HomeMy WebLinkAboutWPO202000053 Calculations 2022-11-10PLEASANT GREEN- PHASES II & III
STORMWATER MANAGEMENT CALCULATIONS PACKET ADDENDUM #1
(WPO 202000053 Amendment #1)
Date of Calculations
JULY 29, 2022
APPROVED
by the Albemarle County
Communijyl jj opT8r gepartment
Date
File WP0202000053-amendment 1
OA;
SCOTT7R. CID-LLINSZ
No. 35791 a
7/29/22
7onAL
PREPARED BY:
COLLINS ENGINEERIN(
200 GARRETT STREET, SUITE K
CHARLOTTESVILLE, VA 22902
434.293.3719 PH
434.293.2813 FX
www.collins-engineering.com
Summary of Addendum #1
1. This addendum is intended to accompany the previously approved Pleasant Green Phases II & III WPO
202000053 Stormwater Management (SWM) Calculations Packet originally dated November 30, 2020 and last
revised on March 24, 2021.
2. The March 24, 2021 SWM calculations packet took into consideration the (then future) development of phase III.
With the finalization of phase III under review at this time, this addendum was created to accompany the
attached plan amendment (WPO 202000053 Amendment #1) reflecting the minor changes that have occurred
since March of 2021.
3. The primary SWM change is associated with the open space located approximately at the intersection of
Litchford Road and Rambling Brook Lane. This grass lawn open space revision impacted the time of
concentration in the post -development subarea D. The previously approved post -development subarea D time
of concentration of 0.23 hrs. has been reduced to 0.18 hrs. This changed prompted revisions to Worksheet 3,
Worksheet 4, the routing calculations for SWM Facility'D' and the 9VAC25-870-66 flood protection calculations
for SWM Facility'D'. Please note, no modifications to the designs of the three SWM facilities were required.
U.S. Department of Agriculture
Natural Resources Conservation Service
TR SS Worksheet 3: Time of Concentration (TJ or Travel Time (Tt)
Project: Pleasant Green Phases II & III
Location: West of McComb Street
Check One: Present X Developed X
Check One: T, X Tt
Segment ID,
Sheet Flow: (Applicable to T. only)
1 Surface description (Table 3-1)
2 Manning's roughness coeff., n (Table 3-1
3 Flow length, L (total L < 100) (ft)
4 Two-year 24-hour rainfall, P,(in.)
5 Land slope, s (ft/ft)
6 Compute Tt = [0.007(n* L)° a] / Pis SDA
Designed By: FGM, PE
Checked By: SRC, PE
Through subarea n/a
FL-ENG-21A
06/04
Date: 7/29/2022
Date: 7/29/2022
DA B
DA C
DA D
DA B
DA C
DA D
(Pre-Dev.)
(Pre-Dev.)
(Pre-Dev.)
(Post-Dev.)
(Post-Dev.)
(Post-Dev.)
Dense
Dense
Woods -Light
Dense
Dense
Dense
Grass
Grass
Underbrush
Grass
Grass
Grass
0.24
0.24
0.4
0.24
0.24
0.24
100
100
100
100
100
100
3.73
3.73
3.73
3.73
3.73
3.73
0.06
0.05
0.04
0.06
0.05
0.05
0.14
0.15
0.25
0.14
0.15
0.15
Shallow Concentrated Flow:
7 Surface description (paved or unpaved)
Unpaved
Unpaved
Unpaved
Unpaved
Unpaved
Unpaved
8 Flow Length, L (ft)
535
150
400
300
150
130
9 Watercourse slope, s (ft/ft)
0.07
0.03
0.08
0.07
0.03
0.02
10 Average velocity, V (Figure 3-1) (ft/s)
4.2
2.8
4.5
4.2
2.8
2.3
11 Tt= L / 3600*V
0.04
0.01
0.02
0.02
0.01
0.02
Channel Flow:
12 Cross sectional flow area, a (ft)
13 Wetted perimeter, Pw (ft)
14 Hydraulic radius, r =a/Pw (ft)
15 Channel Slope, s (ft/ft)
16 Manning's Roughness Coeff, n
17 V= [ 1.49r2/3s05 ] / n
18 Flow length, L (ft)
19 Tt= L / 3600*V
20 Watershed or subarea T,or Tt
(Add Tt in steps 6, 11 and 19)
Note: The shoretest SCS Tc is 0.10 hrs.
3 1 Y
o
LL>
O O
O
O
O
C
?
- d rl
a:Y
E
IY
ry rl
o
L
a W
t m E
V
a«
o7J io
V 'x
r w, E
r¢
z
E
a•X
N U O-
O
>
m
Q
Y O
>
o O ¢
in 0 a
in p
CL
o
l7 a
.y m
¢
ro
d
y
¢
0.06 1
0.02
0.03
0.01
0.18 1 0.22 1 0.27 1 0.18 1 0.19 1 0.18
}\
-§!§■§-®®
® ®
-
cR
IR
cR
Lq
-§2!E§-
!
EE
E
\\\\\\\\{
Pleasant Green- Phases II and III SWM Facility D- AMENDED Tc
BasinFlow printout
INPUT:
Basin: Pleasant Green- Phases II and III SWM Facility D- AMENDED Tc
0 Contour Areas
Elevation(ft) Area(sf) Computed Vol.(cy)
1 Storage Pipes
Storage pipe 0
name: APPROVED UGD System 'D'
diameter (in) 120.000
length (ft) 177.750
invert (ft) 695.500
angle 0.287
volume (cy) 517.054
Start—Elevation(ft) 695.50 Vol.(cy) 0.00
5 Outlet Structures
Outlet structure 0
Orifice
name: APPROVED Low -Flow Barrel
area (sf)
1.227
diameter or depth (in)
15.000
width for rect. (in)
0.000
coefficient
0.500
invert (ft)
694.470
multiple
1
discharge out
of riser
Outlet structure 1
Orifice
name: APPROVED Low -Flow Orifice in Weir Plate
area (sf)
0.028
diameter or depth (in)
2.250
width for rect. (in)
0.000
coefficient
0.500
invert (ft)
695.500
multiple
1
discharge into
riser
Page 1
Pleasant Green- Phases II and III SWM Facility D- AMENDED Tc
Outlet structure 2
Orifice
name: APPROVED Overflow / Emergency Spillway in Weir Plate
area (sf)
2.796
diameter or depth (in)
22.640
width for rect. (in)
0.000
coefficient
0.500
invert (ft)
703.500
multiple
1
discharge into
riser
Outlet structure 3
Weir
name: APPROVED Access MH Below System
diameter (in)
48.000
side angle
0.000
coefficient
3.300
invert (ft)
707.000
multiple
1
discharge
into riser
transition at (ft)
1.215
orifice coef.
0.500
orifice area (sf)
12.566
Outlet structure 4
Orifice
name: APPROVED High Flow Bypass Barrel
area (sf)
1.767
diameter or depth (in)
18.000
width for rect. (in)
0.000
coefficient
0.500
invert (ft)
703.500
multiple
1
discharge into
riser
Page 2
Pleasant Green- Phases II and III SWM Facility D- AMENDED Tc
3 Inflow Hydrographs
Hydrograph 0
SCS
name: AMENDED 1-yr 24-hr SCS Design Storm
Area (acres)
4.790
CN
79.000
Type 2
rainfall, P (in)
3.090
time of conc. (hrs)
0.1800
time increment (hrs)
0.0200
time limit (hrs)
30.000
fudge factor
1.00
routed
true
peak flow (cfs)
6.705
peak time (hrs)
11.970
volume (cy)
807.238
Hydrograph 1
SCS
name: AMENDED 2-yr 24-hr SCS Design Storm
Area (acres)
4.790
CN
79.000
Type 2
rainfall, P (in)
3.730
time of conc. (hrs)
0.1800
time increment (hrs)
0.0200
time limit (hrs)
30.000
fudge factor
1.00
routed
true
peak flow (cfs)
9.334
peak time (hrs)
11.970
volume (cy)
1123.760
Hydrograph 2
SCS
name: AMENDED 10-yr 24-hr SCS Design Storm
Area (acres) 4.790
CN 79.000
Type 2
rainfall,
P (in)
5.610
time of conc.
(hrs)
0.1800
time increment
(hrs)
0.0200
time limit
(hrs)
30.000
fudge
factor
1.00
routed
true
peak flow
(cfs)
17.813
peak time
(hrs)
11.970
volume (cy)
2144.699
Page 3
Pleasant Green- Phases II and III SWM Facility D- AMENDED Tc
OUTPUT:
Routing Method: storage -indication
Hydrograph 0
Routing Summary of Peaks
inflow (cfs)
discharge (cfs)
water level (ft)
storage (cy)
Hydrograph 1
Routing Summary of Peaks:
inflow (cfs)
discharge (cfs)
water level (ft)
storage (cy)
Hydrograph 2
Routing Summary of Peaks
inflow (cfs)
discharge (cfs)
water level (ft)
storage (cy)
AMENDED 1-yr 24-hr SCS Design Storm
6.705 at 11.96 (hrs)
0.311 at 12.66 (hrs)
703.478 at 12.84 (hrs)
417.567
AMENDED 2-yr 24-hr SCS Design Storm
9.334 at 11.96 (hrs)
6.217 at 12.08 (hrs)
704.204 at 12.08 (hrs)
456.340
AMENDED 10-yr 24-hr SCS Design Storm
17.813 at 11.96 (hrs)
16.081 at 12.02 (hrs)
705.770 at 12.02 (hrs)
513.258
Tue Aug 23 09:28:45 EDT 2022
Page 4
9 VAC 25-870-66 (Concentrated Outfall from Subarea D)
Section C: Flood Protection
"Concentrated stormwater flow shall be released into a stormwater conveyance system and
shall meet one of the following criteria as demonstrated by use of acceptable hydrologic and
hydraulic methodologies:"
Section C.2.a.:
The point of discharge (the SWM facility outfall), "Confines the postdevelopment peak flow
rate from the 10-year 24-hour storm event within the stormwater conveyance system [the
SWM facility & outfall pipe] to avoid the localized flooding. Detention of stormwater or
downstream improvements may be incorporated into the approved land -disturbing activity
to meet this criterion...."
10-Year, 24-Hour Design Storm Peak Back Water Surface 705.77 ft
SWM Facility'D' Crown of Pipe Elevation at High Point = 705.87 ft
SWM Facility'D' Rim Elevation at Lowest Access MH / Weir Plate 707.00 ft
(No overtopping Occurs)
Section C.3 Limits of Analysis
....stormwater conveyance systems shall be analyzed for compliance with flood protection
criteria to a point where:" a, b or c are met.
Section C.3.c.:
"The stormwater conveyance system [the SWM Facility outfall] enters a mapped floodplain
or other flood -prone area, adopted by ordinance, of any locality."