Loading...
HomeMy WebLinkAboutWPO201400005 Checklist - Project Closeout (Administrative) 2014-02-10 WATER PROTECTION (REVIEW) FILE CLOSEOUT AT TIME OF ENGINEERING APPROVAL/DENIAL IMAGING CENTER INSTRUCTIONS CHECKLIST The Lead Engineer is to complete this form within 30 days of final action of WPO plan; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in Laser Fiche,Imaging Center staff will forward back to the Engineering Department. WPO# of 4 00000 PROJECT TITLE A/I t/ ?aii FULL NAME OF ENGINEER piiicI' k ,e0 7 FINAL ACTION DATE: OM Cou 'tyView — iFf imits of Disturbance Area(Ac)updated ; Status/Status Date updated Hardcopy— File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file, place an"N/A" next to the check box. The Lead Reviewer/Engineer has the discretion to include any item deemed necessary to provide clarity to the file, please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location (path/ ame) the document in the space provided. Appli . io g signature copy) J Scan ❑ Saved location �Approv:d &S Plan(signed, or stamped"Approved"with Engineer name) ►Ki Scan ❑ Saved location ApprovI itigation Plan(stamped"Approved"with Engineer name) Or/ Scan ❑ Saved location ,ppro I WM Plan(stamped"Approved"with Engineer name) :I Scan ❑ Saved location El Army Corp Approval El Scan ❑ Saved location P- ❑ VDOT Approval El Scan El Saved location �(? alculations (---,--- 4 Scan ❑ Saved location 0 i1 (ate and ,i m at- Request .1:7; - - J1 Saved location Zr;ondV s4; ate Calculated [ h1, Scan Fl Saved location Other Vase explain) Git'tSkthav_02_, 4 guie, C.,r .P ":� Scan El Saved location El Other(Please explain) ❑ Scan El Saved location ❑ At the Engineer's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a