Loading...
HomeMy WebLinkAboutWPO201200062 Correspondence 2022-11-29SHIMP ENGINEERING, P.C. Design Focused Engineering October 201, 2022 John Anderson County of Albemarle Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902-4596 RE: Creekside As -Built WP0201200062 — Comment Response Dear Mr. Anderson, Thank you for your review of the Creekside As -Built Plans, WPO201200062. We have revised the plans per your most recent comments emailed on September 29", 2022. Please find below a summary of your comments and a detailed response to each. 1. Design provides larger stored volume between low and mid flow orifices (4') than as -built condition (3.2F), based on orifice elevations. Please provide routings that indicate less actual stored volume between low and mid -flow orifices does not negatively impact detention or peak release rate during the 10-yr event. The as -built stormwater routings indicate that the as -built conditions of the pond meet the intent of the SWM Plan and does not negatively impact the detention or peak release rates. 2. As -built drawing should include Northing-Easting coordinates. The coordinates of the SWM facility primary spillway have been provided on the cover sheet and the principal spillway callout. 3. As -built drawing should include SWM facility easement deed book and page reference. The SWM facility easement deed book and page reference has been provided on the cover sheet. 4. PE certification for SWM facility is required. The PE certification for the SWM facility has been provided with this submission. 5. Video of SWM Facility pipe outfall is required. A pipe video of the SWM Facility primary spillway culvert has been provided with this submission. If you have any further comments or questions, please feel free to contact me at 434-227-5140 or my email at Michael@shimp-engineering.com or you may contact Justin Shimp at Justin@shimp-engineering.com. Regards, Michael Chandler Shimp-Engineering, P.C.