Loading...
HomeMy WebLinkAboutWPO201300039 Checklist - Project Closeout (Administrative) 2013-06-10 WATER PROTECTION (CONSTRUCTION) FILE CLOSEOUT AT TIME OF COMPLETION (BOND RELEASE) IMAGING CENTER INSTRUCTIONS CHECKLIST The Inspector/Management Analyst is to complete this form within 30 days of project completion and/or bond release; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will forward to Centralized Filing. WPO# G2O/3 ocao 39 PROJECT TITLE rocc2 50930/.35 PocI.D E-D6 ht3C Prj FULL NAME INSPECTOR Mille k 41a k/,cis FINAL ACTION DATE: /c7 -/4-/ Cou9,tyVi ew UlArtatus/Status Date updated Hardcopy — File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file, place an "N/A" next to the check box. The Inspector/Management Analyst has the discretion to include any item deemed necessary to provide clarity to the file, please indicate that item on the "Other" lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location (path/name) of the document in the space provided. ❑/Preconstruction Meeting Form / ❑ Scan ❑ Saved location Grading Permit ❑ Scan ❑ Saved location ❑ Inspection Requests ❑ Scan E Saved location ❑ Inspection Results(Include any inspection tickets,memos, photos, etc.) n Scan ❑ Saved location ❑✓Bond Reduction/Bond Release Notices from Inspector to Management Analyst E Scan n Saved location ❑ Conservation Checklist E Scan E Saved location ❑ As-built/Construction Plans Scan n Saved location ❑ Other(Please explain) n Scan ❑ Saved location ❑ Other Plans - At the Inspector's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date. If such plans are included, they should be clearly marked as unapproved and contain a note clarifying why it was included. ❑ Scan ❑ Saved location NOTES: WPO project folders will be accepted by the Imaging Center when the following items are complete: 1) Checklist is completed and included in folder; 2) Documents are Acco-fastened(except plats/plans),and in chronological order(latest documents on top); 3) Documents are sufficiently identified as to which need to be scanned or saved to LaserFiche. If the above items are not complete, Imaging Center staff will circle the incomplete item and return folder to the County Engineer for corrective action. �30 pgP-/ 10 Draft 12-5-2013 WATER PROTECTION (REVIEW) FILE CLOSEOUT AT TIME OF ENGINEERING APPROVAL/DENIAL IMAGING CENTER INSTRUCTIONS CHECKLIST The Lead Engineer is to complete this form within 30 days of final action of WPO plan; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will forward back to the Engineering Department. WPO# t'r i S-S PROJECT TITLE loi,u Ji'_CLS'tir i d - 7)(e cIfj,,A.9 Plat, FULL NAME OF ENGINEER M o x err:�.t_.: FINAL ACTION DATE: #I i 3113 CountyView— 1 Limits of Disturbance Area(Ac)updated I-s Status/Status Date updated Hardcopy—File Folder Closeout: All items listed should be placed in project folder, in reverse chronological order(latest on top). Please check each item included in this folder. To indicate that an item is not applicable to this file, place an"N/A" next to the check box. The Lead Reviewer/Engineer has the discretion to include any item deemed necessary to provide clarity to the file,please indicate that item on the"Other"lines provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location (path/name)of the document in the space provided. [c/K1 Applic n(signature copy) Scan ❑ Saved location 41 ApproI E&S Plan(signed, or stamped"Approved"with Engineer name) Scan ❑ Saved location El Approved Mitigation Plan(stamped"Approved"with Engineer name) El Scan ❑ Saved location El Approved SWM Plan(stamped"Approved"with Engineer name) El Scan El Saved location ❑ Army Corp Approval El Scan ❑ Saved location ❑ VDOT Approval El Scan ❑ Saved location El Calculations El Scan n Saved location El Bond Estimate Request ❑ Scan n Saved location El Bond Estimate Calculated El Scan n Saved location VOther P ase explain) 7.0 i 04,M..0 -k Scan Saved location CO,..)-- ❑ Other(Please explain) ❑ Scan ❑ Saved location ❑ At the Engineer's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date. If such nlans are included_ they should he clearly marked ac nnannrnved and enntain a