Loading...
HomeMy WebLinkAboutWPO202200005 Study 2022-11-15Castalia Farm Winery Stream Crossing Analysis Existing Stream Conditions In order to determine the requirements for flood control at the proposed stream crossing for the entrance on Stony Point Pass, the existing flood conditions at the stream were analyzed. The flow rates for the stream were determined using the culvert regression method which is best applied to large drainage areas like this. The drainage area to the stream at this point is 456.6 ac. The corresponding flow rates are shown in the table below: Ct1!!ZrtA A E 1156.6 Ac 1010 ft 9215 1). 1.75 Southern Piedmont Regression Equations Storm I Multiple -Parameter Drainage-Area-Onty Q, 214A"T"L"' 108.2 cfs 122(A)aos 98.5 cfs Q10 38.8AO "E' 379 L 0.430 315.6 cfs 335(A)0'596 273.9 cfs Q,, 54.11A"O"'L" 478.1 cfs 504(A)"' 414.2 cfs Q� 74.3A .. E' 3M L � 495 626.4 cfs 661(A)o 170 54S.3 cfs Q1M 101AOM9 E 03no.sn 788.1 cfs 849(A)"" 703.0 cfs The flow rate was also modelled using TR-55 since a second method is required to determine flow rates for drainage areas over 20 acres. The 10-yr flow rate using this method was calculated to be 332.04 cfs. Hydrograph 350 332. j ........... Irype: 11 "r 1"R 300 1 -Raintall-5.34- _3 2 1 1 [' i4cfs ---------- 250 Runo" Depth=1.15* 4 ..... --------- -------- 200 r,in j L Table 2 150 ----------- 100 Print -------- --------------------------- so Export 0 0 5 10 15 2 1 0 2 . 5 3 . D 3 1 5 4 . 0 4'5 Edk Time (hours) Help Using the 10-yr flow rate calculated by TR-55 to be more conservative, the stream crossing was analyzed in Hydraulic Toolbox using survey data to generate a section of the stream at the proposed entrance location: Tailwater/Channel Cross Section Z' M-I 54T5 —5470 C 0 546 5 LU b4b 0 5455 Station (ft) When the 10-yr storm calculation was performed, the depth in the channel is 3.196' which overtops the bank and floods Stony Point Pass. 549 548 C: 0 m> 547 a) W IM, lei 545 Stream Crossing Design Cross Section U 10 1 Station (ft) Since Stony Point Pass currently floods during the 10-yr storm, the stream crossing was designed to allow for overflow to remain onsite and flow over the new access road. A Contech aluminum box culvert will be installed in the stream and overflow is diverted onto the access road at a max depth of 12". HY-8 was used to calculate the overflow depth and model the section view below: 0 W Crossing: Crossing I Frout V� (Nato scak) Station (ft) By a I lowing excess runoff to flow over the access road, the current flooding onto Stony Point Pass will be reduced.