Loading...
HomeMy WebLinkAboutSUB201100145 Bond 2022-11-23Albemarle County Public Road Acceptance Procedure The processing and inspection of public roads is administered by VDOT. The County is not involved in this process until the road is ready for acceptance. When the road is ready for acceptance, provide the following items to the County. 1. Inspection Request and fee A form and fee are required for each project as indicated on plans or bonds, or as requested for board resolution if smaller phases or individual roads are recommended for acceptance. 2. As -built plan approved by VDOT, and copies of all recorded drainage easements, sight easements, and right-of-way plats. Plats should be copies of the actual recorded documents from the Clerk's office. An as -built plan prepared in accordance with the County's As -Built Road Plan Policy is required. VDOT does not always follow this paperwork or policy, but for bond releases, especially where VDOT has not yet accepted the road, the minimum requirements of this policy must be met, if only to ensure that all improvements are in right-of-way and easements. 3. Written documentation of acceptance from VDOT for the entire roadway or for completed items. Formally, this is sent directly to the county on an AM-4.3 from VDOT, when VDOT requests that the Board of Supervisors pass a resolution of acceptance. After the resolution of acceptance is sent to VDOT, it is usually about six weeks before actual acceptance takes place, and VDOT issues a formal memo to the county with the road additions and new route numbers. This final notification is needed for bond release. For partial bond releases prior to this, some correspondence from VDOT for items inspected and approved is necessary. This is usually in the form of letters approving compaction reports, CBR's, pavement cores, pipe video, or other items where partial release is sought. A final punchlist inspection report from VDOT can be used for a partial bond release, but only if outstanding items are not too broad. If the punchlist is not official, and only a courtesy review, it carries much less weight. In any case, if there are problems meeting the eligibility or occupancy minimums, and it is not known how long improvements may sit, or need replacement, partial releases may not be possible. Even if a bond release is not requested, an inspection from the County is required for any County items, such as the street name signs, and any sidewalks or amenities that the County required but VDOT will not maintain. This final inspection by the County must be performed before the road can be recommended to the Board of Supervisors for a resolution of public acceptance. County bond releases (or partial releases) will be considered on public roads for all portions approved by VDOT. In addition to 1-3 above, the following items are required to be submitted for bond releases to be considered: 4. Signed and sealed letter from a professional engineer listing and certifying that completed improvements are built according to plan. Please do not e-mail or fax copies of this letter. An original signature and certifying seal are required. Please do not use qualifying statements such as "it appeared", or "to the best of my knowledge", or "generally in accord". Improvements were either built to plan, or they were not. As -built measurements, construction inspections, and other field verifications should be cited and included. Tolerances should be noted. The items not built according to plan must be listed, with explanations. Deviation in pavement materials and thicknesses must be listed. If street trees or sidewalks, or other items were moved, or added, this should be noted. If drainage changed, by addition or deletion of culverts, inlets, or re -alignments of pipes or grades, this should be verified by revised computations and attached to the letter. If there are outstanding items or omissions, these should be listed. Graphics are helpful. In short, please provide more than a statement of opinion or assurance. Please demonstrate that the improvements and construction have been inspected, investigated and documented, and are certified in detail, and county staff will not be in the position of discovering discrepancies and deficiencies in the field. 5. Certificate of Completion This form must be received for release of a bond. It is available on the county website. In the case of reductions, a letter listing the outstanding items that need to be completed before signing the certification is acceptable. It must be signed by the owner. This form says all subdivision improvements have been completed. It also says that all construction conforms to approved plans and any discrepancies have been approved by the County. This means the as - built plans have been approved by VDOT, and they have agreed to any discrepancies, which should be documented in acceptance correspondence or punchlists. Revised 726/2012 PHASE 10F ALBEMARLE COUNTY, VIRGINIA ROAD AS -BUILT PLANS FOR FINAL BOND RELEASE LEGEND W WATER LINE (EX. / PROP.) WV® WMO WATER VALVE / METER FHA FIRE HYDRANT YH YARD HYDRANT BOA ® BLOW -OFF ASSEMBLY SS SANITARY SEWER LINE (EX. / PROP.) CO o CLEANOUT MH MANHOLE SD- STORM LINE (EX. / PROP.) DI d STORM INLET YD ® YARD DRAIN DSo DOWNSPOUT G GAS LINE (EX. / PROP.) GVO GMO GAS VALVE/ METER OHE OVERHEAD ELECTRIC (EX. / PROP.) UGE UNDERGROUND ELECTRIC (EX. / PROP.) PPO POWER POLE LP* LIGHT POLE GUY e GUY WIRE EMS ELECTRIC METER T❑ TRANSFORMER OHT OVERHEAD COMMUNICATIONS (EX. / PROP.) UGT UNDERGROUND COMMUNICATIONS (EX. / PROP.) PED ❑ UTILITY PEDESTAL SWM/ DWM o/A SINGLE/ DOUBLE WATER METER GV X GATE VALVE BOA o BLOWOFFASSEMBLY ------- BOUNDARY/RIGHT-OF-WAY LINE I.F. IRON PIN FOUND I.S. IRON PIN SET - - - - - - SETBACK LINE - - - - - - - - EASEMENT LIMITS - CENTERLINE �70 CONTOUR LINE (EX. / PROP.) <--3:1-- F2.50% DEGREE/ DIRECTION OF SLOPE 479.70+ SPOT ELEVATION HP HIGH POINT LP LOW POINT - - - DITCH / SWALE = WATER COURSE BM+ BENCHMARK CG-2 VDOT STD. HEADER CURB CG-6 VDOT STD. CURB & GUTTER CG-12 VDOT STD. HANDICAP RAMP HC HANDICAP PARKING SYMBOL DIP DUCTILE IRON PIPE RCP REINFORCED CONCRETE PIPE CMP CORRUGATED METAL PIPE PVC POLYVINYLCHLORIDE PIPE HDPE HIGH -DENSITY POLYETHYLINE PIPE VC VITRIFIED CLAY PIPE FFE FINISHED FLOOR ELEVATION TBR TO BE REMOVED TBT TO BE TRANSPLANTED TBS TO BE SAVED VICINITY 1"= 60' MAP JULY 24, 2013 FaMMATIMIMB Alan Franklin PE, LLC Civil and Site Plan Engineering 427 Cranberry Lane Crozet, VA 22932 434-531-5544 alan@alanfranklinpe.com SHEET INDEX SHEET 2 SHEET 3 SHEET 4 SHEET 5 ROAD AS -BUILT PLAN PUBLIC & PRIVATE ROAD PROFILES ROAD SECTIONS & DETAILS STORM DRAIN PROFILES APPROVALS PLANNING/ZONING ENGINEER BUILDING OFFICIAL ARCHITECTURAL REVIEW BOARD FIRE OFFICIAL ACSA VDOT REVISIONS REV DATE DESCRIPTION SHEETS REVISED 05/20/14 ROAD AS -BUILT PLAN SUBMITTAL AS-BUILTS Alan Franklin PE, LLC Civil and Site Plan Engineering 427 Cranberry Lane Crozet, VA 22932 434-531-5544 alan@alanfranklinpe.com z ui iiiiiiiiiiiiiiij Z Q J Q � O Z m w > w IX O ILLJ U LL.I > O a-0 2 U 47111111111 m U_ Q J m W Q 0VTH OF G Alan G. ranklin Lc. No. 35326 W t 11-15-22 �W �T LION A L MACE: NONE ISSUED: 05-20-14 AC REF #: SUB201100145 REVISIONS: 1. 11-15-22 - UPDATED RESUBMISSION SHEET OF 5 If _ CO It 520 s \ \ - \ \ �, _ \ \ _ AS -BUILT STORM STRUCTURE SCHEDULE co ss \ / 1� - - - - - - 2 _ 25'G`R�ADINGEASEMENLT-_ _---- \ \ S \ S IMF - _ - 18 \ - - -- 20 22 \\ \\ \ \ \\ JI \\\ \\\ \\� 24 _ mm 16 �`v\ \V v AA 26 / n \ 8 - - - - - 30 --- ---� m\uunuu, \ \\ \\ \ \ \ REAR ROOF DRAINS TO DAYLIGHT \ 2 , nnlll m aownnmm�> x \ \ \ \\ \ \ ln � 32 LOT 113 LOT 114 LOT 115 LOT-.1F� Illnm _ - _ numm i \ . \V � � � v _HC RAMP d2 - \ �mNNUllln V v v � � v \ \ II 520 15' CONCRETE 1- - I \ \ \ \ S N8 DI-2B 6.0 542.59 - 535.37 28.41 LF OF 15" RCP @ 4.05% N7 DI-26 6.0 542.91 53422 534.13 92.16 LF OF 15" RCP @ 3.46% N6 DI-2B 4.0 538.03 530.94 530.81 49.53 LF OF 15" RCP @ 0.87% N5 DI-2B 4.0 536.48 530.38 530.31 106.50 LF OF 15" RCP @ 1.43% N4 DI-2A 6.0 534.14 528.79 528.67 42.77 LF OF 18" RCP @ 0.63% N3 DI-2A 2.0 533.77 528.40 528.30 96.31 LF OF 18" RCP @ 0.52% N2 DI-2A 2.0 532.48 527.80 527.67 76.45 LF OF 18" RCP @ 0.56% N 1 E W - 527.24 N6-1 DI-2B 6.0 528.23 - 531.93 126.79 LF OF 15" RCP @ 0.78% N6 DI-2B 4.0 538.03 530.94 530.81 P6 DI-7 - 546.23 539.80 121.93 LF OF 24" RCP @ 1.700 P5 MH 545.46 537.73 532.50 10.64 LF OF 24" RCP @ 2.91% P4 DI-5 - 537.43 532.19 532.16 56.51 LF OF 24" RCP @ 2.37% P3 DI-2C 6.0 537.03 530.82 530.69 26.10 LF OF 24" RCP @ 0.38% P2 DI-21C 6.0 537.06 530.59 530.47 74.78 LF OF 24" RCP @ 128% P1 ES WALKTYP. - - NNNIII \Imp„ \ \ \ \ 70 II �-��--\\ 3 FRONT ROOF DRAINS TO STORM_- gi \ \ \ \ \ \ \ I \ 2.59 ���\ N3 \ CG- ,TYP. TBC _� \\/ \ � \\ \\ \ \\ \ \\ �-------\ \ / I 104 - \ N4 _ �Q� \\ \\\ \\ \\ \\ \\ - \ J� TEMPIELHOF COUR o �0 / PE':STRIAN - ' 13+00�PRIVATER.O.W.) \\ _ \\ \\ ` \\ - - - \ I MAINTENANCE/ I / W _ _ _ \ .5'CONCRETE- c I / I ss _ _ - S_ - -�� S - \ WALK TYP\ \ \ \ \ / ACCESS BRIDGE / I ZD - ---� \\ \ O \ \ \ \ �--------- I / NEXT PHASE (NOT INSTALLED) / / - - ' ZDS SPEE�� LIMIT SIG ---- - VD STD 530 - GP CG , TYP. H\C RAM I TBC I CSW - -5:5-5 �N \ \ \ \� O° O AINS TO \ \ \ \ \ V\ \\� ` 3 REA 0 DR TODAYLI ------ - / FRONT ROOF DRAINS TO DAYLIGHT � Lp /v // �• , / VDOTSTD EC-1I, / LOT OT LOJ- COT LOT LOT SS I RIP RAP VDO R1P RAP LEV 117 1 8- � 119 120 121 122 ` \ CG-6, TYP EL � � I / 5' ONCRETE \ 53 \ \ \ \ \ \ \ \ /SPREADER / / \ \ \ \ \ \ \ \ \ \ W LK TYP. SWI)/YBASIN REAR ROOF DRAINS TO STORM \ \\\ \\\ �O(\\ \\ \\ \\ \ \\ \ \\ \ \ / / \ / / /i10-DETENTION / \ \ \ \\ \ 3Q \ \ \ \ \ \ \ \ \ //I \ //--------- = �'\\ \ 1 \� \ `� \ �\ TMP 32-50 \ \ \ \ \ \ / I 26 2s (\ , - - - - \ N \ o L, `\ \ \ \ \\ `SWM BASIN \\ \\ \\ \ b�'-38 *OTHERS) \\ \ \ \ 40 MODULAR LOCK ---I \ ( \ \ \ \ \ \ \ \ RETAINING ALL --� 540 --_ \ \\ \ \ \ 1 'j16 \ \ \\ \ \ \\ x \ DRAINS TO STORM,ITYP. \ \ \ 38 N6 v(' 0W /--- /-- \ LOT LOT 124 125 LOT 126 e6 a z A - \ I / / �, m / g - I \ \ \ \ / a Q / vs u 42 VDO ICCLAI I R \ \ 6 _ -- \ PERM. u \ Y DISSIP D \ G NO PAR G 8 \ � � � \ \ o / / - - - \ \ LEVEL R \ \ \ 44 \ \\ / \ \ \ 39. OJ \ \\ \\ / R . ACC §S ESMT. CE9 d Oviv 8 a - CONCRETE WA K a / iN3W3SV3 SVO ..9r --. \ T/LOLd 6LZV90 TYtiu ESMT/D.B.4183 P 6 1N3W3SV3 31eV0 .9r STP (TOBEABANDONk� d SOZv 80SVDOTSTD 1N3Wz3reSJ3-U5d3A9r- \CGTYP. \ \ \ \ v \ \ - - - - - --T-- \ i- - _ BUIL D: \ \ _ \ \ BO - OWO VE \ \ \ I: /ll / / TBC 5 2 \ v 539 29 9. \ \ \ \ DET IP DROP OCTINL IRON PI \ \ -- m -EP- - 3 546.36 5 _7f3 \__ _ _ FH = FIRE HYDRACIT \ \ /' \ \ \ 38. - - _ STREET TR@E,�Y . GP = GUTTER PAN \ \ \ \ \ \ / 13+ 4 00 00 \ \ � \ LIMI SIGN \ �, \ � II = INVERT IN \ \ SAI N GLEN CT 548.16 54"8 \ 543. 6 \ 54 .38 �I -- \ \ AD_ INVERT OUT PVC i LYVINYL CHLORIDE \ (57PUBLIC R.O.W.- 25 MPH) VDOT STD VDOT STD \ \ \ � VDOT STD 7� ��539.17 - - - 16 I 37 7 w� � RCP = REINFORCED CONCRETE PIPE \ - - 0 \ \ \ SDMH = STORM -DRAIN MANHOLE \ \ \ \ D.B. 4183 P 645 CG-12, P. CG-9, TYP. \ I UD-4,\TYP. \ - _ - 537 SEWERLINE \ EP 0 46.28 \ \ 5 .80 N8 I 541.27 \ - - - SSMH =SANITARY SEWER MANHOLE \ \ \ O w� 1UVA / T C 39.04 _ TBC TOP BACK OF CURB \ \ \ / / / 48.39 \ I 41.901 4 WM = WATERR METER \ WV =WATER VALVE \ \ \ \ \ / hm o IA'/ 537.50 �•'' \ \ \ \ \ Ih\ \ \ / / S S / /S S S S S \ S S I J S T S - - s a� \ \ \\ \ \\ ,IIII�M'Ip64 SPEED _ _ A ss �3O g \\ _ BO HD C�IyP. \ \ L.IMiT SIGN \ \ \ I D 'TMPO\RE\TE\ WALK TREE, TYP. 536.9\ u umu� IE D-4 STORM • 36.68 a NIYP. \ \\\\ _ 5'CO TEWALK \\ \\ \ \\ TYP. v \ vv / LOT / ` \ \ \ \ LOT 141 I / /148/ LOT LOT 146 L10T 145 \ \ LOT 144 \ LOT 43 \ \ LOT 142 _ _ - / / \ � I \ \ \ 5 97 . y�VAIIIIIIIIN / / A ' . W ry'Nmioltlmlmvvs o�n �/ O / / / / / / / \ `' o �NIn11111 / v // LOT 140 42 v v ��� 7 36.92 v v v v 96s \ \ \ 536. GRASS SW LE 1' DEEP \W/4:1SI FSLOPES v \\_ �N /' \ sO ro v / / 12"PIPE STUB m P3- `1 `\ \ - / 20, DRAINAGE h \ \ \ \ \ 48 / / \ \\ \ \ I 5FA0EMENT 48 _.Llul,p JNu❑p,- X\ umunnuneo�� . A \ X / 0P � / / / / / / \ylun,, - _° _ nnl�`c` lup . ' allu„ �� \auwi,� . • � _ _ 0 / `O'C�j� / / / / / - X / c • _ • _ �mrl bi,� 3 J6 c • E \\\Illnip c /''onull� = : "' n0�oml,,, _ I 'i6 ', i Sp ,mm n \ Sf _gnuo"'58 %.gnlu0: _ • o - - \• c _ I = °j»i cc�' _ ,., P5 \ Q \ wc(�\gV // VDOTSTDEC-1 / / „ ° • 'o, _ - ------ \ 5 \\ 'O : / o / // CLAS�SIRIPRAj ,/ ,' // -T ull - - I I TMP 32-56 - / MODULAR BLOCK \ \ \ -/- -�/ // // // // ,/ // I II RETAINING WALL J""\�,Y AS-BUILTS 0 10, 20' 40' Alan Franklin PE, LLC Civil and Site Plan Engineering 427 Cranberry Lane Crozet, VA 22932 434-531-5544 alan@alanfranklinpe.com z uj z Q Q z J O Z 0 J � 00 J ' J > > J w U Q > 121� O Q C) 0 XH m O _U Q or J m W � rn Q �p,1,TH Op � IJ � I Al�m��in Lc. No. 35326 W 11-15-22 �W DNAL SCALE: 1" = 50' ISSUED: 05-20-14 AC REF #: SUB201100145 REVISIONS: 1. 11-15-22 - UPDATED RESUBMISSION SHEET OF 5 L.P. ELEV = 546.42 H.P. ELEV = 548.71 (DESIGN SPEED = 25 MPH) _ PVI STA = 10+84 LPSTA = 12+0282 .. . H.P. STA=13+43.01 O z PVI ELEV = 549.08 PVI STA= 11+85 PVI STA = 13+60 W � A.D. _ -2.00 PVI ELEV = 545.04 PVI ELEV = 549.66 Alan Franklin PE, LLC Civil and Site Plan Engineering 560 550 540 530 520 N 0 P _ _ 2 0 K = 14.40 NOTE: V OT STD UD-4 O BE 200' VC u) '� tKA4. E N EE = 2 cn (DESIGN SPEED = 25 MPH) INSTALL D ALONG ENTIRE LENGTH JL.P. ELEV = 536.98 W . Q 8' 17 ' C X Z 110 VC OF SHAN ON GLEN COURT AND Q0 W w TIED INTOSTORM SYSTEM O L P. STA = 16+8 .18 O O p I STA = 16+42.27 o a �? w O �, p VI ELEV = 535.55 +KXX o o N + M v of M A.D. = 6.99 U) xXio J > Kxxj u�i + EXISTING GRADE K= 28.60 x Q O > a N Q F w U> w > PROPOSED GRADE o w w' > DE ( IGN SPEED = 5 MPH ) U �x a w S J AS-BUILTGRADE >O 0 J W d w a W BASE A PHALT ONL U w XXX Lu - N ID SY 777 EM ------Wc+o_- #DS R TD WI S D ��� 7 - - 0 - 10 PR ID BY N H400 J - -�Q-7 10 IN N AP V BY - J o- _-- -- - U R �� W 0 - J z 7 \/'\/\/wKXxxxX'xxX FUTURE PHASE XXX /m>V O �p . c) n cD p 00 co In ItO r` h N O (•.� LL7 r h c0 LL7 N O M N M O p c0 O 4 N N 4 M M hIN h c h � h ^ to m p pj rn rn M M M �] M co a r` h r` r` of °o Oj °o Oj °o r; Oj of r; CID u) h l+j a M ^ c� cti h cti h o cti (0 a w h co M r; In In In LL7 Ili Ili Ili Ili Ili LL7 LL7 LL7 Ili Ili ll) In In u) It)ll) u) 4Y ll) + 13+00 14+00 15+00 16+00 hn SCALE: 1"=20' H; 1"=10' V 550 ' co 4 K 520 co M --- - * ro o i j P. ELEV = 536.98 '. STA = 16+8 .18 M 11 STA = 16+42.27 w a0 VI ELEV = 535.55 „, w w AD- _ In O o NOTE: Z� ALL STRUCTURAL FILL SHALL BE COMPACTED TO 95% OF A 0STANDARD PROCTOR TEST. 6.99 M In F o K = 28.60 Io rn X (DE IGN SPEED = 5 MPH) w wIL W - - - ---- - - - - - ---; L_ -cf) 550 540 530 H w EXISTING 00 GRAD NOTE: VDO STD UD-4 TO BE > Z PROPOSED GRA E INSTALLED ALONG ENTIRELENGTH AS -BUILT GRADE OF SHANN N GLEN COURT AND (BASE ASPHALTONLY) TIED INTO STORM SYSTEM 520 �CID N I" rniz h h M M °^o CID (0 to N N N co m co co to In LID 17+00 18+00 S]H[ANNON GLEN COURT- STA. 16+40 - END (PU BLICL SCALE: V=20' H; 1"=10' V FUTURE PHASE FUTURE PHASE 55( 54( 53( 52( L.P. ELEV = 532.76 PVI STA = 10+70 L.P. STA = 13+57 P VI ELEV = 538.79 PVI STA = 12+00 PVI b I A=13+bf A.D. = -1.00 PVI ELEV = 534.89 PVI ELEV = 532.54 K = 10.00 A.D. = 1.50 A.D.= 2.00 10, VC K = 33.33 K = 20. 0 60, V 50' VC coo � 1, m EXISTING G DE (DESIGN SP ED = 20 MPH) o M o M PROPOSED GRADE � m N �`' > u) > "' AS -BUILT GRADE + M N N a w a w (BASE ASPHALT ONLY) w l w w > d j W d - F F M (DE SI N SPEED = 2 MPH) � u) O - O ------ ---- ---------- - - - - --- --- _ -1.50° Z Ow - - (DESIGN SPEE = 20 MPH) rn N00 M + m > w (L rn rn N LO J w Zww ----- ___ N 1.50°h Z JU' I[) LL - - U Ll Z co z 30 zcoo --------- - - - - - - - - - - - -- ---- �� --- Ico n Z Z+Z cl) --_ _;� Lij vx) . adc7 oz w@ C"LL p� to CO CO r r of co In ao w uy p rn p 0 co p co N co 0 N N h t\ 0 o cp 0 V• V• 'n O o N rn+ w O r: M h M rn c�j rn cr!i rn cr!i c0 00 cr!i N 00 cr!i 1- cr!i n c j u) of co M N In M M u) M of N r; N O r; N r; co N r; c" � N M co N Q) N N n N N n N N � N N h h M h M c) In M In M c) co h M c) In M H co h co h co h co h co M Z h u) LL7 u) In u) u) LL7 In LL7 LL7 u) u) u) u) u) u) u) u) cn W 10+00 11+00 TEMPELHOF COURT (PRIVATE) 12+00 13+00 560 550 540 530 520 c0 co In 550 540 530 520 AS-BUILTS 427 Cranberry Lane Crozet, VA 22932 434-531-5544 alan@alanfranklinpe.com z uj J_ z IL Q O J Q ZD 0 _ m J W' I Q } O o - z � � O w L1J U Q > _j � a_O 2 °6 m _� J 06 J Q U CO w Z:)J a � m Q � i TH OF I Lc. No. 35326 W 11-15-22 W. �Lj'I DNA L SCALE: AS SHOWN ISSUED: 05-20-14 AC REF #: SUB201100145 REVISIONS: 1. 11-15-22 - UPDATED RESUBMISSION SHEET OF 5 Alan Franklin PE, LLC Civil and Site Plan Engineering 9- InT gn'Rn"I InT CG-6,TYP. 4 TEMPELHOF COURT (ROAD'G') TYPICAL ROAD SECTION PROPOSED ASPHALT CONCRETE SURFACE COURSE MINIMUM 165lb/yd2 SAW CUT 3 INCHES AND REMOVE EXISTING ASPHALT TO FORM A BENCH JOINT ASPHALT TACK COAT REQUIRED EXISTING PAVEMENT EXISTING PAVEMENT PROPOSES PAVEMENT WIDENING MIN. 12" 3" PROPOSED PAVEMENT LAYERS EXISTING PROPOSED AGGREGATE AGGREGATE LAYER SUBGRADE PAVEMENT CONSTRUCTION JOINT DETAIL (EXISTING PAVEMENT OVER 6" IN DEPTH) (DRAWING NOT TO SCALE) END OVERLAY MIN. 100' TAPERED END MUST BE APPROVED BY ENGINEER SEE CONSTRUCTION JOINT DETAIL PAVEMENT WIDENING SEE CONSTRUCTION JOINT DETAIL 'APERED END MUST IE APPROVED BY NGINEER DO' GIN OVERLAY PLAN VIEW (DRAWING NOT TO SCALE) PAVEMENT WIDENING (VDOT WP-2) DETAIL NOTES 1. THIS ITEM MAY BE PRECAST OR CAST IN PLACE. 2. CONCRETE TO BE CLASS A3 IF CAST IN PLACE, 4000 PSI IF PRECAST. 3. COMBINATION CURB & GUTTER HAVING A RADIUS OF 300 FEET OR LESS (ALONG FACE OF CURB) SHALL BE PAID FOR AS RADIAL COMBINATION CURB & GUTTER. 4. FOR USE WITH STABILIZED OPEN -GRADED DRAINAGE LAYER, THE BOTTOM OF THE CURB AND GUTTER SHALL BE CONSTRUCTED PARALLEL TO THE SLOPEOFSUBBASE COURSES AND TO THE DEPTH OF PAVEMENT. 5. THIS CURB MAY BE USED WHEN DESIGN SPEED IS 40 MPH OR LESS ON RURAL HIGHWAYS AND 45 MPH OR LESS IN DEVELOPED URBAN & SUBURBAN AREAS. IF THESE DESIGN SPEEDS ARE EXCEEDED STANDARD CG-7 IS REQUIRED. SECTION, 12 TYP. J 4 4" \\j\\ a 6„ 2' R a 1 .25":1' MIN THIS AREA MAY BE CONCRETE ` AT THE OPTION OF THE CONTRACTOR THE BOTTOM OF THE CURB AND GUTTER MAY BE CONSTRUCTED PARALLEL TO THE SLOPE OF SUBBASE COURSES PROVIDED A MINIMUM DEPTH OF 7" IS MAINTAINED. 6" REVERSED CURB & GUTTER (VDOT CG-6) SECTION P-048 N.T.S. EXISTING PAVEMENT PROPOSE61 PAVEMENT WIDENING PROPOSED ASPHALT I CONCRETE SURFACE COURSE MIN. 12" MINIMUM 165lb/yd' SAW CUT MINIMUM OF 2 INCHES AND REMOVE MATERIAL TO TOP OF PROPOSED AGGREGATE. EXISTING PAVEMENT PAVEMENT LAYERS ASPHALT TACK COAT REQUIRED EXISTING PROPOSED AGGREGATE AGGREGATE LAYER SUBGRADE PAVEMENT CONSTRUCTION JOINT DETAIL (EXISTING PAVEMENT LESS THAN 6" IN DEPTH) (DRAWING NOT TO SCALE) NOTES: 1. WHEN THE PAVEMENT DESIGN IS GREATER IN DEPTH THAN THE DEPTH OF THE EXISTING PAVEMENT, SUBSURFACE DRAINAGE MAY BE REQUIRED BY THE ENGINEER. 2. OVERLAP THE EXISTING PAVEMENT AS SHOWN IN THE CONSTRUCTION JOINT DETAILS. 3. A PERPENDICULAR CONSTRUCTION JOINT SHALL BE PROVIDED AT ALL LOCATIONS WHERE NEW PAVEMENT ABUTS EXISTING PAVEMENT. 4. THE AREA OF PAVEMENT WIDENING SHALL BE TRENCHED TO THE SUBGRADE AND COMPACTED PER VDOT SPECIFICATIONS. 5. SURFACE OF WIDENING AREA SHALL BE FLUSH WITH THE SURFACE OF EXISTING PAVEMENT PRIOR TO OVERLAY. 6. MILLING OF NEW AND EXISTING PAVEMENT MAY BE REQUIRED TO ACHIEVE ACCEPTABLE PAVEMENT CROSS -SLOPE AND PAVEMENT DRAINAGE. 7. OVERLAY THE ENTIRE SURFACE AREA OF THE NEW AND EXISTING PAVEMENT WITH A MINIMUM OF 165 LBS/SQ YD OF ASPHALT CONCRETE TO A POINT AT LEAST 100 FEET BEFORE AND AFTER THE LIMITS OF WIDENING. 8. ERADICATE EXISTING PAVEMENT MARKINGS AND RESTRIPE THE WORK ZONE AS REQUIRED TO ACHIEVE A UNIFORM APPEARANCE AS DIRECTED BY THE ENGINEER. 9 FINAL TRANSVERSE PAVEMENT TIE-IN SHALL CONFORM TO THE REQUIREMENTS OF SECTION 315.05(c) OF THE SPECIFICATIONS EXCEPT THAT ALL JOINTS AT TIE-IN LOCATIONS SHALL BE TESTED USING A 10 FEET STRAIGHTEDGE IN ACCORDANCE WITH THE REQUIREMENTS OF SECTION 315.07(a) OF THE SPECIFICATIONS. THE VARIATION FROM THE TESTING EDGE OF THE STRAIGHTEDGE BETWEEN ANY TWO CONTACT POINTS WITH THE PAVEMENT SURFACE SHALL NOT EXCEED X". 10. PAVEMENT WIDENING PERFORMED UNDER A VDOT LAND USE PERMIT SHALL HAVE A PAVEMENT DESIGN PROVIDED BY THE PERMITTEE AND APPROVED BY THE MATERIALS ENGINEER. 2' 5' TYP. SIDEWALK TYP. 2% PLANTING STRIP TYP. 2_ % CONCRETE SIDEWALK, VDOT STD. SIDEWALK,* A CG-6,TYP. 12 PF SHANNON GLEN COURT (ROAD'D') LQ) TYPICAL ROAD SECTION LANE PAVING J SECTION, TYP. 7 2% CL LOT 30' R.O.W. LOT �, ..,, ..I.. .. �, SIDEWALK, A CG-6, TYP. IF TYtP I IUN, TYP. 12 4 TEMPELHOF COURT (ROAD'G') N.T.S. TYPICAL ROAD SECTION P-041 N.T.. ADDITIONAL RIGHT-OF-WAY IS REQUIRED IF THE LIMITS OF PEDESTRIAN ACCESS ROUTE EXTEND SFYOND EXISTING OR PROPOSED VDOT RIGHT -OF WAY. [j}PEDESTRIAN ACCESS ROUTES PROVIDE A CONTINUOUS UNOBSTRUCTED, STABLE, FIRM AND SLIP RESISTANT PATH CONNECTING ALL ACCESSIBLE ELEMENTS OF A FACILITY THAT CAN BE APPROACHED, ENTERED AND USED BY PEDESTRIANS. *IF PEDESTRIAN ACCESS ROUTES ABt BEING PROVIDED, A MINIMUM 5' TRAVERSABLE WIDTH IS REQUIRED WITH A MAX. 2% CROSS SLOPE. WHEN USED IN CONJUNCTION WITH STANDARD CG-3 OR CG-7, THE CURB FACE ON THIS STANDARD IS TO BE ADJUSTED TO MATCH THE MOUNTABLE CURB CONFIGURATION. ' I e..t. .,b. o •o •o •o go:ogo4o 0 SECTION F-F c. • b% c. 04 Sq oo . oo• o SECTION E-E E L. 2'-3' '>i . A. . �. • �. 5' MIN. WITHIN VDOT R.O.W. oq goo • o00 o. o.ogo.o E PARA OLIC CUIVE SECTION D-D FACE OF CURB A 21 A NORMAL GUTTER 12% MAX. SLOPE a 7" a CLASS A3 (H.E.S.) CONC. 6" AGGR. BASE TYPE I kZME MI SIZE 21B e 57' RI.O.W. 30' TRAVELWAY C f, Y2 WIDTH OF ENTRANCE U EXISTING OR PROPOSED EXPANSION JOINT � SIDEWALK OR SIDEWALK SPACE o CONSTRUCTION JOINT a w w w w w w z� PPANSNION JOINT w E 2'-O" E w N W W W U w U Z z ¢ a w m CURB INCLUDED � z IN ENTRANCE GU HER w 6" /O JI FLOW LINE 0 o Z ENTRANCE WIDTH WIDTH OF GUTTER EXPANSION DESIRABLE MINIMUM 16' JOINT ABSOLUTE MINIMUM 12' EDGE OF PAVEMENT HALF PLAN CfJ LIMITS OF LIMITS OF PEDESTRIAN PEDESTRIAN ACCESS \ \\\\... WIDTH OF ENTRANCE Ar ACCESS ROUTE M ROUTE R 2% UNPAVED :V y N( _TRGVF CGRI F! , PEDESTRIAN ACCESS ROUTE DETAIL VARIES 5'-O" POINT OF GRADE CHANGE FOR CURB AND GUTTER ONLY FOR SIDEWALK, CURB AND GUTTER **2% MAXIMUM INCREASE IN SLOPE AT MINIMUM 10' INTERVALS BUILT CONCURRENTLY ** MAXIMUM DECREASE IN SLOPE FOR FIRST 10' INTERVAL AND 8%MAXIMUM DECREASE FOR SUCCEEDING MINIMUM 10' INTERVALS SECTION C-C STANDARD ENTRANCE GUTTER (VDOT CG-9D) FOR USE WITH UNPAVED SPACE BETWEEN CURB & SIDEWALK DETAIL LANE VDOT STD. UD-4, TYP. (4" UNDERDRAIN) NOTES: 1. THIS ITEM MAY BE PRECAST OR CAST IN PLACE 2. CONCRETE TO BE CLASS A3 IF CAST IN PLACE, 4000 PSI IF PRECAST. 3. CURB HAVING A RADIUS OF 300 FEET OR LESS (ALONG FACE OF CURB) WILL BE PAID FOR AS RADIAL CURB. 4. THE DEPTH OF CURB MAY BE REDUCED AS MUCH AS 3" (15" DEPTH) OR INCREASED AS MUCH AS 3" (21" DEPTH) IN ORDER THAT THE BOTTOM OF CURB WILL COINCIDE WITH THE TOP OF A COURSE OF THE PAVEMENT SUBSTRUCTURE. OTHERWISE THE DEPTH IS TO BE 18" AS SHOWN. NO ADJUSTMENT IN THE PRICE BID IS TO BE MADE FOR A DECREASE OR AN INCREASE IN DEPTH. 5. THIS CURB IS TO BE USED WHEN DESIGN SPEED IS 40 MPH OR LESS ON RURAL HIGHWAYS AND 45 MPH OR LESS IN DEVELOPED URBAN AND SUBURBAN AREAS. IF THESE DESIGN SPEEDS ARE EXCEEDED STANDARD CG-3 IS REQUIRED. 6" CURB (VDOT STD. CG-2) SECTION NOTES: 1. THIS ITEM MAY BE PRECAST OR CAST IN PLACE. 2. CONCRETE TO BE CLASS A3 IF CAST IN PLACE, 4000 PSI IF PRECAST. 3. COMBINATION CURB & GUTTER HAVING A RADIUS OF 300 FEET OR LESS (ALONG FACE OF CURB) SHALL BE PAID FOR AS RADIAL COMBINATION CURB & GUTTER. 4. FOR USE WITH STABILIZED OPEN -GRADED DRAINAGE LAYER, THE BOTTOM OF THE CURB AND GUTTER SHALL BE CONSTRUCTED PARALLEL TO THE SLOPE OF SUBBASE COURSES AND TO THE DEPTH OF PAVEMENT. 5. THIS CURB MAY BE USED WHEN DESIGN SPEED IS 40 MPH OR LESS ON RURAL HIGHWAYS AND 45 MPH OR LESS IN DEVELOPED URBAN & SUBURBAN AREAS. IF THESE DESIGN SPEEDS ARE EXCEEDED STANDARD CG-7 IS REQUIRED. 4" SEE NOTE 4 /THIS AREA MAY BE CONCRETE AT THE OPTION OF THE CONTRACTOR THE BOTTOM OF THE CURB AND GUTTER MAY BE CONSTRUCTED PARALLEL TO THE SLOPE OF SUBBASE COURSES PROVIDED A MINIMUM DEPTH OF 7" IS MAINTAINED. 6" CURB & GUTTER (VDOT STD. CG-6) P ° i SECTION \:T N.T.S. N.T.S. P-003 N.T.S. P-004 N.T.S. 1.5" VDOT SM-9.5A ASPHALT WEARING COURSE 3" VDOT IM-19 ASPHALT INTERMEDIATE COURSE 6" COMPACTED VDOT 21A STONE BASE COMPACTED SUBGRADE ASPHALT PAVING DETAIL FOR SHANNON GLEN COURT (PUBLIC) SECTION N.T.S. 1.5" VDOT SM-9.5A ASPHALT WEARING COURSE 2" VDOT IM-19 ASPHALT INTERMEDIATE COURSE 6" COMPACTED VDOT 21A STONE BASE COMPACTED SUBGRADE ASPHALT PAVING DETAIL FOR TEMPELHOF COURT (PRIVATE) SECTION AS- B U I LTS 427 Cranberry Lane Crozet, VA 22932 434-531-5544 alan@a lanfranklinpe.com z W v J Q 11 GL J 0 z W m J � I Q > o - } z Q3o z O L,J 0 L= Lu I- U > 0 � �w/� Iy Q Q06 MJ OW a � I Q i �i p1TH OF Gf� c� I t Al Fi �z Lc. No. 35326 W O 11-15-22 �W Js ONAL ECG~ SCALE: AS SHOWN ISSUED: 05-20-14 AC REF #: SUB201100145 REVISIONS: 1. 11-15-22 - UPDATED RESUBMISSION SHEET OF 5 550 540 530 520 510 550 540 530 mo, J D N8 TA 15+03.42 DOT STD. DI-2B SD N6 SD N7 I 542.52542 5 STA 13+8 .42 STA 14+7 .42 I V. OUT 5 5.37 1 SD N3 SD N4 STA 13+28.42 VDOT STD. DI-2B ` SD N2 STA 11+74.9 STA 12 20.42 VD T STD. DI-2B RIM 538.03 RIM 542.91 SO N1 STA 10+76. 5 EXISTING GRADE VDOT STD. DI- A VDOT S D. DI-2B RIM 536.4 INV. IN (N)530.94 INV. IN 534. 2 STA10+ .00 VDOTSTD. I-2C P OPOSEDGRAD RIM�55 3.77 RIM 534.14 INV.IN�6530. 8 INV. IN (N6-1)530. 4 INV. OUT 53 .13 PIPE THROUGH WALL RIM 532.50 532.48 INV. IN 528.40 INV. IN1028.9 528.79 INV. OUT 53A:465 INV. OUT 530.81 W/ VDOT TD. EC-1 RIP INV. IN 527.80 INV. OUT 528. t8528.30 INV. OU 328.81528.6 .31 - - - INV. OUT 527.67 PROTECTI N- INV.OUT 527.24 -' 6 3.46% 41MINI ---- -� 1IM LFOF15" Lm_- 06.5G -' 1.4 %12" MINIMUM SEPARATION 4.0 0 36.31- - - SEPARATION TYP. 76.45 _, ---- -' TYP. J Q J Q J Q J Q J Q J Q J Q J Q J Q J Q J Q J Q p w U w w w U w w w w w w U w w w v � w w w w U W_ w p _ r r r r r F- r r r r F- ru = J J J J J J J J J cr W J W W ` W } } W } } } } W } } W } } } W Z } 3 Z W f!) fn d' co = = fn d' IX (!) J im W J d' W Q r Q r w Q r Q r Q r Q r = w Q r Q r w Q r Q r Q r w w Q r d' w z r Q z z r Q z z z z r Q z z r Q z z z Q �z QQ z Q Q cn 3 Q rn Q Q (n Q (n Q (n Q co Q c) Q rn 3 Q to Q (n Q cn 3 3 rn Q rn 3 00 v v v v v v v v v v v ao v co -00 11+nn 19+00 1.�+00 15+nn 1n+nn 14+00 STORM DRAIN 'N' SCALE: 1"=20' H; 1"=10' V SD-N6 SD-N6-1 STA 10+ 0.00 STA 11+28. 0 RIM 538. DO RIM 538.13 INV. IN 531.10 (N) EXIS ING GRADE INV. OUT 532.00 INV. IN 531.10 (N6-1) PROPOSED GRADE INV. OUT 531.00 ---- --- ------ ° 12"MINIMU SEPARATION TYP. a a w r U � r r w U w r uJ J w J J a w J W Z a Lu Lu a a LLI � ¢ w U 3 cn (a v 'i v v 111 v 00 1n+nn 11+00 STORM DRAIN 'N6-1' SCALE: 1"=20' H; 1"=10' V 550 540 530 SD P3-1 STA 10+5 .73 VDOT STD DI-2B RIM 537.6 SO P3 INV. OUT 532.61 STA 10+00. DO VDOT STD. I-2C RIM 537.07 INV. IN 530.57 INV. OUT 530.47 4% 15"RCP@3. E5i73LF• 1n+4n 1n+nn STORM DRAIN 'P3-1' SCALE: 1"=20' H; 1"=10' V i50 Im 530 550 He -30 >20 >10 SO P4 SDP3 STA 11+ 9.82 STA 2+99.47 VDOT STI 1. DI-5 VDO STD. DI-7 RIM 537.43 RIM 546.23 INV. IN 532.19 INV. OUT540.0053 .93 INV. OUT 532.16 EXISTING GRADE SD P2 SD P3 SD P5 PR POSED GRADE S P1 STA 10+69. STA 10+ 9.67 STA 11+73.8 S A 9+87.69 VDOT STD. D -2C VDOT STD. DI-2C VDOT STD. M -1 VDOT STD. ES-1 RIMS 37.06 RIM 537.03 RIM b4809 5 5.46 W VDOT STD. E 1 RIP INV. IN 530. 9 INV. IN 530.82 INV. IN 537.73 --- RAP OUTLET 530.69 P OTECTION __ IN . OUT�3 29.5112" SEP.TYP. 04(1= 51.93" LF OF 2 CP @ 1..599G.6 n 1.70% Z 2 1 RCP @ 7% 74.7 LF 0 24" LF OF 24" LF OF 2 STONE ENERGY R CP @ 6 w RCP @ A� 0.38% RCP @ �^ 249G 2.37% DISSIPATOR TO BE 144 ¢ � DETERMIN DIN FIELD 00 w 1n+nn 11+nn 19+nn 13+nn STORM DRAIN 'P' SCALE: 1"=20' H; 1"=10' V ..1 -50 R •IC ,, AS-BUILTS Alan Franklin PE, LLC Civil and Site Plan Engineering 427 Cranberry Lane Crozet, VA 22932 434-531-5544 alan@alanfranklinpe.com z W z Q � Q J O Z m J Of u� Q � } Q o LLJ U > n O rr � J m 0 ` ' Q I m W Q i ,TH Op G Alan G. ranklin Lc. No. 35326 W 11-15-22 <v DNAL L SCALE: AS SHOWN ISSUED: 05-20-14 AC REF #: SUB2O11OO145 REVISIONS: 1. 11-15-22 - UPDATED RESUBMISSION SHEET OF 5 tzwo 1 1 S— designS1.uulu Landscape Amhitedum and Site Planning 21 November 2022 Mr. John Anderson, Civil Engineer II Albemarle County Community Development 401 McIntire Road Charlottesville, Virginia 22902 RE: Willow Glen (SUB201100145): Road Bond [Issued by Max Greene on 10/10/2014] Your bond reduction and release requests for Willow Glen Phase 1 have been processed. The current bond amount is $326, 350.00 ( split between public $ 185, 270.00 and private $ 141, 080.00). Thank you for the recent submittal of the Stormwater system video with as -built utility plan. The video appeared to show the pipes were installed properly. The existing road bond is split into two categories, public and private. The Private road bond amount can be reduced from $141,080.00 to $32,600 at this time. The public portion $185,270.00 can be reduced to $37,500.00 at this time. The total road bond amount for Willow Glen Phase 1 is $70,100.00 and No further reductions may occur for this road project prior to final acceptance. I have itemized the list to help facilitate adherence to the County requirements. Items in bold will need to be addressed prior road acceptance into the system: 1. Tests and Inspections: a. CBR test: i. Appear adequately addressed for the private portion of the project. b. Stone depth Inspections: i. Appear adequately addressed for the private portion of the project. c. Fill compaction reports: i. Appear adequately addressed for the private portion of the project. d. Pipe and drainage structure video inspection or equivalent: i. Appear adequately addressed for the private portion of the project. e. Base and surface pavement inspections, documenting materials, thickness and compaction: i. Appear adequately addressed for the private portion of the project. ii. Top coat is required for public section of project. a. This was completed in April 2021. f Concrete tests: i. No concrete testing is required, but curbing is cracking in several locations and will need to be repaired. g. Structural and related inspections for any bridges and foundations: i. Not required, no bridges or foundations for roads on plans. 2. As -built plans and plats ( refer to As -Built Road Plan Policy) a. Sign and date, and seal each sheet by a professional engineer or surveyor. Original signature is required, no photo copied signatures. a. This has been done on the submitted plans, dated 11/15/2022. b. Name and address of preparing firm: 4936 Old Boonsboro Road • Lynchburg, Virginia • 24503 • tele: 434.531.7507 email: steve@edwardsdesignstudio.com 1 of 2 i. Has been provided on as -built utility plan. c. As -Built Label: i. Has been provided on as -built utility plan. d. Location of all proposed vs. Constructed items associated with the road construction must be shown. The items include, but are not limited to the following: i. Horizontal alignment: 1. Has been provided on as -built utility plan. ii. Vertical alignment: 1. Has been provided on as -built utility plan. iii. Edge of pavement: 1. Has been provided on as -built utility plan. iv. Culvert, pipes, and Drainage Structures: 1. Has been provided on as -built utility plan. V. Ditch Lines: 1. Not Applicable for this project review. vi. Drainage Easements: 1. Has been provided on as -built utility plan. vii. Guardrail: 1. Not Applicable for this project review. viii. Right -of -way and Associated Easements: 1. Has been provided on as -built utility plan. ix. Pavement Designs: 1. Has been provided on as -built utility plan. X. Street Trees: 1. 4 trees are missing on the private portion ( Templhof Court) 2. 3 trees are missing from the public portion ( Shannon Glen Court) a. It appears these have been resolved. xi. Signs: 1. A sign maintenance agreement is required for alternative sign and post design installed on site. http.11www. albemarle. org/upload/images/formscenter/departments/CommunityDevelop menUforms/EngineeringandWPOForms /StreetSign—Requirements - _MaintenanceAgreement.pdf a. According to staff, this is no longer applicable. 2. Break -away hole are missing from one sign on Shannon Glen Court. a. We believe this has been completed. 3. Bond Inspection: a. Completed Bond Inspection request form and fee will be required for resubmittal. b. Signed and sealed letter from a professional engineer listing and certifying the completed improvements are built according to approved plan will be required for resubmittal. a. Please see the attached document. c. Completed certificate of Completion will be required for release of bond. 4. The following is the additional punch list of deficient construction based on the site inspection from 9 October 2014: a. VDOT approval for public section of subdivision is required. a. Duly noted. 4936 Old Boonsboro Road • Lynchburg, Virginia • 24503 • tele: 434.531.7507 email: steve@edwardsdesignstudio.com 2 of 2 tz*014tep designStudio Landscape Architecture and Site Planning Transmittal Date: November 21, 2022 Pages: 1 of 1 From: Steve Edwards To: John Anderson, CE II c/o Ana Kilmer Albemarle County of Community Development Re: Willow Glen (SUB201100145) For: X Distribution X Review & Comment X Records Other: Transmitting the Following: Application Fee ($307.84 PAID on 11/14/2021 via Online Payment) Transaction ID# 221114192003731 F95C5A (1) Application Request (1) Copy of the 10/10/2014 County Inspection Comment Letter issued by Max Greene, see LINK (1) Response letter, dated 11/15/2021 (2 pages) (1) Private Road Acceptance Procedure Checklist, see LINK (1) Public Road Acceptance Procedure Checklist, see LINK (1) Certifying Engineer's Letter, to be submitted later (1) Updated Final Phase 1 Road Bond Plans, dated 11/15/22 (5 sheets), see LINK (1) CCTV Tri-State Utilities Drainage Inspection (hard copies can be provided), see LINK (1) Geo-tech Reports performed by Gooch Engineering, see LINK (1) Copy of Permanent Plat for Public Access by Lincoln Surveying (dated 10/25/22, SUB-2022-59), see LINK Comments: John, If you find you need anything else to keep your review moving forward, please reach out and let me know so I can help you not delay things. cc: George Ray, Alan Franklin 22-11-21, Willow Glen PH1 Road Bond Submission Transmittal.docx 4836 Old Boonsboro Road • Lynchburg, Virginia • 24503 • tele: 434.531.7507 email: steve@edwardsdesignstudio.com 1 of 1 Albemarle County Private Road Acceptance Procedure This is the procedure developed by the Albemarle County Community Development Department for the completion of private roads. The items in this list must be completed in the order given. 1. Tests and Inspections: Have all necessary tests and inspections performed by a professional engineer or geotech, or VDOT certified inspector. This should include, at a minimum, a. California Bearing Ratio (CBR) tests, b. stone depth inspections, including installation of under -drains and cross -drains, c. fill compaction tests, d. pipe and drainage structure video inspections or equivalent, e. base and surface pavement inspections, documenting materials, thickness and compaction f. concrete tests g. structural and related inspections for any bridges and foundations Compile a report of these tests, certified by a professional engineer, and submit this report with the as -built plans. 2. As -built plans and plats: Provide drawings of the constructed improvements according to the Albemarle County As -built Road Plan Policy. Provide copies of all recorded drainage easements, sight easements, and right-of-way plats. Plats should be copies of the actual recorded documents from the Clerk's office. Before completing as -built drawings, make any corrections necessary to ensure all improvements are within right-of-ways and easements. 3. Bond inspection: Request a bond reduction or release inspection from the County, which will reduce or release your bond, indicating completion or partial completion, or generate a letter indicating items in need of documentation or completion. The following documents will be needed with your bond inspection request; A. Completed Bond Inspection Request form and fee A form and fee are required for each bond, such as for a project with multiple phases and bonds. B. As -built documents per items 1 and 2 above. An as -built plan prepared in accordance with the County's As -Built Road Plan Policy is required. For any releases or reductions, the minimum requirements of this policy must be met, if only to ensure that all improvements are in right-of-way and easements. C. Signed and sealed letter from a professional engineer listed and certifying that completed improvements are built according to plan. Please do not e-mail or fax copies of this letter. An original signature and certifying seal are required. Please do not use qualifying statements such as "it appeared", or "to the best of my knowledge", or "generally in accord". Improvements were either built to plan, or they were not. As -built measurements, construction inspections, and other field verifications should be cited and included. Tolerances should be noted. The items not built according to plan must be listed, with explanations. Deviation in pavement materials and thicknesses must be listed. If street trees or sidewalks, or other items were moved, or added, this should be noted. If drainage changed, by addition or deletion of culverts, inlets, or re -alignments of pipes or grades, this should be verified by revised computations and attached to the letter. If there are outstanding items or omissions, these should be listed. Graphics are helpful. In short, please provide more than a statement of opinion or assurance. Please demonstrate that the improvements and construction have been inspected, investigated and documented, and are certified in detail, and county staff will not be in the position of discovering discrepancies and deficiencies in the field. D. Completed Certificate of Completion This form must be received for release of a bond. It is available on the county website. In the case of reductions, a letter listing the outstanding items that need to be completed before signing the certification is acceptable. It must be signed by the owner. This form says all subdivision improvements have been completed. It also says that all construction conforms to approved plans and any discrepancies have been approved by the County.