HomeMy WebLinkAboutWPO201300051 Checklist 2013-07-10 akairo Erosion & Sediment Control Preconstruction Conference Checklist Name of Plan: HA (ez.04) Plan No.: 1A)P 20 i 3 000,5 Date: 'S'1 1) Copies of approved plan given to: Owner or Authorized Agent N/A Contractor 2) Have all the conditions been met? c.5 -- 3) Responsible Land Disturber: /" /d Cert. /Lic.No.: Type: Address / Phone / Mobil Phone: 4) Name of Prime Contractor: n1JI4 Address / Phone / Mobil Phone: Name of Subcontractor: 5) Persons in Attendance: Name Firm c, a� f�c �-7 r a Lr3. 64 (6) Date Permit Issued: eivz.c/±3 (7) Notification has been given that the owner /contactor is responsible for obtaining a VSMP permit from DCR. DCR has requested the County to check for the site posting. (8) Article II, section 17 -207 B. Each permit shall also be subject to the following: 1. The permitted land disturbing activity shall be deemed to have commenced on the date the permit was issued, provided that the program authority may establish another date of commencement 1 of 2 o,...:..,.a 1 ' norm'' t,ased on documentation submitted by the owner that clearly demonstrates that the land disturbing Activity commenced on that date 2 Pormanent vegetation shall be installed on all denuded areas within nine (9_1 months after the date the land disturbing activity commenced, except for areas that the program authority finds are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non - erosive surface. For the purposes of this section, a "non- erosive surface includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete, trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures, and such other surfaces that tile program authority determines would adequately provide a permanent barrier to erosion 2 The time limit for installing permanent vegetation as required by paragraph (F3)(2) may he extended by either the program authority or the board of supervisors, or both, as follows' a The program authority may extend the time limit for installing permanent vegetation up to an additional six (6) months, provided the owner subnots a written request to the program authority 10 less than one (1) month prior to the deadline for installing the permanent vegetation. The program authority may grant the extension if it finds that (i) the additional time is necessary due to factors beyond the control of the owner, (11) the owner had made good faith efforts to comply with the time limit, and (iii) the ()whet has effectively controlled erosion and sedimentation on the property during the land disturbing activity In granting an extension, the program authority may oppose reasonable conditions t� the board of supervisors may extend the time ltinit for Installing permanent vegetation for duration it determines to he appropriate, provided the owner submits a written request to the clerk of the board of supervisors no less than two (2) months prior to the deadline for installing the permanent vegetation The program authority shall provide its opinion to the board as to the condition of the property with respect to compliance with this chapter and an estimate of the minimum time needed to complete grading and install permanent vegetation for the land disturbance covered by this permit. The board may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has plans to effectively control or has effectively controlled erosion and sedimentation on the property during the and disturbing activity in granting an extension, the board shall net a time limit and may impose nil reasonable conditions Note , 7-14 %S is _ v i c �-,a7fv A6/a -7T CL/V7 - �►5 s r�� -c�sc :J }*3— �v 4 -A4 6c- The ✓toLA / 'J) 7?) AJ flcT /DA- res 3.4rL T ia L) efs t me ZC c a,-t Vuoi.irt io•%) ►,..AS F 1047 L -L-y / 000 G 4b1 0./a;'/ r 5611 -= /1,c 2 of Revised 11/29/2011 1 U00f' lComnu pity Development \f orms \Inspections \Erosion Preconstruction Conf Checklist 11 29 2011_doc