Loading...
HomeMy WebLinkAboutWPO201400065 Checklist - Project Closeout (Administrative) 2014-08-04 WATER PROTECTION (REVIEW) FILE CLOSEOUT AT TIME OF ENGINEERING APPROVAL/DENIAL IMAGING CENTER INSTRUCTIONS CHECKLIST The Lead Engineer is to complete this form within 30 days of final action of WPO plan; place the completed form in the WPO folder and forward to the Imaging Center for digital closeout into LaserFiche. Once items have been placed in LaserFiche,Imaging Center staff will forward back to the Engineering Department. WPO# W (o QO3O 14-6j PROJECT TITLE 6-c i es �� -A 60_, A c(5 & 6- FULL NAME OF ENGINEER c \ \ J A. FINAL ACTION DATE: O t; I CoyntyView - If i Limits of Disturbance Area(Ac)updated I Status/Status Date updated , l Hardcopy— File Folder Closeout: All items listed should be placed in project folder,in reverse chronological order(latest on top). t Please check each item included in this folder. To indicate that an item is not applicable to this file, place an"N/A" next to the check box. The Lead Reviewer/Engineer has the discretion to include any item deemed necessary to provide clarity to the file, please indicate that item on the"Other"find"provided. Digital Closeout Instructions: Below each item please indicate if Imaging Center is to scan the document; or, if the document is already in digital format, can be saved to LaserFiche. Please provide the digital location (path/ ame)of the document in the space provided. Applica ti a signature copy) lili .can ❑ Saved location �Appr•v-d E&S Plan(signed, or stamped"Approved"with Engineer Scan ❑ Saved location '' neer name) [l" Approv-. ' itigation Plan(stamped"Approved"With Engineer name) ►r: Scan ❑ Saved location 4 ..„ ["Approved WM Plan(stamped "Approved"with Engineer name) r, Scan ❑ Saved location 4, Corp Approval P. scan. �_❑ Saved location ii OT Approval 7 NI' scan 1 Saved location I 911 Calculaf ns rAT Scan ` ❑ Saved.location Bond 7 mate Request . V Scan T ❑ Saved>location and (mate Calculated Scan 11 Saved location Other P e explain) t:res5i c_� 64,-,"--k-f-c\ e.i rut I A-- S o P ' BSc ' Scan ❑ Saved location ❑ Other(Please explain) ❑ Scan ❑ Saved location ❑ At the Engineer's discretion, copies of unapproved plans/plats may be placed in the file if they lend clarity to the review at a later date. If such plans are included, they should be clearly marked as unannrnved and rnntiin .