HomeMy WebLinkAboutSDP201300009 Correspondence 2013-06-10 EIIie Ray From: Blake Abplanalp Sent: Monday, June 10, 2013 9:51 AM To: Ellie Ray Subject: RE: SDP - 2013 -00009 Seminole Trail Fire Station No, I hadn't. Thanks very much. From: EIIie Ray Sent: Monday, June 10, 2013 9:50 AM To: Blake Abplanalp Subject: FW: SDP - 2013 -00009 Seminole Trail Fire Station I presume you've seen this? Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Austin, Nathran. (VDOT) [ mailto: Nathran .AustinCa>vdot.virginia.gov] Sent: Monday, June 10, 2013 9:14 AM To: EIIie Ray Subject: SDP - 2013 -00009 Seminole Trail Fire Station Troy Austin, P.E. Area Land Use Engineer Virginia Department of Transportation Land Development — South Culpeper District P.O. Box 1017 11430 James Madison Highway Troy, VA 22974 Phone: (434) 589 -5871 Fax: (434) 589 -3967 1 EIIie Ray From: Austin, Nathran. (VDOT) [Nathran .Austin @vdot.virginia.gov] Sent: Monday, June 10, 2013 9:14 AM To: Ellie Ray Subject: SDP - 2013 -00009 Seminole Trail Fire Station Attachments: SDP - 2013 -00009 Seminole Trail Fire Station - 6- 10- 13.pdf Troy Austin, P.E. Area Land Use Engineer Virginia Department of Transportation Land Development — South Culpeper District P.O. Box 1017 11430 James Madison Highway Troy, VA 22974 Phone: (434) 589 -5871 Fax: (434) 589 -3967 1 Ellie Ray From: Ellie Ray Sent: Friday, May 10, 2013 4:31 PM To: Blake Abplanalp Subject: RE: STVFD Site Plan to VDOT It was sent to VDOT on 4/23. Your earlier email said the revisions were submitted to CDD on 4/17, but everything is marked received (stamped) 4/19 by intake. Intake's policy is that they have 2 days to process submittals and get them to the planner, so I received the plans on 4/23 and sent them out the same clay. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Blake Abplanalp Sent: Friday, May 10, 2013 3:25 PM To: Ellie Ray Subject: STVFD Site Plan to VDOT Ellie, Do you have a date that the Seminole Trail site plan was sent to VDOT by you all? Thanks, Blake Blake Abplanalp Senior Project Manager County of Albemarle Office of Facilities Development 401 McIntire Road, Room 228 Charlottesville, VA 22902 -4596 PH - 434 - 872 -4501, Ext. 3244 Fax - 434 - 972 -4091 Cell - 434 - 825 -1663 baby lanalp()albemarle.org 1A Please consider the environment before printing this e-mail. 1 Ellie Ray From: Blake Abplanalp Sent: Friday, May 10, 2013 2:51 PM To: Joel DeNunzio, P.E. Cc: Trevor Henry; Ellie Ray Subject: Site Plan Review - Seminole Trail Volunteer Fire Company Good Afternoon Joel, There was a revised site plan for the Seminole Trail volunteer Fire Department project submitted to Community Development on 4/17. I'm sure a copy was sent out to VDOT shortly after that date. EIIie has received almost all comments back from various departments but one that we are still looking for are the VDOT comments / approval. Would you be able to provide an ETA for VDOT's comments? Thanks in advance for your help in this matter, we are in the process of bidding this project and hope to start construction in late June or early July. Thanks, Blake A. Blake Abplanalp Senior Project Manager County of Albemarle Office of Facilities Development 401 McIntire Road, Room 228 Charlottesville, VA 22902 -4596 PH - 434 - 872 -4501, Ext. 3244 Fax - 434 - 972 -4091 Cell - 434 - 825 -1663 babplanalp@albemarle.org Please consider the environment before printing this e-mail. 1 EIIie Ray From: Ellie Ray Sent: Wednesday, May 08, 2013 3:53 PM To: 'dbooth @djginc.com'; Blake Abplanalp; 'Darren Curtis' Cc: Michelle Roberge Subject: RE: SDP201300009 - Seminole Trail Fire Station - Major Amendment Just to make sure there is no confusion, I wanted to make sure everyone knows that WPO comments are still forthcoming. SDPs and WPOs are reviewed separately by engineering, and only the SDP review has been completed at this point. Michelle will forward the WPO comments once that review is complete. Thanks! Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: EIIie Ray Sent: Wednesday, . 08, 2013 3:40 PM To: 'dbooth @djginc.com'; ; .ke Abplanalp; 'Darren Cu Subject: SDP201300009 - Se . .ole Trail Fire Statio Major Amendment All, Please find attached my comments for th- above re - -nce application. I have included a PDF with Engineering comments and a separate PDF with th- other comments r- -ived to date. We are awaiting VDOT comments. A copy of the waiver approval letter is also inc ded. Feel free to contact m- ' ou have any questions, concerns, or need further clarification. Thank you, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development Planning Division 401 McIntire Road, North Wing Charlottesville, Virginia 22902 ph: 434.296.5832 x. 3432 fax: 434.972.4126 1 � of L� "moo �c lIW County of Albemarle Department of Community Development Memorandum To: Ellie Ray, Planning Review From: Michelle Roberge, Engineering Review Date: 8 Feb 2013 Subject: Seminole Trail Fire Station; Critical Slope Waiver Request (SDP -2013- 00009) The critical slope waiver request has been reviewed. The engineering analysis of the request follows: Description of critical slope area and proposed disturbance: The critical slopes proposed as being disturbed are man -made slopes of 2:1 that were created when the fire station was constructed. There are three critical slope areas on site; the first critical slope is along Berkmar Drive, the second is located in between the fire station and parking lot, and the third is behind the fire station. The applicant requests to disturb these critical slopes for a proposed building addition, for an access to separate the emergency and non - emergency traffic, and for a proposed mechanical pad. Areas Acres Total site 1.785 acres approximately Critical slopes 0.18 acres 10% of site Critical slopes disturbed .08 acres 44% of critical slopes The critical slope along Berkmar Drive is exempt from the critical slopes waiver due to no reasonable alternative locations for an additional entrance. The critical slope in between the fire station and the parking lot are also exempt provided that retaining walls are designed for areas with an elevation difference of 6' or greater. The critical slope behind the Fire Station will have minimal disturbance for a mechanical pad. I recommend the disturbance of these manmade critical slopes. Compliance with Zoning Ordinance 18 -4.2: "movement of soil and rock" The site will require proper slope construction, control of drainage, and vegetative stabilization to prevent any movement of soil. The elevation of the existing building is much lower than the existing parking lot. The proposed building addition will cut into the existing topography and retaining walls will be required in between the parking lot and the building addition. "excessive stormwater runoff" The critical slope runoff located along Berkmar Drive is currently draining into a culvert under the existing entrance road and routed to a vegetative area south of the fire station. The disturbance of this critical slope and the additional impervious entrance road will increase the runoff. The proposed building addition will also increase the runoff. A stormwater management analysis will determine if the size of the existing culvert needs to be increased and if erosion control measures are warranted in the vegetative area. "siltation" Inspection and bonding by the County will ensure siltation control during construction. Proper stabilization and maintenance will ensure long term stability. •MS Albemarle Cyeemty Community Development Engineering Review comments Page 2 of 2 "loss of aesthetic resource" The critical slopes on site are manmade and were approved on a site plan for the existing fire station. "septic effluent" The proposed site will not release any septic effluent to the surrounding environment. The site is serviced by public sewer. V." Y EIIie Ray From: Blake Abplanalp Sent: Tuesday, April 09, 2013 4:08 PM To: Ellie Ray Subject: Waiver Request - Seminole Trail Volunteer Fire Department Attachments: STUD_ Sidewalklssue.pdf EIIie, Per our conversation, I would like to request a Waiver Request (s) to be included on the BOS 5/1/13 Consent Agenda for the Seminole Trail Volunteer Fire Department Addition and Renovation project. The waiver request (s) would include the following items: • Disturbance of the 20' buffer zone at the back of the parking lot in close proximity to the location of the new ADA compliant parking spaces. The extent of the disturbance would be removal of an existing 10' x 10' concrete dumpster pad and the subsequent minor grading and seeding to repair the depression in this area where the dumpster pad had been. ❖ A small corner section (approx. 12 Square Feet) of new concrete sidewalk that extends into the 20' buffer zone at the location where the ADA compliant parking spaces connect to this sidewalk. (see attached blown -up portion of drawing) Both of these items and their locations are behind fencing and some deciduous trees and bushes but we will add additional plantings for "protection" or screening purposes to enhance the site. This will be reflected on our drawings. The other waiver request we discussed was for critical slopes and that is being prepared by your office. Please let me know if you require any additional information. Thank you very much for your time and efforts in regard to this matter. Sincerely, Blake Blake Abplanalp Senior Project Manager County of Albemarle Office of Facilities Development 401 McIntire Road, Room 228 Charlottesville, VA 22902 -4596 PH - 434 - 872 -4501, Ext. 3244 Fax - 434 - 972 -4091 Cell - 434 - 825 -1663 babplanalp@albemarle.org `A Please consider the environment before printing this e-mail. 1 ..e ~ T , I i ` r ` . +1I 1 �. \545-u i X . /7 ,L.,.,e -- - A' P' ......".""# NI k ' . AIL . -.,- , .00 --- - IN\ : • 1 6..... -. . '.- , Stlla 7) 1 , ,.. \ ' c . .._ • . (///1 / , ,//////,/ )0 , 7 / / , / .,,.. ♦ 1 ' w IS ihtge y 39 ce. i , -,... -5 11/7/7/ -/ - e I \ 'A5 • S' * .1 \ IS A EIIie Ray From: David Benish Sent: Monday, April 22, 2013 5:28 PM To: Ellie Ray Subject: FW: SDP201300009 Seminole Trail Fire Station - waiver report Attachments: Seminole Trail Fire Station_BOS Consent agenda.doc See to two areas highlighted in yellow and see if they sound OK (clean up as necessary). I just tried re -word them a little bit so the our analysis actually refers to a finding that the staff has made (based on the criteria identified in the relevant section) From: Ellie Ray Sent: Tuesday, April 16, 2013 4:57 PM To: David Benish Subject: SDP201300009 Seminole Trail Fire Station - waiver report As with the Belvedere one, I included all of the special exception language, but I'm assuming much of it will need to be removed. Let me know what revisions need to be made. Thanks! Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development Planning Division 401 McIntire Road, North Wing Charlottesville, Virginia 22902 ph: 434.296.5832 x. 3432 fax: 434.972.4126 1 - w .r Ellie Ray From: Ellie Ray Sent: Wednesday, April 17, 2013 8:56 AM To: 'Darren Curtis' Cc: Blake Abplanalp Subject: RE: Seminole Fire Station Resubmittal Darren, It looks like 5 reviewers had comments on the site plan, so submit 6 copies of the plans and response letter. For the stormwater calculations, I think engineering usually requests 2 copies. Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434296.5832 x. 3432 From: Darren Curtis [mailto:dcurtis(adiginc.com] Sent: Wednesday, April 17, 2013 7:57 AM To: Ellie Ray Cc: Blake Abplanalp Subject: Seminole Fire Station Resubmittal Ellie, We are going to be wrapping up the Seminole Fire Station plans and will be mailing them to you today. Can you please tell me how many copies of the plans, response letter, and stormwater calculations you would like to receive? Thank you, Darren R. Curtis, PLA, LEED AP Landscape Architect ENGINEERS • ARCHITECTS = PLANNERS aw awr z art a ir 44 Orc e • Wt:: amsblog, VA 23185 imorarr a�rr ,rrrr Phone 757 253 0673 • Fax 757 253 2319 --."�► A v v jglnc.cam f r io t t tr it se i• 1 r t t; r = =/ (7 ) t tt .t "r rl�lr 1 EIIie Ray From: Ellie Ray Sent: Tuesday, April 16, 2013 4:57 PM To: David Benish Subject: SDP201300009 Seminole Trail Fire Station - waiver report Attachments: Seminole Trail Fire Station_BOS Consent agenda.doc As with the Belvedere one, I included all of the special exception language, but I'm assuming much of it will need to be removed. Let me know what revisions need to be made. Thanks! Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development Planning Division 401 McIntire Road, North Wing Charlottesville, Virginia 22902 ph: 434.296.5832 x. 3432 fax: 434.972.4126 1 EIIie Ray From: Blake Abplanalp Sent: Tuesday, April 09, 2013 10:52 AM To: Rebecca Ragsdale Cc: Trevor Henry; Ellie Ray Subject: Letter Regarding Meeting Room at Seminole Trail Volunteer Fire Department Attachments: STVFD Letter.pdf Good Morning Rebecca, Attached is the letter that I mentioned in my e -mail yesterday. They addressed it to Ellie. Please let me know if you require any additional information. Thank you, Blake Blake Abplanalp Senior Project Manager County of Albemarle Office of Facilities Development 401 McIntire Road, Room 228 Charlottesville, VA 22902 -4596 PH - 434 - 872 -4501, Ext. 3244 Fax - 434 - 972 -4091 Cell - 434 - 825 -1663 babplanalpc albemarle.org Please consider the environment before printing this e-mail. 1 , , ... ...., i ni, SEMINOLE TRAIL ', VOLUNTEER FIRE DEPARTMENT, INC. . � - � POST OFFICE BOX 7002 • CHARLOTTESVILLE • VIRGINIA • 22906 April 8, 2013 Ellie Ray Engineering Department Albemarle County 401 McIntire Road Charlottesville, VA 22902 Dear Ms. Ray: We are writing to you, as requested, with the intended use of the meeting room in the new fire station expansion project for our department. Seminole Trail VFD intends to use the room for department meetings, training, etc. We also intend to allow small groups from the community to use the facility as the schedule permits. This should be in line with the same use at the Monticello and Hollymead Fire Stations. We do not intend to use the meeting room for bingo or any other large fundraising projects that would require a large attendance from the public. If you have any further questions or needs regarding this matter, please let us know. Respectfully, 6. , : •",.. - 7., /17/7:.,?,:d 3)42;-- , Lloyd F. Wood Daniel W. Tawney President Fire Chief • • Visit us on the web at www.stvfd.org EIIie Ray From: Blake Abplanalp Sent: Friday, April 05, 2013 8:48 AM To: Ellie Ray; Michelle Roberge Subject: Thank You Ellie & Michelle, Thanks very much for your time in our meeting yesterday afternoon. I appreciate you both making time to fit me in on short notice. Michelle, when I went back to my office I found out you had been up there so I apologize for the confusion. I look forward to receiving additional information on the items that required further clarification. I appreciate your input on our site issues. I hope you both have a great weekend !! Blake © Blake Abplanalp Senior Project Manager County of Albemarle Office of Facilities Development 401 McIntire Road, Room 228 Charlottesville, VA 22902 -4596 PH - 434 - 872 -4501, Ext. 3244 Fax - 434 - 972 -4091 Cell - 434 - 825 -1663 babplanalpPalbemarle.org Please consider the environment before printing this e-mail. 1 EIIie Ray From: Blake Abplanalp Sent: Thursday, April 04, 2013 1:54 PM To: Ellie Ray Subject: RE: Seminole Trail 3:00 would be great. Thanks !! From: Ellie Ray Sent: Thursday, April 04, 2013 1:54 PM To: Blake Abplanalp Subject: RE: Seminole Trail I think Michelle should be join us b/c if I'm remembering correctly the waivers were connected to engineering comments. She is available at 3 or later today...can you make that time? Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Blake Abplanalp Sent: Thursday, April 04, 2013 1:49 PM To: Ellie Ray Subject: Seminole Trail Hi Ellie, I've been working with DJG and 1 have a couple of questions regarding waiver requests, etc. Do you have any time this afternoon or tomorrow morning to discuss? I can come down as soon as you have some time. Thanks, Blake Blake Abplanalp Senior Project Manager County of Albemarle Office of Facilities Development 401 McIntire Road, Room 228 Charlottesville, VA 22902 -4596 PH - 434 - 872 -4501, Ext. 3244 Fax - 434 - 972 -4091 Cell - 434 - 825 -1663 babplanalpPalbemarle.org Please consider the environment before printing this e-mail. 1 EIIie Ray From: Ellie Ray Sent: Friday, March 29, 2013 2:36 PM To: Blake Abplanalp Subject: RE: SDP201300009 Seminole Trail Fire Station - Major Amendment Yep! Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Blake Abplanalp Sent: Friday, March 29, 2013 12:36 PM To: EIIie Ray Subject: RE: SDP201300009 Seminole Trail Fire Station - Major Amendment EIIie, Is Rebecca the person to talk with questions about the zoning issues? Thanks, Blake From: EIIie Ray Sent: Friday, March 2, 2013 4:50 PM To: Blake Abplanalp; booth @djginc.com'; 'jconnolly @djginc.com' Cc: Rebecca Ragsdale Subject: RE: SDP201300H09 Seminole Trail Fire Station - Major Amend ent Happy Friday All, Zoning has requested additional in'ormation for their review of e parking requirement and the building height. To make their parking determination the ■ have requested that y. provide the maximum number of employees, the square footage of any assembly or meet g space, and infor ation regarding any sort of trainings or events that you anticipate holding on -site. For the buildin: height, they h. e determined that 530 is the reference elevation in front of the building and would like to see an elevati. of the b ding front in order to determine the actual building height. Let me know if you need more information from .e Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Blake Abplanalp Sent: Thursday, March 21, 2013 6 16 PM To: EIIie Ray Cc: Michelle Roberge Subject: RE: SDP201300009 'eminole Trail Fire Station - Major Amendment Thanks very much. As alwa s I appreciate your help !I Blake 1 "11•P' OF Al% irr County of Albemarle Department of Community Development Memorandum To: Ellie Ray, Planning Review From: Michelle Roberge, Engineering Review Date: 8 Feb 2013 Subject: Seminole Trail Fire Station; Critical Slope Waiver Request (SDP -2013- 00009) The critical slope waiver request has been reviewed. The engineering analysis of the request follows: Description of critical slope area and proposed disturbance: The critical slopes proposed as being disturbed are man -made slopes of 2:1 that were created when the fire station was constructed. There are three critical slope areas on site; the first critical slope is along Berkmar Drive, the second is located in between the fire station and parking lot, and the third is behind the fire station. The applicant requests to disturb these critical slopes for a proposed building addition, for an access to separate the emergency and non - emergency traffic, and for a proposed mechanical pad. Areas Acres Total site 1.785 acres approximately Critical slopes 0.18 acres 10% of site Critical slopes disturbed .08 acres 44% of critical slopes The critical slope along Berkmar Drive is exempt from the critical slopes waiver due to no reasonable alternative locations for an additional entrance. The critical slope in between the fire station and the parking lot are also exempt provided that retaining walls are designed for areas with an elevation difference of 6' or greater. The critical slope behind the Fire Station will have minimal disturbance for a mechanical pad. I recommend the disturbance of these manmade critical slopes. Compliance with Zoning Ordinance 18 -4.2: "movement of soil and rock" The site will require proper slope construction, control of drainage, and vegetative stabilization to prevent any movement of soil. The elevation of the existing building is much lower than the existing parking lot. The proposed building addition will cut into the existing topography and retaining walls will be required in between the parking lot and the building addition. "excessive stormwater runoff" The critical slope runoff located along Berkmar Drive is currently draining into a culvert under the existing entrance road and routed to a vegetative area south of the fire station. The disturbance of this critical slope and the additional impervious entrance road will increase the runoff. The proposed building addition will also increase the runoff. A stormwater management analysis will determine if the size of the existing culvert needs to be increased and if erosion control measures are warranted in the vegetative area. "siltation" Inspection and bonding by the County will ensure siltation control during construction. Proper stabilization and maintenance will ensure long term stability. Albemarle C"orinty Community Development Engineering Review comments Page 2 of 2 "loss of aesthetic resource" The critical slopes on site are manmade and were approved on a site plan for the existing fire station. "septic effluent" The proposed site will not release any septic effluent to the surrounding environment. The site is serviced by public sewer. EIIie Ray From: EIIie Ray Sent: Thursday, February 07, 2013 2:24 PM To: Blake Abplanalp Subject: RE: Site Plans Glenn said since it's a County project, we will just process the waiver...you don't need to write the normal request letter. So, Michelle (the reviewing engineer) and I will work on it and get it on the BOS consent agenda sometime after the Site Review Meeting. Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Blake Abplanalp Sent: Thursday, February 07, 2013 11:26 AM To: EIIie Ray Subject: RE: Site Plans Thanks Ellie. I appreciate your help. Blake From: Ellie Ray Sent: Thursday, February 07, 2013 11:25 AM To: Blake Abplanalp Subject: RE: Site Plans The slopes should also be shown on the site plan, but I can work with what's shown for now. A critical slope waiver will be required since the plan shows disturbance of those slopes. They appear to be man -made slopes created from construction of the original fire station and Berkmar Drive, which used to be an administrative waiver, but now must go to the Board (on consent unless they pull it for discussion). I am supposed to meet with Engineering sometime today to find out exactly what type of request you need to submit...1'11 let you know once our meeting is done. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Blake Abplanalp Sent: Thursday, February 07, 2013 9:05 AM To: EIIie Ray Subject: FW: Site Plans Good Morning Ellie, Please see response below in regard to critical slopes on the plans for the proposed Seminole Trail Volunteer Fire Company project. Slopes greater than 25% are shown in dark shading and identified in the key on the sheet. Please let me know if you require additional information regarding the critical slopes. I've asked the engineer to submit the VDOT information directly to VDOT. 1 Thanks, Blake From: Jerry Connolly [mailto:jconnolly©adiginc.com] Sent: Thursday, February 07, 2013 8:51 AM To: Blake Abplanalp; 'Donald Booth' Cc: Trevor Henry Subject: RE: Site Plans Blake, The critical slopes are shown on sheet C -101 which is the demo plan. If Ellie wants or needs to see more than just the locations of the slopes I can get her whatever she needs. We did not submit to VDOT but I can have a set of plans and a copy of the waiver form sent out to them today. I was not sure if you needed to submit everything to VDOT as well. If you have any questions or concerns please let me know. Thanks Jerry Jerry Connolly, PE Civil Engineer 2 ..... ....... �� pF AL RGINN' COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 MEMORANDUM TO: MEMBERS, SITE REVIEW COMMITTEE: Joel DeNunzio — VDOT (Charlottesville) Chuck Proctor — VDOT (Culpeper) William Craun — Health Dept. Alex Morrison — ACSA David Benish — Planning Jay Schlothauer — Inspections Andrew Slack — GIS Robbie Gilmer — Fire & Rescue Dan Mahon — Parks & Rec. Margaret Maliszewski — ARB Glenn Brooks — County Engineer Deloris Bradshaw Thomas Jefferson Soil and Water Conservation District FROM: Albemarle County Department of Community Development — Division of Planning DATE: February 13, 2013 RE: Site Review Committee Meeting — Thursday 10 a.m., Meeting Room #235, Second Floor, County Office Building Attached is the list of site plans to be reviewed based on the schedule below. Please review these projects and send your written comments to the applicable planner by the Monday preceding the Thursday meeting. The Submission and Review Schedule is: SITE REVIEW: March 21, 2013 For the attached site plans please review each plan for compliance with the technical requirements of Chapter 18 of the Code of the County of Albemarle and/or other applicable laws enforced by your agency /depai tiuent. Please either 1. Recommend approval, including conditions that must be met prior to approval of the final plan and including conditions required to be satisfied before a grading permit may be issued under chapter 17 of the Code. Any recommended conditions shall pertain to any requirements of this chapter and other applicable laws. Or, 2. Recommend denial. Any recommendation for denial shall clearly state what requirements of Chapter 18 of the Code or other applicable laws that the plan does not satisfy. If you have any recommendations for revisions please feel free to provide that information. Please be clear in your comments what a "required" revision is and what a "recommended" revision is. If you are unable to attend the meeting, please submit your comments so they will be available at the meeting. Item Number: SDP201300008 Project Lead Reviewer: Megan Yaniglos Project Name: New Hope Community Church (Phase I) — Initial Site Plan PROPOSED: (Phase I) constructing a 200 -seat sanctuary with associated access road and parking area ZONING CATEGORY /GENERAL USAGE: RA Rural Areas - agricultural, forestal, and fishery uses; residential density (0.5 unit /acre in development lots); EC Entrance Corridor - Overlay to protect properties of historic, architectural or cultural significance from visual impacts of development along routes of tourist access; AIA Airport Impact Area - Overlay to minimize adverse impacts to both the airport and the surrounding land SECTION: Chapter 18, Section 32 of the Albemarle County Code and SP201000046 Conditions of Approval ENTRANCE CORRIDOR: YES AIRPORT IMPACT AREA: YES COMPREHENSIVE PLAN LAND USE /DENSITY: Rural Areas - preserve and protect agricultural, forestal, open space, and natural, historic and scenic resources/ density ( .5 unit/ acre in development lots) LOCATION: Northwest side of intersection of Dickerson Road (Route 606) and Dickerson Lane (Route 763). TAX MAP /PARCEL: 021000000012C1 MAGISTERIAL DISTRICT: White Hall Item Number: SDP201300009 Project Lead Reviewer: Ellie Ray Project Name: Seminole Trail Fire Station— Major Amendment PROPOSAL: Request for approval of a major site plan amendment to expand the Seminole Trail Fire Station. This application includes a building addition that will replace a portion of site parking, and access reconfiguration to separate emergency and non - emergency traffic. Associated with this proposal is a special exception request for disturbance of small areas of critical slopes created by the original site plan. ZONING CATEGORY /GENERAL USAGE: C -1 Commercial — retail sales and service; residential by special use permit (15 units/ acre). SECTION: Section 32 Site Plan ENTRANCE CORRIDOR: No AIRPORT IMPACT AREA: Yes PROFFERS: No EXISTING COMPREHENSIVE PLAN LAND USE /DENSITY: Neighborhood 1 - Places 29: Institutional — civic uses, parks, recreational facilities, and similar uses on County -owned property. LOCATION: 3055 Berkmar Drive, approximately 850 feet south of the intersection with Rio Road [631]. TAX MAP /PARCEL: 061M0-00-12-001G0 MAGISTERIAL DISTRICT: Rio Item Number: SDP201300011 Project Lead Reviewer: Megan Yaniglos Project Name: Old Trail Village Block 2B — Major Site Plan Amendment PROPOSED: Request for major site plan amendment approval for a four story, 43 room hotel with a 1,000 square foot restaurant and associated parking. ZONING CATEGORY /GENERAL USAGE: Neighborhood Model District (NMD)- residential (3- 34 units /acre) mixed with commercial, service, and industrial uses. SECTION: Chapter 18 Section 32 of the Zoning Ordinance COMPREHENSIVE PLAN LAND USE /DENSITY: Urban Density Residential- 6 -12 units /acre; supporting uses such as religious institutions, schools, commercial, office and service uses in the Crozet Master Plan ENTRANCE CORRIDOR: Yes LOCATION: At the corner of the intersection of Golf Drive and Claremont Lane, near The Lodge at Old Trail. TAX MAP/PARCEL: 055E0- 01- 00 -000F1 MAGISTERIAL DISTRICT: White Hall Cc: Architectural Review Board Mary Hughes Krystal Brinkley Melissa Spangler Jennifer Whitaker United States Postal Service Melvin Kosler Sandy VonThelen Sprint- Manager of Engineering Scott B. Peyton Ronnie Rutherford E -mail copy: Board of Supervisors Planning Commission Joe Letteri Dan Mahon David Benish Donna Shaunesey Ella Jordan Jack McClelland Jeff Werner Karla Bower Steve Blaine Melissa Wiley Mike Heckman Ron Higgins Sabrina Stanwood Steve Allshouse Wayne Cilimberg Tom Foley William D. Fritz 0 / DOT Virginia Department y of Transportation August 2012 ACCESS MANAGEMENT EXCEPTION REQUEST: AM -2 MINOR ARTERIAL, COLLECTOR, & LOCAL STREET REGULATIONS 24 VAC 30 -73 SECTION 120 Submitted by: Jerry Connolly Date: 02/01/13 Email Address jonnolly @djginc.com Phone: 757 - 253 -0673 Address: 449 Mclaws Circle Project Name: Seminole Trail Fire Station Rte # 1403 Locality: Charlottesville Description of Project The project consists of adding two additional .ays to the existing Seminole trail fire station. With the addition of the two bays a new entrance will be added to separate the emergency vehicle and non emergency vehicle access to the site. VDOT District: Area Land Use Engineer: NOTES: (1). Submit this form and any attachments to one of the District's Area Land Use Engineers. (2). See Section 120 of the Regulations for details on the requirements, exceptions, and exception request review process. (3). Attach additional information as necessary to justify the exception request(s). (4). If a traffic engineering study is required, the decision on the request will be based on VDOT engineering judgment. (5). Use the LD -440 Design Exception or the LD -448 Design Waiver forms for engineering related standards, e.g. sight distance. See IIM -LD -227 for additional instructions. _ J 1 Select the Exception(s) Being Requested �>♦�' Exception to the shared entrance requirement. (Access M. Regulations Section 120 C.2) Reason for exception: tplit A. An agreement to share the entrance could not be reached with adjoining property owner. Fl Attached: Written evidence that adjoining property owner will not share the entrance. 11 B. Physical constraints: topography, adjacent hazardous land use, stream, wetland, other. Specify constraint: The new entrance will separate non emergency vehicles from emergency vehicles I NC Attached: Documentation of constraint such as aerial photo or topographic map. Exception to the vehicular connection to adjoining undeveloped property requirement. (Section 120 C.4) Reason for exception: { A. Physical constraints: topography, adjacent hazardous land use, stream, wetland, other. ra Specify constraint: Attached: Documentation of constraint such as aerial photo or topographic map. B. Other reason: NI Exception to the requirement that an entrance shall not be located within the functional area of an intersection or roundabout. (See Regulation Section 120 C. 1; Appendix F, Rd Design Manual) pj Attached: A traffic engineering study documenting that the operation of the intersection and public safety will not be adversely impacted. 1 AM -2 • r August 2012 1/1 EXCEPTION TO THE SPACING STANDARDS FOR: • Entrances, intersections, crossovers (Table 2 -2); • Entrances, intersections near interchange ramps (Tables 2 -3, 2 -4); or • Corner clearance (Figure 4 -4). Appendix F, Road Design Manual Provide the following information on the Exception Request MI ON A MINOR ARTERIAL OR COLLECTOR ri NEAR AN INTERCHANGE RAMP (Submittal of a traffic engineering study required) ❑ CORNER CLEARANCE (Submittal of a traffic engineering study required) Type of entrance /intersection /crossover: Signalized ❑ Unsignalized /Full Access ❑ Partial Access ❑ Posted speed limit: 35 mph Minor Arterial: ❑ Collector: ❑ Local: ❑ Required spacing distance 50 ft According to figure 4 -11, appendix F, VDOT Road Desig Proposed spacing distance 10 ft Manuel Requested exception: Reduction in required spacing 40 ft REASON FOR EXCEPTION: 1 A. To be located on an older, established business section of a highway corridor where existing spacing did not meet the spacing standards prior to October 14, 2009. (Regulation Section 120 C.3.c) Ej Attached: Dated aerial photo of corridor identifying proposed entrance /intersection location. B. Not enough property frontage to meet spacing standard, but the applicant does not want a partial access right - in /right - out entrance. (Section 120 C.3.f) " 1 Attached: A traffic engineering study documenting that left turn movements at the entrance will not have a negative impact on highway operation or safety. C. To be located within a new urbanism mixed use type development. (Section 120 C.3.d) ❑ Attached: The design of the development and compliance with intersection sight distance. II D. The proposed entrance meets the signal warrants but does not meet the signalized intersection spacing standard. The applicant requests an exception to the spacing standard. MI Attached: A traffic engineering study that (i) evaluates the location's suitability for a roundabout and (ii) contains specific /documented reasons showing that the proximity of the proposed signal to an adjacent signal will not adversely impact a safe and efficient flow of traffic on the highway. (Section 120 C.5) E. The development's 2 (or additional) entrance does not meet the spacing standards but is necessary for the streets to be accepted into the secondary system. (Section 120 C.3.e) Attached: Information on the development that identifies the location of entrances. F. To be located within the limits of a VDOT and locality approved access management corridor plan. pi Attached: Aerial photo of corridor identifying proposed entrance /intersection location. (Sect 120 C.3.b) 2 AM -2 August 2012 [-FOR-VD-0T USE ONL Recommendation on Exception Request: Approve n Deny n I Date: Area Land Use Engineer or : Name Remarks: Exception Request Action: Approved n Denied Li I Date: District Administrator or Designee: Name (and position if Designee) Remarks: District Staff: Please email copy to Paul .Grasewicz(VDOT.Virginia.Gov 3 AM -2 NNW EIIie Ray From: Blake Abplanalp Sent: Tuesday, October 02, 2012 1:52 PM To: EIIie Ray Subject: RE: Seminole Trail fire station (Albemarle County) - Removal Rate spreadsheet and county Design Standards Manual Thanks ! From: EIIie Ray Sent: Tuesday, October 02, 2012 1:28 PM To: Blake Abplanalp Subject: RE: Seminole Trail fire station (Albemarle County) - Removal Rate spreadsheet and county Design Standards Manual You too! If any other questions come up, get in touch anytime. Ellie Carter Ray, PL4 Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Blake Abplanalp Sent: Tuesday, October 02, 2012 1:23 PM To: EIIie Ray Subject: RE: Seminole Trail fire station (Albemarle County) - Removal Rate spreadsheet and county Design Standards Manual Thanks Ellie. It was great to "officially" meet you. Have a great day !! Blake From: EIIie Ray Sent: Tuesday, October 02, 2012 12:26 PM To: Blake Abplanalp; 'jconnolly @djginc.com'; 'dbooth @djginc.com' Cc: Michael Koslow; Trevor Henry Subject: RE: Seminole Trail fire station (Albemarle County) - Removal Rate spreadsheet and county Design Standards Manual Blake, Milling the top coat is fine...we would consider that to be maintenance, not removal and replacement. Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Blake Abplanalp Sent: Tuesday, October 02, 2012 10:03 AM To: Ellie Ray; 'jconnolly @djginc.com'; 'dbooth @djginc.com' Cc: Michael Koslow; Trevor Henry 1 Subject: RE: Seminole Trail fire statr..r (Albemarle County) - Removal Rate spreat.,..,eet and county Design Standards Manual Thanks very much Ellie. I appreciate your help with these items. I have one question, if we were to remove / mill the top coat of asphalt on the existing parking lot and apply just a new top coat would that be considered a change that would need to comply with the setback and buffer requirements? I ask this because we anticipate that there will be moderate damage to the top coat from construction traffic. Thanks again, Blake From: Ellie Ray Sent: Tuesday, October 02, 2012 9:50 AM To: 'jconnolly ©djginc.com'; Blake Abplanalp; dboothftdiginc.com Cc: Michael Koslow Subject: RE: Seminole Trail fire station (Albemarle County) - Removal Rate spreadsheet and county Design Standards Manual All, As a follow -up to yesterday's pre -app meeting, here are the answers to some of the outstanding items of discussion: 1. I think this plan will need to be submitted as a Major Amendment. It looks like it falls into the 'major' category for the size of the addition (anything over 3,000 sf), the new or modified entrance, and the possibility of waiver requests (as discussed yesterday, but perhaps won't happen). Here is the link to our Site Plan Amendment Policy, let me know if I've misunderstood something: http: / /www.albemarle.org /upload /images /forms center /departments /Community Development /forms /applic ations /SITE PLAN AMENDMENT POLICY.pdf 2. One thing to note is that starting January 1 (assuming the Zoning Text Amendment is approved by the Board tomorrow), by -right site plans can no longer be called up for public hearing by adjoining property owners. So, if you submitted after 1/1/13, the public cannot call the plan up to the Planning Commission. See this link for the SDP submittal schedule: http: / /www.albemarle.org /upload /images /forms center /departments /Community Development /forms /sched ules /Site Plan & Subdivision Schedule.pdf 3. The adjoining site we discussed is zoned PD -MC (Planned Development — Mixed Commercial), so the concerns about setback /buffer to residential on that boundary are no problem. The setback /buffer between commercial and residential does apply in the other areas where residentially zoned property abuts the subject parcel. However, if the site is currently non - conforming in regards to be setbacks /buffers they won't be enforced on this site plan as long as the current condition is maintained as is. In other words, I think the parking lot probably violates the setback and buffer requirement along the back property line, but as long as the parking lot isn't being changed it is fine. If you have to remove the parking lot and then replace it in the exact same place, then the standards do apply. Basically if it's non - conforming now it can remain as such, but if your construction plan includes removing the non - conformity and then reconstructing it, it must conform. I hope this makes sense, this is one of the more confusing interpretations of our code. Feel free to give me a call if you have any questions. 4. I was incorrect about the light pole height. We do have a height restriction in the Entrance Corridor, but otherwise light poles are governed by the height restriction within the zoning district. I think that was all of the unresolved questions, if I've neglected something or you have additional questions please let me know. Thank you, 2 Ellie Carter Ray, PIA, ASLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Michael Koslow Sent: Monday, October 01, 2012 4:56 PM To: iconnolly(adiginc.com Cc: Ellie Ray Subject: Seminole Trail fire station (Albemarle County) - Removal Rate spreadsheet and county Design Standards Manual Jerry, Per our meeting today, please find attached the BMP removal rate spreadsheet Albemarle County uses for stormwater management (until 7/1/2014, then DCR is changing the process to runoff reduction method), which is on our website here: < http : / /www.albemarle.org /deptforms .asp ?department= cdengwpo> Also, the Design Standards Manual here: <http: / /albemarle.org /upload /images /forms center /departments /community development /forms /design standards manual /Albemarle County Design Standards Manual 02- 12- 2010.pdf> has the details for Paved Construction Entrance, sidewalk strength, and dumpster pad strength and layout, which we would be looking for on WPO plans and site plan amendment submittals respectively. Note the WPO (erosion & sediment control and stormwater management for this project) plan submittal is a separate process from the site plan minor or major amendment submittal process (although both would be needed for this project). Cordially, Michael Koslow, PE County of Albemarle Community Development Department 401 McIntire Road Charlottesville, VA 22902 434 - 296 -5832 ext. 3297 434 - 972 - 4126 (fax) mkoslow @albemarle.org 3 Michelle Roberge From: Blake Abplanalp Sent: Friday, April 05, 2013 11:47 AM To: Ellie Ray; Michelle Roberge Subject: RE: Thank You Do you feel like the waiver for the sidewalk in the buffer will hit any kind of obstacles? From: EIIie Ray Sent: Friday, April 05, 2013 11:04 AM To: Blake Abplanalp; Michelle Roberge Subject: RE: Thank You Blake, Michelle and I looked into the remaining issues from yesterday's meeting, and it looks like two waivers will be required. The entrance issues that would have required waivers, that Michelle requested with her initial set of comments, appeared to have been addressed with the revisions you showed us in the meeting. As discussed yesterday, the critical slope waiver is required. The second waiver is for disturbance of the required 20' undisturbed buffer...the removal of the portion of parking that currently violates the buffer is exempt, but it appears that a small section of sidewalk is now proposed to be constructed in the buffer. Are you around? I'll swing by and show you what I'm talking about on the plan. Thanks - ellie Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Blake Abplanalp Sent: Friday, April 05, 2013 8:48 AM To: Ellie Ray; Michelle Roberge Subject: Thank You Ellie & Michelle, Thanks very much for your time in our meeting yesterday afternoon. I appreciate you both making time to fit me in on short notice. Michelle, when I went back to my office I found out you had been up there so I apologize for the confusion. I look forward to receiving additional information on the items that required further clarification. I appreciate your input on our site issues. I hope you both have a great weekend !! Blake O Blake Abplanalp Senior Project Manager County of Albemarle Office of Facilities Development 401 McIntire Road, Room 228 Charlottesville, VA 22902 -4596 1 PH - 434 - 872 -4501, Ext. 3244 Fax - 434 - 972 -4091 Cell - 434 - 825 -1663 babplanalpPalbemarle.org Please consider the environment before printing this e-mail. 2 Michelle Roberge From: Ellie Ray Sent: Friday, April 05, 2013 11:04 AM To: Blake Abplanalp; Michelle Roberge Subject: RE: Thank You Blake, Michelle and I looked into the remaining issues from yesterday's meeting, and it looks like two waivers will be required. The entrance issues that would have required waivers, that Michelle requested with her initial set of comments, appeared to have been addressed with the revisions you showed us in the meeting. As discussed yesterday, the critical slope waiver is required. The second waiver is for disturbance of the required 20' undisturbed buffer...the removal of the portion of parking that currently violates the buffer is exempt, but it appears that a small section of sidewalk is now proposed to be constructed in the buffer. Are you around? I'll swing by and show you what I'm talking about on the plan. Thanks - ellie Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Blake Abplanalp Sent: Friday, April 05, 2013 8:48 AM To: Ellie Ray; Michelle Roberge Subject: Thank You Ellie & Michelle, Thanks very much for your time in our meeting yesterday afternoon. I appreciate you both making time to fit me in on short notice. Michelle, when I went back to my office I found out you had been up there so I apologize for the confusion. I look forward to receiving additional information on the items that required further clarification. I appreciate your input on our site issues. I hope you both have a great weekend !! Blake O Blake Abplanalp Senior Project Manager County of Albemarle Office of Facilities Development 401 McIntire Road, Room 228 Charlottesville, VA 22902 -4596 PH - 434 - 872 -4501, Ext. 3244 Fax - 434 - 972 -4091 Cell - 434 -825 -1663 babplanalp(Walbemarle.org k „ - Please consider the environment before printing this e-mail. 1 Michelle Roberge From: Blake Abplanalp Sent: Friday, April 05, 2013 8:53 AM To: Michelle Roberge Subject: RE: Thank You When you get a chance send me that photo you have and I'll show it to Montie. I am very confident that he can solve your mystery. From: Michelle Roberge Sent: Friday, April 05, 2013 8:52 AM To: Blake Abplanalp Subject: RE: Thank You No problem Blake. - Michelle From: Blake Abplanalp Sent: Friday, April 05, 2013 8:48 AM To: Ellie Ray; Michelle Roberge Subject: Thank You Ellie & Michelle, Thanks very much for your time in our meeting yesterday afternoon. I appreciate you both making time to fit me in on short notice. Michelle, when I went back to my office I found out you had been up there so I apologize for the confusion. I look forward to receiving additional information on the items that required further clarification. I appreciate your input on our site issues. I hope you both have a great weekend !! Blake © Blake Abplanalp Senior Project Manager County of Albemarle Office of Facilities Development 401 McIntire Road, Room 228 Charlottesville, VA 22902 -4596 PH - 434 - 872 -4501, Ext. 3244 Fax - 434 - 972 -4091 Cell - 434 - 825 -1663 babplanalDca albemarle.org i„.43 Please consider the environment before printing this e-mail. 1 Michelle Roberge From: Blake Abplanalp Sent: Friday, April 05, 2013 8:48 AM To: Ellie Ray; Michelle Roberge Subject: Thank You Ellie & Michelle, Thanks very much for your time in our meeting yesterday afternoon. I appreciate you both making time to fit me in on short notice. Michelle, when I went back to my office I found out you had been up there so I apologize for the confusion. I look forward to receiving additional information on the items that required further clarification. I appreciate your input on our site issues. I hope you both have a great weekend !! Blake © Blake Abplanalp Senior Project Manager County of Albemarle Office of Facilities Development 401 McIntire Road, Room 228 Charlottesville, VA 22902 -4596 PH - 434 - 872 -4501, Ext. 3244 Fax - 434 - 972 -4091 Cell - 434 - 825 -1663 babplanalp(c)albemarle.org Please consider the environment before printing this e-mail. 1 Michelle Roberge From: Blake Abplanalp Sent: Tuesday, March 26, 2013 10:30 AM To: Michelle Roberge; Ellie Ray Subject: RE: SDP201300009 Seminole Trail Fire Station - Major Amendment Thanks Michelle. Have a great day ! From: Michelle Roberge Sent: Tuesday, March 26, 2013 10:29 AM To: Blake Abplanalp; Ellie Ray Subject: RE: SDP201300009 Seminole Trail Fire Station - Major Amendment Hello Blake, I have attached a detail of CG -11 that VDOT mentioned at our meeting. I also drew some sketches of what I was looking for, that may have been unclear in the letter. Please note that DI -2 is recommended if the runoff from the parking entrance cannot easily be routed to DI -1. For waivers, please submit a letter which includes the following: 1) State what the waiver is for and refer to the ordinance. Your waivers will fall under 4.12.17, sections a) and b) . 2) Explain what you are proposing and justify the reason for this alternative. You can attach drawings if you like. We would like to see the justification and that your solution is the best available option. We have meetings every Thursday if you would like to come in or have a conference call. 3:30 -4 pm is still available. Let me know if you have any questions. Thanks, Michelle Roberge From: Blake Abplanalp Sent: Thursday, March 21, 2013 6:06 PM To: Ellie Ray Cc: Michelle Roberge Subject: RE: SDP201300009 Seminole Trail Fire Station - Major Amendment Thanks very much. As always I appreciate your help !! Blake From: Ellie Ray Sent: Thursday, March 21, 2013 4:43 PM To: Blake Abplanalp Cc: Michelle Roberge Subject: RE: SDP201300009 Seminole Trail Fire Station - Major Amendment Answers below in red. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 1 From: Blake Abplanalp Sent: Thursday, March 21, 2013 3:46 PM To: Ellie Ray Subject: RE: SDP201300009 Seminole Trail Fire Station - Major Amendment Ellie, I've been reading the new procedures and I have a couple of questions: ❖ Are we to expect a letter of approval or disapproval subsequent to today's meeting? Because this a major amendment it doesn't get a letter or approval or disapproval after the initial review. The plan is reviewed for both initial plan and final plan requirements at the same time and approval is given in the form of a signed site plan when all comments have been addressed. I had this question too, because our site plan amendment policy is a little ambiguous about major amendments...but basically a major amendment is a Final Site Plan, instead of an Initial Site Plan, that has to go through the SRC process....so no interim approvals are given. I hope this makes sense. ❖ Do we have a specified period of time to respond if it is disapproved? Is that 10 ten days? No worries about this. ❖ Are we good on the grandfathered parking lot situation or do we need to submit a waiver request for that? It sounds to me like some portions will be grandfathered and some won't. The location and grade of the parking lot area where you're just removing the top coat and replacing it is exempt, but it sounds like the entrances aren't because one is totally new and one is significantly reconstructed. If the grading in the undisturbed buffers remains, that will also require a waiver. Engineering is working on figuring out what type of waiver is required for the entrances; it will either be a County Engineer decision or a waiver processed similar to the critical slope waiver, which could be included on the same report that goes to the Board. Once they give me the word, I'll let you know. In the meantime, it might be good idea for the DJG folks to figure out how much they can reduce the grades on those entrances. Engineering has Thursday afternoon meetings every week if that's necessary, or we can always do a conference call to work all of these issues out. Thanks very much. Blake From: Ellie Ray Sent: Thursday, March 21, 2013 3:21 PM To: 'dbooth @djginc.com'; Blake Abplanalp; 'jconnolly @djginc.com' Subject: SDP201300009 Seminole Trail Fire Station - Major Amendment Here is the link to the Conservation Plan Checklist: http: / /www.albemarle.org /upload /images /forms center /departments /Community Development /forms /applications /C onservation Plan Checklist.pdf Zoning is working on the parking and building height questions...will pass that info along as soon as I can. Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community De\'eopment Planning Division 401 McIntire Road, North Wing Charlottesville, Virginia 22902 ph: 434.296.5832 x. 3432 fax: 434.972.4126 2 Michelle Roberge From: Blake Abplanalp Sent: Thuxoday, March 21, 2013 6:06 PM To: Ellie Ray Cc: Michelle Roberge Subject: RE: SDP2O1 300009 Seminole Trail Fire Station - Major Amendment Thanks very much. As always appreciate your help Blake From: EIIie Ray Sent: Thursday March 21, 2013 4:43 PM To: Blake Abplanalp Cc: Michelle Roberge Subject: RE: SDP201300009 Seminole Trail Fire Station - Major Amendment Answers below in red. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Blake Abplanalp Sent: Thursday, March 21, 2013 3:46 PM To: Ellie Ray Subject: RE: SDp201300009 Seminole Trail Fire Station - Major Amendment Ellie, 've been reading the new procedures and 1 have a couple of questions: + Are we to expect a letter of approval or disapproval subsequent to today's meeting? Because this a majorarnendme it doesn't get a letter or approval or disapproval after the initial review. The plan is reviewed for both initial plan and final plan requirements at the same time and approval is given in the form of a signed site plan when all comments have been addressed. 1 had this question too, because our site plan amendment policy is a little ambiguous about major amendments...but basically a major amendment is a Final Site Plan, instead of an Initial Site Plan, that has to go through the SRC process....so no interim approvals are given. | hope this makes sense. + Do we have a specified period of tinie to respond if it 15 disapproved? Is that 10 ten days? No worries about this. + Are we good on the grandfathered parking lot situation or do we need to submit a waiver request for that? It sounds to me like some portions will be grandfathered and some won't. The Iocation and grade of the parking lot area where you're just removing the top coat and replacing it is exempt, but it sounds like the entrances aren't because one is totaily new and one 15 significantly reconstructed. the grading in the undisturbed buffers remains, that will also require a waiver. Engineering is working on figuring out what type of waiver is required for the entrances; it either be a County Engineer decision or a waiver processed similar tc the critical slope waiver, which coud induded on the same report that goes to the Board. Once they give me the word, |'U let you know. In the ms :ime, it might be good idea for the DJG folks to figure out how rnuch they can reduce the grades on those et:es. Engineering has Thursday afternoon meetings every week if that's necessary, or we can always do a c: ce caIi to work all of these issues out. Thanks very much. Blake 1 From: Ellie Ray Sent: Thursday, March 21, 2013 3:21 PM To: 'dbooth @djginc.com'; Blake Abplanalp; 'jconnolly @djginc.com' Subject: SDP201300009 Seminole Trail Fire Station - Major Amendment Here is the link to the Conservation Plan Checklist: http: / /www.albemarle.org /upload /images /forms center /departments /Community Development /forms /applications /C onservation Plan Checklist.pdf Zoning is working on the parking and building height questions...will pass that info along as soon as I can. Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development Planning Division 401 McIntire Road, North Wing Charlottesville, Virginia 22902 ph: 434.296.5832 x. 3432 fax: 434.972.4126 2 Michelle Roberge From: Ellie Ray Sent: Thursday, March 21, 2013 4:43 PM To: Blake Abplanalp Cc: Michelle Roberge Subject: RE: SDP201300009 Seminole Trail Fire Station - Major Amendment Answers below in red. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Blake Abplanalp Sent: Thursday, March 21, 2013 3:46 PM To: Ellie Ray Subject: RE: SDP201300009 Seminole Trail Fire Station - Major Amendment Ellie, I've been reading the new procedures and I have a couple of questions: Are we to expect a letter of approval or disapproval subsequent to today's meeting? Because this a major amendment it doesn't get a letter or approval or disapproval after the initial review. The plan is reviewed for both initial plan and final plan requirements at the same time and approval is given in the form of a signed site plan when all comments have been addressed. I had this question too, because our site plan amendment policy is a little ambiguous about major amendments...but basically a major amendment is a Final Site Plan, instead of an Initial Site Plan, that has to go through the SRC process....so no interim approvals are given. I hope this makes sense. ❖ Do we have a specified period of time to respond if it is disapproved? Is that 10 ten days? No worries about this. ❖ Are we good on the grandfathered parking lot situation or do we need to submit a waiver request for that? It sounds to me like some portions will be grandfathered and some won't. The location and grade of the parking lot area where you're just removing the top coat and replacing it is exempt, but it sounds like the entrances aren't because one is totally new and one is significantly reconstructed. If the grading in the undisturbed buffers remains, that will also require a waiver. Engineering is working on figuring out what type of waiver is required for the entrances; it will either be a County Engineer decision or a waiver processed similar to the critical slope waiver, which could be included on the same report that goes to the Board. Once they give me the word, I'll let you know. In the meantime, it might be good idea for the DJG folks to figure out how much they can reduce the grades on those entrances. Engineering has Thursday afternoon meetings every week if that's necessary, or we can always do a conference call to work all of these issues out. Thanks very much. Blake From: Ellie Ray Sent: Thursday, March 21, 2013 3:21 PM To: 'dbooth @djginc.com'; Blake Abplanalp; 'jconnolly @diginc.com' Subject: SDP201300009 Seminole Trail Fire Station - Major Amendment 1 Here is the link to the Conservation Plan Checklist: http: / /www.albemarle.org /upload /images /forms center /departments /Community Development /forms /applications /C onservation Plan Checklist.pdf Zoning is working on the parking and building height questions...will pass that info along as soon as I can. Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development Planning Division 401 McIntire Road, North Wing Charlottesville, Virginia 22902 • ph: 434.296.5832 x. 3432 fax: 434.972.4126 2