HomeMy WebLinkAboutWPO202100026 Review Comments WPO VSMP 2022-11-23�q oe nt 401 McIntire Road, North Wing Charlottesville,VA22902-4579 County of Albemarle Telephone: 434-296-5832 COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG VSMP Permit Plan Review Project title: Brook Hill River Park Phase 1 River Access Improvements Project file number: WP0202100026 Plan preparer: Anhold Landscape Architects David Anhold [david@anholdla.com] Owner or rep.: Albemarle County Parks and Recreation Bob Crickenberger [bcricke@albemarle.org] Plan received date: 03 May 2021 Rev.1 received: 10 Oct 2022 Date of comments: 08 June 2021 Rev.1 comments: 21 Nov 2022 Reviewer: Emily Cox, PE County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to act on any VSMP permit by issuing a project approval or denial. This project is denied. The rationale is given in the comments below. The VSMP application content requirements can be found in County Code section 17-401. A. Stormwater Pollution Prevention Plan (SWPPP) The SWPPP content requirements can be found in County Code section 17-405. A SWPPP must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary. 1. Please provide a SWPPP. Ensure it includes the latest DEQ registration statement (attached to this comment letter for your use). Also, a SWPPP template can be found here: https://www.albemarle.org/home/showdocument?id=166 Rev. 1: SWPPP was not received. B. Pollution Prevention Plan (PPP) The PPP content requirements can be found in County Code section 17-404. 1. Please provide a PPP. Rev. 1: PPP was not received. C. Stormwater Management Plan (SWMP) VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a SWMP. This plan is denied, and the reasons are provided in the comments below. The stormwater management plan content requirements can be found in County Code section 17- 403. 1. Floodplain development permit, FDP202100006, must be approved before this WPO can be approved. Rev. 1: Comment not addressed. 2. Provide Army Corps of Engineers approval for this work. Rev. 1: Comment addressed. 3. Cover sheet should say WP0202100026, not SDP201900080. Rev. 1: Comment addressed. 4. Professional seal should be signed and dated. Rev. 1: Comment addressed. 5. Topographic information should be at least field verified within the past year. Date on the 0 Engineering Review Comments Page 2 of 3 plans is from 2019. Also, site note #7 on the cover sheet says contour data is from County GIS. Please clarify. Rev. 1: Comment addressed. Please show the stream buffer extending to the limits of the flood plain per county code 17-600-B. Rev. 1: Are the wetlands that are sl from the edge of the wetlands per 17-600-B. a. Please also provide a copy of the Phase 1 ESA. 7. Foicx diJU UPUIL �PdUU IILU�L Uc IcwIucu 11L Gib Ud�cLLIcIIL with a deed before this WPO plan can be approved. Please note that this will restrict future development in this area (See next comment). Rev. 1: Comment does not apply anymore. 8. Please add the following note on the plan and plat, "The SWM Forest and Open Space Easement is subject to the guidance set forth by DEQ in the Virginia Stormwater Management Program. The areas will remain undisturbed in a natural, vegetated state, except for activities as approved by the local program authority, such as forest management, control of invasive species, replanting and revegetating, passive recreation (e.g., trails), and limited bush hogging to maintain desired vegetative community (but no more than four times a year)." Rev. 1: Comment does not apply anymore. 9. Please provide a narrative which outlines compliance with 9VAC25-970-66. This plan does not comply with channel protection as it outfalls to a natural channel. Rev. 1: Comment addressed. 10. Please ensure the critical slopes are shown on all applicable sheets. Rev. 1: Comment addressed. 11. Handicap (ADA) spaces must be paved. Rev. 1: Comment addressed. 12. Critical slopes waiver is required for the final site plan. Rev. 1: Comment addressed. 13. Rev. 1: Please provide specification for biofilter media. D. Erosion and Sediment Control Plan (ESCP) Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP. This plan is disapproved, and the reasons are provided in the comments below. The erosion control plan content requirements can be found in County Code section 17-402. 1. Please ensure the critical slopes are shown on all applicable sheets. Site plan does not appear to show them. Rev. 1: Comment addressed. 2. Per County Code 18-4.3.3, slopes shall not be steeper than a 2:1 (50 percent) slope. Rev. 1: Comment addressed. 3. Please show a stockpile location and laydown area. Rev. 1: Comment addressed. 4. Per VESCH 3.05, Please note that Extra -strength filter fabric shall be used for the proposed silt fence in the ditch application with a maximum 3-foot spacing of posts. Consider using check dams, VESCH 3.20 instead. Rev. 1: Please provide detail for Engineering Review Comments Page 3 of 3 proposed check dams in E&S or reference the stormwater detail. 5. Rev.1: [Sheet C-300] Please add to stockpile note that it must be on a permitted site. 6. Rev.1: Please show outlet protection (OP) detail on details sheet and specify the outlet protection on plans (size, type). The VSMP permit application and all plans may be resubmitted for approval when all comments have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete permit package with a completed application form. Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, county staff enters project information in a DEQ database for state application processing, if a DEQ permit is required. DEQ reviews the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter, which must be posted at the construction site. After DEQ coverage is issued, via the coverage letter, a pre -construction conference is required prior to commencing land disturbing activities. Applicants must complete the request for a pre - construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre -construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; https://www.al bemarle.org/government/commu nity-development/apply-for/engineering-applications