HomeMy WebLinkAboutARB202200097 Application 2022-11-07 (2)=Ry O4
Application and Checklist for Sign Permit y= a
Part A: Applicant and Parcel Information
Project Name: The Trading Post BP Address: 3017 Monacan Trail Rd. North Garden, VA
Tax map and areal s : 087B0-00-00-00400 Zoom , RA / Entrance Corridor
Contact (Who should we call w/ questions?) Name: Brittney Garren
Business Name: Interstate Sign Company
Address 1990 Rockford St. City Mount Airy
State NC zip 27030
Daytime Phone () (336)789-3069 Fax # () (336)789-5482
E-mail brittney@interstatesign.com
Contractor Name: Brittney Garren Business Name:
Interstate Sign Company
Address 1990 Rockford St. City Mount Airy
State NC zip 27030
Daytime Phone O (336)789-3069 Fax # (__) (336)789-5482
E-mail brittney@interstatesign.eom
Business Owner Name: Sunil "Bobby" Kapoor Business Name:
TVS Food Mart Inc.
Address 3017 Monacan Trail Rd. City North Garden
State VA zip 22959
Daytime Phone(_) (804)536-5802 Fax#(_)
E-mail riehmondgasll@gmail.eom
Part B: Determining application requirements and fees (includes 4% Technology Surcharge)
NOTE: Fees are calculated PER SIGN. A separate application is required for each sign, except for directional signs,
J
n
Sign Permit — Please indicate which sign type you are applying for:
Freestanding or Monument Sign: $123.30
If a footing is required, an additional fee is required: $54.06
Wall Sign (Includingproperty, awning, fuel pump canopy signs) $123.30
Sign Refacing: $85.60
Electrical Permit — Will the sign he illuminated?
Yes (Illuminated signs require an electrical permit and an electrical schematic.) $73.14
No $ 0.00
ARB Review— Will the permanent sign(s) he constructed in an Entrance Corridor?
(Go to httos://www.albemarle.ore/govemment/wmmmitydevelooment/advisory-boards/architectural-review-board for more information)
Yes This is a new sign application. See ARB requirements next pages.
Yes This is a submittal of revisions to an in -process application.
❑ No This sign will not be constructed in an Entrance Corridor)
FEE TOTAL (Please add all the amounts checked in sections I — 3):
FOR OFFICE USE ONLY BP# ARM
Fee Amount S Date Paid By who? Receipt #
$135.20
$ 67.60
$ 0.00
$ 509.00
Check # By
County of Albemarle Community Development Department
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126
www.albemarle.org 04/2022 Page 1 of
Part C: Submittal Items Required
Note: Submittals must contain all information unless otherwise indicated. Electronic submittals are preferred. If paper
submittals are made, provide one copy. Additional submittal materials may be required if review by the Architectural Review
Board is necessary. Applicants will be notified if additional materials or ARB review are required.
SECTION I: FREESTANDING, SUBDIVISION OR DIRECTORY SIGNS
A. Submittal Requirements
0 Site plan or latest approved plat showing, to scale, the proposed location of the sign(s) with dimensions.
0 Distance from the sign to the property lines and/or edge of the VDOT right-of-way.
❑ Provide written authorization from the Albemarle County Service Authority (ACSA) for an approved location.
❑ If the sign will be located in an easement, a letter of approval from the easement holder will be required.
0 A footing/foundation diagram showing how the base or pole will be anchored in the ground.
0 A to -scale color illustration of the proposed sign showing
0 Dimensions of the sign, including overall height from the ground, cabinet size, length, width and depth, base
size, etc. (Be sure to also include these dimensions on the diagrams provided in the Sign Permit Application packet.)
0 Proposed lettering and/or graphics in their proposed location.
0 Entrance Corridor Requirements: Signs in the Entrance Corridors must conform to the Entrance Corridor Sign
Guidelines and approved Comprehensive Sign Plans. Go to httos://www.albemarle.org/government/community-
develooment/advisorv-boards/architectural-review-board for more information. Provide a color illustration of the
front and side elevations of the sign showing:
o If internally illuminated, indicate which areas of the sign are opaque and which are illuminated. Internally
illuminated cabinet signs must have opaque backgrounds. (Opaque materials don't allow light to pass through.
When lit only from behind, the color of an opaque material cannot be detected nor can objects be seen through it.)
o Identification of proposed materials and colors. Include standard color id numbers (Pantone, Benjamin Moore,
Acrylic, etc.) for all materials, text, graphics, base, faces, trim caps, returns, etc.
o If colors other than Pantone equivalents are identified, accurate physical samples may be required. Applicants
will be notified if physical samples are required.
o Provide a site plan showing proposed landscaping around the sign, including botanical names and planting sizes.
o Additional submittal materials may be required if review by the Architectural Review Board is necessary. (The
B. Inspection Requirements for Freestanding, Subdivision or Directory Signs
❑ Applicant must mark the location of the property lines and the location of the sign with stakes in preparation for a
preliminary zoning inspection. (All four corners of the sign must be marked with stakes that are easily visible to all
inspectors.)
❑ A preliminary zoning inspection must be completed to verify the location of the sign before the permit can be
issued.
❑ Freestanding signs are required to have footing inspections. (scheduled by applicant)
❑ Freestanding signs are required to have electrical inspections if illuminated. (scheduled by applicant)
❑ Freestanding signs are required to have final building and zoning inspections. (scheduled by applicant)
County of Albemarle Community Development Department
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126
www.albemarle.org 04/2022 Page 2 of
SECTION 2: WALL SIGNS
A. Submittal Requirements
A drawing, to scale, showing dimensions of the sign (length, height, depth).
0 Elevation drawing(s) or modified photograph of the entire building, to scale and in color, showing
0 The sign location on the building, sign height above grade, and the length of building frontage. (Be sure to also
include these dimensions on the dta rgrams provided in Appendix B)
0 Sign lettering and/or graphics in their proposed location.
0 Entrance Corridor Requirements: Signs in the Entrance Corridors must conform to the Entrance Corridor Sign
Guidelines and approved Comprehensive Sign Plans. Go to https://www.albemarle.org/govemment/community-
development/advisory-boards/architectural-review-board for more information. Provide a color illustration of the front
and side elevations of the sign showing:
o Indication of sign type (channel letters, cabinet, panel, etc.).
o Indicate on the drawings the proposed materials and colors. Include standard color identification numbers
(Pantone, Benjamin Moore, Acrylic, etc.) for all materials, text, graphics, faces, trim caps, etc. For channel letter
signs, indicate on the drawing that the raceway color shall match the color of the wall to which the raceway is
attached.
• If colors other than Pantone equivalents are identified, accurate physical samples may be required. Applicants
will be notified if physical samples are required.
o If externally illuminated, indicate the location of proposed light fixtures and provide manufacturer's cut sheets
describing illumination type, intensity, style, shielding, color, and height. All lighting must meet ordinance
requirements as outlined in Section 4.17.
o For internally illuminated signs, indicate which areas of the sign are opaque and which are illuminated. (Opaque
materials don't allow light to pass through. When lit only from behind, the color of an opaque material cannot be
detected nor can objects be seen through it. Internally illuminated cabinets must have opaque backgrounds.)
B. Inspection Requirements for Wall or Projecting Signs
❑ Wall and projecting signs are required to have electrical inspections if illuminated. (Scheduled by applicant)
❑ Wall and projecting signs are required to have final building and zoning inspections. (Scheduled by applicant)
SECTION 3: ILLUMINATION REQUEREMENTS
A. If the proposed sign is to be illuminated, the applicant must provide the following:
❑ Electrical permit
❑ Electrical schematic
❑ The location of proposed light fixtures identified on a plan and/or elevation
❑ Manufacturer cut sheets describing illumination type, intensity, style, shielding, color, and height. All lighting
must meet ordinance requirements as outlined in Section 4.17 of the Zoning Ordinance.
❑ Manufacturer cut sheets describing illumination type, intensity, style, shielding, color, and height. All lighting
must meet ordinance requirements as outlined in Section 4.17 of the Zoning Ordinance.
County of Albemarle Community Development Department
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126
www.albemarle.org 04/2022 Page 3 of
SECTION 4: WORK VALUATION
A. Work Valuation $
23,701.00
Part D: Applicant Agreement
Applicant must read and sign
. Electronic submittals are preferred. If paper submittals are made, provide one copy. All submittal items become the
property of Albemarle County. Applicants are encouraged to maintain duplicate copies in their own files.
. The application package is not complete without this checklist, completed, signed, and included with the required
submittal materials indicated on the checklist.
I hereby certify that the information provided on this application and accompanying information is accurate, true and
correct to the best of my knowledge and belief and contains all information required by these checklists
�� J QiL1Q,l1i 10124/2022
Signature of p rson completing checklist Date
Brittney Garren / Permit Coordinator (336)789-3069
Printed Name / Title Daytime phone number of Signatory
County of Albemarle Community Development Department
401 McIntire Road Charlottesville, VA 22902 Voice: (434) 296-5832 Fax: (434) 972-4126
www.albemarle.org 04/2022 Page 4 of