HomeMy WebLinkAboutSDP200500017 Correspondence 2005-03-01 • l- TIMMONS GROUP YOUR VISION ACHIEVED THRO {x €r OUP', P' SDP 05 -017: OLD TRAIL BALLARD FIELD TOWNHOUSES, PHASE 1 (FINAL) SITE PLAN 3/28/05 Planning Department Comments: Shared driveway easements are shown on the site plan around the driveways and these easements will be recorded when the property is subdivided. NX. The details of the tot lot equipment have been added to the plans. ' The tot lot equipment specifications have been provided on the plans to be reviewed by Parks and Recreation. 4. No outdoor lighting is being proposed at this time. A note has been added to the landscaping plans to satisfy this comment. The note also states that if any lighting over 3,000 lumens is being proposed at a future date, then the plan will have to be amended through the site review process. All setback lines have been shown and labeled. The lot lines have been adjusted to ensure a 10' side yard setback on all units. The boundary line adjustment plat has been submitted match the site plan. f! The north arrows have been added to the landscaping plans. ' The square footage of the tot lot areas have been added to sheet 4, and a note has been added to see sheet 11 for the details. 47 The area of the paved parking lot has been shown on sheet 9. The footprint dimensions and square footages of each building have been added to the plans. 10. The parking lot and drive aisles have been dimensioned. 11. On sheet 2, the proposed paving material cross sections for the parking lot, driveway, sidewalk, and trailway have been added. 12. The signature panel has been updated as requested. 13. The trees have been identified and the plans have been updated to show the calculations. 14. The developer has agreed to the concept of the street trees in the development. A plan to this effect has been included in the plans. This will satisfy the tree planting requirement for the entire Ballard Field subdivision. 15. The landscaping plan shows the 5' planting easement and any additional easements for the street trees. These easements will be added to the boundary line adjustment plat, unless the county wants to see an additional easement plat for these easements. 16. The parking lot has been landscaped to meet the 5% area requirement. See the landscaping plans. Engineering Comments: 1. The source of topography note on sheet 1 has been modified as requested. 2. A benchmark has been added to sheet 2. 3. The general construction notes have been added to sheet 2 as requested. Historic Resources Review: No comments Inspections Department Review: No comments Fire Department Review: 1. An all weather emergency vehicle turnabout has been added Summerford Lane at the location as discussed during the Site Plan review meeting. This may eventually be replaced with an entrance into the Ballard Field condo site. 711 North Courthouse Road F Richmond, Virginia 23236 F (804) 794 -3500 F www.timmons.com NM" NNW 2. Attached is a previous fire flow report verifying that 1000GPM can be achieved at 20 psi. Actually, according to the water model, with a 1000 GPM demand, the psi pressure on the system does not drop below 90 psi. Therefore, please allow this to serve as verification that there is adequate fire protection in the subdivision development. The development has a direct feed an looping system to a 12" waterline that is located on the east side of the property. In addition, the ACSA is reporting that 900' from this property, they are receiving fire flows in the range of 2770 GPM at 20 psi. VDOT Review: The developer intends to barricade the access onto existing Haden Lane at the property line as previously discussed and agreed upon with the approval of Ballard Field. The southern improvements of Haden lane will be made in conjunction with the development of the subdivision and a standard VDOT barricade will be placed at the property line. At the time when Jarman's gap road is improved and the intersection of Jarmans Gap Road and Hayden Road is improved, the developer will make the required improvements to the east side of Haden Road and remove the VDOT barricade, allowing the subdivision to have access to Jarmans Gap Road from Hayden Road. ACSA Review: The water meters have been positioned so they will not conflict with the driveways or shared driveways. If you have any questions, please call me at 434 -566 -1328. Si / e -•ly: Scott R. Collins, PE Project Manager- Residential Services 711 North Courthouse Road r Richmond, Virginia 23236 r (804) 794 -3500 F www.timmons.com Page 1 of 2 Yadira Amarante From: James Barber Sent: Thursday, April 28, 2005 3:48 PM To: Yadira Amarante Subject: RE: Old Trail, Ballard Field Townhomes Yadira, Yes ma'am...I was sure I had signed them. James F. Barber Plans Reviewer County of Albemarle Sent To: Department of Fire /Rescue Su . 460 Stagecoach Road, Suite F Charlottesville, VA 22902 -6489 Ph: (434) 296 -5833 Fax: (434) 972 -4123 E -mail: JBarber @Albemarle.org Web: www.ACFireRescue.org From: Yadira Amarante Sent: Thursday, April 28, 2005 1:33 PM To: James Barber Subject: Old Trail, Ballard Field Townhomes Hi James, Can I sign these site plans for you? They've been here for a while. Yadira 0. Amarante, Senior Planner County of Albemarle Department of Community Development 4/28/2005 Page2of2 *we ter/ Division of Zoning and Current Development 401 McIntire Road Charlottesville, VA 22902 -4596 yamarant @albemarie.org (434)296 -5832, phone (434)972-4126, fax No virus found in this outgoing message. Checked by AVG Anti - Virus. Version: 7.0.308 / Virus Database: 266.10.4 - Release Date: 4/27/2005 No virus found in this incoming message. Checked by AVG Anti- Virus. Version: 7.0.308 / Virus Database: 266.10.4 - Release Date: 4/27/2005 4/28/2005 o lin setle vIRCINIP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 - 4126 TO: Scott Collins FROM: Yadira Amarante, Senior Planner DATE: April 8, 2005 RE. SDP 05 -017: Old Trail Ballard Field Townhouses, Phase 1, Final (prior to A t 1/ l Preliminary) Site Plan (Revised 3/28/05) , ;o The Albemarle County Depai lnient of Community Development, Division of Current Development, Planning and Zoning Review will approve the final site plan referenced above when the following items have been satisfactorily addressed: [Each comment is preceded by the applicable reference.] [18.4.16.2.1] Provide a detail of the fence surrounding the tot lot area. [18.4.17.1] It has come to my attention that this development will not have outdoor lighting exceeding the 3,000 lumen limit. Please place the appropriate note on Sheet 1. ✓� [18.32.5.6.a] Make sure that all new property lines and setbacks are shown correctly on all sheets of the site plan. [ 18.32.5.6.n] The dimensions shown in the parking lot detail are not scaling. /' [18.32.7.9.4.a] Identify the trees and plantings shown on the overall landscape plan. ^ /6. [18.32.7.9.7] 5% of the paved parking and circulation area in the parking lot must be landscaped in order to meet the minimum parking lot landscaping requirements. Please identify the plantings shown for the parking area. .// [Phasing issues] Provide a note on Sheet 1 that states when the planting of the street trees will happen. Try to be as specific as possible — as in the month when the planting will begin. Also, include a note that all sidewalks are being built as part of the Lower Ballard Subdivision road plans. [Recommendation] Delete Sheets 10 & 11 and the portion of Sheet 12 that shows the blow -up of the landscaping around the Townhomes. Do provide a blow -up of the parking lot and its landscaping. Please contact Yadira Amarante at 296 -5823 ext. 3297 if you have any questions. Nese Nome A OF A gU i;lll IIM t x!!II(e: COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 (434) 296 - 5823 Fax (434) 972 - 4012 March 24, 2005 Scott Collins Timmons Group 800 E. Jefferson Street Charlottesville, VA 22903 Re: SDP 05 -017 — Old Trail Townhomes, Phase 1, Final (prior to preliminary) Site Plan Dear Scott: The Site Review Committee has reviewed the development proposal referenced above. Preliminary comments from the following agencies, as applicable, are attached. Albemarle County Current Development Division: Planning, Engineering & Zoning Review Albemarle County Planning Division: E911 Mapping, Historic Resources, and ARB Review Albemarle County Building Inspections Division Albemarle County Fire/Rescue Division Virginia Department of Transportation Albemarle County Service Authority Thomas Jefferson Soil and Water Conservation District Comments reflect information available at the time the development proposal was reviewed, and should not be considered fmal. However, the Site Review Committee has attempted to identify all issues pertaining to the approval of the proposed project. Please make the revisions which have been identified as necessary for preliminary approval by the Site Review Committee. If you choose not to make the requested revisions, please submit in writing justification for not incorporating such revisions. Submit seven full size copies and one 11 "x17" copy to the Department of Planning and Community Development. Responses to the attached comments of the Site Review Committee must be submitted by Monday, April 4, 2005. Failure to submit this information by this date will result in suspension of the review schedule. Please contact me at your earliest convenience if you have questions or require additional information. S' ce1y, a• ira Amarant , Senior Planner Attachments: Site Review Comments Neer 1111 o F AL : , +:: `rRGRn COUNTY OF ALBEMARLE Department of Planning & Community Development 401 McIntire Road, Room 218 Charlottesville, Virginia 22902 -4596 (434) 296 - 5823 Ext.3336 Fax (434) 972 — 4012 MEMORANDUM TO: Yadira Amarante FROM: Julie Mahon DATE: March 21, 2005 RE: SDP 2005 -00017 Old Trail — Ballard Field Townhouses (Phase 1) — Historic Resources Review The above referenced submittal has been reviewed for possible impact to known historic (fifty years old or older) architectural resources and known or potential archaeological resources with the following results: 1. The Virginia Department of Historic Resources' Historic Resource Quadrangle Maps have no surveyed historic architectural or archaeological sites identified on within the project area. Note: The absence of historic resources in DI R records does not necessarily mean that no historic properties are present. It is possible that the area in question has not been systematically surveyed for resources. Based upon the information above, I have elected not to conduct a site inspection. However, the presence of a cemetery and the close proximity to other historic buildings located in the area may be an indication that historic (50 years old or older) resources may be present. If you discover anything that you question pertaining to existing structures and/or sites and possible historical significance, please contact me to discuss your findings. V ../ ACSA TO: Yadira Amarante, Planner FROM: Gary Whelan, Engineering Technician DATE: March 18, 2005 RE: Site Plan Technical Review for: Old Trail Ballard Field Townhouses (Phase I) (TM 55, Parcel 71) The below checked items apply to this site. SDP - 2005 -00017 X 1. This site plan is within the Authority's jurisdictional area for: X A. Water and sewer B. Water only C. Water only to existing structure D. Limited service X 2. A 12 inch water line is located approximately 1000' distant. X 3. Fire flow from nearest public hydrant, located 900' distant from this site plan, is 2770 gpm + at 20 psi residual. X 4. An 8 inch sewer line is located approximately 2500' distant. 5. An Industrial Waste Ordinance survey form must be completed. X 6. No improvements or obstructions shall be placed within existing or future easements. 7. and plans are currently under review. X 8. Water and sewer plans have been received and approved. 9. No plans are required. 10. Final and plans are required for our review and approval prior to granting tentative approval. 11. Final site plan may /may not be signed. 12. RWSA approval for water and /or sewer connections. Comments: Verify that meters do not conflict with driveways. The site plan does not show or incorrectly shows: meter locations waterline size waterline locations sewer line size sewer line locations expected wastewater flows easements expected water demands COMMONWEALTH of VIRGINIA DEPARTMENT OF TRANSPORTATION 701 VDOT Way CHARLOTTESVILLE VA 22911 PHILIP A. SHUCET James S. Utterback, PMP COMMISSIONER Residency Administrator TRANSPORTATION FOR THE 21sT CENTURY March 17, 2005 Glenn Brooks Department of Engineer and Development 401 McIntire Rd. Charlottesville, VA 22902 Subject: Site Review Meeting Comments Dear Mr. Brooks: Below are VDOT's comments for the Site Plans reviewed at the March 15, 2005 Site Plan Review Meeting: SDP 2005 -00017 Old Trail — Ballard Field Townhouses, Route 691: (Yadria marante) § The site is internal to the Ballard Field Development, with roadways and entrances that have previously been reviewed and approved; § Part of this phase, develops the area at the end of Haden Lane. This existing roadway is not adequate to support traffic that may want to use this access. Improvements to Haden Lane were previously discussed with the applicant who agreed to make the connection and some of the improvements. If this connection is made traffic will attempt to use this substandard roadway. The developer will need to install a permanent barracade at the connection or make the necessary road improvements. § It is the Departments recommandation have the south end and east side improvements made with this development. The Jarman Gap Road project will make the intersection improvements, and the Haden Lane development has plans to improvement part of the west side of the Roadway. Ild d )) *t. kola& ,,,, COUNTY OF ALBEMARLE FIRE RESCUE ADMINISTRATION 401 McIntire Road, Room 222 Charlottesville, Virginia 22902 -4596 Tel: (434) 296 -5833 Fax: (434) 972 -4123 Memorandum TO: Yadira Amarante FROM: James Barber DATE: March 14, 2005 RE: SDP 2005 -00017 Old Trail- Ballard Field Yadira, I have had a chance to review the plan submitted and can offer the following comments on behalf of the Department of Fire/Rescue. • Dead end fire apparatus access roads in excess of 150 feet in length shall be provided with an approved area for turning around fire apparatus. (Virginia Statewide Fire Prevention Code 503.2.5). • Verify adequate fire flow is available. Required fire flow is 1500 GPM @ 20 PSI. (Albemarle County Subdivision Ordinance 14 -521). Please let me know if you have any questions. ILS' la, COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 TO: Scott Collins FROM: Yadira Amarante, Senior Planner DATE: March 14, 2005 RE: SDP 05 -017: Old Trail Ballard Field Townhouses, Phase 1, Final (prior to Preliminary) Site Plan The Albemarle County Department of Community Development, Division of Current Development, Planning and Zoning Review will approve the final site plan referenced above when the following items have been satisfactorily addressed: [Each comment is preceded by the applicable reference.] w; I \ 80 c" i n s4. [14-241] Shared driveway easements will be necessary when these properties are subdivided. SO t V' ' F " __�2. [18.4.16.2.1] On Sheet 11 provide the details of the tot lot equi . ment to ensure that they meet the follows e •• ' , •,11 ., Muu. -. • u - nts: . ' • • with 4 se. • - • 2 cl• • • ers; 1 buckab whirl; 2 be es; tot lot area mu .� '� t of lot area must be fence • • de, -i \ A. [18.4.16.3] Provide tot lot equipment specs ications to be reviWv and Rec. -.--404. [18.4.17.1] Provide a description and photograph or diagram and show the location of each type of jtJ4 -- co outdoor luminaire that emits 3,000 or more initial lumens. Please be aware that installation of such 5h{f luminaires in the future that are not shown on this plan shall require an amendment to this plan. If no A. such lighting will be provided then provide a statement to that effect on the site plan. -- 5. [18.32.5.6.a] Show and label all setback lines. There are some blocks of Townhomes where the end g hp W units are not setback from the side property line. Side setbacks shall not be reduced less than 10 feet or o.d-t unless constructed to a common wall. There is currently a plat under review which adjusts these S 't ' boundaries. Make sure that the revised site plan reflects these new boundaries. - ''V' [18.32.5.6.a] Provide north arrows on the landscaping sheets. [ 18.32.5.6.b] State /show the square footage of the tot lot on Sheet 4 and put a note that the equipment details are shown on Sheet 11. J( [18.32.5.6.b] Provide the area of the paved parking lot shown on Sheet 9] ."8.32.5.6.n] Show footprint dimensions and square footage for each building. Keep the lot areas as shown. '-> 10. [18.32.5.6.n] Dimension the parking spaces (a typ. Is fine) and travelway aisles in the parking lot on Sheet 9. n01.-- S cet4,-" y .4e[18.32.5.6.n] State the proposed paving material types for all walks, parking lots and driveways. 12. [18.32.6.6.f] Change the signature panel to provide a line for each of the following reviewers: /Current Development: Planning and Zoning Reviewer --ejgrent Development: Engineering Reviewer (Includes VDOT approval) ARB //wilding Official re Official Albemarle County Service Authority 13. [18.32.7.9.4.a] Identify the trees and plantings you show on the landscape plans. I need this specific information so that I can make sure that you meet the minimum requirements for street trees, canopy, and parking lot landscaping. 14. [18.32.7.9.6 Generally] It's going to be difficult to look at the landscaping requirements on a per - lot/block basis. Technically, to conform with the ordinance requirements, each block should meet the street tree and canopy requirements on it's own. For example a 0.472 acre block should provide a 20% canopy within that individual block or 0.0944 ac in canopy. The review of this is already tedious. I propose a solution. In reality I only really care about the street trees but I could not require and have you bond the street trees as part of the subdivision plat. If you would be willing to submit the overall landscape plan as the landscape plan for the entire development (this includes future townhouse plans as well) we'll be done. Basically if you do this one plan now we won't have to do another landscape plan again for the rest of Lower Ballard. If you are agreeable to this let me know and we can work out the details. We will have to have a separated detail for the parking lot landscaping. 15. [18.32.7.9.6.d] All street trees located on future individual lots must be protected through an easement agreement and maintained by a homeowner's association. Please show these easements on the site plan and submit a plat, with a fee and application, which shows these easements and also submit a maintenance agreement. This plat and agreement must be recorded prior to site plan approval. 16. [18.32.7.9.7] 5% of the area identified in #4 above must be landscaped in order to meet the minimum parking lot landscaping requirements. Please identify the plantings shown for the parking area on sheet 11 — you may already meet the requirements but I have to verify. Please contact Yadira Amarante at 296 -5823 ext. 3297 if you have any questions. • 2 Page 1 of 1 Yadira Amarante From: Pam Shifflett Sent: Friday, March 11, 2005 3:06 PM To: Yadira Amarante Subject: RE: Old Trail - Ballard Field (upper) Yadira: I see sidewalks in the road bond estimate Glenn prepared but not street trees. Pam From: Yadira Amarante Sent: Friday, March 11, 2005 2:56 PM To: Pam Shifflett Subject: Old Trail - Ballard Field (upper) xc Hi Pam — can you tell me if we are holding a bond for sidewalks and street trees in this development? Sub Yadira 0. Amarante, Senior Planner County of Albemarle Department of Community Development Division of Zoning and Current Development 401 Mdntire Road Charlottesville, VA 22902 -4596 yamarant @albemarle.org (434)296-5832, phone (434)972 -4126, fax Internal Virus Database is out -of -date. Checked by AVG Anti - Virus. Version: 7.0.308 / Virus Database: 266.6.2 - Release Date: 3/4/2005 Internal Virus Database is out -of -date. Checked by AVG Anti - Virus. Version: 7.0.308 / Virus Database: 266.6.2 - Release Date: 3/4/2005 3/28/2005 ... 5.. i. ,;4.z Akd s. ».Il.s. tef....�W.. `fi 1:L. Y•:.. .. '. �.'.k .,�ye, °' 'l f'.:1.�Wktl i.r .� :C xt'. . ,.... ..M�J''si -4,. •Wn s+e. �. u. _,5'... er. t...,"... .S ii #+ _... ..v 't5. .,.d7s'.i.+ irk ., r. ye #. *R 1 \rr r■./ , pF A1. ,r • � 111 9 P V IRGINZ�' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 March 1 1 '�nnc 1v1a11J11 1 1, L V V✓ RE: SDP 2005 -017 Old Trail - Ballard Field Townhouses Phase 1; Tax Map 55, Parcel 71 Dear Sir or Madam: This letter is to notify you that the following development proposal has been submitted to the County for review: • SDP 2005 -017 Old Trail - Ballard Field Townhouses Phase 1: Request for Final (prior to preliminary) site plan approval for 79 townhouse units on 5.11 acres zoned R6 - Residential. The property, described as a portion of Tax Map 55, Parcel 71 is located in the White Hall Magisterial District on Jarman's Gap Road (Route 691) approximately 1 mile west of the intersection of Jarman's Gap and Route 240. The Comprehensive Plan designates this property as Urban Density in the Crozet Community. This development proposal is scheduled for the Site Review Committee meeting on the date listed below. The applicant's attendance is not mandatory, although it may be requested by the County. Regardless of whether the applicant will be attending, the County staff will be available for consultation on the Site Review Committee meeting date at 10:00 a.m., in Room 235 of the County Office Building on McIntire Road in Charlottesville. This meeting will be an informal session with the Site Review Committee to discuss issues and share information. The development proposal will be reviewed and approved, subject to compliance with applicable ordinances, by the Site Review Committee, unless a written request is made for Planning Commission review by a member of the Planning Commission, Board of Supervisors, or an abutting property owner by the Request for Review deadline. If requested for review, the development proposal will be reviewed by the Planning Commission. All applicable dates scheduled for this development proposal are listed below. Site Review comments available (Tuesday, March 22) Site Review Committee meeting date (Thursday, March 24, 10 a.m.) Revision & Request for Review deadline (Monday, April 4) Planning Commission meeting (Tuesday, April 26) Nome SDP 2005 -017 Ballard Field Townhouses Phase 1 March 11, 2005 Plans for the proposed development are available for your review in the Department of Planning and Community Development. Interested members of the public are encouraged to contact this department at any time during working hours (8 a.m. -5 p.m., Mon -Fri), and make an appointment to discuss the proposed development. Should you wish to attend the Site Review Committee meeting, please notify the Department of Community Development so that any concerns may be adequately addressed. Si erel , adira .. ar; Senior Planner Zoning and Current Development Division /aer C: BARRETT, RUTH A BRANDT, RICHARD M TRS U/A RICHARD M BRANDT U /D/T & MATTICE F BRANDT TR U/A MATTICE F BRANDT U /D/T CLARK, ROBERT L OR VIVIAN CAROL DAVIS, RANDOLPH F OR DORIS S MOYER, JOANNE L G FAMILY TRUST; RICHARD W MOYER ETAL TRUSTEES OLD TRAIL CREEKSIDE LLC RYALLS, LARRY WAYNE OR LORA SUE SPENCER R RYALLS, LORA S SAUL, CLAUDE H OR PATRICIA C SAZ LLC SHIFFLETT, JACKIE B WEATHER HILL HOMES LTD cc: Collins, Scott 800 East Jefferson Street Charlottesville, VA 22902 March Mountains Properties, LLC 800 E. Jefferson Street Charlottesville, VA 22902 Beights Development 800 East Jefferson Street Charlottesville, VA 22902 File OF AL J 1- in 8 6% I 'IRGINI P COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 - 4126 Project: SDP 2005- 00017, Old Trail — Ballard Field Townhouses Plan preparer: Scott Collins (fax (434) 295 -8317) Owner or rep.: March Mountains Properties, LLC (fax (434) 245 -0300) Date received: 01 March 2005 Date of Comment: 3 March 2005 Lead Engineer: Max Greene The final (prior to preliminary) site plan for Ballard Field Townhouses received on 01 March 2005 has been reviewed. The engineering review for current development can not recommend approval of the final (prior to preliminary) site plan until the following items have been adequately addressed. A. Final site plan comments: 1. Please correct the source of topography. The topography shown appears to match the previously approved proposed grading for the Ballard Field Subdivision Plan. [ 18- 32.5.6a] 2. A bench mark is required. [DM_CD -15] 3. Please add the "General Construction Notes" verbatim as stated in the Albemarle County Design Manual. [DM902.B.4, DM CD-10] Copy: file