Loading...
HomeMy WebLinkAboutWPO201100042 Checklist 2011-07-06 r ALL, Now' cp 8011%7N-k, r 1 Erosion & Sediment Control Preconstruction Conference Checklist Name of Plan: � '&d 3h'f1 ( a-41;/ 7 S 91- Seake a d N4 Plan No.:fa ZO//-�000 512 Date: T"F4, f� 20/4 1) Copies of approved plan given to: Owner or Authorized Agent I Contractor Z 2) Have all the conditions been met? fe,s- 3) Responsible Land Disturber: /1iAt)C A/4 MDR/AVel t, Cert./Lic.No.: .35953 //��// /Type: /4142 Address/Phone/Mobil Phone: 8440 cliff C.A/J)E7QON atit ', .4.5-0* 1sc ,tIi .C. Z :Z(, 6 4 ,, , 4) Name of Prime Contractor: ",""Aikido 44,3l,iva`4A/, zze ��, Address/Phone/Mobil Phone: 844 t / m�4o�oid4r, sr: r iss' I`' CA J&, e. 49Z49 - o ` -7$-sy-,5os8 Name of Subcontractor: ,,,19/4g AX " �D�-s��`GZ/'7 5) Persons in Attendance: Name Firm coley did ^4///-T a '-o(3fl7 /0/044144 d,,s4 ,), «e- (6) Date Permit Issued: /C.:1, j AP /Z (7) Notification has been given that the owner/contactor is responsible for obtaining a VSMP permit from DCR. DCR has requested the County to check for the site posting. (8)Article II, section 17-207 B. Each permit shall also be subject to the following: 1. The permitted land disturbing activity shall be deemed to have commenced on the date the permit was issued, provided that the program authority may establish another date of commencement 1 of 2 Revised 11/29/2011 I:\DEPT\Community Development\Forms\Inspections\Erosion Preconstruction Conf Checklist I 1 29 2011.doc based on documentation submitted by the owner that Alertly demonstrates that the land disturbing activity commenced on that date. 2. Permanent vegetation shall be installed on all denuded areas within nine (9) months after the date the land disturbing activity commenced, except for areas that the program authority finds are necessary parts of the construction that are subject to an active building permit and areas where erosion is prevented by a non-erosive surface. For the purposes of this section, a "non-erosive surface" includes, but is not limited to, roadways and sidewalks covered by gravel, asphalt pavement; or concrete; trails or paths covered by gravel, stone dust, or mulch; buildings and'other permanent structures; and such other surfaces that the program authority determines would adequately provide a permanent barrier to erosion. 3. The time limit for installing permanent vegetation as required by paragraph,(B)(2) may be extended by either the program authority or the board of supervisors, or both, as follows:- • a. The program authority may extend the time limit for installing permanent vegetation up to an additional six (6) months, provided the owner submits a written request to the program authority no less than one (1) month prior to the deadline for installing the permanent vegetation. The program authority may grant the extension if it finds that: (i) the additional time is necessary due to factors beyond the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has effectively controlled erosion and sedimentation on the property during the land disturbing activity. In granting an extension, the program authority may impote rdasonable conditions. b. The board of supervisors may extend the time limit for installing permanent vegetation for duration it determines to be appropriate, provided the owner submits a written request to the clerk of the board of supervisors'no less than two (2) months prior to the deadline for installing the permanent vegetation. The program authority shall provide its opinion to the board as to the,condition of the property with respect to compliance with this chapter and an estirriate of the minimum"time needed to complete grading and install permanent vegetation for the land disturbance covered by this permit. The board may grant the extension if it finds that: (i) the additional time'is necessary'due to factors beyond,the control of the owner; (ii) the owner had made good faith efforts to comply with the time limit; and (iii) the owner has plans to effectively control or has effectively controlled erosion' arid- sedimentation on the property during the land disturbing activity. In granting„an extension, the botard shall set a time limit and may imposeother reasonable conditions. Notes: 0,914,44 • D iY 1 • 2 of 2 Revised 11/29/2011 1:\DEPT\Community Development\Forms\Inspections\Erosion Preconstruction Conf Checklist 11 29 2011.doc �»0 �10` Ana Kilmer From: Ana Kilmer Sent: Wednesday, November 09, 2011 4:06 PM To: 'Jamie C. Dunaway': Kenny Thacker; Philip Custer Cc: Esther Grace Subject: Crown BMW Retail Parts&Service Building-Water Protection Performance Bond- WP0-2011-00042 The $283,700 water protection performance bond has been posted and approved (erosion$26,500;stormwater $257'200). The stormwater agreement was recorded on 9/20/2011. The permit and first year inspection fee has not been paid. Ms. Dunaway: Prior to setting up the preconstruction meeting,you need to pay the permit and first year inspection fee f$2 ($l0U/per disturbed acre). Please make check payable to the County of Albemarle and submit to my atten Thank you � ' ( �� /a./ ---- /�`^q` 2---�`~' � Aria D. Kilmer County of Albemarle Community Development Department 401 Mclntire Road Charlottesville,VA 22902 434'206'5832 akilmer@albemarle.org