HomeMy WebLinkAboutWPO201700028 Plan - As-built WPO VSMP 2021-12-10STORMWATER MANAGEM
(SCALE OF 1"=20')
PROPOSED 018" CL. III RCP
BARREL
jhq 5.
¢; 2o.i7LF, 0.650'
INV. I N=59F91. 529.58
INV. OUT= 519.45
R0POSED MH-:
_,- RIM=5-6 GO.526.
lot
FACILITY 'A' DETAIL
PROPOSED 018" CL. III RCP
BARREL
n , L=223.07', 5=0.57
INV. IN=_qeo," 520.91'
INV. OUT=�q 6q' 519.64'
PROPOSED 126' WIDE GRASS LINED
EMERGENCY SPILLWAY W/4:1 SIDE
SLOPES CREST ELEVATION=529.37'
(zo' TOP OF DAM ELEV.=530.50')
_____., ►,1=1 1-------I I - _ _ � � �-__ _ . _ -\ .---__�._i_ \ � ! 1, --_, `I =_:i ! -=04�
-� _ \_� -�
__
------ __... - i ! -�-I -_ I ' PROPOSED VDOT EW-1 AND VDOT
_
I ,- i _.EC-1 CLASS Al OUTLET PROTECTION w/
GEOTEXTILE FILTER FABRIC
UNDERLAYMENT (L=8', W=4.5', D=1.4'
{ I
I'
I
1-� OPOSED FOREBAY
`.
4-1
/ `•'Cy._
PROPOSED 048 CL, III RCP STANDPIPE w/
/ TRASHRACKS SHALL SERVE AS THE RISER
STRUCTURE. RISER STRUCTURE w/ "
i RIM=f 528.42' \
ONE (1) 02.67 LOW -FLOW ORIFICE w/ INVERT
ELEV.=js% 521.04'
/ PROPOSED ETENTION CELL
Watershed Summary INV.- 0.18
Pre -Development Post -Development
DA 'A' 5.14 ac. 5.14 ac. / �`\! 10' WIDE RIPRAP WEIR 6 /
AT ELEV. 529.00 53
DA V 2.10 ac. 2.10 ac. 48'
Total= 7.24 ac. 7.24 ac. \
4 .... / �-- 540 /
Outflow Summary: (2-Year Storm Event) \
Pre -Development Post -Development \
/ S4v
DA 'A' 2.11 cfs 0.40 cfs . .
DA ' B' 0.73 cfs 0.09 cfs °
Total= 2.83 cfs 0.49 cfs
Outflow Summary: (10-Year Storm Event)
Pre -Development Post -Development
DA 'A' 8.48 cfs 8.40 cfs a ,
DA ' 6' 3.24 cfs -T 0.42 cfs 4
Total= 11.72 cfs 8.82 cfs
DETENTION BASIN CONSTRUCTION NOTES:
FACILITY PLANTING SPECIFICATIONS:
1. THE DETENTION BASIN SHALL HAVE TURF GROUND COVER, SUCH AS GRASS, MULCH OR SOME OTHER FORM OF A VEGETATIVE GROUNDCOVER. LANDSCAPING
BEYOND THIS IS OPTIONAL AND IS NOT REQUIRED.
2. THE PROPOSED SIDE SLOPES OF THE BASIN SHALL BE A MAXIMUM OF 2:1 TO REDUCE THE RISK OF EROSION. THE PROPOSED FLOOR SLOPES SHALL BE GRADED
TO PROVIDE POSITIVE DRAINAGE AT ALL TIMES TO THE RISER STRUCTURES.
3. WOODY VEGETATION SHALL NOT BE PLANTED OR ALLOWED TO GROW WITHIN 15 FEET OF THE TOE OF THE EMBANKMENT NOR WITHIN 25 FEET OF THE
PRINCIPAL SPILLWAY STRUCTURE.
4. A VEGETATED BUFFER SHALL BE PROVIDED THAT EXTENDS AT LEAST 25 FEET OUTWARD FROM THE BASIN TOP OF DAM ELEVATION. PERMANENT STRUCTURES
(E.G., BUILDINGS, SHEDS, etc.) SHOULD NOT BE CONSTRUCTED WITHIN THE BUFFER AREA. EXISTING TREES SHALL BE PRESERVED IN THE BUFFER AREA DURING
CONSTRUCTION IF AT ALL POSSIBLE.
5. THE SOILS IN THE STORMWATER BUFFER AREA ARE OFTEN SEVERELY COMPACTED DURING THE CONSTRUCTION PROCESS, TO ENSURE STABILITY THE DENSITY
OF THESE COMPACTED SOILS CAN BE SO GREAT THAT IT EFFECTIVELY PREVENTS ROOT PENETRATION AND, THEREFORE, MAY LEAD TO PREMATURE MORTALITY
OR LOSS OF VIGOR. AS A RULE OF THUMB, PLANTING HOLES SHOULD BE THREE TIMES DEEPER AND WIDER THAN THE DIAMETER OF THE ROOTBALL FOR
BALL -AND -BURLAP STOCK, AND FIVE TIMES DEEPER AND WIDER FOR CONTAINER -GROWN STOCK.
6. AVOID SPECIES THAT REQUIRE FULL SHADE, OR ARE PRONE TO WIND DAMAGE. EXTRA MULCHING AROUND THE BASE OF TREES AND SHRUBS IS STRONGLY
RECOMMENDED AS A MEANS OF CONSERVING MOISTURE AND SUPPRESSING WEEDS.
CONTRACTOR REQUIREMENTS:
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LAYOUT OF ALL WORK COVERED UNDER THESE PLANS.
2. LANDSCAPE CONTRACTOR SHALL REFER TO THE STANDARDIZED LANDSCAPE SPECIFICATIONS FOR THE STATE OF VIRGINIA FOR ADDITIONAL INFORMATION.
THE CONTRACTOR SHALL ABIDE BY ITS CONTENTS; HOWEVER ANY NOTES OR SPECIFICATIONS ON THE PLANS SHALL SUPERSEDE THOSE OUTLINED IN THE
SPECIFICATIONS MANUAL (COPIES ARE AVAILABLE FOR A FEE FROM THE VIRGINIA CHAPTER OF THE AMERICAN SOCIETY OF LANDSCAPE ARCHITECTS, VIRGINIA
NURSERYMEN'S ASSOCIATION, INC. AND THE VIRGINIA SOCIETY OF LANDSCAPE DESIGNERS).
3. ALL PLANT MATERIAL SHALL MEET THE MINIMUM SPECIFICATIONS AND STANDARDS DESCRIBED IN THE CURRENT ISSUE OF THE AMERICAN STANDARD FOR
NURSERY STOCK, PUBLISHED BY THE AMERICAN ASSOCIATION OF NURSERYMEN, 1250 STREET, NW, SUITE 500, WASHINGTON, DC 20005.
4. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS IN THE FIELD AND NOTIFY THE DESIGNER OF ANY VARIANCE FROM THE PLAN.
5. THE LANDSCAPE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE LOCATION OF ANY ONSITE UTILITIES (CALL MISS UTILITY 1-800-552-7001 BEFORE ANY
EXCAVATION).
6. REFER TO THE APPROVED FINAL SITE PLANS FOR ANY DETAILED SITE INFORMATION.
7. ALL WORK SHALL BE COORDINATED WITH OTHER PARTIES.
8. PLANTS WILL BE PREPARED FOR SHIPMENT IN A MANNER THAT WILL NOT CAUSE DAMAGE TO THE BARK, BUDS, BRANCHES, STEMS, OR OVERALL SHAPE OF
THE STOCK. CONTAINER GROWN PLANTS WILL BE TRANSPORTED IN THE CONTAINERS IN WHICH THEY HAVE GROWN.
9. ALL PLANT MATERIAL, UNLESS OTHERWISE SPECIFIED, SHALL BE UNIFORMLY BRANCHED AND HAVE A VIGOROUS ROOT SYSTEM. PLANT MATERIAL SHALL BE
HEALTHY, VIGOROUS, AND FREE FROM DEFECTS, DECAY, DISEASES, INSECT PEST EGGS, AND ALL FORMS OF INFESTATION. ALL PLANT MATERIAL SHALL BE
FRESH, FREE FROM TRANSPLANT SHOCK OR VISIBLE WILT. PLANTS DEEMED UNHEALTHY WILL BE REJECTED.
10. ALL CONTAINER STOCK SHALL HAVE BEEN PROPAGATED IN A CONTAINER LONG ENOUGH FOR THE ROOT SYSTEM TO HAVE DEVELOPED SUFFICIENTLY TO HOLD
ITS SOIL. CONTAINER STOCK WITH POORLY DEVELOPED ROOT SYSTEMS WILL NOT BE ACCEPTED.
11. PLANTS NOT INSTALLED ON THE DAY OF ARRIVAL ON SITE SHALL BE STORED AND PROTECTED BY THE CONTAINER. OUTSIDE STORAGE AREAS WILL BE SHADED
AND PROTECTED FROM THE WIND AND SUN. PLANTS STORED ON SITE SHALL BE PROTECTED FROM ANY DRYING AT ALL TIMES BY COVERING THE BALLS OR
ROOTS WITH MOIST SAWDUST, WET BURLAP, WOOD CHIPS, SHREDDED BARK, PEAT MOSS, OR OTHER SIMILAR MULCHING MATERIAL.
12. THE OWNER RESERVES THE RIGHT TO SUBSTITUTE PLANT MATERIAL TYPE, SIZE AND/OR QUANTITY. ANY SUBSTITUTIONS MUST BE APPROVED BY THE
INSPECTOR INITIALLY, AND THEN THE DESIGNER.
13. MINOR FIELD ADJUSTMENTS MAY BE NECESSARY DUE TO SITE CONDITIONS (EX: ROOTBALL AND UTILITY CONFLICT). MAJOR ADJUSTMENTS MUST BE
APPROVED BY THE DESIGNER.
14. NO PLANTING SHALL OCCUR WHEN THE SOIL IS FROZEN.
15. PLANT MATERIAL SHALL BE PLACED IN EXISTING SOIL WITH EACH PLANTING PIT EXCAVATED TO A SIZE SUFFICIENT TO CONTAIN THE ENTIRE ROOT BALL OR
ROOT MASS, WITHOUT CRAMPING ROOT STOCK.
16. THE CONTRACTOR SHALL MAINTAIN A ONE (1) CALENDAR YEAR 90% CARE AND REPLACEMENT WARRANTY FOR ALL PLANTINGS. THE PERIOD OF CARE AND
REPLACEMENT SHALL BEGIN AFTER INSPECTION AND APPROVAL OF THE COMPLETE INSTALLATION OF ALL PLANTS AND CONTINUE FOR ONE CALENDAR YEAR.
17. THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND DISPOSAL OF TRASH AND DEBRIS WITHIN THE LIMITS OF THE PLANTING ON A DAILY BASIS.
18. THE CONTRACTOR WILL NOT BE RESPONSIBLE FOR PLANT MATERIAL THAT HAS BEEN DAMAGED BY VANDALISM, FIRE, OR OTHER ACTIVITIES BEYOND THE
CONTRACTOR's CONTROL.
FACILITY CONSTRUCTION
1. THE DETENTION BASIN MAY SERVE AS A SEDIMENT BASIN AND/OR TRAP DURING PROJECT CONSTRUCTION. IF THIS IS DONE, THE VOLUME SHALL BE BASED ON
THE MORE STRINGENT SIZING RULE (EROSION AND SEDIMENT CONTROL REQUIREMENTS VS. STORMWATER TREATMENT REQUIREMENTS). INSTALLATION OF
THE PERMANENT RISER SHALL BE INITIATED DURING THE CONSTRUCTION PHASE, AND DESIGN ELEVATIONS SHALL BE SET WITH FINAL CLEANOUT OF THE
SEDIMENT BASIN AND CONVERSION TO THE POST -CONSTRUCTION POND IN MIND. APPROPRIATE PROCEDURES SHALL BE IMPLEMENTED TO PREVENT
DISCHARGE OF TURBULENT WATERS WHEN THE BASIN IS BEING CONVERTED INTO AN DETENTION BASIN.
2. THE DETENTION BASIN SHALL ONLY BE CONSTRUCTED AFTER THE CONTRIBUTING DRAINAGE AREA TO THE POND IS COMPLETELY STABILIZED. IF THE
PROPOSED POND SITE WILL BE USED AS A SEDIMENT TRAP OR BASIN DURING THE CONSTRUCTION PHASE, THEN THE FACILITY WILL BE DEWATERED, DREDGED
AND RE -GRADED TO DESIGN DIMENSIONS AFTER THE ORIGINAL SITE CONSTRUCTION IS COMPLETE.
3. INSTALL E&S CONTROLS PRIOR TO CONSTRUCTION OF THE BASIN, INCLUDING TEMPORARY DE -WATERING DEVICES AND STORMWATER DIVERSION PRACTICES.
ALL AREAS SURROUNDING THE BASIN THAT ARE GRADED OR DENUDED DURING CONSTRUCTION SHALL BE PLANTED WITH TURF GRASS, NATIVE PLANTINGS,
OR OTHER APPROVED METHODS OF SOIL STABILIZATION.
4. CONTRACTOR SHALL EXCAVATE THE CORE TRENCH AND INSTALL THE SPILLWAY PIPE DURING THE ESC PHASE.
5. CONTRACTOR SHALL ALSO INSTALL THE RISER, OUTFLOW STRUCTURE AND/OR THE BARREL(s) DURING THE ESC PHASE TO ENSURE THE TOP INVERT OF THE
OVERFLOW WEIR IS CONSTRUCTED LEVEL AT THE DESIGN ELEVATION.
6. THE CONTRACTOR SHALL THEN CONSTRUCT THE EMBANKMENT AND ANY INTERNAL BERMS IN 8 TO 12-INCH LIFTS AND COMPACT THE LIFTS WITH
APPROPRIATE EQUIPMENT.
7. UPON COMPLETION OF THE EMBANKMENT GRADING, THE CONTRACTOR SHALL EXCAVATE/GRADE UNTIL THE APPROPRIATE ELEVATION AND DESIRED
CONTOURS ARE ACHIEVED FOR THE BOTTOM AND SIDE SLOPES OF THE BASIN.
8. CONTRACTOR SHALL THEN CONSTRUCT THE EMERGENCY SPILLWAY IN CUT OR STRUCTURALLY STABILIZED SOILS.
9. THE CONTRACTOR SHALL THEN FINISH CONSTRUCTION OF ALL OUTLET STRUCTURES, INCLUDING DOWNSTREAM RIP -RAP APRON PROTECTION.
10. THE CONTRACTOR SHALL NEXT STABILIZE EXPOSED SOILS BY HYDROSEEDING OR SEEDING OVER STRAW.
11. THE CONTRACTOR SHALL THEN INSTALL THE APPROPRIATE BASIN LANDSCAPING IN ACCORDANCE WITH THE APPROVED PLANS.
FACILITY MAINTENANCE:
MAINTENANCE OF THE DETENTION BASIN IS DRIVEN BY ANNUAL INSPECTIONS THAT EVALUATE THE CONDITION AND PERFORMANCE OF THE FACILITIES. DURING
THESE INSPECTIONS THE FOLLOWING TASKS SHALL BE PERFORMED BY THE CONTRACTOR IN THE FIRST YEAR FOLLOWING INSTALLATION, AND THE OWNER
THEREAFTER:
1. MEASURE SEDIMENT ACCUMULATION LEVELS IN THE BASIN.
2. MONITOR THE GROWTH OF THE GROUNDCOVER AND ANY TREES AND SHRUBS PLANTED, AS APPLICABLE. RECORD THE SPECIES AND THEIR APPROXIMATE
COVERAGE, AND NOTE THE PRESENCE OF ANY INVASIVE PLANT SPECIES, AS APPLICABLE.
3. INSPECT THE CONDITION OF STORMWATER INLETS TO THE BASIN FOR MATERIAL DAMAGE, EROSION OR UNDERCUTTING.
4. INSPECT THE BANKS OF UPSTREAM AND DOWNSTREAM CHANNELS FOR EVIDENCE OF SLOUGHING, ANIMAL BURROWS, BOGGY AREAS, WOODY GROWTH, OR
GULLY EROSION THAT MAY UNDERMINE EMBANKMENT INTEGRITY.
5. INSPECT BASIN OUTFALL CHANNEL FOR EROSION, UNDERCUTTING, RIP -RAP DISPLACEMENT, WOODY GROWTH, etc.
6. INSPECT CONDITION OF PRINCIPAL SPILLWAY AND RISER FOR EVIDENCE OF SPALLING, JOINT FAILURE, LEAKAGE, CORROSION OR OTHER FAILURES.
7. INSPECT CONDITION OF ALL TRASH RACKS, REVERSE SLOPED PIPES OR FLASHBOARD RISERS FOR EVIDENCE OF CLOGGING, LEAKAGE, DEBRIS ACCUMULATION
OR OTHER FAILURES.
8. INSPECT MAINTENANCE ACCESS TO ENSURE IT IS FREE OF WOODY VEGETATION, AND CHECK TO SEE WHETHER VALVES, MANHOLES AND LOCKS CAN BE
OPENED AND OPERATED.
9. INSPECT INTERNAL AND EXTERNAL SIDE SLOPES OF THE BASIN FOR EVIDENCE OF SPARSE VEGETATIVE COVER, EROSION, OR SLUMPING.
10. OWNER OR CONTRACTOR SHALL MAKE NEEDED REPAIRS IMMEDIATELY.
FACILITY INSPECTION:
MULTIPLE INSPECTIONS ARE CRITICAL TO ENSURE THE BASIN(s) ARE PROPERLY CONSTRUCTED. BECAUSE THE TIMING OF THE INSTALLATION IS DICTATED BY THE
CONTRACTOR, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CONTACTING THE ENGINEER AND INSPECTOR PRIOR TO INSTALLATION. MULTIPLE SITE VISITS AND
INSPECTIONS ARE REQUIRED TO BE SCHEDULED BY THE CONTRACTOR WITH THE ENGINEER AND INSPECTOR DURING THE FOLLOWING STAGES OF THE DETENTION
BASIN's CONSTRUCTION PROCESS:
1. PRE -CONSTRUCTION MEETING
2. INITIAL SITE PREPARATION (INCLUDING INSTALLATION OF PROJECT E&S CONTROLS)
3. EXCAVATION/GRADING (e.g., INTERIM/FINAL ELEVATIONS)
4. EXTENDED DETENTION BASIN INSTALLATION (e.g., INTERIM AND FINAL ELEVATIONS)
5. INSTALLATION OF THE EMBANKMENT, THE RISER/PRIMARY SPILLWAY, AND THE OUTLET STRUCTURE(s).
6. PLANTING PHASE (WITH AN EXPERIENCED LANDSCAPE ARCHITECT PRESENT/DIRECTING)
7. FINAL INSPECTION (DEVELOP A PUNCH LIST FOR FACILITY ACCEPTANCE)
EMBANKMENT NOTES:
THE EMBANKMENT SHALL HAVE A COMPACTED CLAY CORE WITH A CUTOFF TRENCH & BE IN ACCORDANCE
WITH THE DETAILS SHOWN ON THIS SHEET. BERMS AND SPILLWAYS SHALL BE STABILIZED WITH EC-3 MATTING
& THE REMAINING DISTURBED SLOPES SHALL BE STABILIZED WITH EC-2 MATTING. ALL BERM FILL MATERIAL
SHALL CONSIST OF ML, CL, SC OR GC SOILS & BE FREE OF WOOD, ROOTS, ROCKS OR ANY OTHER NON
COMPACTING SOIL. COMPACTED FILL SHALL BE PROCTOR MAXIMUM DRY DENSITY ASTM D698 AND HAVE A
MINIMUM OF 95% OF MAXIMUM DRY DENSITY AND 2% OF OPTIMUM MOISTURE CONTENT. ALL FILL
MATERIAL AND CONSTRUCTION SHALL BE APPROVED BY AN ONSITE GEOTECHNICAL ENGINEER PRESENT
DURING THE CONSTRUCTION OF THE EMBANKMENTS AND FILL AREAS.
StorrnRaXTM
ROUND SERIES TRASH RACK
CONCRETE MANHOLE
STANDARD W INCH RACK SHOWN
DIMENSIONS IN INCHES
PLAN
SIDE VIEW
StormllaxT"" Round Series for Concrete MlW*4k
Part No.
Wm A
elm B din C
MUD
min W*24
17 Y,
14 W
28 •
24
30
Wa
21 4
14
40-�
35
43
-
27 X
A
sa .
49
37
P&W
27 %
is ya
66
W
70
Plastic Solutions, Inc. W5T0wit
v -1 PAD box 4306, H'Incfwstec VA Z.18U4
M McGhee Rd, W ndSeswr, VA Z2403
877) 877.5727 phone pftm-
(540) 722.2219 fax
htgx rrwww.plazCk-saWaotumn
raor� oxaucruna vuanoaH
•wr�csauTw�s, rt
RLM0VAfW E FOR A=3S
r•.
ISOMETRIC
CONCRETE STRUCTURE DPAENSIONS
INSIDE STRUCTURE DIMENSION
OUTSIDE STRUCTURE DIMENSION
AVAILABLE 0PT10N8
CROSS BRACING FOR OVERHANC
HOPE ANTI -VORTEX PLATE
DATE:
DPAMYN BY-
APPO BY:
DffQL
SSO
Pipe
tulvort
550
545
PROPOSED \WIDE EART EN
WEIR AT LEV.=529'
540 \
2.5' EEP -
FOREB Y W/3:1
SIDE LOPES
535
530
525
520
53-5
510
EXISTING
GRADE
\
PROPOSED 0
TRASHRACKS
\ STRUCTUR
8" CL. III RCP STAN PIPE w/
SHALL SERVE AS THE RISER
. RISER STRUCTU E RIM
LEV.=528.37'
\NE (2) 02.
7" LOW -FLOW ORI ICE w/
_ i
EV.=521.00
PROPOSE
LINED
p 126' WI E GRAS
EMERGENCY PILLWAy
W/4:1 SI[� t SLOPE CREST
\ 1O'
ELEVAATION=S 9.37'
TOP OFDAM ELE V. = 530.5 ')
w
w
J J
ri
M
W W
a)
rn
C7 L7Ln
In
W I..L
10+00
10+50
PROFILE SCALES
M
1"=50' (H)
6/5" rikn hole
it rl r4('Ei
T)FRRTS CAOT
TO PREVENT F OATATIO THE
RISER BASE ND BARR L
CECTI At
MBEDDE 6" INTO A
OEINFORC D i8" THICK
CONCRETE FOL NDATION THAT
,BURIED BELOW
THE LIMITS OF THE BASIN
GRADING.
PROPOSE-II018" C4. III RCP BARREL
(221LF, S=�,o.So%;
INV. IN=g21.00', INV. OUT=S 9.89')
00 g o o M
N r4 Li)
N LNf1 N
Ln
11+00 11+50 12+00 12+50 13+00
SWM BASIN'A'
d
1/2" uric plated hook
aktached with 3/8R fastener
--- 4-1 �8b rtlie. ltalr�
Ito()
n 0
1/4" HDPE p ale (opl,iorial )
HDPF oiructirral plastic with
�
0 2-1/8" hales and 114 " plate
J" man umacLured SAX €'larstic
Bolukions Inc. or equal
000
S,ection
lovat-ion
* shown with ophorel plate
HrYPr pimptin with
:2-1/8" hales and 1/4' plate
rnarUiaatured by P1astje
Solutions Inc. or rqu-ml
PLASTIC
P.O. Box 4 380
SOLUTIONS liinesrester tea 22W4
INC. 877-1877-6727
tmra.pleatic-rat u+�o+e.�am
�TH 0�
550 ,�� .�
O
O SC0TT R. LLINS
U Lic. No. 035791,E
545 �o�o� 12/ 10/21�4'
IONAL 1 �
z
540
W
2
O
z
O
535 Q
U
L-
O
O g
530 W
� J
PROPOSED MH-1 U) � Z
RIM=526.00' 0
oza�
O J O
R
EXISTING MANMADE R PRAP
CHANNEL - CONTRACTOR SHALL w z Q
ENSURE THE MINIMUM 00
STANDARDS BELOW ARE MET z
VDOT EC-1 CLASS Al OUTLET
\PROTECTION w/ GEOTEXTILE FILTER > }-
FABRIC UNDERLAYMENT (L=8', �J,
W=4.5', D=1.4' MIN. U
520 ce m
LU
-PR OSED 018" CL, III RCP BARREL
(19 LF, 5=o.530i6;
INV. IN=519.79', INV. OUT=519.69')
W
515 0
W fV N
\ �
0
Q N O
510 �
13+50 14+00 14+25
SECTION' A-9: TYPIC AL GRAPHICAL DETAIL-S
Sj Homogeneous fill
-------
.. ,
`✓.�//* l' min
Cart off tnmeh-4 below sable I
S61 or rock L______r
TYPICAL HOMOGENEOUS
EMBANKWENT
1-" ouuet
Ulu fl rse
Perforxat+:d collectorar+��,lr sot
foundikon <lruin
FOUNIDATION DRAIN
dmfll
Sor►d, gravel or rod
i11 obw
1.Rod llot
:�Tranzition filter
CHIMNEY DRAIN
71II
of �grrn�l
'�,84wket dmirs
BLANKET DRAIN
Red or gavel
J/ dr&
Trana►tti on filter
TOE DRAIN
.Source: SCS Engineenng Field Vapivai
Figure A-Ia. Hantogerreorls Ent bait nreyas w Seiepage Col'rtrols
ti
ZM
M
N
� M
N
O
N
N
W
w
ZJ
J
i
w
O
Za
U
W Y
W
Ln
Zw
W
J� W
Ja
0
N
z
Q
z
Uj
W
(D H
Q m
zV)
Q
Q _
z
1---I
W U)
Q
co
1
z
W
w
o(D
Q
� z
Q
c
L.L
O
ce
0
Z
w
J
I-
H
L w
W
d U0
JOB NO.
162126
SCALE
AS NOTED
SHEET NO.
1 OF 1