HomeMy WebLinkAboutWPO202200031 Bond Estimates 2022-11-15Project Name: Castle Rock Farm Phase 1
WPO file number: WP0202200031
TMP: 08400-00-00-05300
Date Estimate Completed: 11/15/22
Erosion and Sediment Control Bond Estimate
Item
Item
No. Unit
Unit Cost
Cost
Number
(installed)
1
stablization (IFS, TS)
0.8 acres
$5,000.00
$4,100.00
2
slit fence (SIF)
745.0 ft
$5.00
$3,725.00
3
safety fence (SAF)
0.0 ft
$5.00
$0.00
4
diversion (IDID, FID, RWD)
0 ft
$13.00
$0.00
5
temporary slope drain (TSID)
pipe length
0 ft
pipe diameter
0 in
$0.00
$0.00
6
earlhwork for trap #1
7
height of dam at toe
0 ft
cut at high side
0 ft
8
height of fill at face
0 ft
cut at face
0 ft
9
length of dam
0 ft
length of cut
0 ft
10
top width
0 ft
width of cut
0 ft
11
(area above transition
0 sf
(area below trarsitic
0 sf
12
(total width of dam)
0 ft
(total width of cut)
0 ft
13
(height below transitio
0 ft
(depth below transit
0 ft
14
(area below transition)
0 sf
(area above transiti(
0 sf
15
(total fill volume)
0.0 cy
(total fill volume)
0.0 cy
16
length of spillway
0 ft
(TOAL CY estimate
0 cy
$13.00
$0.00
17
width of spillway
0 ft
(spillway stone tons
0 tons
$50.00
$0.00
18
silt fence inlet protection (IP)
0
$100.00
$0.00
19
stone inlet protection (P)
0
$200.00
$0.00
20
outlet protection (OP)
length
0 ft
vAdth
0 ft
0
$0.00
$0.00
21
channel (SCC, matted)
length
0 ft
vAdth
0 ft
$0.00
22
check dam
depth in channel
0 ft
channel width
0 ft
0
$0.00
$0.00
23
construction entrance (CE)
1
$2,500.00
$2,500.00
24
wash rack
0
$2,000.00
$0.00
25
paved construction entrance
0
$3,500.00
$0.00
26
rip -rap, placed
depth
0 ft
length
0.0 ft
27
width
0.0
(tons)
0 tons
$60.00
$0.00
28
29
survey and layout (price per 0.1 mi.) acres
0.01
traps and basins
$5.00
30
mobilization
$1,000.00
31
stream crossing (computed independently)
$0.00
cost sum
$11,330 - OD
WPO20220DO31-Castle Rock Farm -hopes legacy_ESC Bond 11 1522.xlsx
contingency
$1,133-01)
Total $12,470
1111 5F2O22