HomeMy WebLinkAboutWPO201900062 Approval - County 2022-12-01f•� OF AL8
County of Albemarle
m COMMUNITY DEVELOPMENT DEPARTMENT
Project title:
Project file number:
Plan preparer:
Owner or rep.:
Plan received date:
(Rev. 1)
(Rev. 2)
Date of comments:
(Rev. 1)
(Rev. 2)
Reviewer:
VSMP Permit Plan Review
Southwood Village 1 - Amendment 3
W PO-2019-00062
Timmons Group
Clint Shifflett [clint.shifflett@timmons.com]
Charlottesville Habitat for Humanity
Andrew Vinisky[avinisky@cvillehabitat.org]
31 August 2022
13 October 2022
8 November 2022
29 September 2022
7 November 2022
1 December 2022
Matt Wentland
401 McIntire Road, North Wing
Charlottesville, VA 22902-4579
Telephone: 434-296-5832
WWW.ALBEMARLE.ORG
County Code section 17-410 and Virginia Code §62.1-44.15:34 requires the VSMP authority to
act on any VSMP permit by issuing a project approval or denial. This project is approved. The
rationale is given in the comments below. The VSMP application content requirements can be
found in County Code section 17-401.
A. Stormwater Pollution Prevention Plan (SWPPP)
The SWPPP content requirements can be found in County Code section 17-405. A SWPPP
must contain (1) a PPP, (2) an ESCP, (3) a SWMP, and (4) any TMDL measures necessary.
1. The existing Village 1 SWPPP will need to be updated once this plan is approved.
B. Pollution Prevention Plan (PPP)
The PPP content requirements can be found in County Code section 17-404.
1. The existing Village 1 PPP will need to be updated once this plan is approved.
C. Stormwater Management Plan (SWMP)
VSMP Regulation 9VAC25-870-108 requires the VSMP authority to approve or disapprove a
SWMP. This plan is approved, and the reasons are provided in the comments below. The
stormwater management plan content requirements can be found in County Code section 17-
403.
1. This plan cannot be approved until the 999 0.04 Ib/yr of nutrient credits have been
purchased. Please contact Ana Kilmer prior to purchasing credits. Since this project drains
to impacted streams, the credits will need to be purchased from the Ivy Creek or Rivanna
River credit banks, since they are located in the same HUCB. [9VAC25-900-91.B] (Rev. 1)
The 0.20 Ib/yr of credits purchased for the previous amendment that has been
withdrawn can be used towards this requirement and the remaining 0.04 Ib/yr will need
Engineering Review Comments
Page 2 of 3
to be purchased. Include a note on the cover sheet of the amendment describing this.
The cover sheet should also be changed to Amendment #3. (Rev. 2) Comment
addressed.
2. Ensure all the proposed grades tie into existing grades. (Rev.1) Comment addressed.
3. Provide a design for the proposed ditch along the berm. (Rev.1) Comment addressed.
4. The maximum allowable slope is 2:1. (Rev.1) Comment addressed.
5. Provide more detail at the end of the berm. It doesn't appear that structure 502 (the end
of the culvert) is in a low point. (Rev.1) Comment addressed.
D. Erosion and Sediment Control Plan (ESCP)
Virginia Code §62.1-44.15:55 requires the VESCP authority to approve or disapprove an ESCP.
This plan is approved, and the reasons are provided in the comments below. The erosion control
plan content requirements can be found in County Code section 17-402.
1. Show the drainage area to the proposed trap. (Rev.1) Comment addressed.
2. Show silt fence at the base of the berm along Horizon. (Rev.1) Comment addressed.
The VSMP permit application and all plans may be resubmitted for approval when all comments
have been satisfactorily addressed. For re -submittals please provide 2 copies of the complete
permit package with a completed application form.
Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a
meeting to discuss this review.
Process:
After approval, erosion and sediment control and stormwater management improvements must
be bonded. The bonding process begins when the plan is approved, and the applicant submits a
bond estimate request form and fee to the Department of Community Development. A plan
reviewer will prepare estimates and check parcel and easement information based on the
approved plans. The County's Management Analyst will prepare bond agreement forms, which
will need to be completed by the owner and submitted along with cash, certificates or sureties
for the amounts specified. The agreements will need to be approved and signed by the County
Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and
forms.
Stormwater Management Facilities Maintenance agreements will also need to be completed and
recorded. The County's Management Analyst or other staff will prepare the forms and check for
ownership and signature information. The completed forms will need to be submitted to the
County, who will record the agreement.
After bonding and agreements are complete, county staff enters project information in a DEQ
database for state application processing, if a DEQ permit is required. DEQ reviews the
application information based on local VSMP authority approval. At this time, the DEQ portion of
Engineering Review Comments
Page 3 of 3
the application fees will need to be paid directly to the state. For fastest processing, this is done
electronically with the emails provided on the application. DEQ should notify applicants with
instructions on how to pay fees. When DEQ approves the application, they will issue a permit
coverage letter, which must be posted at the construction site.
After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction
conference. Applicants must complete the request for a pre -construction conference form and
pay the remainder of the application fee. The form identifies the contractor and responsible land
disturber, and the fee remaining to be paid. This will be checked by county staff, and upon
approval, a pre -construction conference will be scheduled with the County inspector. At the pre -
construction conference, should everything proceed satisfactorily, a joint VSMP and grading
permit will be issued by the County so that work may begin.
County forms can be found on the county website forms center under engineering;
https://www.al bemarle.orR/government/com munity-development/arpp Iv-for/engi neerinR-applications
File: WPO201900062 Southwood Village 1 Amendment 3 rev2 review comments 12-01-22.docx