Loading...
HomeMy WebLinkAboutSUB202200020 Review Comments Road Plan and Comps. 2022-12-01 (2)�q oe nt 401 McIntire Road, North Wing Charlottesville, VA 22902-4579 c A� County of Albemarle Telephone: 434-296-5832 COMMUNITY DEVELOPMENT DEPARTMENT WWW.ALBEMARLE.ORG Road and Drainage Plan Review Project title: North Pointe Subdivision Section 2 Project file number: SUB-2022-00020 Plan preparer: Townes Site Engineering [Inugent@cctownes.com] Owner or rep.: CWH Properties [david@southern-classic.com] Plan received date: 1 February 2022 (Rev. 1) 10 June 2022 (Rev. 2) 14 October 2022 Date of comments: 8 April 2022 (Rev. 1) 18 July 2022 (Rev. 2) 1 December 2022 Reviewer: Matt Wentland Lyndsy, We have reviewed the plans and have the following comments: Engineering 1. Be aware that items outside of the road are not being reviewed on these plans. 2. If the platting and bonding will be divided up like in Section 1, please show phase lines at this time. (Rev. 1) Comment addressed. 3. Label drainage easements as public or private. (Rev. 1) Comment addressed. 4. Show outlet protection on all pipes and include the sizing/design calculations. (Rev. 1) Comment addressed. 5. Label roads as public or private. (Rev. 1) Comment addressed. 6. Provide an exhibit showing the grading for the possible future connection to Pritchett to ensure the 10' temporary construction easements are adequate. (Rev. 1) Comment addressed. 7. Since VDOT no longer allows their standard details on the plans, label the requirements on the plans/profiles or in notes (such as inlet shaping, steps in manholes, etc.). (Rev. 1) Comment addressed. 8. Provide pipe and inlet calculations for the drainage system. (Rev. 1) Comment addressed. 9. Show and label the road name signs and stop signs. (Rev. 1) Comment addressed. ACSA - Richard Nelson ACSA comments are attached to this email. Planning, Fire Rescue, VDOT and GIS had no objections to the plans. Engineering Review Comments Page 2 of 2 Engineering plan review staff are available from 2-4 PM on Thursdays, should you require a meeting to discuss this review. Process: After approval, plans will need be bonded. The bonding process begins when the plan is approved, and the applicant submits a bond estimate request form and fee to the Department of Community Development. A plan reviewer will prepare estimates and check parcel and easement information based on the approved plans. The County's Management Analyst will prepare bond agreement forms, which will need to be completed by the owner and submitted along with cash, certificates or sureties for the amounts specified. The agreements will need to be approved and signed by the County Attorney and County Engineer. This may take 2-4 weeks to obtain all the correct signatures and forms. Stormwater Management Facilities Maintenance agreements will also need to be completed and recorded. The County's Management Analyst or other staff will prepare the forms and check for ownership and signature information. The completed forms will need to be submitted to the County, who will record the agreement. After bonding and agreements are complete, county staff enters project information in a DEQ database for state application processing, if a DEQ permit is required. DEQ reviews the application information based on local VSMP authority approval. At this time, the DEQ portion of the application fees will need to be paid directly to the state. For fastest processing, this is done electronically with the emails provided on the application. DEQ should notify applicants with instructions on how to pay fees. When DEQ approves the application, they will issue a permit coverage letter, which must be posted at the construction site. After DEQ coverage is issued, via the coverage letter, the County can hold a pre -construction conference. Applicants must complete the request for a pre -construction conference form and pay the remainder of the application fee. The form identifies the contractor and responsible land disturber, and the fee remaining to be paid. This will be checked by county staff, and upon approval, a pre -construction conference will be scheduled with the County inspector. At the pre - construction conference, should everything proceed satisfactorily, a joint VSMP and grading permit will be issued by the County so that work may begin. County forms can be found on the county website forms center under engineering; https://www.al bemarle.org/government/com munity-development/apply-for/engineering-applications If you have any questions or concerns, please contact me either by email (mwentland@albemarle.org) or by phone at 434-296-5832 ext. 3458. Sincerely, Matt Wentland, P.E. Civil Engineer II File: SUB202200020 North Pointe Section 2 road plans review comments rev2 12-01-22.docx