Loading...
HomeMy WebLinkAboutWPO202200032 Review Comments WPO VSMP 2022-11-15401 McIntire Road, North Wing Charlottesville, VA 22902-4579 County of Albemarle Telephone: 434-296-5832 COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG VSMP Permit Plan Review Project title: Berkmar Self Storage VSNP Project file number: WPO2022-00032 Plan prcparcr: Jessica Denko, PE / Timmons Group [ Jessica.denko(Ltimmons.com 608 Preston Ave., Suite 200 / Charlottesville, VA 22903 Owner or rcp.: Berkmar Holdings, LLC — Frank Stoner Ifstoner(a),milestonel)artners.com 411 East Franklin Street, Suite 400 Richmond, VA 23219 Plan received date: 19 Jul 2022 (Rev. 1) 13 Oct 2022 Date of comments: 25 Aug 2022 (Rev. 1) 15 Nov 2022 Reviewer: John Anderson, PE, CFM County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSNW authority to act on any VSNW permit by issuing a project approval or denial. This project is disapproved for reasons listed below. The VSM[p application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWW, and (4) any TNIDL measures necessary. WN wl; 1. Revise SWPPP cover to include ref. to WP0202200032. (Rev. 1) Addressed. 2. Registration Statement, SWPPP Sec. I a. Sec. IA and Sec. V of Registration Statement are the same entity. If Sec, IA is TBL, then statement should remain unsigned until Construction Activity Operator is named /listed. (Rev. 1) Addressed. Applicant response (10/13/22 letter): 'Signature has been removed from Registration Statement. LOD has been revised to reflect all plan revisions.' b. Sec. 113: Once Construction Activity Operator named /listed, please include valid email. (Rev. 1) Persists. Applicant: 'Once contractor is selected, the section will be completed (understood prior to receiving grading permit).' c. Sec. 111, off -site support activity: If anticipate off -site disposal, please complete this section. (Rev. 1) Addressed. Applic : 'No off -site activity is anticipated at this time.' 3. Sec. 4/5: Update once ESC /SWM plan sheets revised. (Rev. 1) Addressed. 4. Sec. 6A.: SWPP Exhibit (I I" x 17"), update as needed. (Rev. 1) Addressed. 5. Sec. 6E.: List named individual responsible for PPP. Not required for plan approval but required to receive a grading permit. (Rev. 1) Persists. Applic : 'Once contractor is selected, the section will be completed (understood prior to receiving grading permit).' 6. Sec. 8: List named individual responsible for VESCH /SWPPP compliance inspections. Not required for plan approval but required to receive a grading permit (Rev. 1) Persists. Applic : 'Once contractor is selected, the section will be completed (understood prior to receiving grading permit).' 7. Sec. 9: Signed Certification: complete /required prior to plan approval. (Rev. 1) Addressed. R. Pollution Prevention Plan (PPP) — See above items 4, 5. Engineering Review Comments Page 2 of 8 The PPP content requirements can be found in County Code section 17-404. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is disapproved for reasons listed below. The stormwater management plan content requirements can be found in County Code section 17-403. 1. CO.0 a. Revise plan set title to include ref to WP0202200032. (Ftev. 1) Addressed. b. List associated (off -site) SDP-WPO plans, including: (Rev. 1) Addressed. Listed under 'Site Data' on Sheet CO.O. i. WP0201800030, Charlottesville -Albemarle SPCA ii. WP020160001 1, Harvest Moon iii. WP020160001 1, Kegler's Pond As -built iv. WP0201100076, Rivanna Plaza v. Rivanna Plaza easement plat @ DB-PG 3839-301 vi. SDP 199500087, Lowe's Home Improvement Center (Calculations /approved site plan) vii. SDP200300102, Lowe's Minor Amendment 2. C6.2 a. Revise capacity of pipe 4-27 103 such that Q provided > Q required (24.466cfs v. 38.16cfs). (Rev. 1) Persists. Applic : 'We think reviewer means pipe 103 (not 127) [yes, true, thank you]. Pipe 103 has been upsized. See Sheet C6.2.' Please note: Table, C6.2 appears to report identical values for pipe 103 as listed in comment, possible review error. If so, please notify. 3. C6.3 a. Revise Calculations (7/15/22), SVVPPP, and plan to reference: i. Existing dry detention basin, SWM facility ID 0021.01 rather than 'Keglers Regional Pond' since Kegler's is not a regional pond within regulatory meaning of the definition, but rather a typical SWM facility immediately adjacent to development areas which drain to it. Many developments drain to it, but it was constructed primarily to serve Kegler's (bowling alley) and Lowe's 30 years ago. As development has progressed along Berkmar (Harvest Moon, UVA Credit Union, ACSPCA /improvements pending, Berkmar Overlook, now Berkmar Self -Storage /hotel), reliance on the small detention basin is a proposition Engineering evaluates with care since the Ex. detention basin is not a 'regional' facility. VAC states: "A locality's VSMP authority may develop comprehensive stormwater management plans to be approved by the department [DEQ] that meet the water quality objectives, quantity objectives, or both of this chapter." (9VAC25-870-92). 9VAC25-870-69 outlines offisite compliance options that a VSMP authority may allow an operator to use to meet required phosphorus nutrient reductions, including "Offsite controls utilized in accordance with a comprehensive stormwater management plan adopted pursuant to 9VAC25-870-92 for the local watershed within which a project is located." The small detention basin was not developed by Albemarle as a regional SWM facility —it is simply a detention basin. (Ftev. 1) Addressed. Reference to Kegler's Regional Pond has been removed. b. Include supplemental narrative in Ca1c. packet: i. Please state: "Albemarle SWM facility database states existing dry detention basin watershed is 61.87 Ac. with 21.37 Ac. impervious. Plan approval date is 11/19/87. Facility is listed in county SWM database (co -owned by) Keglers of Charlottesville and Lowes Investment Corp #341." Proposed development, Berkmar Self -Storage, appears to lack ownership in the facility, or privilege to use it. Applicant parcel is not child to parent subdivision that might assign use rights to Applicant. Applicant should coordinate /execute notarized Agreement with owner to use the existing dry detention basin, and famish copy to Albemarle. Albemarle would not be party to this Agreement, but relies 4. Engineering Review Comments Page 3 of 8 on prior -recorded instruments —see item iii. If Applicant is aware of an implicit right to rely upon the existing dry detention basin exists (via recorded instrument), please advise Engineering so we may forward document/s to county attorney's office for their review. (Rev. 1) Need for Agreement persists. Applic : 'The supplemental narrative has been added as requested to the calculations packet. The owner/engineer are working with the County regarding legal documentation.' Note: Albemarle is not party to the Agreement. ii. Add Note ref to: Deed of Easement (establishes right of County to Maintain), DB-PG: 1786-0734, recorded 2/9/99, (Rev. 1) Addressed. iii. Add Note ref to: Detention Pond Easement Plat, DB-PG: 1786-0737, plat by Wiley & Wilson, Lynchburg, April 15, 1994. (Rev. 1) Addressed. iv. Add Note ref to: County of Albemarle deed of easement with Keglers of Charlottesville (item iii, above). (Rev. 1) Addressed. Revise ex detention basin detail rial of riser label to read 471.0 rather than 417.0. (Rev. 1) Addressed. 1� Calculation packet /Additional: a. Revise title /cover of calc. packet to ref. to WP0202200032. (Ftev. 1) Addressed. b. Please review, compare (with calcs), and incorporate, as needed: i. SDP200300102, Lowe's Home Centers Inc. Minor Amendment, and ii. SDP199500087, Lowe's Calculations and Approved plan in Berkmar Self -Storage evaluation of ex. detention basin (design, parameters, As -built volume /structures, routings, etc.), and revise design /calculations, as needed, Note: Albemarle sent link to files /plans: County Engineer (Frank Pohl) to Timmons Group (C. Kotarski) and Milestone Partners (Frank Stoner), Sep. 28, 2021, 4:30 PM. (Rev. 1) Addressed. Applic :'The Lowes calculations (SDP-1995-0087) packet has been referenced on Sheets C6.0 and C6. 1. SDP-2003-00102 was a minor amendment to the photometrics of the parking lot and not applicable to hydrology.' c. Separate post-DEV offsate drainage areas into discrete areas since CN / Tc differ for off -site DAs. Engineering Review Comments Page 4 of 8 i. Tc, Berkmar Overlook residential development, for example, C6. 1, should be routed with Tc =7.2min, not 20.5min, as appears to be the case on pg. 25 of calc. packet, Please route offisite Areas A, B, C as distinct separate DAs in HydroCAD pre- /post-DEV routings. ii. Specifically, the following (see C6. 1) should route as sub -catchments, not a weighted Tc /CN, single, off -site contributing DA to the dry detention basin: I . DA Area A (S of Berkmar Overlook Development): 36.6 Ac, CN =70, Tc =20.5min 2. 36.6 DA: Delineate developed v. undeveloped ' route developed areas and one undeveloped area to obtain a composite pre- /post-DEV (pre- /post, identical) peak flow for each inlet discharging to the basin: a. Developed parcels NW of Int. Woodbrook Drive /Berkmar Drive, b. Charlottesville -Albemarle SPCA c. Harvest Moon d. UVA credit union e. Undeveloped Note: At first glance, SPCA, Credit Union and Harvest Moon appear to have high CN /low Tc, and may be anticipated to deliver peak flow rates nearly simultaneously. Also, pre- /post-DEV rates for all off -site areas will be identical, since not affected by Berkmar Self -Storage development, but it is important to discriminate between off -site developed v. undeveloped areas as was done for Berkmar Overlook, Timmons Group likely has reliable post-dev H&H data for ACSPCA (WP0201800030), having prepared the design. (Rev. 1) Addressed. Applic :'Revisions have been made to the H&H calculations packet per above directive.' 3. Route Lowe's to basin, along with areas discussed in items 4.c. ii. 1 .-2., above. (Rev. 1) Addressed. Applic : 'This area is accounted for in the H&H model.' 4. Route Kegler's (bowling alley) to basin, along with L2,3. (Rev. 1) Addressed. Applic : 'This area is accounted for in the H&H model.' 5. Route Rivanna Plaza to basin, along with L-4. Note: Engineering does not use /run HydroCAD, we comment on methodology. (Rev. 1) Addrcssed. Applic : 'This area is not accounted for in the H&H model since this site does not drain to the pond. In the "Berkmar Drive North Extension Drainage Map 03-30-1994, this area is listed as "undetained." Please see plans by DDR shoving storm network connecting directly to storm pipes along Route 29.' 6. DA B (Berkmar Overlook development): 6.78 Ac., CN =80.9, Tc =7.2min. (Rev. 1) Addressed. Applic : 'This area is accounted for in the H&H model. Area is 7.43 acres and CN is 79.2 per amendment 2 of the plan.' 7. DA C (Berkmar Overlook development): 0.90 Ac., CN =65.8, Tc =6min. (Rev. 1) Addressed. Applic : 'This area is accounted for in the H&H model.' iii. Notes: 1. Berkmar Overlook west of Berkmar Drive employs on -site detention, detained offisite Q peak more accurately models (HydroCAD) post-DEV Q peak rates. (Rev. 1) Addressed. Applic : 'The Berkmar Overlook basin has been added to the model.' 2. Berkmar Self -Storage should rely on post-DEV scenario anticipated by WP0201800030 which proposes on -site detention with improvements at ACSPCA. HydroCAD for ACSPCA (anticipated future development) and Berkmar Overlook (existing development) should reflect detained off -site pre- /post-DEV discharge rates when evaluating Berkmar Self -Storage stormwater 5. M Engineering Review Comments Page 5 of 8 quantity compliance. (Rev. I)Addrcsscd. Applic :'The ACSPCA model has been incorporated into the routing calculations for this plan.' 3. Analysis that may not consider detained release from off -site sources that contribute runoff to ex. dry detention basin (Kegler's Pond) requires revision, and may ultimately require Berkmar Self -Storage on -site detention similar to on - site detention practices proposed at ACSPCA (design stage) /Berkmar Overlook (construction stage). (Rev. 1) Addressed. Applic : 'The model has been revised.' 4. To the extent Berkmar Self -Storage relies on off -site dry detention (Keglers) for water quantity compliance, Applicant should furnish notarized Agreement between Berkmar and Keglers. Agreement should outline shared maintenance responsibility for the off -site SWM facility (Ex. detention). Initial VvTO plan indicates that the existing detention basin cannot provide detention for Berkmar Self -Storage without structural modification [Stornrwater Narrative, sheet C6.31. (Rev. 1) Persists. Applic : 'Applicant will coordinate this item with the County.' Note: Agreement is between Berkmar and Keglers, and not Berkmar and Albemarle. iv. Lowes. 15.40 Ac., CN =92, Tc = undefined, route Lowe's storm runoff in pre- /post- DEV with definedTc. (Rev. 1) Addressed. Applic :'The information used in the model has been taken from the approved Lowe's plan.' v. Keglers (bowling alley): 5.61 Ac., C' -84, Tc = undefined, route Kegler's in pre- /post- DEV with defined Tc. (Ftev. 1) Addressed. Applic : 'The plan did not disclose what Tc they used. The site is mostly impervious utilizing mostly concrete pipe conveyance resulting in a low Tc. A minimum Tc of 6.0 min was used for the most conservative approach.' vi. Please include Construction Record Drawing, Kegler's Pond (As -built) by Dominion Engineering, dated 3/16/16 (approved 4n1l6 =WP020160001 I Rev, I comment date) with Berkmar Self -Storage plans. Print /digital As -built available to Applicant, (Rev. 1) Addressed. Applic : 'Since the survey is the most up-to-date it has been used for current conditions of the pond and structures. Additionadly, our survey had relevant information of the riser and pipe size that was not included on the as -built plan. The survey was completed by Roudabush Gale and Associates (previously Dominion Engineering) earlier this year. We believe it is a more accurate depiction of the current state of the pond.' vii. If modification proposed to existing detention (ex. dry detention basin), please provide plan /profile detail (small-scale) of both existing structure and any proposed change. (Rev. 1) Addrcssed. viii. Revise calculations, as needed, to reflect ex. detention basin As -built riser rim elev. /invert out elev. /embankment elev. /ex pipe/s DIA, etc, (Rcv. 1) Addressed. Applic see response at item vi. immediately above. ix. Rivanna Plaza drains to Ex. detention, revise calculations, as needed, to reflect pre- /post- DEV flow from Rivanna Plaza. Note: See instrument / plat at DB-PG 3839-301, 1/13/2010 for easement/s established /vacated with WPO201100076 (Rivanna Plaza). (Rev. 1) NA. Per TG research and discussion, APPlicant response: 'As discussed with reviewer, Rivanna Plaza does not drain to the pond, although this area was included as un-detained area in the original pond design.' If on -site SWM is required, a recorded SWM facility /public drainage easement plat (with deeds) is required for VSXT /WPO plan approval. (Ftev. 1) Persists. Applic : 'Acknowledged, our intention is to use the offske detention pond.' If on -site SWM required, please include Construction Record Drawings (As-_btaj1t for VSMP on the plans, as well as practice -specific SWM installation, periodic inspection /maintenance information on the plans. (Rev. 1) Not addressed, unless overlooked. Please direct reviewer to location /sheet # of PDF on plans. C6.0, C6.1 Engineering Review Comments Page 6 of 8 a. Ref. comments elsewhere. Revise pre- /post-DA maps to define discrete contributing DAs with more accurate CN /Tc values. (Rev. 1) Addressed. 8. Letter of nutrient credit availability (5�) must be included on the plans. (Rev. 1) Addressed. 9. New: Unless discharge at Str. 100 is to a mamnade channel, EB applies at Str. 100. Please make provision to extend manmade channel from Str. 100 to dry detention basin which straddles Kegler's and Lowe's parcels. This plan does not meet EB requirements at Str. 100, but appears to meet EB at outfall of dry detention basin. Between Str. 100 and the detention basin, please show compliance with state stormwater channel protection requirements for storm runoff release to a mamnade channel (riprap ditch), 9VAC25- 870-66.B. 1. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is appro but please see follow- request at item 2.b., below. 1. C3.0 a. Indicates 4.74 Ac. limits of disturbance, VARIO registration statement indicates 5.44 LOD. Please revise plan or registration statement for consistency /accuracy. (Rev. 1) Addressed. LOD revised to 5.00 Ac. across plan, calculations and VARIO Registration Statement. 2. C3.2 a. Both sediment traps lie immediately adjacent to a developed propert\ , the south (Harvest Moon). Provide additional ST2 dry storage capacity. (Rev. 1) Addressed. Applic : 'Adequate dry storage capacity is provided per VESCH. If construction site conditions require a field change based on reviewer's comment 2.b., we will work with the County ESC inspector to rectify any issues that might come up in the field. ST2 is strategically located ass to not interfere with the construction of the Self Storage facility.'As follow-up: Please label ST2, and show weir outfall stone, C3.3 b. Recommend provide additional STI wet/dry storage capacity. (Rev. 1) Addressed. Applic 'The storage provided for STI is more than required by code. As mentioned above, if field conditions dictate a change, we will work with the County ESC inspector to rectify the problem.' Note: An incident release of sediment -laden site runoff will route thru ex. detention basin and may affect ponds in residential areas downstream of the detention basin located E of U.S. Rt. 29 (Carrsbrook subdivision), a circumstance to avoid via design, One way is to increase volume of temporary sediment traps. c. Pipe 119 leaves MH Str. 104 at an acute angle. Revise pipe-to-MH design (90-deg, Min.). (Rev. 1) Addressed. d. Provide double row SF or fence -backed ("super" silt fence) between sediment traps and Harvest Moon (HG Land, LLQ to the south. (Rev. 1) Addressed. e. Label sediment trap floor dimensions (L x WL (Rcv. 1) Addrcssed. 3. Provide interim 'Mass grade' ESC plan, a stage intermediate to Phase I and Phase 2 (between C3.2, C3.3). Phase 1, C3.2, shows no grading, Phase 2, C3.3, shows complete build -out, and traps removed, Depict ESC measures required to prevent off -site sediment transport as site is brought to grade, as improvements are constructed. This may entail smaller traps, or traps in multiple locations, Also, a primary focus of interim ESC measures is to avoid discharge of sediment -laden runoff to Harvest Moon or to ex. dry detention basin from SW quadrant of Berkmar Self -Storage tract, shown as graded turf at completion. (Rev. 1) Addressed. 4. Point of Int. with Berkmar Drive is of special concern, provide interim ESC design to ensure no tracking of mud or sediment onto Berkmar Drive as grading /building and parking lot construction proceed. (Rcv. 1) Addressed. 5. Depict /provide ESC naffative for right turn lane from Berkmar Dr. Depict right turn lane ESC measures. (Rev. 1) Addrcssed. Engineering Review Comments Page 7 of 8 6. Provide and label ESC measures between proposed 10' asphalt sidewalk and Berkmar Drive, (Rev. 1) Addressed. Silt fence has been added on Sheets C3.2 — C3.4. 7. C3.3 a. Provide SF between site and Keglers to east to extend from cut /fill transition (contour 494') to SE comer of parcel, (Rev. 1) Addressed. b. Provide RVTD at 482' (=L) and /or appropriate ESC measures to prevent runoff reaching U.S. Rt. 29 until relatively steep 40' pvt. ROW between site and Rt. 29 is paved (25' width). (Rcv. 1) Addressed. 8. C4.0 a. SW quadrant of site (layout and utility plan) shows existing grade, inconsistent with proposed grade shown on C3.3. Revise C4.0 to show proposed final grade. (Rev. 1) NA. Applic : 'Grading is not shown on C4.0 to provide clarity for layout dimensions and labels. All grading, storm network, and utilities are shown on Sheet C5.0.' 9. C5.0 a. 40' pvt. ROW includes an existing gravel road half the width (or less) of proposed final 25' paved width. Ex. drainage with respect to U.S. Rt. 29 is unclear, but final condition proposes to tie new 25' wide pavement with existing paved road that then continues and connects with U.S. Rt. 29. Provide /show drainage /storm conveyance for this 25' paved connection between Berkmar Self - Storage and U.S. Rt. 29, design should prevent runoff from this facility entering U.S. Rt. 29, (Rev. 1) Addressed. b. Recommend different hatching for cemetery zone since hatching may be misinterpreted as proposed grading across a cemetery, (Rcv. 1) Addressed. c. Recommend paved walk /stairs between 9 parking spaces located on 25' paved road (40' Pvt. ROW) and 4-story self -storage since use of slope without a designated pedestrian facility may direct sediment -laden runoff immediately to DI 112, and thence to ex. dry detention basin. (Rev. 1) Withdrawn. Applic : 'It is unlikely that the Storage facility customers will park in those spaces since they are overflow for the hotel. Parking for the Storage facility is provided in front of the building and not expected to exceed 8 spaces provided.' 'Next Steps' after VVP0 plan approval I Purchase Nutrient Credits( L��. 4.44 lb. nutrient credit purchase required) a. Please coordinate with the County reviewer before working with a nutrient bank. The reviewer must confirm if your project must follow the DEQ hierarchy requirements. b. Letter of availability must be provided on the WPO approved plans. c. Applicant must contact/coordinate nutrient purchase with Ana Kilmer, akilroerAalbernarle.org. d. Affidavit of Purchase must be provided to Ana Kilmer before a grading permit can be issued. 2. Post WPO Bond a. Applicant must submit a'R—equest to Establish aBond'forrn and fee to CDD. i. Complete the form and email it to akilmergalbemarle.org, along with proof of payment (see below). b. Payment can be made either online or with a check. i. If paying online: I . Go to the online payment portal. a. Select WPONSMP as the application 'type.' b. Type in the WPO number and project name in the Notes/Details section of the form. C. Type in the 'payment amount' as $294.34. d. Click "Proceed to Secure Checkout" link to make payment. 2. You will receive a receipt in an email. ii. Email a copy of the receipt to akilmer"bemarle.org. Engineering Review Comments Page 8 of 8 c. Once the bond request and payment are received, the applicant can provide the bond estimate (completed on the County worksheet), or Engineering staff will complete the estimate. Once the estimate is approved, Ana Kilmer will contact and work with the applicant to post the bond. Obtain DEQ Permit (LOD > I Ac.) After nutrient credits have been purchased and the bond has been posted: a. County staff will register the project with DEQ. b. Applicantloperator listed on the Registration Statement will receive an email with instructions on how to pay the DEQ permit fee. c. Applicant must email a copy of the DEQ receipt of payment to charris(o),albemarle.org. d. DEQ typically will issue a permit within 2 weeks of receiving payment. 4. Request pre -construction meeting: a. Complete and email the Request for a Preconstruction Meeting and Grading Permi to charrisaalbemarle.org. b. Pay the fee via the online VaVment Portal or a check at the pre -construction meeting. If paid online, email a copy of the receipt to charris(a),albemarle.org. All steps must be completed before the grading permit can be issued. County forms can be found on the county website forms center under Engineering Applications: hfti)s://WWW.albemarle.org/goverrunent/community-develol)ment/al)plv-for/engineering-al)vlications Thank you. Please call if any questions — tel. 434.296-5832 -x3069, or email 4anderson2(a)albemarle.org. WP0202200032—Berkmar self storage_VSMP 111522revi