Loading...
HomeMy WebLinkAboutWPO201300004 Checklist - Project Closeout (Administrative) 2013-01-16 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND RELEASE) IMAGING CENTER INSTRUCTIONS CHECKLIST The Inspector/Management Analyst is to complete this form within 30 days of project completion and/or bond release; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will forward to Centralized Filing. WPO# 6/3 ` 000 I{ PROJECT TITLE 1 V 61E-'6-r K LL it/ e__, FULL NAME INSPECTOR MM "30 k FINAL ACTION DATE: / (91, ac.)/4 CountyView — [ 31-atus/Status Date updated -6'111/ / r Hardcopy — File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file, place an "N/A" next to the check box. The Inspector/Management Analyst has the discretion to include any item deemed necessary to provide clarity to the file, please indicate that item on the"Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location (path/name) of the document in the space provided. ❑°Preconstruction Meeting Form ❑ Scan (l Saved location ['Grading Permit I rnf.r-W) ,I>`7 1')1__ I, ❑ Scan ❑ Saved location inspection Requests (l Scan n Saved location ❑ Inspection Results(Include any inspection tickets, memos, photos, etc.) ❑ Scan ❑ Saved location ❑ -Bond Reduction/Bond Release Notices from Inspector to Management Analyst ❑ Scan ❑ Saved location ❑ Conservation Checklist ❑ Scan ❑ Saved location ❑ As-built/Construction Plans ❑ Scan ❑ Saved location [--Other(Please explain) (261 \-)f -re) tc.r<`P+F/_)_/Yr ^ x�,..).• ❑ Scan ❑ Saved location ❑ Other Plans - At the Inspector's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. ❑ Scan I Saved location NOTES: WPO project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2) Documents are Acco-fastened(except plats/plans),and in chronological order(latest documents on top); 3) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete, Imaging Center staff will circle the incomplete item and return folder to the County WATER PROTECTION (REVIEW) FILE CLOSEOUT AT TIME OF ENGINEERING APPROVAL/DENIAL IMAGING CENTER INSTRUCTIONS CHECKLIST The Lead Engineer is to complete this form within 30 days of final action of WPO plan; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will forward back to the Engineering Department. WPO# 2.-°t'3- Li PROJECT TITLE i v 1 C o e k U t-i Aik.,tt.,, i s ,i c 1. FULL NAME OF ENGINEER ft,U c kixtt k. 3LU,,3 FINAL ACTION DATE: d1811 3 CountyView— 0 Limits of Disturbance Area(Ac)updated t 2 0, Status/Status Date updated Hardcopy— File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file,place an"N/A" next to the check box. The Lead Reviewer/Engineer has the discretion to include any item deemed necessary to provide clarity to the file, please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location (path/name)o e document in the space provided. PAN Applic on(signature copy) Scan ❑ Saved location 56 Approv d E&S Plan(signed, or stamped"Approved"with Engineer name) Scan ❑ Saved location ❑ Approved Mitigation Plan(stamped"Approved"with Engineer name) ❑ Scan ❑ Saved location IE Approv d SWM Plan(stamped"Approved"with Engineer name) Scan ❑ Saved location El Army Corp Approval El Scan El Saved location ❑ VDOT Approval El Scan El Saved location ❑ Calculations ❑ Scan f 1 Saved location ❑ Bond Es mate Request Scan f 1 Saved location El Bond E imate Calculated Scan f 1 Saved location El Other(Please explain) j;KtAlitt.4£owvne t ❑ Scan Saved location C--v El Other(Please explain) ❑ Scan ❑ Saved location El At the Engineer's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date. If such plans are included. they should be clearly marked 2S nnannroved and contain a