Loading...
HomeMy WebLinkAboutWPO202100003 Bond 2022-12-07Internal Use Only Date Received: Fee Paid: _ Received by: Intake: Forward to Program Administrator BOND INSPECTION REQUEST APPROVED PLAN #: WPO- 2021- 000 a 5 PROJECT NAME (including Phase #): S'1j0he& Ia U-S - 22-31 561M bV46E LA;a.1C (As listed on the approved plan) This form is used to request a reduction or release of a bond. A fee is required for each inspection. Please check the appropriate box below for the requested inspection(s). Fees includes 4% Technology Fee. Inspections for the purposes of bond reduction or release will require a separate fee for each bond. Q/ VSMPNESCP Erosion Control, Stormwater Management and/or Mitigation per Water Protection Ordinance sections 17-207 & 17-208 $294.32 ❑ Reduction w4elease ❑ Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14-435 & 14-438 $307.84 ❑ Reduction ❑ Release ❑ Water & Sewer bond per Subdivision Ordinance section 14-435 $307.84 ❑ Reduction ❑ Release ❑ Site Development Performance bond (Incomplete Site Work & Landscaping) $344.24 o-Reduction (site work only) ❑ Release TOTAL FEES $ 2q4- 3z Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville, VA 22902, Attention: Management Analyst — Phone 434-296-5832; Fax 434-9724126. All roads and stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esmts, certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures). Bonds will not be reduced or released without record drawings and inspection documentation per the state requirements and County's published procedures. A minimum 20% of the original posting is held until acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is part of the bonded site work, a request for reduction should only be made once all landscaping is complete. If all required documentation is not received within 30 days of receipt of this request, this application shall be deemed incomplete and shall be rejected. If rejected, anew application, supporting documentation and fee will be required. Applications may be withdrawn for a full refund within 30 days of receipt. If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner. Please provide contact information. EMAIL: 1 r(.5 B VIAn/k+^ 6,-eN. co n OR REGULAR MAIL ADDRESS: ( AWN l nrl /1 Vv`" -� -v I Signature of Owner/Developer N SCOAS lI 1u 2L Print Name IDate Revised 7/15/2014, 7120/2015, 11/3/2015, 8/14/2017, 1/28/2020, 7/1/2021 VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY GENERAL VPDES PERMIT FOR DISCHARGES OF STORMWATER FROM CONSTRUCTION ACTIVITIES (VAR10) NOTICE OF TERMINATION 2019 Permit Coverage Number (VAR10####): W Pd ?O Z1 - o oo o 3 Section I. Operator/Permittee Information. The person or entity that has active permit coverage approval and operational control over construction activities to ensure compliance with the general permit. A person with signatory authority for this operator must sign the certification in Section VII (per Part III. K. of the VAR10 Permit). Construction Activity Operator Name: CVA,r► k.(/.JCJ-LMAt4W 1140aWl� Contact Person: M1Kc 9A-SINO(JJ12 Address: 210 G AV L To-4 ". City, State, Zip Code: CIS- _T'TES ✓J u_E , VA- Z7-401- Phone Number: 43, , 2_93. (o1-11 Primary Email: CCU 60U1 @ IAA(XV'6 61-A-cc-, CC Email: \S\ .$CO ylnq✓�•, �o✓4,Co.... Section 11. Construction Activity Location Information. Project site information. Construction Activity Name:ZZ3lyttlnJOl.0 (AM/� Address: 2221 S10"AintOGC CJWC City and/or County and Zip Code: t✓I%IAtf-l.OT9'E'$ Vl l.t.F ✓A • Zytrl Latitude and Longitude (6-digit, decimal degrees format): H c4isca-rAt-- Al "133 ►/CY"'"'-- /1IA MIF Section IJI., Reason, for Terrr�inating•foverage under the General Permit. The operator shall submit a Notice of Termination within 30 days after meeting one or more of the following conditions (select one or more): Necessary permanent control measures included in the SWPPP for the site are in place and functioning effectively and final stabilization has been achieved on all portions of the site for which the operator is responsible. When applicable, long-term responsibility and maintenance requirements for permanent control measures shall be recorded in the local land records prior to the submission of a Notice of Termination; ❑ B. Another operator has assumed control over all areas of the site that have not been finally stabilized and obtained coverage for the ongoing discharge; ❑ C. Coverage under an alternative VPDES or state permit has been obtained; or ❑ D. For residential construction only, temporary soil stabilization has been completed, the operator has provided written notification to the homeowner about the importance of final stabilization and incorporating a copy of the notification and signed certification statement into the SWPPP, and the residence has been transferred to the homeowner. Rev 04/2019 PAGE 1 l 6 CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019 Section IV. Participation in a Regional Stormwater Management Plan. If your site discharges to a regional stormwater management facility, provide information related to the regional stormwater management plan. Attach a separate list if discharging to multiple regional facilities. - - Regional Stormwater Management Facility Type: Address: City and/or County and Zip Code:. Latitude and Longitude ' (6-di it, decimal degrees format): Total Acres Treated by Regional Facility (report to one -hundredth of an acre): Impervious Acres Treated by Regional Facility .. . . (report to one -hundredth of an acre): Section V. Perpetual Nutrient Credits. If your site is utilizing nutrient credits, provide information related to the perpetual nutrient credits that were acquired in accordance with § 62.1744.15:35 of the Code of Virginia. Attach separate list if needed. Nonpoint Nutrient Credit Generating Entity IVY Ci M9— IVi4'f44VJ'i PJAM:f U.0 (Bank Name): Perpetual Nutrient Credits Acquired (pounds/acres/year): 0* 13 1pinos pl�­v%kc v 4-& Lre-Wll b o, 7.o ra o4"ky' - Grod4cs f Ltom'�j ec.wrd3 6y seAiwt+* oTrT4'S Include the affidavit of sale for all nutrient credits acquired. Is the affidavit of sale of nutrient credits attached? ❑YES ONO Section VI. Permanent Control Measures. If applicable, list the post -development stormwater management facilities or best management practices (BMPs) that "were constructed,and: installed"as part of this activity to comply with the stormwater management technical criteria (structural and nonstructural, on -site and off -site). Attach a separate list if needed. If you have permanent control measures, the following items are required to be included with this form in order to complete your Notice of Termination submittal: t. VEngineer's Certification Statement 5w m A - &V c, A4? 5-ro"is nar, . As -built plans(constructionrecorddrawings) — digital folt5-l2Z I,% ser✓tc.it ❑ C. As -built plans (construction record drawings) —full-sized, paper $oK44n {o+K prykd'1 — �� JAVf.jt!/d ElD. StormwaterManagementPlans—digital Imeerytcw acrcjv 0.1+26 ❑ E. BMP Maintenance Agreement— notarized original, for public and private projects under DEQ's VSMP Authority Stormwater Management Facility Types (please choose from the following bmp types): Bioretention 1 Bioretention 2 Bioretention basin Bioretention filter Constructed Wetland 1 Constructed Wetland 2 Constructed wetlands Dry Swale 1 Dry Swale 2 Extended detention (2 x WQ Vol) Extended Detention Pond 1 Extended Detention Pond 2 Extended detention -enhanced Filtering Practice 1 Filtering Practice 2 Grass Channel Grassed swale Infiltration (1 x WQ Vol) Infiltration (2 x WQVoI) Infiltration 1 Infiltration 2 Other JIB (manufactured treatment device, etc.) Other IIC (manufactured treatment device, etc.) Permeable Pavement 1 Permeable Pavement 2 Rainwater Harvesting Retention basin 1 (3 x WQVoI) Retention basin II (4 x WQ Vol) Retention basin 111 (4 x WQ Vol with aquatic bench) Sand filter Sheetflow to Vegetated Filter or Conserved Open Space 2 Soil Amendments Urban Bioretention Vegetated filter strip Vegetated Roof 1 Vegetated Roof 2 Wet Pond 1 Wet Pond 2 Wet Swale 1 Wet Swale 2 Rev 04/2019 PAGE 2 16 CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019 Stormwater Management Facility #1 BMP Type: 5wM A LMP STOieA4(e PIRe Date BMP Became Functional: &/15/2Z Address(ifavailable): ZZ3l 5&AIfJot.0 C*%V — Cd*41CrffSSVt"C, VA City and/or County and Zip Code: ptt-Fi6ntAY .0 Cc Awry ILtil . - Latitude and Longitude. bk14 'J8.O9b6$o - Low a — 7B • yfirjZ3o (6-digit, decimal degrees format): Hbe = Ate3 1101-1. AlA+/DBB Receiving Water(s) (outfall discharge): 3�0-44- ('WLy- Wk�p2SN+� Total Acres Treated (report to one -hundredth of an acre): 0.10 ac�S Impervious Acres Treated 0•N7.B ao� S (report to one -hundredth of an acre): Stormwater Management Facility #2 BMP Type: Date BMP Became Functional: Address (if available): City and/or County and Zip Code: Latitude and Longitude (6-digit, decimal degrees format): Receiving Water(s) (outfall discharge): Total Acres Treated (report to one -hundredth of an acre): Impervious Acres Treated (report to one -hundredth of an acre): Stormwater Management Facility #3 BMP Type: Date BMP Became Functional: Address (if available): City and/or County and Zip Code: Latitude and Longitude (6-digit, decimal degrees format): Receiving Water(s) (outfall discharge): Total Acres Treated (report to one -hundredth of an acre): Impervious Acres Treated (report to one -hundredth of an acre): Rev 04/2019 PAGE 3 16 CONSTRUCTION GENERAL PERMIT (VAR10) NOTICE OF TERMINATION 2019 Section VII. Certification. This Certification must be signed by a person representing the operator identified in Section I. and meeting the requirements of 9VAC25-880-70 Part III K. Certification: "I certify under penalty of law that I have read and understand this Notice of Termination and that this document and all attachments were prepared in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. Based on my inquiry of the person or persons who manage the system or those persons directly responsible for gathering the information, the information submitted is to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false information including the possibility of fine and imprisonment for knowing violations." Printed Name: ) Y ,SrM5 ` PM. rqD& 4.Ct MA4fir✓ Mom MIC43 Signature (signed in ink): Date: Section Vill. Submittal Instructions. Please submit this form to the Virginia $tormwater Management Program (VSMP) Authority that has jurisdiction for your construction activity. If the locality is the VSMP Authority, please submit your form directly to the locality; do NOT send this form to DEQ. A list of local VSMP Authorities is available here: VSMP Authorities. If DEQ is the VSMP Authority, please send to: Department of Environmental Quality Office of Stormwater Management Suite 1400 PO Box 1105 Richmond VA 23218 constructiongp@deg.virginia.gov If the locality is the VSMP Authority, please send to: The Local VSMP Authority (insert address below) Permit terminations may be delayed if there are outstanding annual permit maintenance fee balances due. Rev 04/2019 PAGE 4 16 AFFIDAVIT OF NUTRIENT OFFSET SALE Ecosystem Services. L.L.C. , [broker] (the "Company") on behalf of Ivy Creek Nutrient Bank, L.L.C. [Bank Sponsor], hereby certifies the following: 1. Pursuant to that certain Acquisition and Sale Agreement dated August 6t , 2021 (the "Agreement"), between the Ivy Creek Nutrient Bank (as Seller) and Commercial Rentals. L.L.C. ("Acquirer"), the Company, for the benefit of the Acquirer, agreed to sell 0.13 pounds of phosphorus offsets and retire 0.20 pounds of nitrogen (representing the ratio of nitrogen offsets to the phosphorus offsets at the offset generating facility) offsets to Acquirer; 2. The Company and the Acquirer, as of the date hereof, have closed the transaction contemplated by the Agreement and the Company has sold to Acquirer phosphorus offsets and retired 40_99 pounds of sediment (representing the ratio of sediment offsets to the phosphorus offsets at the offset generating facility) offsets. WITNESS the following signature: IVY CREEK NUTRIENT BANK, L.L.C., a Virginia limited liability company By: ECOSYSTEM SERVICES, L.L.C., a Virginia limited liability company, authorized agent By: � ow — Name: Anatban R. Roller Title: Manager Autl rized Re resentative Date: r- �P- I/ A —CZ Sworn to and subscribed before me this I B1n day of Atys-y- 2021, by Jonathan R. Roller, Manager, on behalf of Ecosystem Services, LLC. My commission expires: 6/3( 11cal Notary Public Acquirer: Commercial Rentals. L.L.C. Nutrient Offset Bank: Ivy Creek Nutrient Bank Bank Sponsor HUC: 020802040202 Name of Project: Starbucks -2213 Seminole Lane WPO: 202100003 Project HUC: 020802040203 Phosphorus Offsets: 0.13 pounds Nitrogen Offsets: 0.20 pounds Sediment Offsets: 40.99 pounds TMP: 045B1-05-OA-01100 WILLIAM JACKSON SIMMONS NOTARY PUBLIC REGISTRADON.27737889 coK40o-NWEALTo-0F VIRGINIA MY.G6MMISSION ExNlgR ;S AUGUST31.202t- IVY CREEK NUTRIENT BANK, L.L.C. — IVY CREEK NUTRIENT BANK BILL OF SALE BILL OF SALE, made as of August 18rh, 2021, by Ivy Creek Nutrient Bank, L.L.C., a Virginia limited liability company ("Seller"), to Commercial Rentals, L.L.C., a Virginia limited liability company (`Buyer"). WHEREAS, Seller and Buyer have entered into that certain Nutrient Offset Purchase Agreement as of August 6h, 2021 (the "Agreement'), with respect to the sale by the Seller and purchase by the Buyer of offsite nonpoint nutrient offset credits generated within the Rivanna River watershed (HUC: 02080204) in Albemarle County, Virginia. NOW, THEREFORE, for and in consideration of the payment of the Purchase Price (as defined in the Agreement) and other good and valuable consideration, the receipt and sufficiency of which are hereby acknowledged, Seller hereby sells, transfers, assigns, conveys, delivers and sets over to Buyer, its successors and assigns, 0.13 pounds of phosphorus offset credits (and retire 0.20 pounds of nitrogen offset credits and 40_99 pounds of sediment offsets) generated within the Rivanna River watershed (HUC: 02080204) in Albemarle County, Virginia as such are described in the Agreement. TO HAVE AND TO HOLD all such nutrient credits hereby sold and transferred to Buyer and its successors and assigns forever. IN WITNESS WHEREOF, Seller has caused this Bill of Sale to be executed by its duly authorized representative as of the date first above written. IVY CREEK NUTRIENT BANK, L.L.C., a Virginia limited liability company By: ECOSYSTEM SERVICES, L.L.C., a Virginia limited liability company, authorized agent 1r( kA- By: Name: Jonathan R. Roller Title: Manager -Authorized Representative Date: Acquirer: Commercial Rentals, L.L.C. Nutrient Offset Bank: Ivy Creek Nutrient Bank Bank Sponsor HUC: 020802040202 Name of Project: Starbucks - 2213 Seminole Lane WPO: 202100003 Project HUC: 020802040203 Phosphorus Offsets: 0.13 pounds Nitrogen Offsets: 0.20 pounds Sediment Offsets: 40.99 pounds T W: 045B1-05-OA-01100 MERIDIAN PLANNING GROUP, LLC 440 Premier Circle, Suite 200 Charlottesville, VA 22901 (P) 434.882.0121 STARBUCKS - 2231 SEMINOLE LANE AS -BUILT PLANS FOR WPO ALBEMARLE COUNTY, VIRGINIA L 0 C H R I D G E Charlottesville Albemarle SPCA 0 WOODBROOK CROSSINGS CONDOS Walmart Super b59 Jim Price Che Bowlero 0 ®SkrimpShack Crde� Doc : - DoubleTree by Hilton . Hotel Charlottesville V Sam's'ClubQ QUrr i wwd.1 Po/0 Grounds Rd UVA Primary Care Riverside Hondo ,y SITE LOCATION CARRSBROOK FIELDS Q /J/ � VICINITY MAP SCALE: 1" = 1000' Monticeilo United Soccer Club S T I pLTH Or! � c i AS BUILT PLAN TIMOTHY RAY MILLER D FOR WPO Lic. 0 2065 STARBUCKS 2231 SEMINOLE LANE �2 ALBEMARLE COUNTY, VA "ND SUF\4 FILE: STARBUCKS 9 NORTH-AB-SWM.DWG DATE: SEPTEMBER 16, 2022 r MMODENPRII/ACYFENICE DRAINAGE AREA �X CCFARSPROPERTYLINEBY0.3° - _ - TO DITCH A r-,�f wcrFENc __ �-` _ _ _ 470 RU(BRfY L1Nt 81'0T v _ _ _ _ - -464- \ pR1VAZYEEQICE`-_-``` �`,,`,,`,,` ,, - _ _ -------------- ----------a ------- - �- - ® _--- - _- i�ENCROACIjESONFO_ - ��` --_-- -----------------------462--63------_----------__ ------ 4_,. �`-- _S0JE&TP`OPERTY2.T_ ` �``�`��`-------_-----__ - - - _4-- 461- ------ _ - -- _6----- _ �_-S - - - - - - - - 45 - 459- _60 _ - - - - - - - - - - - - - - _ -_ ---__-456 _457---8_ ________________ _________ �_ �460- -455 - _ _ _-- -- ----- ___ ---- _ - -_ _ _ _ _ ` _ --__-_ o----- - - - -__ - 4 _453----___--0.7�-AE'RE- ----- ---- ---- __ ----- - - - - 450-451- 4SBL--Q3 a=01}00 ----- - - - - ------ - - - - -- - - _----449-_-_ _ - _ - - - - -- - -- -- --- - --_ -455- -447 - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - _ _ - - - _ _ _ _ _ - - - - - - - - - - - - - - - - - - - - - _ _ 11 433 433 - - - - - - - - - - - - - - - - - - - - - - - _ _ _ - - - _ _ _ _ - -443- - - - - - - - _ ----- --------- ------------------ - - - - - - - - _ _ __ MANAGED STEEP SLOPES - - 441'-_ `-----------------_-----____---_____ _---___------------ �- 450 - _ _---- - DRAINAGE AREA TO DITCHA=0.17AC _ _ _ C= 0.30 440 - `� `- ------- - - - ----------__ - ___ - �REELINE=NIIX-OFEV€RGE EN ANDDEOIQU9lLS__ - __ TC=6MIN -'439- _ _ `�`---------- - - - -- ---- -- _ _ _ _ _ _ _ _ - - 438- _ _ _ - - - - - - - - - - - - - - - - - - - - - - - - _ _ _ _ - _ _ - _ _ _ _ - _ _ _ _ - - - - _ _ - - ---__ �Tw --437-__ ----- _ - - - - - - - _---_------_-_------ __ _ I(2)=5.01N/HR Q(2)=0.30(5.0)(0.17)=0.26CFS - --_ 432.W0 �-436-_ TYT ----_ _ TM1F- - _ --___ 4; --- ---- - - - - -- 436:81' _ _ - _ -43g24''---_--- 441.14'_------ - - -- - _ - _ I(10)=6.61N/HR fl(10)=0.30(6.6)(0.17)=0.34CFS 3a_ _ _ 439.Tfl'- _ _ _ _ - 434.9 `- - - - - - - - - - - - - - - - - _ - - - _- _ - _ _ _ _441.83-- - - - - - - 445 -- -i - - - - - -- __ ' - - 432 - - - - - - - - - - - - - = - -` _ _ _ - - - - - V(2) = 2.29 FT/S (ALLOWABLE VELOCITY = 5 FT/S) 429.35' `431 `J' - __- I\�----____- __---_\_ ---- -II� __--_ _ _-441ST �59----__1 -_ _ __ D(10)=0.22' _ - -- ---- ------ 436:83' I -pvv I I - 3.\ ^ 440 43. 43119' .24' 14' GRASS LED DITCH .3' 1.94' Tw - 428.96' a� `� "'� w 431.32' 439.49' n = 0.035: $ = 7.0% ' 120 ew \ 119 1 ` J34.74'f a , BOLLARD a° . TW 4"wi e DITCH CALCULATIONS No Scale 12'DRAANAGENT 1 " \ Tc a ROOFDRAIN NOTES: DB 1159° PO232 �\ 1 1 a; '• 435.28 ` \ 428� 1. PIPES FROM ROOFDRAINS TO HAVE A MINIMUM SLOPE DB2041, PG309 1 � � ..., '1 .. .....,. o LP® 11 '' �:; :'= '`::''y' `':' �= '''i' 3 2.30 OF 1.0% OR AS SPECIFIED ON PLAN. _ 1 DBM9. PG44% \ 1 t �� T� 63' \' .• •S'.:• :;.'': ':'. •.. ,:.. , ,:'. <,:. .,". :: 432 \ ` 2. PIPE FROM ROOFDRAINS TO HAVE A MINIMUM COVER 1 F - � \ r30_� LP . 14 . '-o LP TC I \ OF2.0' 4 r>:' ; : 3. CONTRACTOR TO VERIFY IF DOWNSPOUT BOOT CAN a 1 I I �� ,Q p TC 43 431: C .. ,... Tc BE SUBSTITUTED FOR CLEANOUT. IF NOT, PROVIDE \ 1 1 1 T r', •. .. t'::'°:: - \ 430-7T I 1 " : Peq: 430.98' \59' CLEANOUTS AT ALL LOCATIONS WHERE ROOFDRAINS 11 Tc BIKE RACK CO STR: 114 _ .. \ . \ i a 1 • I 1, 428.20' 6 ; GM @'.i° $ `" 't Y. ..,..;' ,Y.,.. w c r..::`';':.'a:'r ,'.:':� ..:..,'. TURN OR CONNECT TO PIPE OUT OF BUILDING. 1 CO CO LP \ \\ 1 q 4. O FIELD VERIFY ALL EXISTING AND '.CO .'-y.",.,K:«y •Ir" x '-'11`::'=.'-•®-�. �.: -r.; ,:ff .:;.',...•.'' 430.1 CONTRACTOR I I ` PROPOSED STORM INVERTS OUT OF THE BUILDING UIVABLE LO(.Ak NVERT I�I ' N 9 I p >�,''> a TC I - \ ♦ \ 11 \\ AND CONFIRM REQUIRED SLOPES, COVER, CROSSING FF �28.35' i ' `i` _ II 2' WIDE CURB I 1 a ! \ ° m ? AND CONNECTION POINTS CAN BE ACHIEVED. CUT FOR p I TC -:' '' \ 438.67 CONTRACTOR SHALL COORDINATE ANY CONFLICTS I 1 ♦ :y' j I II II STORMWATER OLLARD '426.09 F 4281s >i,' ' - °e `9� \ ost D I q•rT \ \ \ WITH ENGINEER BEFORE BEGINNING CONSTRUCTION. I OVER FLOW EM ° 12 Post \ OLLARD \ \ II II ELEV:427.85 ' �' :~ L1 \ ¢ O\ :- P BOLLARD v I I I �I 1 6 l .! •.'.?'' ®427.99' 11 121 a 430. FH f6" PVC ; ROOF DRAIN": ` TC �� 431.54' \ 1 { ~,:;:.:ria .. i ... `9. 430.52'TC TC ~ 6 I 1 , -- PROPOSED Y 0 v 430.86 431M \` BOLLARD` I 1 1 I I STARBUCKS \ \ \ ±1,150SF \ 1 I I C FFE=428.35 I 8• 9 \ `� \ \ I IA 7A8' \ I I I 1 FFE=428. ' CENTER OF DRIVE BOLLARD I I I\\ ♦° I \ \ \ I I II THROUGH WINDOW 6"PVC IDOWNSPOUT TO ROOF DRAIN " j"' \ \ I \� A28 ®\ ♦ 1 \ \` \ ' Tw I ROOF DRAIN BOLLARD n 0 1 g \ \ \ ` \\ \I�/I 1 4 9 ( ) ' 42 9' 427.73' ® DROP INLET i i I I. I \ 27.87' \ Ta 1 TOP =421 B G'>.: \ 43022'♦ ANV W 417.1' y- \ X-10 \.:.. •° ,.42i 3 \ Bsz.aa' 7. 7- / y.. 'tk. i TC \ ..:y .. ... TC T ITC 4zs.zr I 36" ACCESS O%429.8T a a.18 431 BN \ //� / / A' i \ �• RISER 432,33' \ \ `\� 36" ACCESS RISER 36" ACCESS RISER '.::• •a ' (7 / i// / / 4 \ 47�.94 1 \ 427 .. "'''•ak ~`+`' r I \\ \ .` W� •TC... Tw TC 26.79' \ \ "�•'. # 42823' \ 425.85' l \` , '�,•.'\.( LP \ 427.W - -� a. \ BW 432.7 ----------®�-- v- -�' SWMA ) Tw -- TC_/ rl S 4 427.2i' \ 427.3D' \ TC - --- --- -� \ \ \ 429.75' i ` ____ ___ - 434.18' - - - / 30 LF OF 66" CMP �-________-_ �_ �. i GO STORAGE PIPE . , "�`�+' \ � 6w `\ --_--___-__- X T .v 5 �o 433.8T �-�____-____ - WITH WEIR PLATE \ \ ---------- ___ 89 SS 8• SS 8p SS 8B 18°PU,9LfC'---------- EX' 1 / S�1INITARYAAI� / TOP=425.4' INV IN-4179' / / I INVa OUT177 - - SEMINOLE LANE \ PUBLIC VARIABLE INDTN R/W \ \ \ \� \�\`\ BEAICliA010qKSET SOUAREINT17P T 9AV N �128W 43\\ \ \ ♦ \ I I \\ 11ROUTE MERIDIAN TO U.S 29 I 1 \\ SEMINOVE TRAIL 1 PLANNING GROUP, LLC �J' aI \I VARIABLE i�DTH R/w ARI 440 Premier Circle, Suite 200 \ Charlottesville, VA 22901 I \ (P) 434.882.0121 ACCESS \ \ _DEED BOOK 14� PAGE406 `� \ `o �ry ) FH DO 515/4M \ d M a5 v \ v \ \ PJB 1159/189 DO167W74 I \1 , v TC wM \ 4 .77' \ c ` TC ♦ T429.22' 430 C 427.03' 429.76' TC \ \ • / 426 68' 427. 429 426.9 TC �J 5 ♦ \ 427.55' 1 t 11 1 \ \ \ -1EN1- -lgni- s/ v I 1 TEL \ I UG JBOK d / 1MARK 11 I \ °\ Ot - _� ;"kn ®, Aux►- - \ I Gw I 1 / } i 190E-- -. 1 I / 11 } .n EhN .IL'a lENd- 'T _.. v _ �\ 190- - - yIf t -FH I AS BUILT PLAN :t- MATCH EXISTING \ ? \ 1\ 1 I FOR WPO s.. ELEVATIONS \ TIMOTHY RAY HILLER > \ \ wv + I STARBUCKS 2231 SEMINOLE LANE TRAFFIC \ Lic. o. 2065 \ w \ I `1 \ �' \ ALBEMARLE COUNTY, VA DROP IAILEr - m rac = .' ❑ r TO��2&4' % /�2 \� \\ O (®�--wM SHEET: 2 of 3 EX. I INV��I fB��2•5' - ENO SURV�y �� - - �- ` F - - - - - - ' - - - 4 1 FILE: STARBUCKS-29 NORTH-AB-SWM.DWG o - _\- ®-:� IIw IAF=4290 4 \, : - ' 4 �, 1' q 1 ` DATE: SEPTEMBER 16, 2022 SCALE 12'=10' 0 10' 20' 18' RCP W J Uj J O z z Q Q L11 W > U) Q z Z T__jLLJ M U _ N Q Q 06 Nz w 0 Q Z () Q y U W CII V 1 SHEET NO MERIDIAN PLANNING GRouP, LLC 440 Premier Circle, Suite 200 Charlottesville, VA 22901 (P) 434.882.0121 TOP OF WEIR PLATE 422.77 ELEV: 422.77 3.5" ORIFICE INV. 419.64 ELEV: 419.47 I STEEL PLATE 5.5" ORIFICE WITH TRASH RACK ELEV: 418.12 INV 418.00 TOP OF 66" STORAGE PIPE ELEV. = 423.50 10 YEAR WSE 422.77 V 2 YEAR WSE 71 YEAR WSE ELEV. SWM A WEIR PLATE SECTION DETAIL ��pLTH pX o � TIMOTHY RAY MILLER n Lic. Po. 2065 420.23 419.64 HMIN. (RIGID PVMT.) HMIN. (FLEX PVM FILTER. (WHEN SF 1. ALL CORRUGATED ME METALLIC COATING SI M245 AND/OR ASTM 16-GAUGE WITH A 2N BURIAL DEPTH SHOW 2. IT SHALL BE THE RESP REGULATIONS; AND C AUTHORITIES. 3. THE CONTRACTOR SH RELATIVE STIFFNESS C TO WITHSTAND ANTh 4. PIPE BEDDING AND El CLASSIFICATIONS. WE APPLICATIONS THAT I WITH A SIZE DISTRIBL POTENTIAL OF SOIL N S. ALL CMP SHALL BE IN'. CORRUGATED STEEL I SPECIFICATIONS. IN G MIDDLE -THIRD OF TH AASHTO T99 STANDA INCHES OR ONE-THIRI ONE -EIGHTH THE DIA 6. PUBLISHED INSTALLA: OF MANIFOLDS AND I ALONGSIDE THE PIPE TOWARDS THEOPPO', EVENLY AS WELL, AN[ REGIONS OF THE PIPE CHALLENGING AND V 7. NO EQUIPMENT SHAI COMPACTION EQUIPI DUMP STONE DIRECT AS BUILT PLAN FOR WPO STARBUCKS 2231 SEMMOLE LANE ALBEMARLE COUNTY, VA SHEET: 3 of 3 FILE: STARBUCKS-29 NORTH-AB-SWM.DWG DATE: SEPTEMBER 16, 2022 SHEET NO. 3 ii