Loading...
HomeMy WebLinkAboutWPO201200062 Correspondence 2022-11-29 (2)SHIMP ENGINEERING, P.C. Design Focused Engineering October 20, 2022 Dan Ratzlaff Manager of Engineering Compliance Albemarle County Dept. of Community Development 401 McIntire Rd Charlottesville, VA 22902 Re: Engineer's Certification Letter — Old Trail Creekside — WPO201200062 Dear Mr. Ratzlaff, I have reviewed the as -built surveys and conditions of the SWM Facility at Old Trail Creekside III Phase III, WPO201200062. • 1 hereby certify that the SWM Facility is constructed in an acceptable manner that meets the intent of the approved plans dated 05-28-2013 with approval date 07-11-2013. While it is not constructed exactly as proposed in the approved plans, the SWM Facility appears to be functioning as designed. We report the following specifically. o The pond size and shape are not constructed exactly per the approved plan; however, they are constructed in a manner that meets the intent of the SWM Plan. This has been verified with routing calculations. o The pond side slopes are constructed per the approved plans. o The rip -rap lined swale down the center of the pond is constructed per the approved plan. o The top of the dam and the emergency spillway are each constructed 0.50-ft higher than the approved plan, however the pond base is also constructed higher and the elevations meet the intent of the SWM Plan. This has been verified with routing calculations. o The primary spillway location material & dimensions are per the approved plan. o The primary spillway orifices were constructed with a vertical separation of only 3.21-ft whereas the plan proposed a separation of 4.0-ft. However, they are constructed in a manner that meets the intent of the SWM Plan. The runoff is still released at rates compliant with the stormwater regulations. This has been verified with routing calculations. Appropriate trashracks have also been installed over each of the orifices. o The primary spillway culvert is installed at approximately 120 off from the proposed location. However, the direction is at a more gradual angle to the stream than proposed and therefore does not cause any adverse effects. The material and size are per the approve an. o There is adequate outlet protection at the culvert ouffall leading to the stream. /NO � p,LTII OF If you have any questions, please feel free to contact me at your convenience. JI Sincerely, Justin Shimp, P.E. Shimp Engineering, P.C. Z N M. sM y NO.45183 `6lrLv1224r