HomeMy WebLinkAboutSDP201800045 Correspondence 2022-11-09I® COLLINS ENGINEERING October 23, 2022 Department of Community Development 401 McIntire Road 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ��434.293.3719 PH 434.293.2813 FX www.collins-engineering.com Charlottesville, VA 22902 RE: North Pointe— Northwestern Residential Area Final Site Plan (SDP2018-45) Per discussions with Charles Rapp, this final plan has been reinstated for review and approval. The last comment letter, dated July Ste 2019, indicated that the plan was basically ready for approval, pending confirmation that the proffer items had been addressed. CE met with Albemarle County and VDOT in August 2019 and discussed the completion of the project. In that meeting, it was deemed that the transportation proffers were not completely addressed until all VDOT approvals had been obtained. This included the VDOT approvals for the shop drawings associated with the entrance culvert and the retaining wall along Route 29. CE worked with VDOT over the past 3 years (during the pandemic) to obtain final approvals on the shop drawings for the North Pointe infrastructure associated with the road plan, site plan, and Route 29 entrance improvement plan. Attached is the letter from VDOT with the approval for these shop drawing designs. CE is resubmitting the final site plan for approval, addressing the comments below from the final review letter, dated July St', 2019. Planning 1. Comment previously addressed 2. Comment previously addressed B. Comment previously addressed 4. Comment previously addressed 5. Comment previously addressed 6. Comment previously addressed 7. Comment previously addressed 8. As noted above, the road plans can now be approved with the approval from VDOT on the shop drawings. In addition, a request to establish a road bond is being submitted to the county as well. 9. Attached is the approved letter from VDOT for the road plans, entrance plans, and shop drawings. VDOT has now approved all aspects of the North Pointe project. 10. Comment previously addressed 11. Comment previously addressed 12. The note on sheet 6 has been updated to reference SMA2000-9. 13. Comment previously addressed 14. Comment previously addressed 15. Comment previously addressed 16. Comment previously addressed 17. Comment previously addressed 18. Comment previously addressed 19. Comment previously addressed 20. Comment previously addressed 21. Comment previously addressed 22. Comment previously addressed 23. Comment previously addressed 24. Comment previously addressed 25. This comment has been addressed with the approval from VDOT for the shop drawings for the culvert at North Pointe. 26. Comment previously addressed 27. Comment previously addressed 28. This comment has been addressed. The WPO has been approved and VDOT has approved the stream crossing and shop drawings for the culvert. 29. Comment previously addressed 30. Comment previously addressed 31. Comment previously addressed 32. Comment previously addressed 33. Comment previously addressed 34. Attached is the updated recreational substitution letter for review and approval. 35. Comment previously addressed 36. Comment previously addressed 37. Comment previously addressed 38. All comment have been addressed. 39. Comment previously addressed 40. Comment previously addressed 41. Comment previously addressed 42. Comment previously addressed 43. Comment previously addressed 44. Comment previously addressed 45. The WPO plans, road plans, and entrance improvement plans have all been deemed ready for approval. 46. Comment previously addressed 47. Comment previously addressed 48. Comment previously addressed 49. Comment previously addressed 50. Comment previously addressed 51. Comment previously addressed 52. Comment previously addressed 53. Lot 74 meets the minimum front setback requirements, as shown on the plans and labeled on the cover sheet. The setback from the alley is 6', and Lot 74 meets this setback requirement. 54. Comment previously addressed 55. Comment previously addressed 56. Comment previously addressed '' mment previously addressed 58. This comment has been addressed with the approval of the plans by VDOT. 59. This comment is addressed with the bonding of the utility improvements. 60. The bus stops have been added to the road plans and site plans. No further comments have been received to -date. This comment has been addressed. 61. Requirements associated with a proffer will be completed prior to site plan approval, including cash payments as required. 62. This is not a site plan comment and should be removed from the comment letter. ARB Plans have been approved by ARE. E911 Plans have been approved. Fire/Rescue No objections Engineering 1. The WPO is being resubmitted for final approval with an updated SWPP and registration statement. 2. This comment has been addressed. The road plans are ready for approval. 3. This comment has been addressed, the entrance improvement plan is ready for approval. 4. The roadway shift has been coordinated with Townes Engineering (engineering firm for GEMC). This has been deemed acceptable. VDOT Plans have been approved. ACSA Plans have been approved. Should you have any questions, please feel free to contact me at 434-293-3719. Sincerely, Scott Collins, PE Collins Engineering ® COLLINS ENGINEERING October 23, 2022 County of Albemarle - Department of Community Development 401 McIntire Road Charlottesville, VA 22902 200 GARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 ( 434.293.3719 PH 434.293.2813 FX ..collin"ngimedng.com RE. North Pointe SDP2018-45-RequestforSubstitution ofRequiredRecreationa/Amenities Please consider this request to allow substitution of the recreation facilities specified in section 18- 4.16 of the Zoning Ordinance. Per the approved rezoning plan, the North Pointe density on this property is 184 townhouse units for the Northern residential development area of North Pointe. The required amenities, as listed below, includes (4) tot lots and (1) full basketball court The rezoning plan for the entire North Pointe development did not contemplate any active recreational areas or tot lot areas within this section of the overall project With the close proximity of these townhouse units to the proposed elementary school property, the active recreational elements can be accommodated for this townhouse development with the playgrounds and fields within the elementary school property. In addition, this section of the North Pointe Development is platting and dedicating approximately 16.23 acres of floodplain, Greenway, and trail area to Albemarle County as a recreational area for the benefit of the overall development and Albemarle County. Access easements to this area will also be platted, allowing public access to the Greenway and recreational area within this development Required Amenities The following summarizes the required amenities per the ordinance: Required Recreation area: 200 s.f. x 184 units = 36,800 s.f. or 0.85 ac Four (4) tot lots required, each to include: • 1 swing with 4 seats • 1 buckabout or whirl • 1 slide • 2 benches • 2 climbers (1) Full Basketball Court: Y2 court/100 units x 184 units =1 full or 2 half courts required ProposedAmenitiesr Land dedication to Albemarle County Greenway, Floodplain area, and trail area dedicated to Albemarle County along with access easements to this property through the townhouse development TOTAL AREA PROWDED: 16.23 acres Please consider this land dedication and proximity to the proposed elementary school site as a substitution for the required recreational amenities per the Albemarle County zoning regulations. The Greenway, floodplain, and trail area will be a public amenity to everyone within the development and also available to the residents of Albemarle County. In addition, the homeowners will have pedestrian access to the proposed Elementary school for active recreation. Thank you for your consideration of this request Sincerely,nn c�C9r?L`(�6C�K� Scott Collins, P.E. COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 1601 orange Road Culpeper Virginia 22701 Stephen C. Brich, P.E. Commissioner June 18, 2019 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Matthew Wentland, P.E. Re: North Pointe — Route 29 Improvements Plan (Lewis & Clark Drive) SUB-2016-00196 Review #7 Dear Mr. Wentland: The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, as well as the Culpeper District Traffic Engineering and Location & Design Sections, have reviewed the above referenced plan as submitted by Collins Engineering, revised 26 April 2019, and finds it to be generally acceptable. Note that although the plans are approved, a permit will not be issued until the Culpeper District Structure & Bridge Section approves the plans for the proposed retaining wall and box culvert. Comments concerning these items have been provided in previous review letters. Also note that inventoried structures such as the proposed Lewis & Clark box culvert with utilities crossings will not be approved unless a maintenance agreement with the County of Albemarle is obtained in order to offset relocation of utility costs associated with maintenance of the culvert. If further information is desired, please contact Justin Deel at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, Adam J. M ore, P.E. Area Land Use Engineer Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION Stephen C. Brich, P.E. 1401 East Broad Street Commissioner Richmond, Virginia 23219 June 28, 2022 County of Albemarle Department of Community Development 401 McIntire Road Charlottesville, VA 22902 Attn: Matthew Wentland, P.E. Re: SUB-2016-00196 - North Pointe Northwest, Structural Review Review #9 Dear Mr. Wentland: (804) 786,2701 Fax: (804) 786,2940 The Department of Transportation, Charlottesville Residency Transportation and Land Use Section, has reviewed the above referenced plan as submitted by Collins Engineering, revised 10 May 2021, revised construction plans 5-30-2022, and find the plans generally acceptable. If further information is desired, please contact Max Greene at 434-422-9894. A VDOT Land Use Permit will be required prior to any work within the right-of-way. The owner/developer must contact the Charlottesville Residency Transportation and Land Use Section at (434) 422-9399 for information pertaining to this process. Sincerely, John C. Wilson, P.E. Assistant Resident Engineer Area Land Use Charlottesville Residency VirginiaDOT.org WE KEEP VIRGINIA MOVING COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 Phone (434) 296-5832 Fax (434) 972-4126 Road and Drainage plan review Project title: North Pointe — Route 29 Improvement Plan Project file number: SUB201600196 Plan preparer: Collins Engineering [scott@colhns-engineering.com] Owner or rep.: Neighborhood Investments NP, LLC [richard@neighborhoodprops.com] Date Received: 14 October 2016 (Rev. 1) (Rev. 2) (Rev. 3) Date of comments: (Rev. 1) (Rev. 2) (Rev. 3) 2 June 2017 16 August 2017 8 May 2019 22 December 2016 28 July 2017 2 October 2017 3 July 2019 Scott, We have reviewed the plans and have the following comments: Engineering 1. The VSMP plan will need to be approved before the road plans can be approved. (Rev. 1) Response noted. (Rev. 3) The V SMP has not yet been approved. 2. The plan cannot be approved until VDOT has approved the hydrologic/hydraulic computations for the stream crossing [SP2006-34, Condition #2]. Comments have not yet been received from Planning. ACSA, Fire Rescue and ARB currently have no objection to the plans. VDOT comments were emailed on 6/18/19. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process; After approval, plans will need to be bonded. The bonding process is begun by submitting a bond estimate request form and fee to the Department of Community Development. One of the plan reviewers will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need Engineering Review Comments Page 2 of 2 to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted along with court recording fees. After bonding and agreements are complete, county staff will need to enter project information in a DEQ database for state application processing. DEQ will review the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter. This should be copied to the county. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants will need to complete the request for a pre -construction conference form, and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; http://www.albemarle.org/dgptfomis.asp?departrnent=cdengmTo If you have any questions or concerns, please contact me either by email (mwentland@albemarle.or¢) or by phone at 434-296-5832 ext. 3458. Sincerely, Matt Wentland, P.E. Civil Engineer II File: SLB201600196 North Pointe Rt29 Improvements Road Plans review comments rcv3 07-03-19.doc