Loading...
HomeMy WebLinkAboutSDP201300002 Correspondence Final Site Plan and Comps. 2013-04-25 Ellie Ray From: Todd Shifflett Sent: Thursday, April 25, 2013 2:47 PM To: MYLAR SIGNING Subject: Final Site Plan Ready For Signature Good Afternoon, I have the following Final Site Plan ready to be signed Northtown Center Phase IIA—Final; SDP2013-2 Please have signed no later than 5/3/13 Thanks, Todd Shifflett Intake/Support Specialist II Community Development 401 McIntire Road,North Wing Charlottesville,Virginia 22902 Phone-(434)296-5832 ext. 4504 Fax-(434)972-4126 Email: tshifflett@albemarle.org 1 - w✓ Ellie Ray From: Ellie Ray Sent: Thursday, April 25, 2013 12:31 PM To: 'Nena Harrell' Subject: RE: SDP201300002 Northtown Phase II-A- Final The plans came in yesterday afternoon,were in my box this morning. I've been in meetings most of the morning and just completed my review of the few remaining comments I had. I am taking the plan sets down to Todd as soon as I send this email. He will notify all of the reviewers that the plans are here for signature. I don't think there is anything that you can do to assist at this point...someone will let you know when everyone has signed them and a copy is ready to be picked up. Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Nena Harrell [mailto:ulcwww @embarqmail.com] Sent: Thursday, April 25, 2013 10:54 AM To: Ellie Ray Subject: RE: SDP201300002 Northtown Phase II-A - Final Ellie, Understand that T& N got plans to you yesterday AM for Northtown. Alex from ACSA says he can sign today& I think Joel will be able to as well. Is there anyone else that I can follow up with to assist in getting plan signed? Will be glad to help. We really need the signed plan. Let me know how I can help. Thanks, Nena From: Ellie Ray [mailto:eray @albemarle.orq] Sent: Thursday, April 18, 2013 1:25 PM To: Nena Harrell Subject: RE: SDP201300002 Northtown Phase II-A - Final Scott wanted to swap out the plans to match the ARB submittal and as of this morning the plans weren't in my box yet...1'II check again this afternoon. I told him yesterday that due to the swap my review may not get completed by the 18th I'm not sure where the engineering review stands, but I'll check on that as well. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Nena Harrell [mailto:ulcwww(aembargmail.com] Sent: Thursday, April 18, 2013 1:19 PM To: Ellie Ray Subject: Re: SDP201300002 Northtown Phase II-A- Final Ellie Ray `"� `"` From: Ellie Ray Sent: Tuesday, April 23, 2013 3:17 PM To: 'Scott Collins' Subject: RE: Northtown Center Phase 2A I think you can. E911 wanted me to reiterate their comment,which is as follows: This site will require a private road name at the time the third structure is built. To minimize the impact of re- addressing the existing structures we recommend establishing a private road name at this time. The applicant will need to speak with the property owner of TMP 45-111A (Stellar One Bank) to develop a list of potential road names that would have to be submitted and approved by this office. We need four copies for signature. Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Scott Collins [mailto:scoff @collins-engineering.com] Sent: Tuesday, April 23, 2013 2:23 PM To: Ellie Ray Subject: Fwd: Northtown Center Phase 2A Ellie- Can we submit the plans for final signature yet, and how many copies do you need? Thx Begin forwarded message: From:Jeremy Lynn <ilvnn@serviceauthoritv.org> Date:April 22, 2013, 12:12:02 PM EDT To:Scott Collins<Scott@collins-engineering.com> Cc:Alex Morrison<amorrison @serviceauthority.org> Subject: Northtown Center Phase 2A Approval Letter should go out later today or tomorrow. Jeremy M. Lynn, P.E. Senior Civil Engineer Albemarle County Service Authority 168 Spotnap Road, Charlottesville, VA 22911 (434) 977-4511 ext. 114 1 Ellie Ray From: Scott Collins [scott @collins-engineering.com] Sent: Friday, April 19, 2013 5:49 PM To: Ellie Ray Cc: Adam Long Subject: Re: SDP201300002 Northtown Phase II-A- Final Ellie- Thank you very much. I agree that we can get this wrapped up with the signature set of plans. I will follow-up with Acsa on Monday, and when they are satisfied (they are wrapping up the dedication of phase I utilities with United Land)we will submit the plans. Again,thank you and I hope you have a great weekend. Scott On Apr 19, 2013, at 5:02 PM, Ellie Ray<eravPalbemarle.org>wrote: Scott, Please find attached my comments for the above referenced application. My comments are minor enough that, if you want,you can make them on the signature submittal once all other tentative approvals are granted. Of course,there is always the risk that the comment won't be satisfactorily addressed and an additional submittal will be required, but I wanted to put that out there as an option since the comments are so minor. I am still awaiting comment/approval from ACSA. Feel free to contact me if you have any questions, concerns,or need further clarification. Thank you, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development Planning Division 401 McIntire Road, North Wing Charlottesville,Virginia 22902 ph: 434.296.5832 x. 3432 fax: 434.972.4126 <CDP3_sdp_ECR_Northtown II-A.pdf> i Ellie Ray ` From: Ellie Ray Sent: Friday, April 19, 2013 5:02 PM To: 'Scott Collins' Cc: 'Adam Long' Subject: SDP201300002 Northtown Phase II-A- Final Attachments: CDP3_sdp_ECR_Northtown II-A.pdf Scott, Please find attached my comments for the above referenced application. My comments are minor enough that, if you want,you can make them on the signature submittal once all other tentative approvals are granted. Of course,there is always the risk that the comment won't be satisfactorily addressed and an additional submittal will be required, but I wanted to put that out there as an option since the comments are so minor. I am still awaiting comment/approval from ACSA. Feel free to contact me if you have any questions, concerns,or need further clarification. Thank you, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development Planning Division 401 McIntire Road, North Wing Charlottesville, Virginia 22902 ph: 434.296.5832 x. 3432 fax: 434.972.4126 1 Ellie Ray From: Ellie Ray Sent: Thursday, April 18, 2013 1:25 PM To: 'Nena Harrell' Subject: RE: SDP201300002 Northtown Phase II-A- Final Scott wanted to swap out the plans to match the ARB submittal and as of this morning the plans weren't in my box yet...l'll check again this afternoon. I told him yesterday that due to the swap my review may not get completed by the 18th. I'm not sure where the engineering review stands, but I'll check on that as well. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Nena Harrell [mailto:ulcwww @embarqmail.com] Sent:Thursday, April 18, 2013 1:19 PM To: Ellie Ray Subject: Re: SDP201300002 Northtown Phase II-A - Final Ellie, Are there any comments on plan? Thanks. Nena Harrell Count your RAINBOWS not your THUNDERSTORMS On Apr 11, 2013, at 11:46 AM, "Ellie Ray"<erav @albemarle.org> ote: Can you provide tatus of the site plan .nd WPO engineering approvals including the two conditions of preliminary approval mentioned bel. ? Thanks, Ellie Carter Ray,PLA Senior Planner Albemarle County Commu•• Development ph: 434.296.5832 x. 3'- From: Scott • lins [mailto:scott(acollins-engineering.com] Sent: Thursday, April 11, 2013 11:05 AM To: Ellie ''ay; Michelle Roberge Cc: N= a Harrell Su• ect: RE: SDP201300002 Northtown Phase II-A- Final 1 Ellie Ray From: Ellie Ray Sent: Wednesday, April 17, 2013 2:46 PM To: 'Scott Collins' Subject: RE: Gander Mountain ARB comments I still haven't received this plan copy....and I'm in meetings for the remainder of this afternoon and then again tomorrow for most of the morning. So I will not be able to do my review on this until tomorrow afternoon or possibly even Friday. My original deadline was the 18th, so I'm just letting you know that since the plans were switched out that may not happen. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Scott Collins [mailto:scott(acollins-engineering.com] Sent: Wednesday, April 17, 2013 10:07 AM To: Ellie Ray Cc: Jenni Pack Subject: Re: Gander Mountain ARB comments Ellie- Thank you for the heads up. Your copy may have mistakenly been routed to Arb, so we are dropping off a new set this morning within the hour. Thx. Scott On Apr 17, 2013,at 10:02 AM, Ellie Ray<erav@albemarle.org>wrote: I haven't received the revised set of plans you refer to below. I planned to review the set your previously submitted today...do you want me to wait until the new set arrives? Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 l xQm: Scott Collins [mailto:scott@collins-engineering.com] Sent: sday, April 16, 2013 9:03 AM To: Ellie Ray Subject: FW: Gan Mountain ARB comments Ellie- Attached are (2)outstanding comments from A' :, which we have just addressed and resubmitted yesterday afternoon. We dropped off(1) r= ed set of site plans for your final review, with the landscaping and lighting updated sot . you woutdi.4ve the latest set. Please let me know if you have any questions or need anything a•.itional. The hold-up'wa$ hat the builder had to find a special manufactured light fixture to • atch the color rendering of the nder building to meet ARB approval. Thx. Scott 1 Ellie Ray From: Scott Collins [scott @collins-engineering.com] Sent: Tuesday, April 16, 2013 9:03 AM To: Ellie Ray Subject: FW: Gander Mountain ARB comments Attachments: ARB_2013_08_Gander comment_letter 4_8_13.pdf Ellie- Attached are (2) outstanding comments from ARB, which we have just addressed and resubmitted yesterday afternoon. We dropped off(1) revised set of site plans for your final review, with the landscaping and lighting updated so that you would have the latest set. Please let me know if you have any questions or need anything additional. The hold-up was that the builder had to find a special manufactured light fixture to match the color rendering of the Gander building to meet ARB approval. Thx. Scott From: Margaret Maliszewski [mailto:MMaliszewskaalbemarle.orq] Sent: Monday, April 08, 2013 6:05 PM To: Scott Collins; Adam Long Subject: Gander Mountain ARB comments Please find attached ARB comments based on your most recent revisions to the Gander Mountain plan. Margaret M.Maliszewski,Principal Planner Albemarle County Department of Community Development 401 McIntire Road,Charlottesville,VA 22902 434-296-5832 x3276 1 Ellie Ray From: Michelle Roberge Sent: Thursday, April 11, 2013 5:25 PM To: Scott Collins; Ellie Ray Cc: Nena Harrell Subject: RE: SDP201300002 Northtown Phase II-A- Final Hello Scott, You are correct that I approved the WPO plans. However,there is a condition of approval for the site plan that still needs to be addressed.There is a detail from the approved Phase 1 WPO plans that discusses improvements for downstream channel,which expired. Due to the number of complaints I received about the site, I recommend notes/details on improvements for the downstream channel to be attached to the WPO plan. Let's shoot for a time to discuss this on Monday. -Michelle Roberge From: Sco Collins [mailto:scott @collins-engineering.com] Sent: Thursda April 11, 2013 11:05 AM To: Ellie Ray; Mic Ile Roberge Cc: Nena Harrell Subject: RE: SDP20131•002 Northtown Phase II-A- Final Ellie- Here is what I have from Engine- ing on the approval of e site plan and approval of the WPO plan for Northtown. It is my understanding that both are ap6 oved, based on t ° letters received. If there is anything outstanding, please let me know as soon as possible, because we -re under the .ssumption that we have satisfied all engineering requirements, based on these approval letters. Thank you. Scott Collins From: Ellie Ray [mailto:era a albemarle .r.] Sent: Wednesday, March 27, 2013 4:5. PM To: Scott Collins Cc: Michelle Roberge Subject: RE: SDP201300002 No town Phase II-A - Final Thanks! On another topic, during m preparation of the staff report it has come to light t .t there are a couple of conditions of preliminary approval asso'iated with the WPO plan that haven't been addressed. -m handling this by noting in my report that they haven't .een addressed and saying that Engineering will make sure t' >t the conditions are satisfied prior to granting appr. al of the site plan. In other words,there may be a few other ite to deal with before the site plan can be signed. ichelle and I have talked about this in detail, and I think she can answ- any questions you might have. The site plan itself also has several conditions of approval that haven't been satisfied...official ARB approval (with conditions satisfied), ACSA approval, an approved landscape and lighting plan, etc...these items are also noted in the report as not currently satisfied and 'in progress'. None of these should come as a surprise since they have been in the comments you have received. I wasn't sure if the WPO items had been covered before or not, so I wanted to make sure 1 Ellie Ray From: Ellie Ray Sent: Thursday, April 11, 2013 11:47 AM To: Michelle Roberge Cc: Nena Harrell; 'Scott Collins' Subject: RE: SDP201300002 Northtown Phase II-A- Final Michelle, Can you provide the status of the site plan and WPO engineering approvals including the two conditions of preliminary approval mentioned below? Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Scott Collins [mailto:scott@collins-engineering.com] Sent: Thursday, April 11, 2013 11:05 AM To: Ellie Ray; Michelle Roberge Cc: Nena Harrell Subject: RE: SDP201300002 Northtown Phase II-A- Final Ellie- Here is what I have from Engineering on the approval of the site plan and approval of the WPO plan for Northtown. It is my understanding that both are approved, based on the letters received. If there is anything outstanding, please let me know as soon as possible, because we are under the assumption that we have satisfied all engineering requirements, based on these approval letters. Thank you. Scott Collins From: Ellie Ray [mailto:eray(aalbemarle.orq] Sent: Wednesday, March 7, 2013 4:53 PM To: Scott Collins Cc: Michelle Roberge Subject: RE: SDP201300002 Northtown Phase II-A - inal Thanks! On another topic, during my preparation of he staff report it has come to light that there are a couple of conditions of preliminary approval associated with the PO plan that haven't been addressed. I am handling this by noting in my report that they haven't been address:. and saying that Engineering will make sure that the conditions are satisfied prior to granting approval of the site .Ian. In other words, there maylbe a few other items to deal with before the site plan can be signed. Michelle and ave talked about this in detail, and i think she can answer any questions you might have. The site plan itself also has several conditions of approval that haven't been satisfied:: ficial ARB approval (with conditions satisfied),ACSA approval, an approved landscape and lighting ptan, etc...tttese itms are also noted in the report as not currently satisfied and 'in progress'. None of these should come as a surprise since they have been in the 1 Ellie Ray From: DeNunzio, Joel D., P.E. (VDOT) [Joel.DeNunzio@ VDOT.virginia.gov] Sent: Wednesday, April 10, 2013 3:35 PM To: Ellie Ray Cc: 'Scott Collins' Subject: FW: Northtown final site plan approval Ellie, After I sent the comment about landscaping for Northtowncenter I received a pdf with the changes that addressed VDOT comments by removing the proposed landscaping with the Route 29 right of way from Scott Collins. As long as the revisions were inserted into the plan for approval I have no objections to the plan. Thanks Joel Joel DeNunzio, P.E. Residency Administrator VDOT Charlottesville Residency 434-422-9373 ioel.denunzio @vdot.virginia.gov Original Message From: Scott Collins [mailto:scott @collins-engineering.com] Sent: Wednesday, April 10, 2013 3:23 PM To: DeNunzio, Joel D., P.E. (VDOT) Subject: Northtown final site plan approval Joel- Can you do me a favor and confirm with Ellie Ray that VDOT has approved the site plan for northtown. You sent over the one comment about all landscaping being out of the r/w, and I sent back a PDF showing that we had already accomplished it. Ellie just needs it for her records, and we are trying to get final signatures. Thanks Joel, and if you can, please copy me on it. Thx. Scott 1 Ellie Ray From: Ellie Ray Sent: Wednesday, April 10, 2013 11:51 AM To: 'Nena Harrell' Subject: FW: SDP201300002 Northtown Phase II-A- Final Attachments: CDP2_sdp_ECR_Northtown II-A.pdf; SDP201300002 Reviewer Comments- REV1.pdf Nena, Please find attached the most recent comments. I am also going to forward a couple of other emails that were sent regarding additional requirements. If you need anything additional please let me know. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Ellie Ray Sent: Tuesday, arch 12, 2013 4:06 PM To: 'Scott Collins' Cc: Adam Long i Subject: SDP201300002 •• town Phase II-A- Final Scott, j Please find attached my comments for the abode ; erenced application. I have also attached a PDF with other reviewer comments received to date. I am still awaiti g comme rom ACSA and VDOT. Feel free to contact me if you have any questions,concerns,or need further clarif ation. Thank you, , Ellie Carter Ray, PLA Senior Planner Albemarle County Community D elopment Planning Division 401 McIntire Road, North " g Charlottesville,Virginia 902 ph: 434.296.5832 x. 3 2 fax: 434.972.4126 1 b...., VI.00 Ellie Ray From: Ellie Ray Sent: Monday, April 08, 2013 5:05 PM To: 'Scott Collins' Subject: Northtown Scott, David said he hasn't heard any questions, etc about this consent item, but that you may want to be there just in case questions do come up during the meeting. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development Planning Division 401 McIntire Road, North Wing Charlottesville,Virginia 22902 ph: 434.296.5832 x. 3432 fax: 434.972.4126 1 Ellie Ray From: Shawn Maddox Sent: Friday, April 05, 2013 1:37 PM To: Ellie Ray Subject: RE: Northtown Phase IIA That is perfect,thanks so much. Shawn From: Ellie Ray Sent: Friday, April 05, 2013 1:29 PM To: Shawn Maddox Subject: FW: Northtown Phase IIA Shawn, Let me know if this satisfies your comment, and if you need anything else. Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Adam Long [mailto:adam(acollins-engineering.com] Sent: Friday, April 05, 2013 1:27 PM To: Ellie Ray Subject: FW: Northtown Phase IIA Northtown fire flow info attached. Please let me know if you need anything else. Thanks! Adam Long, PE Project Engineer Collins Engineering, L.L.C. 200 Garrett Street, Suite K Charlottesville,VA 22902 PH:434.293.3719 adam@collins-engineering.com 1 Ellie Ray From: Ellie Ray Sent: Friday, April 05, 2013 12:53 PM To: 'Scott Collins' Cc: Shawn Maddox Subject: FW: SDP201300002 Northtown Phase II-A Scott, See below...please provide the fire flow calculations for Fire/Rescue. Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 F • Shawn Maddox Se : Fr.ay, April 05, 2013 11:59 AM To: Ellie Ra Subject: RE: S■• 01300002 Northtown Phase II-A Did the applicant provide •e fire flow calculations for the project? Shawn From: Ellie Ray Sent: Thursday, April 04, 2013 4:47 PM To: Michelle Roberge; Margaret Maliszewski; Sh. , n Maddox; Alex Morrison; Joel DeNunzio, P.E.; Jay Schlothauer; Andrew Slack Subject: SDP201300002 Northtown Phase II-A The applicant has submitted 2 copies of the revised site plan. It looks like most of you had no objection to the previous submittal, but I wanted to check in and see if anyone would like o see the latest revision. Let me know! I only have one copy to spare, but I can request more if you'd like to have one. Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development Planning Division 401 McIntire Road, North Wing Charlottesville, Virginia 22902 ph: 434.296.5832 x. 3432 fax: 434.972.4126 1 ',woe Ellie Ray From: Scott Collins [scott@collins-engineering.com] Sent: Thursday, April 04, 2013 8:37 AM To: Ellie Ray Subject: Northtown Phase IIA Attachments: 130403 alb. co. ARB response letter.docx; 130314 alb. co. planning response letter.docx; ARB 2013-08 Gander comment letter.pdf Ellie- I am sending down (2)sets of Northtown Phase IIA plans for your final review and approval. We have approval from Engineering and Fire/Rescue on the project. ACSA has approved the project, pending some completions of the dedication of Phase I utilities,which is being wrapped up now. ARB had just a couple of final comments, which have been resubmitted this week(attached is a comment response and their list of final comments). I think we are pretty much there, once Margaret looks at the plan one more time. I was hoping that you could also wrap up your final review while Margaret is finishing hers over the next week or so. Gander needs to get their Building Permit by the end of the month, so we need to try and keep everything moving forward, if possible. Thank you! Scott 1 *ow *oral Ellie Ray From: Ellie Ray Sent: Wednesday, March 27, 2013 4:53 PM To: 'Scott Collins' Cc: Michelle Roberge Subject: RE: SDP201300002 Northtown Phase II-A- Final Thanks! On another topic, during my preparation of the staff report it has come to light that there are a couple of conditions of preliminary approval associated with the WPO plan that haven't been addressed. I am handling this by noting in my report that they haven't been addressed and saying that Engineering will make sure that the conditions are satisfied prior to granting approval of the site plan. In other words, there may be a few other items to deal with before the site plan can be signed. Michelle and I have talked about this in detail, and I think she can answer any questions you might have. The site plan itself also has several conditions of approval that haven't been satisfied...official ARB approval (with conditions satisfied),ACSA approval, an approved landscape and lighting plan, etc...these items are also noted in the report as not currently satisfied and 'in progress'. None of these should come as a surprise since they have been in the comments you have received. I wasn't sure if the WPO items had been covered before or not, so I wanted to make sure you are aware. Hopefully the number of items 'in progress' won't make the Planning Commission reluctant to grant their approval, but I guess that's the chance that's being taken with pushing this to the PC before all of these items are resolved. Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Scott Collins [mailto:scott@colli's-engineering.com] Sent: Wednesday, March 27, 2013 2:58 'M To: Ellie Ray Subject: RE: SDP201300002 Northtown Phas= II-A - Final Too big to send as one file,so here are the rest. From: Ellie Ray [mailto:erav(a>albemarle.orq] Sent: Wednesday, March 27, 2013 2:56 PM To: Scott Collins Subject: RE: SDP201300002 Northtown Phase II-= - Final Yep, I need all of them. Also, any way you c combine them into a s- ? Our PDF software here is the pits. If not, I can take the individual sheets to the GIS folks, nd get them to combine, but I would be nice to skip that step. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 1 Ellie Ray From: Ellie Ray Sent: Wednesday, March 27, 2013 2:29 PM To: 'Scott Collins' Subject: RE: SDP201300002 Northtown Phase II-A- Final Scott, I'm trying to get my report written for this to go on the April 9th agenda. I marked up the copy of the site plan that I have,can you send me a digital copy of the plan sheets dated 2/19? It can't show any revisions you've done since then because haven't reviewed them and my report is written based on the last review I completed. Unfortunately, my report is due today....so let me know as soon as you can so I can dig around for s fresh set with the other reviewers if you can't provide it. Thanks, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Scott Collins [m."Ito:scott@collins-engineering.com] Sent: Friday, March 15, 413 9:51 AM To: Ellie Ray Subject: RE: SDP201300002 '•rthtown Phase II-A - Final Ellie- Just read the comment. We have our ertificate of appropriateness. rom ARB, so that should count as ARB approval. And, all the major site issues have been :ddressed. Is there any possibly way to get on the April 2nd consent agenda, please. I can not tell you how much that •uld help us out. Thank you!!! /7r Scott From: Ellie Ray [mailto:eraycaalbemarle.org] , Sent: Friday, March 15, 2013 9:46 AM To: Scott Collins J. Subject: RE: SDP201300002 Northtown Pha II-A- Final Scott, f , This issue was conveyed in commen #35 on both of my comment letters, . hopefully it doesn't come as a surprise. I talked to David about scheduling d it looks like 4/23/13 is likely the earliest i eeting we could potentially shoot for getting on the agenda. For that eeting date, I would need to have a pretty goo. idea of where ARB and the WPO issues stand by April 3rd at the atest, because my report would be due by the 10th. ' at would give you approximately two and a half weeks to try resolve all of the outstanding issues. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development 1 Ellie Ray From: Scott Collins [scott @collins-engineering.com] Sent: Wednesday, March 20, 2013 11:40 AM To: Ellie Ray; Joel DeNunzio, P.E. Subject: RE: SDP-2013-00002 Northtown Center Phase II A final Attachments: 5- LANDSCAPING.pdf Joel- Thank you for the review. Attached is a current landscaping plan that is under review for approval at the county. All the landscaping and grading has been removed from the VDOT right-of-way, so this should hopefully address your concern. Let me know if this is acceptable, when you get a chance. Thank you! Scott Collins From: Ellie Ray [mailto:eray@aalbemarle.orq] Sent: Tuesday, March 19, 2013 4:18 PM To: Scott Collins Subject: FW: SDP-2013-00002 Northtown Center Phase II A final VDOT comments below. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: DeNunzio, Joel D., P.E. DOT) [mailto:Joel.DeNunzio • VDOT.vir•inia.•ov] Sent: Tuesday, March 19, 2013 4: PM To: Ellie Ray Cc: Oleynik, Megan (VDOT) Subject: SDP-2013-00002 Northtown Cent- Phase II A final Ellie, I have reviewed the subject plan and have one com gent: • Proposed landscaping needs to be placed off of the Rote 24 ight of way. Thanks Joel Joel DeNunzio, P.E. Residency Administrator VDOT Charlottesville Residency 434-422-9373 joel.denunzio @vdot.virginia.gov 1 r.r Ellie Ray From: Ellie Ray Sent: Friday, March 15, 2013 9:56 AM To: 'Scott Collins' Subject: RE: SDP201300002 Northtown Phase II-A- Final It's just not possible, I can't get the report written by next week...I have 6 other deadlines between now and next Wednesday(the day the report would be due). Additionally,you have a certificate of appropriateness with conditions, and many of the conditions haven't been met. And, I think the biggest issue is the WPO plan...many of the conditions of approval of the preliminary were about WPO issues and it looks like that was just resubmitted 4 days ago. To answer your previous questions about faster scheduling b/c it's on consent: It has to do with the required lead time for the reports to go to the PC...the PC members get it a week in advance, which means it's due a week before that for attorney review and all that good stuff. It also has to do with the availability of meetings...right now, there is only a 4/2 meeting(can't meet the deadline for the report) and a 4/23 meeting scheduled, so that's where we are. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Scott Collins [mailto:scoff @collins-engineering.com] Sent: Friday, March 15, 2013 9:51 AM To: Ellie Ray Subject: RE: SDP201300002 Northtown Phase II-A - Final Ellie- Just read the comment. We have our certificate of appropriateness from ARB, so that should count as ARB approval. And, all the major site issues have been addressed. Is there any possibly way to get on the April 2nd consent agenda, please. I can not tell you how much that would help us out. Thank you!!! Scott From: Ellie Ray [mailto:erayC@albemarle.orq] Sent: Friday, March 15, 2013 9:46 AM To: Scott Collins Subject: RE: SDP201300002 Northtown Phase II-A - Final Scott, This issue was conveyed in comment#35 on both of my comment letters, so hopefully it doesn't come as a surprise. I talked to David about scheduling and it looks like 4/23/13 is likely the earliest meeting we could potentially shoot for getting on the agenda. For that meeting date, I would need to have a pretty good idea of where ARB and the WPO issues stand by April 3`d at the latest, because my report would be due by the 10th. That would give you approximately two and a half weeks to try to resolve all of the outstanding issues. Ellie Carter Ray, PLA Senior Planner 1 Albemarle County Community Developmtpe 'woe ph: 434.296.5832 x. 3432 From: Scott Collins [mailto:scott@collins-engineering.com] Sent: Thursday, March 14, 2013 2:59 PM To: Ellie Ray Subject: RE: SDP201300002 Northtown Phase II-A - Final Ellie- Wow,that is going to mess things up really bad. How quickly can we get this on the consent agenda? Scott From: Ellie Ray [mailto:eray @albemarle.orq] Sent: Thursday, March 14, 2013 2:30 PM To: Scott Collins Subject: RE: SDP201300002 Northtown Phase II-A - Final It also just occurred to me that this has to go to the PC for final approval...it was a condition of the preliminary approval. Due to changes in the ordinance and such, it will go on consent, but it still has to go. I need to wait for the other approvals before I can write the report and get it scheduled, so that could cause a larger delay before approval. I'm going to include a bit in my report to hopefully keep future Final Site Plans from having to go to the PC as well, so that should help with those plans, but this one definitely has to go through that step. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Scott Collins [mailto:scott@collins-engineering.com] Sent: Thursday, March 14, 2013 2:20 PM To: Ellie Ray Subject: RE: SDP201300002 Northtown Phase II-A - Final Thank you. I understand. I am hoping to get the approval from all the other agencies this week. Thx. Scott From: Ellie Ray [mailto:eray @albemarle.org] Sent: Thursday, March 14, 2013 2:18 PM To: Scott Collins Subject: RE: SDP201300002 Northtown Phase II-A - Final It's difficult to say how long the final check will take....assuming the WPO is approved, ARB,ACSA and VDOT approval is granted, the fire/rescue comment has been addressed, and any bonds have been posted...we try to complete our planning reviews within 14 days. I try my best to make that 14 day policy, but it really just all depends on workload and we've been slammed lately. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 2 From: Scott Collins [mailto:scott@collins-engineering.com] Sent: Thursday, March 14, 2013 11:48 AM To: Ellie Ray Subject: RE: SDP201300002 Northtown Phase II-A - Final Ellie- That is pretty funny,thanks for making me laugh as well. Sounds good, I will make sure ARB is complete and that we have sign-off from the other agencies. Just out of curiosity, how long do you think that final check on the plans will take, after all the other agencies approve the project. United Land has a commitment to start dirt work by April ft, so I want to make sure that this can actually happen. A lot hinges on Gander being able to start the pad construction by the end of April. Thank you. Scott Collins From: Ellie Ray [mailto:erayalbemarle.orq] Sent: Thursday, March 14, 2013 11:22 AM To: Scott Collins Subject: RE: SDP201300002 Northtown Phase II-A - Final Scott, You just made me laugh...I don't think anyone has ever called my comments"outstanding"...hmmm. Anyway, I think it's probably best to wait until ARB and the other agencies complete their reviews before you resubmit. I have to review again after their comments are addressed, so it will save you a submittal and extra review. Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Scott Collins [mailto:scott @collins-engineering.com] Sent: Thursday, March 14, 2013 10:47 AM To: Ellie Ray Subject: RE: SDP201300002 Northtown Phase II-A - Final Ellie- Thank you very much for the review and sending over the outstanding comments. We have revised the plans to address the couple of comments that you had on the plan. Most of the other comments seem to focus around the approval from the other agencies. We resubmitted plans to ARB last Friday in hopes to wrap up their approval in the next 3-5 days or so. Would you like us to resubmit to you the plans for your last review, and if so, do you just need a couple of sets for your final review. Thank you very much. Scott From: Ellie Ray [mailto:eray @albemarle.org] Sent: Tuesday, March 12, 2013 4:06 PM To: Scott Collins Cc: Adam Long Subject: SDP201300002 Northtown Phase II-A - Final Scott, 3 N.r ,.or Please find attached my comments for the above referenced application. I have also attached a PDF with other reviewer comments received to date. I am still awaiting comment from ACSA and VDOT. Feel free to contact me if you have any questions, concerns,or need further clarification. Thank you, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development Planning Division 401 McIntire Road, North Wing Charlottesville, Virginia 22902 ph: 434.296.5832 x. 3432 fax: 434.972.4126 4 COLLINS ;ARRETT ST, SUITE K CHARLOTTESVILLE VA 22902 *saw *vie 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com March 14,2013 Ellie Ray Senior Planner Department of Community Development 401 McIntire Road Charlottesville,VA 22902 RE: SDP-2013-00002, Northtown Phase II-A—Final Site Development Plan Thank you for your comments dated March 12, 2013 on the above-referenced project. The attached plans reflect changes to address your comments as described below: 1. Comment acknowledged. 12. Final Site Plan and ARB submittal updated to match. 14. Plant count and calculations updated. 15. Plantings moved outside of VDOT R/W. 16. Conservation plan has been signed and dated. 18. Calculations updated. 20. Canopy calculations updated. 21. Lighting plan updated per ARB comments. 23. Model number added to cut sheet reference. 26. All plantings and grading have been moved outside of the VDOT R/W. 27. Information provided on the existing conditions page. 28. Comment acknowledged. 29. Comment acknowledged. 30. Comment acknowledged. 33. All Fire/Rescue comments have been addressed. Documentation will be provided to Fire/Rescue showing that the required flow of 1500gpm with a residual pressure of not less than 20psi for the site is available. 35. Comment acknowledged. 36. Comment acknowledged. Should you have any questions, please feel free to contact me at 434-293-3719 Sincerely, Adam Long, PE Collins Engineering Ellie Ray From: Ellie Ray Sent: Tuesday, March 12, 2013 4:06 PM To: 'Scott Collins' Cc: Adam Long Subject: SDP201300002 Northtown Phase II-A- Final Attachments: CDP2_sdp_ECR_Northtown II-A.pdf; SDP201300002 Reviewer Comments- REV1.pdf Scott, Please find attached my comments for the above referenced application. I have also attached a PDF with other reviewer comments received to date. I am still awaiting comment from ACSA and VDOT. Feel free to contact me if you have any questions, concerns, or need further clarification. Thank you, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development Planning Division 401 McIntire Road, North Wing Charlottesville, Virginia 22902 ph: 434.296.5832 x. 3432 fax: 434.972.4126 1 Ellie Ray From: Alex Morrison (amorrison @serviceauthority.org] Sent: Wednesday, February 20, 2013 3:50 PM To: Ellie Ray Subject: RE: SDP-2013-00002: Northtown, Phase II-A Final Ellie, No,that is not needed.They will update them when they resubmit to Jeremy.Thank you for checking. Alexander J. Morrison, EIT Civil Engineer Emk ctv Service Authirir 168 Spotnap Road Charlottesville,VA 22911 Office: (434)977-4511 EXT: 116 This email may contain confidential information that should not be shared with anyone other than its intended recipient(s). From: Ellie Ray [mailto:erayCaalbemarle.orq] Sent: Wednesday, February 20, 2013 3:33 PM To: Alex Morrison Subject: RE: SDP-2013-00002: Northtown, Phase II-A Final They have submitted revised plans here to the County, do you want me to send a copy to you? Ellie Carter Ray,PLA Senior Planner Albemarle County Community Development ph: 434.296.5832 x. 3432 From: Alex Morrison [mailto:amorrison(a>senriceauthoritv.orq] Sent: Thursday, February 07, 2013 10:14 AM To: Ellie Ray Subject: SDP-2013-00002: Northtown, Pha - II-A Final Ellie, The above referenced project is currently under co . ruc '.n review(by JML). I will let you know once he gives final construction approval. Alexander J. Morrison, EIT Civil Engineer 1 Ellie Ray From: Adam Long [adam @collins-engineering.com] Sent: Tuesday, February 19, 2013 4:38 PM To: Ellie Ray Subject: Northtown Phase IIA Resubmittal - SDP-2013-00002 Attachments: 130219 -Alb. Co. Northtown Comment Response Letter.pdf Hey Ellie, The Northtown Phase IIA plans are on the way down to the county, I've attached a comment response letter for your planning comments. Please let me know if you need anything else. Thanks, Adam Long, PE Project Engineer Collins Engineering, L.L.C. 200 Garrett Street, Suite K Charlottesville,VA 22902 PH:434.293.3719 adam@collins-engineering.com 1 Nov/ Noe COLLINS 200 GARRETT ST,SUITE K CHARLOTTESVILLE VA 22902 434.293.3719 PH 434.293.2813 FX www.collins-engineering.com February 19, 2013 Ellie Ray Senior Planner Department of Community Development 401 McIntire Road Charlottesville,VA 22902 RE: SDP-2013-00002, Northtown Phase II-A—Final Site Development Plan Thank you for your comments dated February 1,2013 on the above-referenced project. The attached plans reflect changes to address your comments as described below: Planning 1 [Comment]It appears that a 24'access easement is being provided for the future Phase 118.For your information,should this property be subdivided to split Phases IIA and 118,a minimum 30'private street easement would be required,and private street approval would be necessary for frontage for Phase 118.Similarly,if you plan to subdivide Phase IIA from Phase I,the existing 24'access easement would need to be increased to a minimum of 30'to qualify for private street approval. -A 30'access easement has been provided from Phase I through Phase IIA to the limits of Phase IIB. If Phase IIB is ever subdivided from Phase IIA,then the travelway located within this access easement would need to meet the private road standards. Note added on Sheet 3. 2 [Comment]The parking and building setback lines along Route 29 have two different labels.In one area they are refered to as 20'buffer and 50'building setback,and in another they are labeled 10'parking setback and 30'building setback;please correct on all sheets. -Parking and building setback labels have been corrected on all plan sheets. 3 [32.5.2(a)]The boundary information provided does not include reference to TMP 04500000011180,and the cover sheet provides the incorrect acreage for TMP 04500000011100;please verify and provide accurate existing boundary lines and acreage information. -TMP-45-111 and TMP45-111B have been referenced on both the existing conditions(Sheet 2)and the cover sheet. Existing boundary lines and acreage information has been provided. 4 [32.5.2(a)]Add A/A(Airport Impact Area)to the Zoning note. Please also document the waiver granted for disturbance of critical slopes including the associated conditions of approval by reference to the approval letter for SDP 200400045 dated October28,2005. -AIA(Airport Impact Area)has been added to the Zoning notes on the cover sheet. Critical slope impacts were previously approved with the Phase I development plan(approval of SDp-2004-024 and SDP-2004-045). This was approved by the Planning Commission on October 18th,2005 and the Board of Supervisors on November 9th,2005. The conditions of approval for the critical slope impacts are located on the cover sheet. 5 [32.5.2(b)]While the maximum building height on HC zoned land is 65',any building height in excess of 35' requires an additional 2'of setback for each 1'in height above 35'. The cover sheets states"'proposed building height is approximately 40'to highest peak". It appears this is referring to the front façade treatment, which is exempt from the setback provisions.Please provide the actual maximum building height(not approximate)to verify that no additional setback is required. -Cover sheet Building Height notes have been updated. The proposed building height is 28'-10" from the ground elevation to the top of the parapet wall. The building peak(front facade treatment)is 40'-0"from the ground elevation to the top of the structure. Since the front façade is exempt from the setback provisions,the building is within the 35'requirement and no additional setback is required. 6 [32.5.2(b)&4.12.4(a)]The number of parking spaces provided may not exceed the number of spaces required by more than twenty(20)percent. The site plan indicates that the requirement is being exceeded by 54%. Please either reduce the number of parking spaces to a maximum of 209,or request a waiver from this section of the ordinance. -Parking notes updated on the cover sheet. The total number of parking spaces provided with this phase has been reduced to 196. With a parking requirement minimum of 174 spaces,the 196 spaces provided are within the 20%requirement. 7 [32.5.2(b)]Provide the maximum amount of impervious cover on the Cover Sheet. -Maximum amount of impervious cover has been provided on the cover sheet. Impervious notes have been provided to detail both the total impervious cover of the Northtown project as well as the impervious cover associated with each phase. 8 [32.5.2(b)]Provide the maximum amount of paved parking and vehicular circulation area on the Cover Sheet and Landscape Sheet. -Maximum amount of paved parking and vehicular circulation area has been provided on the cover sheet(121,014 sf). 9 [32.5.2(l)]Please show the location of other existing and proposed utilities and utility easements,including telephone,cable,electric and gas easements. -All existing and proposed utilities and utility easements have been provided on the plan sheets. 10 [32.5.2(n)]Label the length of the loading/dumpster area. -Loading/dumpster area dimensions have been provided on Sheet 3. 11 [32.6.2(g)]Indicate all utility and drainage easements outside the right-of-way of public streets.Any new easements may be generally shown and dedicated by separate plat.All water and sewer facilities to be dedicated to public use and the easements for those facilities and shall be identified by a statement that the facilities are to be dedicated to the Albemarle County Service Authority. -All utility and drainage easements outside of the right-of-way of Route 29 on the Northtown property have been provided. Notes added to Sheet 3,detailing the utilities dedication to the ACSA. 12 [32.6.2(j)& Comment]The landscape plan submitted for ARB review is different from the plan shown in the Site Plan set;these plans must match before a full landscape plan review will be completed. The following comments are for reference when submitting the revised plan. -Updated landscape plan provided. i.r vase 13 [32.6.2(j)& Comment]Many of plant labels have conflicts with other lines/labels on the sheet and are difficult to read;please make sure all labels are legible. -Labels have been relocated to avoid text conflicts. 14 [32.6.2(j)& Comment]The plant counts provided for Corpus florida and Ilex x'Nellie R.Stevens'appear to be incorrect;please verify and revise. -Updated plant list has been provided on the landscape plan. 15 [32.6.2(j)& Comment]Many of the proposed plantings appear to have site conflicts.Some are shown outside of the site,some are in utility easements and some are directly on top of proposed utilities and drainage structures.Please move plants into more suitable locations or provide approval from the associated agency(VDOT, ACSA,etc)that they will allow the plantings within their property/easement. -Landscape plan updated with all plantings removed from the existing and proposed drainage and utility easements on the site. 16 [32.6.2(j),32.7.9.4(b)& Condition of approval]Existing trees may be preserved in lieu of planting new plant materials in order to satisfy the landscaping and screening requirements of section 32.7.9 or to meet conditions of approval,subject to the agent's approval. It appears the Preliminary Site Plan and first Final Site Plan were approved with a condition that certain trees along the border of the 20'undisturbed buffer be marked and preserved. The landscape plan should show the trees to be preserved,the limits of clearing,the location and type of protective fencing,grade changes requiring tree wells or walls,and trenching or tunneling proposed beyond the limits of clearing. The conservation checklist refers to these elements,but they don't appear to be present on the plan. -Plans have been updated to protect existing trees on the south side of the property. The retaining wall and travelway layout have been modified to provide a maximum buffer area and ensure that no disturbance takes place within the 20'undisturbed buffer. Limits of clearing and disturbance have been added to both the grading and landscape plans. 17 [32.6.2(j)&32.7.9.5(a)]An area of at least five(5)percent of the paved parking and vehicular circulation area shall be landscaped with trees or shrubs.Neither the areas of street trees and shrubs required by sections 32.7.9.5(d)and(e)nor shrubs planted between a parking area and the building shall be counted toward the minimum landscaped area for a parking lot.As noted above,the square footage of'paved parking and vehicular circulation area'has not been provided.Additionally,the 5%requirement refers to square footage of planting space, not tree canopy(as provided on the plan submitted).Please provide all relevant information to verify this requirement is satisfied. -Landscape plan updated to provide this 5%requirement. Notes have been added on the landscape plan to verify this requirement has been satisfied. 18 [32.6.2(j)&32.7.9.5(b)]The 5%landscaped area required shall be planted with a mixture of shade trees and shrubs and shall include one(1)large or medium shade tree per ten(10)parking spaces or portion thereof,if five(5)spaces or more. The Acer rubrum,Platanus acerifolia,and Ulmus parvifolia are the only trees provided that are on the current list of recommended large or medium shade trees approved by the agent;therefore there are 31 parking lot trees provided,not 37 as indicated on the plan. -Landscape plan and plant list updated. 19 [32.6.2(j)&32.7.9.7]Please extend the additional screening plants on top of the retaining wall to the end of the adjacent residential district. -Additional screening has been provided at the top of the retaining wall. The retaining wall layout low *we and grading in this area has been updated in an effort to provide a maximum amount of protection to the existing trees that will be saved. 20 [32.6.2(j)&32.7.9.8]It appears that the site acreage used to calculate the tree canopy requirement is incorrect. The plan only lists the acreage for TMP 45-110, when TMP 45-110A should also be included;please revise.Additionally,provide information as to how the canopy numbers for the Taxodium distichum and Magnolia grandflora were determined. -Landscape plan, plant list and plant calculations have been updated. 21 [32.6.2(k)&4.17]Lighting comments provided with the AR8 review apply to the Site Plan as well.Also,it appears that the lighting plan submitted for ARe review shows building mounted fixtures, while the plan included with the Site Plan set does not.All proposed lighting fixtures must be included on the lighting plan included in the Site Plan set. -Updated lighting plan provided. 22 [32.6.2(k)&4.17]Two of the pole fixtures are proposed directly on top of storm drain pipe;please correct this conflict. -Pole fixtures have been relocated away from any pipe conflicts. 23 [32.6.2(k)&4.17]Please indicate that the proposed pole fixture will have a flat lens. -Note added to lighting plan indicating that the proposed pole fixtures will have a flat lens. 24 [32.6.2(k)&4.17]The lighting plan indicates that a LLF of 0.75 was used to create the photometric plan. Albemarle County requires that the LLF be 1.0;revise the photometric plan using the proper LLF. -Updated lighting plan provided with LLF of 1.0 for all calculations. 25 [32.6.2(k)&4.17]Provide the following standard lighting note on the lighting plan:Each outdoor luminaire equipped with a lamp that emits 3,000 or more initial lumens shall be a full cutoff luminaire and shall be arranged or shielded to reflect light away from adjoining residential districts and away from adjacent roads. The spillover of lighting from luminaires onto public roads and property in residential or rural areas zoning districts shall not exceed one-half footcandle. -Note added to the lighting plan. 26 [Comment]Provide documentation of all off-site easements,including grading and off-site plantings. -No offsite easements,grading or plantings is proposed. 27 [Comment]Provide the deed book and page references for all existing utility easements located on the property. -Deed book and page references have been provided for all existing utility easements located on the property. 28 [Condition of Preliminary Approval]Architectural Review Board issuance of a Certificate of Appropriateness. -Acknowledged. 29 [Condition of Preliminary Approval]Virginia Department of Transportation approval of entrance design, signal improvements,frontage and turn lane improvements as well as any associated road plans and drainage wirw 'ter plans. -Acknowledged 30 [Condition of Preliminary Approval]Albemarle County Service Authority approval including approval of the design of the relocated sanitary sewer meeting ACSA standards with no portion located within storm water management facilities. -Acknowledged 31 [Condition of Preliminary Approval]The 18'retaining wall on the northern side of the site cannot disturb the undisturbed buffer for a footing or reinforcing grid. The plan must be revised as necessary,or provide computations,details and construction methods to avoid disturbance of the buffer. The preliminary plan did not show a retaining wall where it is currently proposed in Phase HA;this condition is applicable to the proposed wall as well. -Acknowledged. The layout has been updated to provide adequate room for the retaining walls. No disturbance will occur within the undisturbed buffer area. 32 [Condition of Preliminary Approval]Grading to the edge of the undisturbed wooded buffer on the sides of the site will likely cut tree root systems,damaging and eventually killing trees. On final plans,the grading should be moved back,or specific trees surveyed and marked on plans to ensure survivability of trees within the undisturbed buffer. -Grading and wall layout updated to provide additional area between the limits of grading disturbance and the undisturbed buffer area. 33 [Condition of Preliminary Approval]Fire Marshall approval. -Acknowledged 34 [Condition of Preliminary Approval]Building Official approval. -Acknowledged 35 [Condition of Preliminary Approval]The final site plan shall be subject to Planning Commission Review. This submittal will be scheduled on the consent agenda once ARB approval is obtained and the majority of the site plan issues have been resolved. -Acknowledged 36 [Comment]This site plan cannot be approved until Engineering,ACSA and VDOT completed their reviews and grant their approval;comments will be forwarded upon receipt. ARB,Fire/Rescue,inspections,and E911 comments have been provided. -Acknowledged Should you have any questions, please feel free to contact me at 434-293-3719 Sincerely, Adam Long, PE Collins Engineering Ellie Ray From: Alex Morrison [amorrison @serviceauthority.org] Sent: Thursday, February 07, 2013 10:14 AM To: Ellie Ray Subject: SDP-2013-00002: Northtown, Phase II-A Final Ellie, The above referenced project is currently under construction review (by JML). I will let you know once he gives final construction approval. Alexander J. Morrison, EIT Civil Engineer anc tc.=l Service Authority 168 Spotnap Road Charlottesville,VA 22911 Office: (434)977-4511 EXT: 116 This email may contain confidential information that should not be shared with anyone other than its intended recipient(s). Ellie Ray From: Michelle Roberge Sent: Wednesday, February 06, 2013 9:35 AM To: scott@collins-engineering.com Cc: Ellie Ray Subject: E1_SDP_Northtown, Phase II-A Attachments: E1_SDP_Northtown, Phase II-A.pdf Hello Scott, Here are my comments. -Michelle Roberge Michelle Roberge County Engineer Department of Community Development County of Albemarle,Virginia 401 Mclntire Road Charlottesville,VA 22902 434.296.5832 ext.3458 1 Ellie Ray From: Ellie Ray Sent: Friday, February 01, 2013 11:31 AM To: 'Scott Collins' Subject: SDP201300002 Northtown Phase II-A- Final Attachments: CDP1_sdp_ECR_Northtown II-A.pdf; 2013-02-01 SDP201300002 Reviewer Comments.pdf Scott, Please find attached my comments for the above referenced application. I have also attached a PDF with other reviewer comments received to date. I am still awaiting comment from Engineering,ACSA and VDOT. Feel free to contact me if you have any questions, concerns, or need further clarification. Thank you, Ellie Carter Ray, PLA Senior Planner Albemarle County Community Development Planning Division 401 McIntire Road, North Wing Charlottesville,Virginia 22902 ph: 434.296.5832 x. 3432 fax: 434.972.4126 1