HomeMy WebLinkAboutSUB202200190 Application 2022-11-08•
APPLICATION FOR A SUBDIVISION PLAT
Owner/Applicant Must Read and Sign
The plat application process includes providing the County with all the information required in Chapter 14
Subdivision of Land of the Albemarle County Code.
The foregoing information is complete and correct to the best of my knowledge. I have read and understand the
provisions of Chapter 14 Subdivision of Land of the Albemarle County Code.
By signing this application I am consenting to written comments, letters and or notifications regarding this
application being provided to me or my designated contact via fax and or email. This consent does not preclude
such writt communication from also being sent via first class mail.
1117/22
Signature of Owner, Contract Purchaser, Agent Date
Scott Collins
Print Name
434-293-3719
Daytime phone number of Signatory
FOR OFFICE USE ONLY SUB # Fee Amount S Date Paid
By who? Receipt
•
APPLICATION FOR A SUBDIVISION PLAT
FEES
Preliminary Plat Reviewed in Accord with 14-206
5 copies of plat are required for first submittal
❑ Two -lot subdivision as described in Section 14-232(B)(2) or if all lots front on an existing public street =
$307.84 ($296 + $11.84 Technology Surcharge)
16 copies of plat are required for first submittal - 8 copies required for a revision
❑ 1 or more lots = $1,414.40 ($1,360 + $54.40 Technology Surcharge) + ❑ Fire Rescue Fee = $75
Final Plat Reviewed in Accord with 14-206 (SEE CHECKLIST FOR SECTION 14-206)
# of copies required for submittal will be noted with your preliminary approval letter
❑ 1 to 9 lots = $1,230.32 + ❑ Fire Rescue Fee = $75
($1,183 + 47.32 Technology Surcharge)
❑ 10 to 19 lots = $053.04 + ❑ Fire Rescue Fee = $75
($1,301+ $52.04 Technology Surcharge)
❑ 20 or more lots = $1,513.20 + ❑ Fire Rescue Fee = $75
($1,455 + $58.20 Technology Surcharge)
Final Plat Reviewed in Accord with 14-207 (SEE CHECKLIST FOR SECTION 14-207)
5 copies of plat are required for first submittal
❑ Two -lot subdivision as described in Section 14-232(B)(2) or if all lots front on an existing public street=$664.56
($639 + $25.56 Technology Surcharge)
❑ Vacation (Section 14-212.2) _ $295.36 ($284 + $11.36 Technology Surcharge)
❑ Subdivisions following final site plan approval = SEE FEES ABOVE for 1-9 lots, 10-19 lots, and 20 or
more lots
Other matters subject to Review
❑ Relief from plat conditions imposed by the commission prior to the date of adoption of this chapter = $479.44
($461 + $18.44 Technology Surcharge)
Prior file Name/Number SUB-
® Variation or exception under section 14-203.1 before approval of a final plat, not provided for under
subsections (E)(4), (5), or (6) _ $1,021.28 ($982 + $39.28 Technology Surcharge) Attach written justification
❑ Variation or exception under section 14.203.1 after approval of a final plat, not provided under sub-
sections (E)(4), (5), or (6) _ $1,021.28 ($982 + $39.28 Technology Surcharge) Attach written justification
Groundwater Review Fees
❑ Tier 2 Groundwater Review = 406.64 ($391 + 15.64Technology Surcharge) (Required for all plats
showing lots less than 21 acres)
O Tier 3 Groundwater Review $627.12 ($603 + 24.12 Technology Surcharge) (Required for all plats
showing lots where at least 3 lots are 5 acres or less)
❑ Tier 4 Groundwater Review = $1,354.08 ($1,302 + 52.08 Technology Surcharge)
Notices as required by sections 14-216 and 14-221
Preparing and mailing or delivering up to fifty (50) notices = $237.00 plus the actual cost of first class
postage.
Preparing and mailing or delivering, per notice more than fifty (50) _ $1.19 plus the actual cost of first
class postage