HomeMy WebLinkAboutWPO201300051 Checklist 2013-07-10 akairo
Erosion & Sediment Control
Preconstruction Conference Checklist
Name of Plan: HA (ez.04)
Plan No.: 1A)P 20 i 3 000,5
Date: 'S'1
1) Copies of approved plan given to: Owner or Authorized Agent N/A Contractor
2) Have all the conditions been met? c.5 --
3) Responsible Land Disturber: /" /d
Cert. /Lic.No.: Type:
Address / Phone / Mobil Phone:
4) Name of Prime Contractor: n1JI4
Address / Phone / Mobil Phone:
Name of Subcontractor:
5) Persons in Attendance:
Name Firm
c, a� f�c �-7 r a Lr3. 64
(6) Date Permit Issued: eivz.c/±3
(7) Notification has been given that the owner /contactor is responsible for obtaining a VSMP permit
from DCR. DCR has requested the County to check for the site posting.
(8) Article II, section 17 -207
B. Each permit shall also be subject to the following:
1. The permitted land disturbing activity shall be deemed to have commenced on the
date the permit was issued, provided that the program authority may establish another date of commencement
1 of 2
o,...:..,.a
1 ' norm''
t,ased on documentation submitted by the owner that clearly demonstrates that the land
disturbing Activity commenced on that date
2 Pormanent vegetation shall be installed on all denuded areas within nine (9_1
months after the date the land disturbing activity commenced, except for areas that the program authority
finds are necessary parts of the construction that are subject to an active building permit and areas where
erosion is prevented by a non - erosive surface. For the purposes of this section, a "non- erosive surface
includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement, or concrete,
trails or paths covered by gravel, stone dust, or mulch; buildings and other permanent structures, and such
other surfaces that tile program authority determines would adequately provide a permanent barrier to erosion
2 The time limit for installing permanent vegetation as required by paragraph (F3)(2) may
he extended by either the program authority or the board of supervisors, or both, as follows'
a The program authority may extend the time limit for installing permanent
vegetation up to an additional six (6) months, provided the owner subnots a written request to the program
authority 10 less than one (1) month prior to the deadline for installing the permanent vegetation. The program
authority may grant the extension if it finds that (i) the additional time is necessary due to factors beyond the
control of the owner, (11) the owner had made good faith efforts to comply with the time limit, and (iii) the ()whet
has effectively controlled erosion and sedimentation on the property during the land disturbing activity In
granting an extension, the program authority may oppose reasonable conditions
t� the board of supervisors may extend the time ltinit for Installing permanent
vegetation for duration it determines to he appropriate, provided the owner submits a written request to the
clerk of the board of supervisors no less than two (2) months prior to the deadline for installing the permanent
vegetation The program authority shall provide its opinion to the board as to the condition of the property with
respect to compliance with this chapter and an estimate of the minimum time needed to complete grading and
install permanent vegetation for the land disturbance covered by this permit. The board may grant the
extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii)
the owner had made good faith efforts to comply with the time limit; and (iii) the owner has plans to effectively
control or has effectively controlled erosion and sedimentation on the property during the and disturbing
activity in granting an extension, the board shall net a time limit and may impose nil reasonable conditions
Note ,
7-14 %S is _ v i c �-,a7fv A6/a -7T CL/V7 - �►5 s r�� -c�sc :J }*3—
�v 4 -A4 6c- The ✓toLA / 'J) 7?) AJ flcT /DA- res 3.4rL T ia
L) efs t me ZC c a,-t Vuoi.irt io•%) ►,..AS F
1047 L -L-y
/ 000 G
4b1 0./a;'/
r 5611 -= /1,c
2 of
Revised 11/29/2011
1 U00f' lComnu pity Development \f orms \Inspections \Erosion Preconstruction Conf Checklist 11 29 2011_doc