HomeMy WebLinkAboutWPO202200031 Bond Estimates 2022-11-15Project Name: Castle Rock Farm Phase 1 WPO file number: WP0202200031 TMP: 08400-00-00-05300 Date Estimate Completed: 11/15/22 Erosion and Sediment Control Bond Estimate Item Item No. Unit Unit Cost Cost Number (installed) 1 stablization (IFS, TS) 0.8 acres $5,000.00 $4,100.00 2 slit fence (SIF) 745.0 ft $5.00 $3,725.00 3 safety fence (SAF) 0.0 ft $5.00 $0.00 4 diversion (IDID, FID, RWD) 0 ft $13.00 $0.00 5 temporary slope drain (TSID) pipe length 0 ft pipe diameter 0 in $0.00 $0.00 6 earlhwork for trap #1 7 height of dam at toe 0 ft cut at high side 0 ft 8 height of fill at face 0 ft cut at face 0 ft 9 length of dam 0 ft length of cut 0 ft 10 top width 0 ft width of cut 0 ft 11 (area above transition 0 sf (area below trarsitic 0 sf 12 (total width of dam) 0 ft (total width of cut) 0 ft 13 (height below transitio 0 ft (depth below transit 0 ft 14 (area below transition) 0 sf (area above transiti( 0 sf 15 (total fill volume) 0.0 cy (total fill volume) 0.0 cy 16 length of spillway 0 ft (TOAL CY estimate 0 cy $13.00 $0.00 17 width of spillway 0 ft (spillway stone tons 0 tons $50.00 $0.00 18 silt fence inlet protection (IP) 0 $100.00 $0.00 19 stone inlet protection (P) 0 $200.00 $0.00 20 outlet protection (OP) length 0 ft vAdth 0 ft 0 $0.00 $0.00 21 channel (SCC, matted) length 0 ft vAdth 0 ft $0.00 22 check dam depth in channel 0 ft channel width 0 ft 0 $0.00 $0.00 23 construction entrance (CE) 1 $2,500.00 $2,500.00 24 wash rack 0 $2,000.00 $0.00 25 paved construction entrance 0 $3,500.00 $0.00 26 rip -rap, placed depth 0 ft length 0.0 ft 27 width 0.0 (tons) 0 tons $60.00 $0.00 28 29 survey and layout (price per 0.1 mi.) acres 0.01 traps and basins $5.00 30 mobilization $1,000.00 31 stream crossing (computed independently) $0.00 cost sum $11,330 - OD WPO20220DO31-Castle Rock Farm -hopes legacy_ESC Bond 11 1522.xlsx contingency $1,133-01) Total $12,470 1111 5F2O22