Loading...
HomeMy WebLinkAboutSUB201600021 Bond Estimates 2022-11-01Project: Old Trail Block 10 Road & Utility Plan Amendment (SUB-201600021) Plan #: SUB201600021 TM P(s): 055EO-01-10-000AO Date Estimate complete: 11101I2022, ,1 Road and Infrastructure Construction Bond Estimate (roads, site work, storm sewer) Item Beechen Lane Begin station 10+00.00 End station 14+14.02 road length 414.0 ft aggregate base r 6.0 in it 414o ft L 30.0 ft W blotted or primeMouble seal 414o ft L f W asphalt base in all ft L ft W asphalt surface in all414o ft L ft W curb CG 2 curb CG e underdmin, UDA sidessik, concrete(5-8') ramp CG-12 street name sign traffic control sign Street Landscape 5 Each guardrail 0 ES @ 3000 drop inlet or grate standard manhole theme top (not inlet) manhole stoical (per ft. rise) pipe, rcp, crop (12") in it LftL ES-1,1 0 EC-0 pipe, rcp, crop(15 to48') indES-1,2 0EC-1 pipe, trip, crop(15 to48') indES-1,2 0EC-1 pipe, trip, crop (60 to 108') in dES-1,2 0 EC-1 rip -rap, placed ft dftL 0.0ftW mating, EC-2 or 3 ft L 0.0 ft W dear antl gmb(for svmded sites) hoi cut grading fill grading as-builtdhev4ngs(lk+ price per 0.1 mi.) 414.0 ftL 0.0784 mi. survey and layout (price per 0.1 mi.) 414.0 ft L 0.0784 mi. mobilization materials testing 414.0 ft L 0.828 inc of 500' comparison testing 414.0 ft L 0.828 inc of 500' CBR tests (1 every 0.1 mi. per road) 414.0 ft L 0.828 inc of 500' stone depth inspections 414.0 ft L 0.828 inc of 500' pavement inspections 414.0 ft L 0.828 inc of 500' pipe and drainage video inspections ($500 min) VDOT surety (1 lane) 319.5 ft L 0.08 mi. VDOT Inspection fee (1 In rd, 1 yr) 319.5 ft L 0.08 mi. VDOT admin. Cost recovery limit lane) 319.5 ft L 0.08 mi. SUB201800021__OWbiw 10_P ero_RF_boroesl_JLF_chk11n522-ja.xlu No. Unit Unit Cost Cost installed %compete cost remaining 434.7 ton $35.00 $15,215.24 0% $15,215.24 0.0 sy $10.00 $0.00 0% $0.00 111.6 tons $120.00 $13,389A1 0% $13,389.41 83.7 tons $140.00 $11,715.73 0% $11,715.73 $1.00 $0.00 0% $0.00 �ft ft $19.00 $18,150.00 0% $18.150.00 0.0 ft $6.00 $0.00 0% $0.00 0.0 ft $25.00 $0.00 0% $0.00 4 each $moo $1,400.00 0% $1,400.00 2 each $200.00 $400.00 0% $400.00 5 each $200.00 $1,000.00 0% $1,000.00 5 each $150.00 $750.00 0% $750.00 0.0 ft $17.00 $0.00 0% $0.00 2 each $3.500.00 $7,000.00 0% $7,000.00 1 each $500.00 $500.00 0% $500.00 7ft $450.00 $3,127.50 0% $3,127.50 700.0 ft $26.00 $17,500.00 0% $17,500.00 135.0 ft $35.00 $4,725.00 0% $4,725.00 0.0 ft $40.00 $0.00 0% $0.00 0.0 ft $320.00 $0.00 0% $0.00 0.0 ton $60.00 $0.00 0% $0.00 0.0 sy $2.00 $0.00 0% $0.00 0.0 acre $24,000.00 $0.00 0% $0.00 330.0 cy $8.00 $1,980.00 0% $1,980.00 1150.0 cy $12.00 $13,80000 0% $13,800.00 11sum $2,000.00 $3,000 at 0% $3,000.00 11sum $2,000.00 $3,000oo 0% $3,000.00 11sum $5,000.00 $5g0000 0% $5,000.00 2 each $200.00 $380.00 0% $380.00 2 each $200.00 $380.00 0% $380.00 2 each $200.00 $380.00 0% $380.00 2 each $200.00 $380.00 0% $380.00 2 each $200.00 $380.00 0% $380.00 ft $1.00 $0.00 0% $0.00 Lanes E $3,000.00 $0.00 0% $0.00 Lanes $150.00 $0.00 0% $0.00 Lanes $250.00 $0.00 0% $0.00 cost sum $121,552.87 $121,552.87 COfl9ngenCy $12,155.29 $12.155.29 Total $133,710 $133,710 rk11-0rive offload 102519 -TO DO to doudWnderson1040918_bondskestimates\SUB201600021_OTV block 10_Amend_RP_bond_eat _JLF_chk110522-ja.xlsx 111WO22