"HDPE 533.41(SD-7) SD-7 537.85 IN:15"HDPE 533.151SD-81 OUT:15"HDPE 533.10(SWM C) SD-C 537.26 TOP OF WEIR: 534.90 6" ORIFICE: 530.64 IN:18"HDPE 530.121SWM CI OUT: 18" RCP 629.92 (SD-11 SDA 536.18 IN:15"HDPE 531.63(SD-18) IN:18"HDPE 528.43(SD-0) OUT:18"RCP 528.38(X-2) SD-X2 535.67 IN:18"RCP 528.17(SD-1) SD-19 540.47 OUT:15"HDPE 536.32(SD-18) SD-18 539.42 IN:16"HDPE 535.87(SD-19) IN:15"HDPE 535.8211NV) OUT:15"HDPE 535.58(SD-1) SD-11 544.34 OUT:15"HDPE 540.15(SD-10) SD-3 546.29 IN:15"HDPE 538.59(SD-4) OUT:18"HDPE 538.56(SD-2) SD-4 546.68 IN:6"PVC 539.64(NORTH) IN:15"HDPE 538.88(SD-5) OUT:15"HDPE 538.85(SD-31 SD-5 548.09 IN:15"HDPE 543.681SD-6) OUT:15"HDPE 543.65(SD-4) SD-6 548.83 IN:6"PVC 544.31(NORTHWEST) OUT:15"HDPE 544.23(SD-51 SD-2 540.47 CL:531.06 IN:18"HDPE 534.32(SD-3) SANITARY SCHEDULE: SSMH/1 547.78 IN:6"PVC 537.78(CO) IN:6"PVC 537.82(SSMH) OUTA"PVC 537.72(EX.SAN) SSMH/2 547.69 IN:4"PVC 544.20(RECLAIM) INA"PVC 542.85(GREASE) OUT:6"PVC 538.84(SSMH/1) PHYSICAL SURVEY OF 000 HEALTH of AIRPORT ROAD SHEETZ PARCEL XXmAB TAX MAP 32 PARCEL 39 RIO MAGISTERIAL DISTRICT CHRISTOPHER B. -WE- AN ALBEMARLE COUNTY, VIRGINIA LIC. NO. 2378 DATE: JUNE 17, 2022 SCALE: 1" = 20' REVISED: JUNE 30, 2022 10-03-2022 CONTOUR INTERVAL 1' (BIO FILTERS) REVISED: AUGUST 3, 2022 L9� suos 04 REVISED: OCTO ER 3 202 2 NAVD '88 VERTICAL DATUM 121007900-22276-ASB.PRO 121-007900