HomeMy WebLinkAboutSDP200400106 Application Final Site Plan and Comps. 2004-12-06 Commun velopment Department,Planning&
County of All narle Community Development Division
401 McIntire Road Charlottesville,VA 22902-4596
' `,t. Planning Application / Voice: (434)296-5823 Fax: (434)972-4012
PARCEL/ OWNER INFORMATION STREET ADDRESS
TMP 056A2 01 00 05800 House Street Name Apt/ Suite
5400 THREE NOTCH'D RD
Owner(s) ROUTE 240 LLC
PROPERTY INFORMATION
Legal Description ACREAGE TR-8 &9 & 10
Magisterial Dist Whitehall Land Use Primary Industrial--Light
Current AFD Not in A/F District Current Zoning Primary Light Industry
APPLICATION INFORMATION
House # Street Name Apt/ Suite City State Zip
Street Address 5400 THREE NOTCH'D RD CROZET 22932-
Entered By: Esther Grace on 12/06/2004 Application #
Application Type Site Development Plans SDP200400075
Project 2,198.00 Charlottesville Self Storage @ AR6200400112
Engineering File # 0 ARB200400132
Received Date 12/06/2004 Received Date Final Total Fees SDP200400106
ARB200400159
Submittal Date 12/13/2004 Submittal Date Final Total Paid
Closing File Date Revision Number
❑ Proffering Plan? ❑ Spec. Use Permit Amend.? ❑ Preliminary Site Plan?
❑ Site Plan Waiver? ❑ Preliminary Subdivision Plat? ❑ Planned District Amend.?
❑ Proffers Amendment? ❑ Special Conditions?
SEE TMP 56A3-1, 6 &7
Legal Description ACREAGE TR-8 &9 & 10
SUB APPLICATION(s)
Type Sub Application Date Date Entered: 12/06/2004
Final — Non-residential —Commission 12/06/2004 Comments
Final — Non-residential —Commission 12/06/2004
STATUS TRACKING
Status Status Date Entered By: Esther Grace on 12/06/2004
Under Review 12/06/2004 Comments
Under Review 12/06/2004
APPLICANT / CONTACT INFORMATION
Contact Type Owner/Applicant
Contractor Contact#
Name ROUTE 240 LLC Street Address P 0 BOX 35
ROUTE 240 LLC City/State IVY VA
SEIPP,AMY K. Phone #
Zip Code 22945- ( ) -
Fax # ( ) - Cellular# ( ) -
E-mail
Signature of Contractor or Authorized Agent Date
ENGINEERS
SURVEYORS
PLANNERS
ASSOCIATES
December 6,2004
Mr. Francis H. MacCall
County of Albemarle
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, VA 22902-4596
RE: SDP-2004-075 —Charlottesville Self Storage @ Crozet
Final Site Plan Review Process Submittal
Dear Mr. MacCall:
Enclosed is our submittal for the above referenced project. As per our phone
conversation on November 22, 2004, we are submitting:
• 8 tentative plans for review
• Preliminary approval letter
• Stormwater management calculations
As you mentioned, we will be submitting the final application and fees at a later date with
the final mylar plans. If you have any questions about this submittal or need further
information,please feel free to contact me.
Sincerely,
•
L-A/.1,2A/0/01
Amy K. Seipp, EIT � `, ►
Assistant Project Manager fps
D c 7004
CoMNICIIVIT y(.`
r'��cIVT
147 Mill Ridge Road•Lynchburg,Virginia 24502
Telephone(434)582-6175 •Fax(434)582-6179
Lynchburg•Charlottesville
C`(OF At4
o V
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,Room 227
Charlottesville,Virginia 22902-4596
Phone(434)296-5832 Fax(434)972-4126
November 1, 2004
Amy K. Seipp
WWW Associates
147 Mill Ridge Road
Lynchburg, VA 24502
RE: SDP-2004-075 Charlottesville Self Storage @ Crozet Preliminary Site Plan
Dear Ms. Seipp:
The Department of Community Development hereby grants administrative approval to the above-referenced
site plan.
The approval of the preliminary site plan is valid for(1)one year in accordance with Zoning Ordinance
Section 32.4.3.1. Therefore,the preliminary approval shall expire on November 2,2005. If the preliminary
site plan approval expires,a new application must be filed and processed.
Please address all of the requirements and conditions listed below and submit eight(8)tentative plan copies to
the Department of Community Development. This letter must be submitted with the tentative plans, as a
checklist,to document that you have addressed all requirements or conditions, or the tentative plan will be
denied. A submission and review schedule is attached for your information.
The Erosion and Sediment Control Plan and the BMP Stormwater Management Plan,with the associated
applications and fees,may also be submitted with the eight(8)tentative Plans. Failure to do so will result in a
separate application to be filed with the Department of Community Development at a later date.
After the initial tentative plan submittal,each department/agency will contact you to discuss any remaining
conditions. After all aforementioned department/agencies have granted a tentative approval,you may submit
the final mylars(2 sets),two paper copies, final site plan application, final site plan fee, and a copy of all
written tentative approvals to the Department of Community Development. Signing of the plans will occur
within one week once it is determined that the final site plan mylars reflect all tentative approvals.
The final site plan will be subject to all final site plan requirements(Zoning Ordinance Section 32.6),in
addition to the following conditions.
1. The Zoning&Current Development Division shall not accept submittal of the final site plan for
signature until tentative approvals for the following conditions have been obtained. The final site
plan shall not be signed until the following conditions are met:
❑ A. Planner approval to include:
O 1. [32.7.9] Approval of the final landscape plan, the plan should be overlaid
with all public utility easements to avoid conflicts; and,
O 2. [30.6] The final plan approval is subject to the issuance of a Certificate of
Appropriateness from the Architectural Review Board; and,
O 3. [32.6.6(j) &4.17.4(b)] Provide a description and photograph or diagram and
show the location of each type of outdoor luminaire that emits 3,000 or more initial
lumens. Please be aware that installation of such luminaires in the future that are not
shown on this plan shall require an amendment to this plan. Include a photometric
plan on the site plan demonstrating that parking area luminaires are in compliance
with 4.17.4(b)and,
O 4. Provide proof of legal recordation of the boundary line adjustment plat.
O B. Engineer approval to include:
The following items must also be reviewed and approved by the Engineer before tentative approval of
the site plan can be granted. A completed submittal form and application must accompany all
submittals. The required number of copies and the required fees are indicated on the form and
application.
A. An erosion control plan,narrative, computations, completed application and fee. [18-
32.7.4.3, 17-203]
B. A stormwater management/BMP plan and computations. Computations must include water
quality and detention routings for the 2yr and l0yr storms. [17-304]
C. A completed stormwater management facilities maintenance agreement and fee. [17-323]
D. Drainage computations. [18-32.7.4,Policy]
VDOT approval will also be required for final site plans and computations must accompany site
plan submittals.
❑ C. Albemarle County Service Authority approval to include:
0 1. Show water meter location; and,
❑ 2. Provide backflow prevention device; and,
❑ 3. Final water and sewer plan to be delivered directly to the Authority; and,
❑ 4. Provide plumbing fixture information to size meter.
Please contact me at your earliest convenience if you have any questions or require additional information.
Sincerely,
Francis H.MacCall
Senior Planner
Zoning&Current Development
fmaccall@albemarle.org
Copy: Amy Seipp WW Associates
240 LLC
File: SDP-2004-075
F
�pF AL „
Lirf
�'IRGIN�P
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road,Room 227
Charlottesville,Virginia 22902-4596
Phone(434)296-5823 Fax(434)972-4126
October 26, 2004
Amy K. Seipp
WW Associates
1402 Greenbrier Place
Charlotteville, VA 22901
RE: SDP 2004-075 Charlottesville Self Storage @ Crozet; Tax Map 56A2-01 Parcel 58 and Tax Map
56A3 Parcels 1, 6 and 7
Dear Ms. Seipp:
The Albemarle County Planning Commission, at its meeting on October 19, 2004, recommended approval
of the above-noted petition.
If you should have any questions or comments regarding the above noted action, please do not hesitate to
contact me (434)296-5823.
Sincerely,
Francis MacCall
Senior Planner
Cc: Ella Carey
Amelia McCulley
Jack Kelsey
Steve Allshouse