Planning Department Comments:
Shared driveway easements are shown on the site plan around the driveways and these easements will be
recorded when the property is subdivided.
NX. The details of the tot lot equipment have been added to the plans.
' The tot lot equipment specifications have been provided on the plans to be reviewed by Parks and
Recreation.
4. No outdoor lighting is being proposed at this time. A note has been added to the landscaping plans to
satisfy this comment. The note also states that if any lighting over 3,000 lumens is being proposed at a future
date, then the plan will have to be amended through the site review process.
All setback lines have been shown and labeled. The lot lines have been adjusted to ensure a 10' side yard
setback on all units. The boundary line adjustment plat has been submitted match the site plan.
f! The north arrows have been added to the landscaping plans.
' The square footage of the tot lot areas have been added to sheet 4, and a note has been added to see sheet
11 for the details.
47 The area of the paved parking lot has been shown on sheet 9.
The footprint dimensions and square footages of each building have been added to the plans.
10. The parking lot and drive aisles have been dimensioned.
11. On sheet 2, the proposed paving material cross sections for the parking lot, driveway, sidewalk, and
trailway have been added.
12. The signature panel has been updated as requested.
13. The trees have been identified and the plans have been updated to show the calculations.
14. The developer has agreed to the concept of the street trees in the development. A plan to this effect has
been included in the plans. This will satisfy the tree planting requirement for the entire Ballard Field
subdivision.
15. The landscaping plan shows the 5' planting easement and any additional easements for the street trees.
These easements will be added to the boundary line adjustment plat, unless the county wants to see an
additional easement plat for these easements.
16. The parking lot has been landscaped to meet the 5% area requirement. See the landscaping plans.
Engineering Comments:
1. The source of topography note on sheet 1 has been modified as requested.
2. A benchmark has been added to sheet 2.
3. The general construction notes have been added to sheet 2 as requested.
Historic Resources Review:
No comments
Inspections Department Review:
No comments
Fire Department Review:
1. An all weather emergency vehicle turnabout has been added Summerford Lane at the location as discussed
during the Site Plan review meeting. This may eventually be replaced with an entrance into the Ballard Field
condo site.
711 North Courthouse Road F Richmond, Virginia 23236 F (804) 794 -3500 F www.timmons.com
NM" NNW
2. Attached is a previous fire flow report verifying that 1000GPM can be achieved at 20 psi. Actually,
according to the water model, with a 1000 GPM demand, the psi pressure on the system does not drop below
90 psi. Therefore, please allow this to serve as verification that there is adequate fire protection in the
subdivision development. The development has a direct feed an looping system to a 12" waterline that is
located on the east side of the property. In addition, the ACSA is reporting that 900' from this property, they
are receiving fire flows in the range of 2770 GPM at 20 psi.
VDOT Review:
The developer intends to barricade the access onto existing Haden Lane at the property line as previously
discussed and agreed upon with the approval of Ballard Field. The southern improvements of Haden lane
will be made in conjunction with the development of the subdivision and a standard VDOT barricade will be
placed at the property line. At the time when Jarman's gap road is improved and the intersection of Jarmans
Gap Road and Hayden Road is improved, the developer will make the required improvements to the east side
of Haden Road and remove the VDOT barricade, allowing the subdivision to have access to Jarmans Gap
Road from Hayden Road.
ACSA Review:
The water meters have been positioned so they will not conflict with the driveways or shared driveways.
If you have any questions, please call me at 434 -566 -1328.
Si / e -•ly:
Scott R. Collins, PE
Project Manager- Residential Services
711 North Courthouse Road r Richmond, Virginia 23236 r (804) 794 -3500 F www.timmons.com
Page 1 of 2
Yadira Amarante
From: James Barber
Sent: Thursday, April 28, 2005 3:48 PM
To: Yadira Amarante
Subject: RE: Old Trail, Ballard Field Townhomes
Yadira,
Yes ma'am...I was sure I had signed them.
James F. Barber
Plans Reviewer
County of Albemarle
Sent
To: Department of Fire /Rescue
Su . 460 Stagecoach Road, Suite F
Charlottesville, VA 22902 -6489
Ph: (434) 296 -5833
Fax: (434) 972 -4123
E -mail: JBarber @Albemarle.org
Web: www.ACFireRescue.org
From: Yadira Amarante
Sent: Thursday, April 28, 2005 1:33 PM
To: James Barber
Subject: Old Trail, Ballard Field Townhomes
Hi James,
Can I sign these site plans for you? They've been here for a while.
Yadira 0. Amarante, Senior Planner
County of Albemarle
Department of Community Development
4/28/2005
Page2of2
*we ter/
Division of Zoning and Current Development
401 McIntire Road
Charlottesville, VA 22902 -4596
yamarant @albemarie.org
(434)296 -5832, phone
(434)972-4126, fax
No virus found in this outgoing message.
Checked by AVG Anti - Virus.
Version: 7.0.308 / Virus Database: 266.10.4 - Release Date: 4/27/2005
No virus found in this incoming message.
Checked by AVG Anti- Virus.
Version: 7.0.308 / Virus Database: 266.10.4 - Release Date: 4/27/2005
4/28/2005
o
lin
setle
vIRCINIP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 - 4126
TO: Scott Collins
FROM: Yadira Amarante, Senior Planner
DATE: April 8, 2005
RE. SDP 05 -017: Old Trail Ballard Field Townhouses, Phase 1, Final (prior to
A t 1/ l Preliminary) Site Plan (Revised 3/28/05)
, ;o
The Albemarle County Depai lnient of Community Development, Division of Current Development, Planning and Zoning
Review will approve the final site plan referenced above when the following items have been satisfactorily addressed:
[Each comment is preceded by the applicable reference.]
[18.4.16.2.1] Provide a detail of the fence surrounding the tot lot area.
[18.4.17.1] It has come to my attention that this development will not have outdoor lighting exceeding
the 3,000 lumen limit. Please place the appropriate note on Sheet 1.
✓� [18.32.5.6.a] Make sure that all new property lines and setbacks are shown correctly on all sheets of the
site plan.
[ 18.32.5.6.n] The dimensions shown in the parking lot detail are not scaling.
/' [18.32.7.9.4.a] Identify the trees and plantings shown on the overall landscape plan.
^ /6. [18.32.7.9.7] 5% of the paved parking and circulation area in the parking lot must be landscaped in order
to meet the minimum parking lot landscaping requirements. Please identify the plantings shown for the
parking area.
.// [Phasing issues] Provide a note on Sheet 1 that states when the planting of the street trees will happen.
Try to be as specific as possible — as in the month when the planting will begin. Also, include a note that
all sidewalks are being built as part of the Lower Ballard Subdivision road plans.
[Recommendation] Delete Sheets 10 & 11 and the portion of Sheet 12 that shows the blow -up of the
landscaping around the Townhomes. Do provide a blow -up of the parking lot and its landscaping.
Please contact Yadira Amarante at 296 -5823 ext. 3297 if you have any questions.
Nese Nome
A OF A
gU i;lll IIM t
x!!II(e:
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
(434) 296 - 5823 Fax (434) 972 - 4012
March 24, 2005
Scott Collins
Timmons Group
800 E. Jefferson Street
Charlottesville, VA 22903
Re: SDP 05 -017 — Old Trail Townhomes, Phase 1, Final (prior to preliminary) Site Plan
Dear Scott:
The Site Review Committee has reviewed the development proposal referenced above. Preliminary
comments from the following agencies, as applicable, are attached.
Albemarle County Current Development Division: Planning, Engineering & Zoning Review
Albemarle County Planning Division: E911 Mapping, Historic Resources, and ARB Review
Albemarle County Building Inspections Division
Albemarle County Fire/Rescue Division
Virginia Department of Transportation
Albemarle County Service Authority
Thomas Jefferson Soil and Water Conservation District
Comments reflect information available at the time the development proposal was reviewed, and should
not be considered fmal. However, the Site Review Committee has attempted to identify all issues
pertaining to the approval of the proposed project.
Please make the revisions which have been identified as necessary for preliminary approval by the Site Review
Committee. If you choose not to make the requested revisions, please submit in writing justification for not
incorporating such revisions. Submit seven full size copies and one 11 "x17" copy to the Department of
Planning and Community Development. Responses to the attached comments of the Site Review Committee
must be submitted by Monday, April 4, 2005. Failure to submit this information by this date will result in
suspension of the review schedule.
Please contact me at your earliest convenience if you have questions or require additional information.
S' ce1y,
a• ira Amarant , Senior Planner
Attachments: Site Review Comments
Neer 1111
o F AL
: , +::
`rRGRn
COUNTY OF ALBEMARLE
Department of Planning & Community Development
401 McIntire Road, Room 218
Charlottesville, Virginia 22902 -4596
(434) 296 - 5823 Ext.3336
Fax (434) 972 — 4012
MEMORANDUM
TO: Yadira Amarante
FROM: Julie Mahon
DATE: March 21, 2005
RE: SDP 2005 -00017 Old Trail — Ballard Field Townhouses (Phase 1) — Historic Resources Review
The above referenced submittal has been reviewed for possible impact to known historic (fifty years old or older)
architectural resources and known or potential archaeological resources with the following results:
1. The Virginia Department of Historic Resources' Historic Resource Quadrangle Maps have no surveyed
historic architectural or archaeological sites identified on within the project area. Note: The absence of
historic resources in DI R records does not necessarily mean that no historic properties are present. It
is possible that the area in question has not been systematically surveyed for resources.
Based upon the information above, I have elected not to conduct a site inspection. However, the presence of a
cemetery and the close proximity to other historic buildings located in the area may be an indication that historic (50
years old or older) resources may be present. If you discover anything that you question pertaining to existing
structures and/or sites and possible historical significance, please contact me to discuss your findings.
V ../
ACSA
TO: Yadira Amarante, Planner
FROM: Gary Whelan, Engineering Technician
DATE: March 18, 2005
RE: Site Plan Technical Review for: Old Trail Ballard Field
Townhouses (Phase I)
(TM 55, Parcel 71)
The below checked items apply to this site. SDP - 2005 -00017
X 1. This site plan is within the Authority's
jurisdictional area for:
X A. Water and sewer
B. Water only
C. Water only to existing structure
D. Limited service
X 2. A 12 inch water line is located approximately 1000'
distant.
X 3. Fire flow from nearest public hydrant, located 900'
distant from this site plan, is 2770 gpm + at 20 psi
residual.
X 4. An 8 inch sewer line is located approximately
2500' distant.
5. An Industrial Waste Ordinance survey form must be
completed.
X 6. No improvements or obstructions shall be placed
within existing or future easements.
7. and plans are currently under review.
X 8. Water and sewer plans have been received and
approved.
9. No plans are required.
10. Final and plans are required for our
review and approval prior to granting tentative
approval.
11. Final site plan may /may not be signed.
12. RWSA approval for water and /or sewer connections.
Comments: Verify that meters do not conflict with driveways.
The site plan does not show or incorrectly shows:
meter locations waterline size
waterline locations sewer line size
sewer line locations expected wastewater flows
easements expected water demands
COMMONWEALTH of VIRGINIA
DEPARTMENT OF TRANSPORTATION
701 VDOT Way
CHARLOTTESVILLE VA 22911
PHILIP A. SHUCET James S. Utterback, PMP
COMMISSIONER Residency Administrator
TRANSPORTATION FOR THE 21sT CENTURY
March 17, 2005
Glenn Brooks
Department of Engineer and Development
401 McIntire Rd.
Charlottesville, VA 22902
Subject: Site Review Meeting Comments
Dear Mr. Brooks:
Below are VDOT's comments for the Site Plans reviewed at the March 15, 2005 Site
Plan Review Meeting:
SDP 2005 -00017 Old Trail — Ballard Field Townhouses, Route 691: (Yadria marante)
§ The site is internal to the Ballard Field Development, with roadways and entrances
that have previously been reviewed and approved;
§ Part of this phase, develops the area at the end of Haden Lane. This existing roadway
is not adequate to support traffic that may want to use this access. Improvements to
Haden Lane were previously discussed with the applicant who agreed to make the
connection and some of the improvements. If this connection is made traffic will attempt
to use this substandard roadway. The developer will need to install a permanent barracade
at the connection or make the necessary road improvements.
§ It is the Departments recommandation have the south end and east side improvements
made with this development. The Jarman Gap Road project will make the intersection
improvements, and the Haden Lane development has plans to improvement part of the
west side of the Roadway.
Ild d
)) *t. kola& ,,,,
COUNTY OF ALBEMARLE
FIRE RESCUE ADMINISTRATION
401 McIntire Road, Room 222
Charlottesville, Virginia 22902 -4596
Tel: (434) 296 -5833
Fax: (434) 972 -4123
Memorandum
TO: Yadira Amarante
FROM: James Barber
DATE: March 14, 2005
RE: SDP 2005 -00017 Old Trail- Ballard Field
Yadira,
I have had a chance to review the plan submitted and can offer the following comments on behalf of the
Department of Fire/Rescue.
• Dead end fire apparatus access roads in excess of 150 feet in length shall be provided with an
approved area for turning around fire apparatus. (Virginia Statewide Fire Prevention Code
503.2.5).
• Verify adequate fire flow is available. Required fire flow is 1500 GPM @ 20 PSI. (Albemarle
County Subdivision Ordinance 14 -521).
Please let me know if you have any questions.
ILS' la,
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
TO: Scott Collins
FROM: Yadira Amarante, Senior Planner
DATE: March 14, 2005
RE: SDP 05 -017: Old Trail Ballard Field Townhouses, Phase 1, Final (prior to
Preliminary) Site Plan
The Albemarle County Department of Community Development, Division of Current Development, Planning and Zoning
Review will approve the final site plan referenced above when the following items have been satisfactorily addressed:
[Each comment is preceded by the applicable reference.]
w; I \ 80 c" i n
s4. [14-241] Shared driveway easements will be necessary when these properties are subdivided. SO t V' ' F "
__�2. [18.4.16.2.1] On Sheet 11 provide the details of the tot lot equi . ment to ensure that they meet the
follows e •• ' , •,11 ., Muu. -. • u - nts: . ' • • with 4 se. • - • 2 cl• • • ers; 1 buckab whirl; 2
be es; tot lot area mu .� '� t of lot area must be fence • • de, -i \
A. [18.4.16.3] Provide tot lot equipment specs ications to be reviWv and Rec.
-.--404. [18.4.17.1] Provide a description and photograph or diagram and show the location of each type of jtJ4 -- co
outdoor luminaire that emits 3,000 or more initial lumens. Please be aware that installation of such 5h{f
luminaires in the future that are not shown on this plan shall require an amendment to this plan. If no A.
such lighting will be provided then provide a statement to that effect on the site plan.
-- 5. [18.32.5.6.a] Show and label all setback lines. There are some blocks of Townhomes where the end g hp W
units are not setback from the side property line. Side setbacks shall not be reduced less than 10 feet or o.d-t
unless constructed to a common wall. There is currently a plat under review which adjusts these S 't
' boundaries. Make sure that the revised site plan reflects these new boundaries.
- ''V' [18.32.5.6.a] Provide north arrows on the landscaping sheets.
[ 18.32.5.6.b] State /show the square footage of the tot lot on Sheet 4 and put a note that the equipment
details are shown on Sheet 11.
J( [18.32.5.6.b] Provide the area of the paved parking lot shown on Sheet 9]
."8.32.5.6.n] Show footprint dimensions and square footage for each building. Keep the lot areas as
shown.
'-> 10. [18.32.5.6.n] Dimension the parking spaces (a typ. Is fine) and travelway aisles in the parking lot on
Sheet 9. n01.-- S cet4,-" y
.4e[18.32.5.6.n] State the proposed paving material types for all walks, parking lots and driveways.
12. [18.32.6.6.f] Change the signature panel to provide a line for each of the following reviewers:
/Current Development: Planning and Zoning Reviewer
--ejgrent Development: Engineering Reviewer (Includes VDOT approval)
ARB
//wilding Official
re Official
Albemarle County Service Authority
13. [18.32.7.9.4.a] Identify the trees and plantings you show on the landscape plans. I need this specific
information so that I can make sure that you meet the minimum requirements for street trees, canopy,
and parking lot landscaping.
14. [18.32.7.9.6 Generally] It's going to be difficult to look at the landscaping requirements on a per -
lot/block basis. Technically, to conform with the ordinance requirements, each block should meet the
street tree and canopy requirements on it's own. For example a 0.472 acre block should provide a 20%
canopy within that individual block or 0.0944 ac in canopy. The review of this is already tedious. I
propose a solution. In reality I only really care about the street trees but I could not require and have you
bond the street trees as part of the subdivision plat. If you would be willing to submit the overall
landscape plan as the landscape plan for the entire development (this includes future townhouse plans as
well) we'll be done. Basically if you do this one plan now we won't have to do another landscape plan
again for the rest of Lower Ballard. If you are agreeable to this let me know and we can work out the
details. We will have to have a separated detail for the parking lot landscaping.
15. [18.32.7.9.6.d] All street trees located on future individual lots must be protected through an easement
agreement and maintained by a homeowner's association. Please show these easements on the site plan
and submit a plat, with a fee and application, which shows these easements and also submit a
maintenance agreement. This plat and agreement must be recorded prior to site plan approval.
16. [18.32.7.9.7] 5% of the area identified in #4 above must be landscaped in order to meet the minimum
parking lot landscaping requirements. Please identify the plantings shown for the parking area on sheet
11 — you may already meet the requirements but I have to verify.
Please contact Yadira Amarante at 296 -5823 ext. 3297 if you have any questions.
•
2
Page 1 of 1
Yadira Amarante
From: Pam Shifflett
Sent: Friday, March 11, 2005 3:06 PM
To: Yadira Amarante
Subject: RE: Old Trail - Ballard Field (upper)
Yadira:
I see sidewalks in the road bond estimate Glenn prepared but not street trees.
Pam
From: Yadira Amarante
Sent: Friday, March 11, 2005 2:56 PM
To: Pam Shifflett
Subject: Old Trail - Ballard Field (upper)
xc Hi Pam — can you tell me if we are holding a bond for sidewalks and street trees in this
development?
Sub
Yadira 0. Amarante, Senior Planner
County of Albemarle
Department of Community Development
Division of Zoning and Current Development
401 Mdntire Road
Charlottesville, VA 22902 -4596
yamarant @albemarle.org
(434)296-5832, phone
(434)972 -4126, fax
Internal Virus Database is out -of -date.
Checked by AVG Anti - Virus.
Version: 7.0.308 / Virus Database: 266.6.2 - Release Date: 3/4/2005
Internal Virus Database is out -of -date.
Checked by AVG Anti - Virus.
Version: 7.0.308 / Virus Database: 266.6.2 - Release Date: 3/4/2005
3/28/2005
... 5.. i. ,;4.z Akd s. ».Il.s. tef....�W.. `fi 1:L. Y•:.. .. '. �.'.k .,�ye, °' 'l f'.:1.�Wktl i.r .� :C xt'. . ,.... ..M�J''si -4,. •Wn s+e. �. u. _,5'... er. t...,"... .S ii #+ _... ..v 't5. .,.d7s'.i.+ irk ., r. ye #. *R
1
\rr r■./
, pF A1. ,r
•
� 111 9 P
V IRGINZ�'
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
March 1 1 '�nnc
1v1a11J11 1 1, L V V✓
RE: SDP 2005 -017 Old Trail - Ballard Field Townhouses Phase 1; Tax Map 55, Parcel 71
Dear Sir or Madam:
This letter is to notify you that the following development proposal has been submitted to the County
for review:
• SDP 2005 -017 Old Trail - Ballard Field Townhouses Phase 1: Request for Final
(prior to preliminary) site plan approval for 79 townhouse units on 5.11 acres zoned R6 -
Residential. The property, described as a portion of Tax Map 55, Parcel 71 is located in
the White Hall Magisterial District on Jarman's Gap Road (Route 691) approximately 1
mile west of the intersection of Jarman's Gap and Route 240. The Comprehensive Plan
designates this property as Urban Density in the Crozet Community.
This development proposal is scheduled for the Site Review Committee meeting on the date
listed below. The applicant's attendance is not mandatory, although it may be requested by the
County. Regardless of whether the applicant will be attending, the County staff will be available
for consultation on the Site Review Committee meeting date at 10:00 a.m., in Room 235 of the
County Office Building on McIntire Road in Charlottesville. This meeting will be an informal
session with the Site Review Committee to discuss issues and share information.
The development proposal will be reviewed and approved, subject to compliance with applicable
ordinances, by the Site Review Committee, unless a written request is made for Planning
Commission review by a member of the Planning Commission, Board of Supervisors, or an
abutting property owner by the Request for Review deadline. If requested for review, the
development proposal will be reviewed by the Planning Commission. All applicable dates
scheduled for this development proposal are listed below.
Site Review comments available (Tuesday, March 22)
Site Review Committee meeting date (Thursday, March 24, 10 a.m.)
Revision & Request for Review deadline (Monday, April 4)
Planning Commission meeting (Tuesday, April 26)
Nome
SDP 2005 -017 Ballard Field Townhouses Phase 1
March 11, 2005
Plans for the proposed development are available for your review in the Department of Planning and
Community Development. Interested members of the public are encouraged to contact this
department at any time during working hours (8 a.m. -5 p.m., Mon -Fri), and make an appointment to
discuss the proposed development. Should you wish to attend the Site Review Committee meeting,
please notify the Department of Community Development so that any concerns may be adequately
addressed.
Si erel ,
adira .. ar;
Senior Planner
Zoning and Current Development Division
/aer
C:
BARRETT, RUTH A
BRANDT, RICHARD M TRS U/A RICHARD M BRANDT U /D/T & MATTICE F BRANDT TR U/A
MATTICE F BRANDT U /D/T
CLARK, ROBERT L OR VIVIAN CAROL
DAVIS, RANDOLPH F OR DORIS S
MOYER, JOANNE L G FAMILY TRUST; RICHARD W MOYER ETAL TRUSTEES
OLD TRAIL CREEKSIDE LLC
RYALLS, LARRY WAYNE OR LORA SUE SPENCER R
RYALLS, LORA S
SAUL, CLAUDE H OR PATRICIA C
SAZ LLC
SHIFFLETT, JACKIE B
WEATHER HILL HOMES LTD
cc: Collins, Scott
800 East Jefferson Street
Charlottesville, VA 22902
March Mountains Properties, LLC
800 E. Jefferson Street
Charlottesville, VA 22902
Beights Development
800 East Jefferson Street
Charlottesville, VA 22902
File
OF AL
J 1- in
8 6%
I 'IRGINI P
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 - 4126
Project: SDP 2005- 00017, Old Trail — Ballard Field Townhouses
Plan preparer: Scott Collins (fax (434) 295 -8317)
Owner or rep.: March Mountains Properties, LLC (fax (434) 245 -0300)
Date received: 01 March 2005
Date of Comment: 3 March 2005
Lead Engineer: Max Greene
The final (prior to preliminary) site plan for Ballard Field Townhouses received on 01 March 2005 has
been reviewed. The engineering review for current development can not recommend approval of the final
(prior to preliminary) site plan until the following items have been adequately addressed.
A. Final site plan comments:
1. Please correct the source of topography. The topography shown appears to match
the previously approved proposed grading for the Ballard Field Subdivision Plan.
[ 18- 32.5.6a]
2. A bench mark is required. [DM_CD -15]
3. Please add the "General Construction Notes" verbatim as stated in the Albemarle County
Design Manual. [DM902.B.4, DM CD-10]