HomeMy WebLinkAboutWPO201900027 Correspondence 2022-11-07 (2)® COLLINS ENGINEERING 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902
434.293.3719 PH 434.293.2813 FX
lwww.collins-engineering.com
October 26, 2022
Emily Cox, PE
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: Pleasant Green Connector Road VSMP Plan (WPO 201900027)
Thank you for the minimal comments dated October 17, 2022 on the above referenced project. Below are detailed responses to the
remaining comments.
A. Stormwater Pollution Prevention Plan (SWPPP)
1. Comment addressed.
2. Comment addressed.
3. The proposed start date has been updated on the registration statement, in the SWPPP report, and in the plan set.
4. The registration statement and Section 9 have been recently signed.
5. The registration statement has updated area calculations. The LOD exhibit shows the areas associated with each set of plans
for the entire development.
6. The SWPPP LOD exhibit includes Phase II of the project and has the disturbed area and plan approval date listed.
7. The SWPPP report has been updated so that it corresponds with the current county template.
B. Pollution Prevention Plan (PPP)
1. Comments addressed.
C. Stormwater Management Plan (SWMP)
2. Sheet 6 of the attached Pleasant Green Connector Road VSMP plans has been revised with this resubmittal. The
Stormwater Management Narrative's 'Water Quality Summary section has been updated. The narrative now includes the
last sentence in this section, where it notes the date of the nutrient credits purchase (2/1/21) and the deed book and page
numbers of the easement vacation (DB 5657, Pg. 428-432). Also, the WPO 201600069 Amendment #2 has been
resubmitted for approval. This resubmittal included the aforementioned documents showing the recorded nutrient credits
and easement vacation.
6. The CLOMR-F is in the final stages of its review and approval with FEMA. The applicant will provide County Engineering
with this information once it is received.
14. Sheet 6 of the attached Pleasant Green Connector Road VSMP plans has been revised with this resubmittal. The 'Pleasant
Green Water Quality Master Plan' data located in the bottom -middle portion of sheet 6 has been revised, and the "NOTE"
now references "WPO 201600069 Amendment #2" instead of the previously incorrect reference to "Amendment #1".
Sheet 43 of the previously reviewed/accepted SW M report was also updated to read 'WPO 201600069 Amendment #2"
instead of the previously shown incorrect "Amendment #1" reference. This sheet is at the back of the set within the
"Overall Water Quality Calculations... " section and matches the table described above and shown on sheet 6.
D. Pollution Prevention Plan (ESCP)
1. Comments addressed.
E. Mitigation Plan
1. Comments Addressed.
Should you have any questions during your review and approval of this plan, please feel free to contact Scott Collins at
scottPcollins-eneineerine.com or Graham Murray at¢rahamCdcollins-eneineerine.com.
Sincerely,
Scott Collins, PE