Loading...
HomeMy WebLinkAboutARB202200093 Staff Report 2022-11-30ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB-2022-93: Galaxie Farm Townhomes Final Site Plan Review Type Final Site Plan and Preliminary Review of Architecture Parcel Identification 09100-00-00-00900, 09100-00-00-01500 Location 192 and 193 Galaxie Farm Lane on the west side of Rt. 20, .3 miles south of the intersection of Mill Creek Drive and Rt. 20. Zoned Planned Residential Development (PRD) / Entrance Corridor (EC) Owner/Applicant Galaxie Farm Investments LLC / Riverbend Development, Inc., Collins Engineering (Scott Collins) Magisterial District Scottsville Proposal To construct 16 attached townhouses in one group of four units and two groups of six units as part of a larger development including 43 detached residences and associated site improvements on approximately 13.36 acres. Context The character of this portion of the Entrance Corridor is largely residential and rural. Some commercial properties are interspersed. Visibility See Project History/Visibility. ARB Meeting Date December 5, 2022 Staff Contact Khris Taggart PROJECT HISTORY/VISIB LITY The ARB reviewed and recommended approval of the initial site plan, ARB-2021-76, at the August 16, 2021 ARB meeting. Entrance Corridor requirements apply to the townhome portion of this development and Galaxie Farm Lane. Assuming the height of the townhomes is similar to or less than that of the single-family detached units, Lots 18-27 and Lots 54-59 will have visibility from the EC (Fig. 2 and 3). Figure 1: County GIS map highlighting subject properties along the Entrance Corridor. Imps, g� O MR. sue' i� •'�EXISTING TREE 16 EXISTING STREAM � LOT I/ - TREE PROTECT10A 1A' ' a7 _ C' FENCING (TYP)1av�0 �l - 0 STBEA 6 ,P,§�-SECTION�a. EXISTING TREE i 1 �9 +00 CANOPY TO REMAIN 0 �•ro ' f 30 � �tp / H ..STREAM BUEPER 'a+ ! T. M.ga-a8 WOOD, WENDEI papa OB.a727, PG.6 T LOT LO I' Ksosn _ +00 00 u nv fK4lf� I �) 3+EXISTING TREE CANf2:6o0 REMAIN �r _ �ROSs-SECTION qi//// Figure 2: Snippet from Sheet 18 of the Final Site Plan with Lots 18-27 and 54-59 highlighted. 9 Figure 3: Photos of views from Rt. 20 into the site. November 21, 2022. ANALYSIS REF GUIDELINE ISSUE 8/16/21 RECOMMENDATION ISSUE 12/5/22 RECOMMENDATION 8/16/21 12/5/22 GENERAL GUIDELINES Purpose, Compatibility with significant historic sites, Compatibility with the character of the Entrance Corridor 1 The goal of the regulation of the design of Architectural designs were not provided with Provide architectural designs Architectural drawings have been See the development within the designated Entrance the initial plan. The side and rear elevations with the next submittal. Note provided with this submittal. The recommendations listed Corridors is to ensure that new development of the townhouses that are visible from the that the side and rear overall building design of the below on the within the corridors reflects the traditional EC must be designed to eliminate blankness elevations of the townhouses townhomes is contemporary in style but architectural designs. architecture of the area. Therefore, it is the and achieve appropriate form, scale, etc. in lots 18-27 and 54-59 must uses gabled roof forms and building purpose of ARB review and of these Guidelines, be designed to eliminate materials (brick, standing seam metal, that proposed development within the designated blankness and achieve and board and batten and horizontal Entrance Corridors reflect elements of design appropriate form, scale, etc. siding) that are reflective of those used characteristic of the significant historical historically within the County. The use landmarks, buildings, and structures of the of gable roof forms and the proposed Charlottesville and Albemarle area, and to materials provides a minimal promote orderly and attractive development connection to both the local historic within these corridors. Applicants should note that architecture and the surrounding replication of historic structures is neither required context of nearby developments. nor desired. 2 Visitors to the significant historical sites in the Charlottesville and Albemarle area experience these sites as ensembles of buildings, land, and vegetation. In order to accomplish the integration of buildings, land, and vegetation characteristic of these sites, the Guidelines require attention to four primary factors: compatibility with significant historic sites in the area; the character of the Entrance Corridor; site development and layout; and landscaping. 3 New structures and substantial additions to existing structures should respect the traditions of the architecture of historically significant buildings in the Charlottesville and Albemarle area. Photographs of historic buildings in the area, as well as drawings of architectural features, which provide important examples of this tradition are contained in Appendix A. 4 The examples contained in Appendix A should be used as a guide for building design: the standard of compatibility with the area's historic structures is not intended to impose a rigid design solution for new development. Replication of the design of the important historic sites in the area is neither intended nor desired. The Guideline's standard of compatibility can be met through building scale, materials, and forms which may be embodied in architecture which is contemporary as well as traditional. The Guidelines allow individuality in design to accommodate varying tastes as well as special functional requirements. 5 It is also an important objective of the Guidelines to establish a pattern of compatible architectural characteristics throughout the Entrance Corridor in order to achieve unity and coherence. Building designs should demonstrate sensitivity to other nearby structures within the Entrance Corridor. Where a designated corridor is substantially developed, these Guidelines require striking a careful balance between harmonizing new development with the existing character of the corridor and achieving compatibility with the significant historic sites in the area. SPECIFIC GUIDELINES ConWalibUity with significant historic sites Structure design 9 Building forms and features, including roofs, Architectural designs were not provided with Provide architectural designs Line drawings and color renderings Provide a drawing that windows, doors, materials, colors and textures the initial plan. The side and rear elevations with the next submittal. Note have been provided, but they show keys the building designs should be compatible with the forms and features of the townhouses that are visible from the that the side and rear different building designs and are not to the site layout. of the significant historic buildings in the area, EC must be designed to eliminate blankness elevations of the townhouses keyed to the site plan. exemplified by (but not limited to) the buildings and achieve appropriate form, scale, etc. in lots 18-27 and 54-59 must Provide color renderings described in Appendix A [of the design be designed to eliminate The townhomes illustrated in the color for the designs shown in guidelines]. The standard of compatibility can be blankness and achieve renderings feature a brick base with the line drawings and met through scale, materials, and forms which appropriate form, scale, etc. board and batten and horizontal siding line drawings for the may be embodied in architecture which is above. The south and east side and contemporary as well as traditional. The rear) elevations feature material design shown in the replication of important historic sites in changes, variations in depth, and color renderings. Albemarle County is not the objective of these windows and balconies that sufficiently guidelines. break up the mass and scale of the buildings. Revise the line drawings to note wane earth -tone 11 The overall design of buildings should have human scale. Scale should be integral to the colors for horizontal building and site design. The townhomes illustrated in the line drawings include a number of different siding on the south and east elevations of the 12 Architecture proposed within the Entrance Corridor should use forms, shapes, scale, and design options. The front elevations townhomes labeled materials to create a cohesive whole. feature bases of stone veneer that vary in height. Above the stone is either a Holly I and note that adjacent townhomes will 13 Any appearance of "blankness" resulting from building design should be relieved using design single type of siding or a mixture of not use the same color. detail or vegetation, or both. board and batten, horizontal, and shake. The east and south (side and rear) elevations are limited to a single material - horizontal siding — and they have no ornamental features. They do have windows that help relieve blankness and establish scale, and an optional balcony on the south elevations would add interest. The distance between the townhomes and the EC, the existing vegetation to remain, and the proposed landscaping are expected to filter the views of the townhomes from Rt. 20. This limits the need for additional architectural features. Wall colors have not been identified on the line drawings, but warn earth tones would help the buildings blend into the surroundings. Also, varying the warm tones from one townhouse to the next would help reduce the scale of the townhouse blocks. 10 Buildings should relate to their site and the No physical materials/color samples Revise the building surrounding context of buildings. have been provided with this submittal. design to limit the use of However, the architectural drawings white to trim and/or identify the materials which include decorative features. brick, board and batten and horizontal siding, and standing seam metal. The colors identified include earth tones (Navajo Beige, Iron Ore, Weathered Wood, and Salem Creek Tudor) and white (Arctic White). In the ARB's review of similar developments that have used Arctic White, the Board has required the color be limited to trim and decorative features. In the design for the proposed townhomes, the use of this color expands beyond trim and decorative features to the walls of the non -gable roof portions of the front and rear elevations and the central bay of the side elevations. Based on the surrounding context, revising the building design to limit the use of white to trim and/or decorative features would be appropriate. 14 Arcades, colonnades, or other architectural The layout of the site is not conducive None. connecting devices should be used to unify to connecting devices. groups of buildings within a development. 15 Trademark buildings and related features should The buildings do not have the None. be modified to meet the requirements of the appearance of a trademark design. Guidelines. 16 Window glass in the Entrance Corridors should not The color renderings include a note that Revise the line drawings be highly tinted or highly reflective. Window glass the window glass will meet the EC to provide specs on in the Entrance Corridors should meet the guidelines. However, no specifications proposed window glass following criteria: Visible light transmittance on the proposed window glass have that meet the design (VLT) shall not drop below 40%. Visible light been indicated on the line drawings criteria. reflectance (VLR) shall not exceed 30%. with this submittal. Specifications on the proposed window glass should be submitted with the application for final review. Accessory structures and equipment 17 Accessory structures and equipment should be No accessory structures are proposed in this Show the location of The locations of the ground -mounted Clarify whether the integrated into the overall plan of development development. mechanical equipment mechanical equipment for the existing fence remains and shall, to the extent possible, be compatible (building- and ground- townhomes have been shown on the on the southern property with the building designs used on the site. The location(s) of mechanical equipment is mounted) on the site and plans. Both the mechanical equipment line. not labeled on the plan. architectural plans and show how it will be screened from and associated screening fencing are Revise the site plan to the EC. not expected to be visible from the EC. show the height of the 18 The following should be located to eliminate Some, but not all, sheets of the site plan set Confine that the fence on the The proposal includes new fencing to new fence consistently visibility from the Entrance Corridor street. If, show existing fencing along the southwest southwest side of the site is to supplement an existing fence along the throughout the site plan. after appropriate siting, these features will still side of the site. Sheet 2 notes that it is to remain. Revise the site plan to southern property line but based on a have a negative visual impact on the Entrance remain. Retaining the fence seems show the fence consistently site visit there appears to be no existing Corridor street, screening should be provided to challenging given the proximity of throughout the site plan. fence. Also, the height of the new fence eliminate visibility. A. Loading areas, b. Service construction. (8' on sheet 3, 6' on sheet 4) is not areas, c. Refuse areas, d. Storage areas, e. shown consistently on the site plan. Mechanical equipment, f Above -ground utilities, and g. Chain link fence, barbed wire, razor wire, and similar security fencing devices. 19 Screening devices should be compatible with the design of the buildings and surrounding natural vegetation and may consist of. a. Walls, b. Plantings, and c. Fencing. 21 The following note should be added to the site plan The note is present of the site plan. Include the standard The architectural drawings include the None. and the architectural plan: "Visibility of all Architectural drawings have not been mechanical equipment note on standard mechanical equipment note. mechanical equipment from the Entrance submitted at this time. the architectural plans. Corridor shall be eliminated." 22- Lighting A note on the site plan indicates no lighting is None. The plan has been revised to note that Revise the site plan to 31 proposed with this site plan. no street lighting is proposed. Building include information on and/or post -mounted lighting is likely any proposed building and could be appropriate if impacts are and/or post -mounted minimized. lighting. Show how impacts of this lighting will be minimized. Full cutoff fixtures with limited intensity and warn color temperatures (2000-3000K) are recommended. Landscaping 7 The requirements of the Guidelines regarding It is anticipated that building masses and Revise the plan to provide The site plan has been revised to None. landscaping are intended to reflect the rooflines ascending the slope will be seen trees along the include a complete landscaping plan. landscaping characteristic of many of the area's from the street, particularly through the south/southwest perimeter of The plan shows an irregular significant historic sites which is characterized southwest perimeter of the development. the site to help integrate the arrangement of mixed deciduous trees by large shade trees and lawns. Landscaping Trees along this side and distributed development into environment between the stream buffer and the should promote visual order within the Entrance throughout the development would help of the corridor. A mix of trees, backs of Lots 15-21 and 4-6. This Corridor and help to integrate buildings into the integrate the development into the irregularly spaced, is arrangement, combined with the existing environment of the corridor. surrounding context and help transition from more urban to rural character. recommended. existing vegetation to remain along the EC, is expected to help integrate the 8 Continuity within the Entrance Corridor should be obtained by planting different types of plant development into the surrounding materials that share similar characteristics. Such context. common elements allow for more flexibility in the design of structures because common landscape features will help to harmonize the appearance of development as seen from the street upon which the Corridor is centered. 32 Landscaping along the frontage of Entrance Along the Rt. 20 frontage of the development Corridor streets should include the following: is a 100' stream buffer that is wooded and to a. Large shade trees should be planted parallel to remain; existing trees to remain can be the Entrance Corridor Street. Such trees should counted as EC frontage trees. The buffer is be at least 3% inches caliper (measured 6 inches not particularly dense; views will be available above the ground) and should be of a plant through the wooded area in the fall and species common to the area. Such trees should be winter. Some trees are located very close to located at least every 35 feet on center. the road, as is an overhead power line. The b. Flowering ornamental trees of a species wooded buffer is consistent with the common to the area should be interspersed among surrounding context. the trees required by the preceding paragraph. The ornamental trees need not alternate one for one with the large shade trees. They may be planted among the large shade trees in a less regular spacing pattern. c. In situations where appropriate, a three or four board fence or low stone wall, typical of the area, should align the frontage of the Entrance Corridor street. d. An area of sufficient width to accommodate the foregoing plantings and fencing should be reserved parallel to the Entrance Corridor street, and exclusive of road right-of-way and utility easements. 33 Landscaping along interior roads: A landscape plan has not been provided in Include with the final site plan A complete landscape plan has been Shift the two trees east a. Large trees should be planted parallel to all this submittal. On the site plan trees are a complete landscape plan. included with the final site plan. Large of "Open Space B" to interior roads. Such trees should be at least 2% shown along Galaxie Farm Lane and Mary Ensure that there are no shade trees, 2'/z" caliper at time of eliminate the stormwater inches caliper (measured six inches above the Jackson Court but spacing exceeds 40' in conflicts between landscaping planting, have been identified along pipe conflict and resolve ground) and should be of a plant species several locations. Overall, the quantity of and utilities. Galaxie Farm Lane and Mary Jackson all other street trees provided is consistent with the Court. However, two trees located east trees/utility conflicts. 10 common to the area. Such trees should be located at least every 40 feet on center. requirement. However, there appear to be numerous conflicts between interior road trees and utilities. Also, details on the species and caliper of the proposed trees have not been provided with the initial plan. of open Space B are still shown too close to stonnwater pipes and there are additional conflicts with a few trees further west on Mary Jackson Court. 34 Landscaping along interior pedestrian ways: Sidewalks are provided along all public None. a. Medium trees should be planted parallel to all roadways within the site. The interior street interior pedestrian ways. Such trees should be at trees provided along these roadways also act least 2% inches caliper (measured six inches as interior pedestrian way trees. above the ground) and should be of a species common to the area. Such trees should be located A trail is proposed through the stream buffer, at least every 25 feet on center. more or less parallel to the EC. Pedestrian way trees are not needed along it because trees remain in the stream buffer. 35 Landscaping of parking areas: Parking spaces are proposed west of Lots 54- None. Parking spaces are proposed west of None. a. Large trees should align the perimeter of 56 and west of Lot 27. They are not expected Lots 54-56 and west of Lot 27. They parking areas, located 40 feet on center. Trees to be visible from the Entrance Corridor. are not expected to be visible from the should be planted in the interior of parking areas Entrance Corridor. at the rate of one tree for every 10 parking spaces provided and should be evenly distributed throughout the interior of the parking area. b. Trees required by the preceding paragraph should measure 2'/z inches caliper (measured six inches above the ground); should be evenly spaced; and should be of a species common to the area. Such trees should be planted in planters or medians sufficiently large to maintain the health of the tree and shall be protected by curbing. c. Shrubs should be provided as necessary to minimize the parking area's impact on Entrance Corridor streets. Shrubs should measure 24 inches in height. n 36 Landscaping of buildings and other structures: The longest townhome block is None at this time. Line drawings and color renderings Revise the line drawings a. Trees or other vegetation should be planted approximately 132' long. The townhome have been provided with this submittal. to note wane earth -tone along the front of long buildings as necessary to block that is closest to the EC is located The color renderings confirm that the colors for horizontal soften the appearance of exterior walls. The approximately 340' from the street. building designs incorporate variations siding on the south and spacing, size, and type of such trees or vegetation Architectural designs haven't been provided, in depth and variations in east elevations of the should be determined by the length, height, and but the blocks incorporate minor variations in materials/colors that help provide relief townhomes labeled blankness of such walls. depth; some units project forward, others are along the length of the elevations. Holly I and note that b. Shrubs should be used to integrate the site, recessed. However, the south (rear) elevations in adjacent townhomes will buildings, and other structures; dumpsters, the line drawings show a single not use the same color. accessory buildings and structures; "drive thru" material (horizontal siding) and windows; service areas; and signs. Shrubs should presumably no variations in wall color. measure at least 24 inches in height. Lots 18-27 and 54-59 are the townhouse lots but building designs have not been keyed to the site plan. While the lots' distance from the EC and site elements between them and the EC are expected to filter views of the buildings, using warn earth tones (varying from one townhome to the next) would both integrate the buildings into the surrounding context and rovide visual interest. 37 Plant species: A landscape plan has not been provided with Include with the final site plan A complete landscape plan has been None. a. Plant species required should be as approved the initial site plan. a complete landscape plan. included with the site plan. The plants by the Staff based upon but not limited to the are found on the various lists and do not Generic Landscape Plan Recommended Species include invasives. List and Native Plants for Virginia Landscapes (Appendix D . 38 Plant health: Include the standard plan The standard plant health note has been None. The following note should be added to the health note on the landscape included on the landscape plan. landscape plan: "All site plantings of trees and plan. shrubs shall be allowed to reach, and be maintained at, mature height; the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of theplant." Development pattern Site development and layout 12 6 Site development should be sensitive to the The site is a combination of existing None. The two single-family residential None. existing natural landscape and should contribute developed areas (single-family residential) properties and natural landscape (open to the creation of an organized development plan. and natural landscape (open space, mature space, mature trees), with the exception This may be accomplished, to the extent trees). Except for the tree buffer that is to of the tree buffer, have been removed to practical, by preserving the trees and rolling remain along Rt. 20, the existing natural accommodate the proposed terrain typical of the area; planting new trees landscape is being removed to accommodate development. along streets and pedestrian ways and choosing the proposed development. species that reflect native forest elements; insuring that any grading will blend into the surrounding topography thereby creating a continuous landscape; preserving, to the extent practical, existing significant river and stream valleys which may be located on the site and integrating these features into the design of surrounding development; and limiting the building mass and height to a scale that does not overpower the natural settings of the site, or the Entrance Corridor. 39 The relationship of buildings and other structures The site is accessed from Rt 20. The Provide architectural designs The site is accessed from Rt 20. The See recommendation in to the Entrance Corridor street and to other travelways and parking areas have an with the next submittal. Note travelways and parking areas have an Guideline 36. development within the corridor should be as organized pattern. A trail is proposed through that the side and rear organized pattern. A trail is proposed follows: the stream buffer, more or less parallel to the elevations of the townhouses through the stream buffer, more or less a. An organized pattern of roads, service lanes, EC; it connects to the interior pedestrian in lots 18-27 and 54-59 must parallel to the EC; it connects to the bike paths, and pedestrian walks should guide the ways. be designed to eliminate interior pedestrian ways. layout of the site. blankness and achieve b. In general, buildings fronting the Entrance The townhome blocks are not adjacent to the appropriate form, scale, etc. Architectural drawings have been Corridor street should be parallel to the street. EC street. Those that will be most visible are provided with this submittal. The side Building groupings should be arranged to arranged more or less perpendicular to the and rear of the townhomes shown in the parallel the Entrance Corridor street. EC. The sidewalk layout suggests that the color renderings have been designed c. Provisions should be made for connections to front of the townhomes visible from the EC with sufficient form and material adjacent pedestrian and vehicular circulation will face the interior of the site (north), so the changes to relieve blankness and break systems. east and south elevations of these units will up the mass of the elevations. The side d. Open spaces should be tied into surrounding be the side and rear elevations. They must be and rear of the townhomes shown in the areas to provide continuity within the Entrance designed to eliminate blankness and achieve line drawings have windows and doors Corridor. appropriate form, scale, etc. that help to reduce blankness and e. If significant natural features exist on the site establish some scale, but there are no (including creek valleys, steep slopes, significant The existing site is a mixture of two single- material changes and potentially no trees or rock outcroppings), to the extent family residential properties and open spaces variations in wall color. Siding colors practical, then such natural features should be with mature trees, most of which will be in wane earth tones, varying the colors reflected in the site layout. If the provisions of from one townhouse to the next, may 13 Section 32.5.2.n of the Albemarle County Zoning removed to accommodate the proposed help to provide additional visual Ordinance apply, then improvements required by development. interest and integrate the elevations into that section should be located so as to maximize the surrounding context. the use of existing features in screening such Views around the site are not expected to be improvements from Entrance Corridor streets. negatively impacted. The two single-family residential f. The placement of structures on the site should properties and mature trees in open respect existing views and vistas on and around spaces have been cleared to the site. accommodate the proposed development. Views around the site are not expected to be negatively impacted. Site Grading 40 Site grading should maintain the basic relationship Grading is proposed throughout the site. Revise the plan to indicate The site plan has been revised to None. of the site to surrounding conditions by limiting Retaining walls reaching 6' tall are proposed retaining wall material, color, identify the retaining wall material as the use of retaining walls and by shaping the at the northwestern comer of the site and manufacturer. A block in a segmental block in the color "Blue terrain through the use of smooth, rounded southeast of Lot 4. The wall at the northwest muted, earth -tone color would Ridge". When viewed during a recent landforms that blend with the existing terrain. comer of the site is not anticipated to be be appropriate. Samples may site visit, the muted, earth -tone color Steep cut or fill sections are generally visible from the EC; however, the wall be required. appeared to be appropriate for the EC. unacceptable. Proposed contours on the grading southeast of Lot 4 is anticipated to have some plan shall be rounded with a ten -foot minimum visibility from the EC. The use of an earth radius where they meet the adjacent condition. tone color for the block material would be Final grading should achieve a natural, rather than appropriate. engineered, appearance. Retaining walls 6 feet in height and taller, when necessary, shall be terraced and planted to blend with the landscape. 41 No grading, trenching, or tunneling should occur The grading plan shows grading in the stream Show the tree protection The site plan has been revised to show None. within the drip line of any trees or other existing buffer along the EC frontage. An existing fencing for the tree buffer tree protection fencing throughout the features designated for preservation in the final wooded area is between the EC and the site, throughout the landscaping, plan set. Certificate of Appropriateness. Adequate tree but no tree protection fencing is shown on the grading and, E&S plans. protection fencing should be shown on, and plans. If this wooded area is to remain, tree 14 coordinated throughout, the grading, landscaping protection will need to be coordinated and erosion and sediment control plans. throughout the site plan set. 42 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and protected on the site prior to any grading activity on the site. This protection should remain in place until completion of the development of the site. 43 Preservation areas should be protected from storage or movement of heavy equipment within this area. 20 Surface runoff structures and detention ponds A stormwater facility is shown south of Lots Revise the plan to indicate the The site plan has not been revised to None. should be designed to fit into the natural 17-21 between the site and the EC, it is use of earth -tone concrete and indicate the use of earth -tone concrete topography to avoid the need for screening. When anticipated that the tree buffer will reduce stone to better integrate the and stone. Installed portions of the visible from the Entrance Corridor street, these visual impacts of the facility as viewed from culverts and rip rap located in culverts and rip rap (light gray) were features must be fully integrated into the the EC. the tree buffer into the site. viewed in a recent site visit. Existing landscape. They should not have the appearance vegetation to remain, combined with of engineered features. A stormwater pipe runs along the southwest perimeter of the site ending behind Lot 16 proposed landscaping, are expected to sufficiently integrate the light gray 44 Natural drainage patterns (or to the extent required, new drainage patterns) should be with a culvert and a rip rap lined channel that features into the site. incorporated into the finished site to the extent connects to the nearby stream (Cow Branch). possible. There are also pipes, culverts, and rip rap associated with Cralaxie Farm Lane. These features are expected to have some visibility from the EC. All these features could be better integrated into the site with the use of earth -tone colors for the concrete and stone. 15 SUMMARY OF RECOMMENDATIONS Staff recommends the following as the primary points of discussion: 1. The appearance of the townhomes; materials, colors and level of detail. 2. The proposed landscaping between the development and the EC. 3. The visibility of the culverts and riprap located in the tree buffer. Staff recommends approval of the final site plan with the following revisions: 1. Provide a drawing that keys the building designs to the site layout. 2. Provide color renderings for the designs shown in the line drawings and line drawings for the designs shown in the color renderings. 3. Revise the line drawings to note warn earth -tone colors for horizontal siding on the south and east elevations of the townhomes label Holly I and note that adjacent townhomes will not use the same color. 4. Revise the building design to limit the use of white to trim and/or decorative features. 5. Revise the line drawings to provide specs on proposed window glass that meet the design criteria: Visible light transmittance (VLT) shall not drop below 40%. Visible light reflectance (VLR) shall not exceed 30%. 6. Clarify whether the existing fence remains on the southern property line. 7. Revise the site plan to show the height of the new fence consistently throughout the site plan. 8. Revise the site plan to include information on any proposed building and/or post -mounted lighting. Show how impacts of this lighting will be minimized. Full cutofffixtures with limited intensity and warm color temperatures (2000-3000K) are recommended. 9. Shift the two trees east of "Open Space B" to eliminate the stormwater pipe conflict and resolve all other street trees/utility conflicts. ATTACHMENTS Attach. 1: ARB202-93: Galaxie Farm Townhomes Final Site Plan Attach. 2: ARB202-93: Galaxie Farm Townhomes Color Renderings Attach. 3: ARB202-93: Galaxie Farm Townhomes Line Drawings IG