Loading...
HomeMy WebLinkAboutWPO201300062 Checklist - Project Closeout (Administrative) 2013-09-09 WATER PROTECTION (REVIEW) FILE CLOSEOUT AT TIME OF ENGINEERING APPROVAL/DENIAL IMAGING CENTER INSTRUCTIONS CHECKLIST The Lead Engineer is to complete this form within 30 days of final action of WPO plan; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will forward back to the Engineering Department. WPO# :1_,013 - (01- PROJECT TITLE nclAikk 10 Ll LLC FULL NAME OF ENGINEER ti'U o1U■ Lro:9u-s FINAL ACTION DATE: k(q1 i 13 CountyView— [I Limits of Disturbance Area(Ac)updated ° lip Status/Status Date updated Hardcopy— File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer/Engineer has the discretion to include any item deemed necessary to provide clarity to the file, please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location (path/name)of he document in the space provided. Applica on(signature copy) can ❑ Saved location JApprove E&S Plan(signed, or stamped"Approved"with Engineer name) Scan ❑ Saved location ❑ Approved Mitigation Plan(stamped"Approved"with Engineer name) ❑ Scan ❑ Saved location ❑ Approved SWM Plan(stamped"Approved"with Engineer name) ❑ Scan ❑ Saved location ❑ Army Corp Approval ❑ Scan ❑ Saved location ❑ VDOT Approval ❑ Scan ❑ Saved location ❑ Calculations ❑ Scan n Saved location ❑ Bond Estimate Request ❑ Scan f 1 Saved location ❑ B nd Estimate Calculated ❑ Scan �,-�-n Saved location Other(P ase explain) 6- i 6,011.11t41-1 j Scan ❑ Saved location ❑ Other(Please explain) ❑ Scan ❑ Saved location ❑ At the Engineer's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date If such nlanc are included they chnuld he clearly marlrarl ac unannrnyarl and enntain a