HomeMy WebLinkAboutSDP201300064 Correspondence 2014-05-28 Christopher Perez
From: Christopher Perez
Sent: Wednesday, May 28, 2014 4:00 PM
To: 'Alan Franklin'
Cc: 'Geoffrey Kilmer; Ana Kilmer; Kenny Thacker
Subject: RE: Church of Our Savior
Alan,
I have reviewed my emails from before the holiday and it appears we have all the approvals now. Please submit
four(4)print signed copies of the plan. One (1) copy is retained by the Planner for the file,two (2) copies are
passed on to Zoning,and one (1) copy is returned to the applicant. Once received all SRC members will be
notified that the plan is ready to be signed. Once I receive all the SRC members signatures, then I'll sign it and
then it is approved and you will be notified for pickup.
Below I have provided a recap of the appro s:
1)Building official—approved 1-8-14 •
ç2) E911 _aPProvedll344 (' a 1V11223114-'
3)ARB—approved 2-18-14
4)Engineering—no objections 4-18-14
5) Fire and Rescue- approved 5-7-14
6)ACSA- approved 5-7-14 V
7)VDOT - approval 5-16-14
Also, RWSA provided an approval email on 5-21-14.
Thanks
Christopher P.Perez I Senior Planner
Department of Community Development I County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
From: Alan Franklin [mailto:afranklin(&waterstreetstudio.net]
Sent: Wednesday, May 28, 2014 3:41 PM
To: Christopher Perez
Cc: Geoffrey Kilmer
Subject: Church of Our Savior
Chris,
Are you ready for signature sets of the site plan?
Alan
waterstreet
d 12'
Ens,Main 3tref: 1 1<r!QIt SU i:,s;... „„
www.waterstreetstudio.net facebook twitter
�.r
Christopher Perez
From: Christopher Perez
Sent: Monday, May 12, 2014 11:10 AM
To: 'Alan Franklin'
Cc: Geoffrey Kilmer
Subject: RE: Church of Our Savior Final Site Plan Approval
Alan,
I have looked over the changes you sent me in the email and I have no objections.
Below I have provided a recap of where the project is with approvals:
1)Building official—approved 1-8-14
2)E-911 —approved 1-13-14
3)ARB—approved 2-18-14
4)Engineering—no objections 4-18-14
5) Fire and Rescue - approved 5-7-14
6)ACSA- approved 5-7-14
I'm awaiting approvals from the following:
1)VDOT review is still pending
Also, I'm awaiting to hear from RWSA as you also provided them revisions.
Once I have received the above agencies approvals the site plan can be approved. Once these approvals are
received the applicant is required to submit four(4)print signed copies of the plan. One (1) copy is retained by
the Planner for the file,two (2) copies are passed on to Zoning, and one (1) copy is returned to the applicant.
Once received all SRC members will be notified that the plan is ready to be signed. Once I receive all the SRC
members signatures I'll sign it and then it is approved and you will be notified for pickup.
Thanks
Christopher P,Peren I Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road I Charlottesville,VA 22902
434.296.5832 ext.3443
1
Christopher Perez
From: Alan Franklin [afranklin @waterstreetstudio.net]
Sent: Monday, May 05, 2014 11:54 AM
To: Christopher Perez
Cc: Geoffrey Kilmer
Subject: Church of Our Savior Final Site Plan Approval
Attachments: C-7- Landscape Plan.pdf; C-2 - EXISTING CONDITIONS-Planning.pdf
Chris,
As you have seen in earlier emails we are working directly with Fire and Rescue, RWSA, and VDOT to get to Final
Approval.There are two additional changes that you need to review.
1.The proposed ground cover on the large 2:1 slope adjacent to the new church building has been changed to Hard
Fescue (no mow). If allowable this change would save the church around $12,000.
2.The existing 36'white oak that was slated to remain (in the center of the upper terrace wall between the church
buildings) has been recommended to be removed by an arborist.
The attached revised sheets reflect these changes.The plan is to replace this tree but to not show it on the site plan so
that the church can carefully select and budget for its replacement. Please let me know if you need a hard copy of the
plan.
Thanks,
Alan Franklin
waterstreet
418 East Main Street 'Charlottesville VA 22902 434.295.8177
www.waterstreetstudio.net 3 facebook twitter
1
Notre
i' ' 1* d 4-ions
A ° a a 6 IA on s ;t ,t ot
�" �1 RIp RQq� �i A �` e< o c ° FF
6 i:1 ���� N,,,,, wIOTMq FAST L a, , ^ � ;,
:1�I * ���t r GH,Og.wah F� ' AP f ra Y al
II 4g A.'� ; s_h _ terse b;' '8p Y '0 � YP °
pply I j o p� wm �q as
4� 2i r I � A 44IsY
-I £ YA `K'
000 IR1 r °I I 1 € i! e
liiiiri
8i I I I ea II I -J.__
?, € A
' �°.° ; NIP,I f� 11 <I 1111 'iii• I i :a ° Y A 4 H
IRR ! ,,., RR sl 4 v i& .. _,4' m---, .--.....4t::,:,§-,_11
o 4„ `�', 1!!!!111111111"IR€<1 :11::' i pril
5 Mild! t-,....< , A.,....,____"?t. ,,,,,,,e, Ittlikii , , 7, imim,r,lidoi, ,,0 ,
\ P 5f z' �' a `° , &.
,�^l \ x gyp} P
6,41::,:.-7."11{•`0 Z -4 si
.!. � 1`\ \\ `t °lei m *. to '' 2
I,' , 4 " N ', •‘.: !..,.....ilir 1 1.,..-. ‘..,::: ,e,v.oriht . ,-- AK,
$ ice\„ �... : A x, 1-1."'�"I"
‘‘itrik,
-$6 o�,,s \ mR RRReama .\'
1
ti
it I I\\ //' /J
F� I \/ 406
6 6 •• - • `h .. ■.FlR ¢9 � ,: 1urr _1'ii � p 4i4� I ha r.�'IA r ' t` ;f'° .SIR ,�.r,;
i s S ! tt 1 11 ! i i FIE 1 iE /9111 t e- \ :-i �.i :.�°
e i i f i j F S $a ° `g! aF g 4 ;`e
£ it 'r i if ; ' x 9
,-ic, t 1! 1 - !! , t , ,t
i; I i ? fs
03.17.14 ICO.IACSA/RWSA COMMENT^._
0204.14 ICC.L.ARE S T AFF-COMM-N'0 1� �i
`R� — = EXIS;;NG CONDITIONS & DEMO PLAN ,.., ,,PZ:, ,i:,.:,
N) I 12.26 13 TARS STAF°COMMENTS °
Ip I 06.30.15 INITIA'-PLAN APPROVAL IFINAL SITE P_AN-NEW ANNEX BUILDING-SDP2013-0064 j
REVISIONS iCHURCH OF CUR SAVIOUR-ALBEMARLE COUNTY,VIRGINIA 11.221:: il
. .,
*Noe
'owe
. 4
,
,
'81 :I •• = . - •
\ ^ or mg ar ,v'0,000 AG 4.p mK mr? mml^,!'n=7M_ 1 l'H'^*- 1 9''d ■In 4 l''',M;:tt!,•;" '
, 11 ;__ / -1,, . •, !!" iq i4;; ;;L.
, ii i LaV
• '
II , 1.. . .,, , z
I 1 s. '!": ' 14-i.i
I ' ,
_.__ "g,..--- "..: ;•---st, --...., _-------_ ;/----:4"''' ; ; !r; 't `i ;7 1 *.;
it : t.' ;;'' i • i ;I tpt 1 _, -:. „,„„„„„E. ,9 I
;7
; 1 s'''''—'"?`-■,..--- „_' : ' : ' ''''64.----:---- -..° tl.:_,_ :, ; I. !,. :, v .r• 't •i i.:.0 t 0- i s =tit 7 i'' ; t, ; 1
di i
1 li ,. . t
i ,e ',J , . '.---H---, :' - t ii ; ; -i :',' i 't ' ..-,t ill -,,,...,-..t-t:-..„.- I ' ;
1 - t / I; I T ' ‘. ‘'. :! ' ''' ''. : : 4 a ! 1, : t ! -1,' ,0 I ---`--- _,„.
.__._,.. i ei i ',Li; e. f 4
t i -• it
LI .'
,. - -4 1- --- i - ; li i i 11; 7 It ti -\
HOI'l'k 7..
'it 11•11it R ,-'" '1 ' it
--1---- : ‘,. .; 1 [ ii
1 i
i
i 1
i s \
---- 7.,....7,177...„, ‘,}
____,,___ I , , s i 1
——_ , ; _I
,...
' !
:''''
,
.0 , s.
,,,, '' (-71-\, " . " .-------- - ' ":"—j , ,_1_,,,___i ■ /r
--;=--; A
1 ,1
' _ 1= ' .: -
Tj
1 1' •
9 ti. ----
.7 7..1 IS': —, p it;.- '
i
1
k''
1
'
.— ,
,
-.,, 1^, 'I
' /
,c,.r.,
-----
' ' ----.--—I.--., ,) ' i
----
4. : , (/ - ii ii -.7 ''
----
as
a i t I
I 1 !
I il ;'' -,,-..i .::\ !,511 \,ii,i_,I ,
1 -i
,.. ow. . ,.
, . ,. .
,-rn „____._ ...,i , , __• ,-,,,,, -,,---
LE EGGEE _ •-'," - 1 , I ,-1--__ ' - i , _
- - ,, , ______ 1„, 1 i., ■
,... ':',..-fl:'-:-"::::::-..:::--!
1----"' f
; p.'`,\ • . , „.4,...,,, _.
„._.,,,,,,,,,,\\ '0,-77'1.1=..7 1 I l rti.!: Ili
1 11 1 il
.1 1
11 •, <:' ■. 1
, 7
i • 2.4_1
L. • 1 t '.., ,,,t
, ,,,, -- ,-___--.....__ ' t - • t
! ! ------,--:::::__•-•--,,,, ;___L_ ' t
,.
. - , ;
- - ,
,, ,____
1. , ',,1„ A „ !
. ,.1.:
. 1 ,,,,,:',!,, / „ ,. , . ..„ . - ..
.. .. , ... , , ,____,
:!, ' 1,, •- '- -' '' :-' ° -
, ■ ,,,,,,,
- -..„ - ' , - ,
______
,
,,
, .-
—,
-h----,
If ,
I,
i ,
,L..__,
-1---4--, I ii•-,--;1-
8 ' l'"
s- LiJiii.. E II'
,..,...• 't . ,,, 1
ip ,, , ,, 5 ,-8- --__ I i
8 Mg =
z •. -aA ,-a"."-:"■.,:-.74,■-•0= 1..J '.7 7 '''---. ---...4_.i ; 4I $ . -g- '3
-- _,
\\ -;?,1-- ''; : ; -.:,,"!1'• , i
__ t'- - ' ! ' ' •./,PNaa."1-7-4-,—...A-::'' a N, :-,- --I-..;8' 4, . ' 0'\ P
,, '''.----14-----'."-- -' 11"•- ''.,".','1,X--"trr ''''. ,I., 1„ I ip t• 41,- Is!,,,
.., ,
,•••\..v .,,, .••••• : •. I.. i :,, ,
. „.
1,_...--_,„- ‘V"r.,--;-, ' ,1
',> '
T - r l', ,' 1 'A
,..
,- i
r ' 17 ll
,,
' s' 1 ,
1 :,
.., ., - A ,, , - •• ‘,=Y 74 '..`. g ' .-'''''' 1
'
.,,,S ,,p1
• s •N 1 N''' '
. • ' '11',',4,
,, ,,•., , ,,,
,.n .,- .,-,,s,-.4 ,' . ,‘ )
. '
,
-'''' 1 // -?` b c' ", ',/
c.. ,1 i --,-,
_, ,, , ,,,, ,, p.. .. .-r
' -
N ,.--, ‘,`\ .l'ilt.kt,),, 1 . / 1 i 1. .4:Ir• ) . ' ' -
:k Att‘i
1 j , , ,..„ ..,,... _,.
I, i 3,,
:,__ .1—..
„ / 14 '- 1/' '• '` i A v„, II. , -maniammaiiii—hwiewv..,..#4,4,.......„_-..-..:rivii.,0:. ,.,,,-- „--- ....„ . ,..,
z, , . 1 • 51 -
S.,,,'1, , '''-.Z., n ) p, p N, -, ,044-VINIIIIIFINfpNAF40.,-"71-'1 'tV,N4' • -- •--- - ' — ‘s \•,,
•)"!•:'''''t::c.."4, ' '''' / -1, i" , N 7.'s'k ‘,A111,1 .1".1111_01UPACAkik ' ; ' -. ' ' '.- -- „„
i IL N-1'40 WrVviili '
' ' .....4. — ,'-. 4 s N' ''".. V■ '°4'41. . ' ' '.- V ' -- „,-" ---::',-;,--'>'-''`'.'
0. .. 1 —/ 7--.. woo, ' '''.•■■•••S .-. ■''''''.."7 17 x...,7'_., ; \ ,........."........-
■......., i ;114! ,_ \,,,,,,,„,. ._,:,,,." 7:,,..---.H:\\ \\: 'L\:'\t\,..'',\,2,.'.:„.„:■, ' ,N\sl \'4A-:' ;IA ■'..,:-.1.-.`-.'. .-7.7:'1 \..1 11 ;''''' '
III Ig"1
0 9 , ' ,2-'.---- 7-- '
_-. , ---. , ■ : :. , '+" ` ,,'.1•'-. '''\,
■
, •,"- , !;,. '.
■ ? T "49 ''P i
i I
' ' '
f
i 11 9i'l.
,..o.t N, :‘ \ - -1, , 1 3'
\1,111. 1 g 3 1.--4---4, 1
I -
-' -
6
; il
.-■ 1 .. ' a ._ _....,....1
1 _
----
,•
4
ir:::„„,J . ...-- .....„..-•
,,,,,, ........,../ .
N I .
03.17.14 COJACSAIRWSA COMMENTS
02.04.14 CO.8 ARB STAFF COMMENTS LANDSCAPE PLAN ,, ,i,
, ;.. ,-. waterstreetstudio
....4 12.26.13 ARB STAFF COMMENTS ' a
FINAL SITE PLAN-NEW ANNEX BUILDING-SDP2013-0064 ^., ,
08.30.13 INITIAL PLAN APPROVAL
0
REVISIONS CHURCH OF OUR SAVIOUR-ALBEMARLE COUNTY,VIRGINIA 11.22.13
8
Christopher Perez
From: Christopher Perez
Sent: Monday, April 07, 2014 5:15 PM
To: 'Alan Franklin'
Subject: FW: SDP201300064 Church of Our Savior—final site plan
Alan,
Below is Fire and Rescue's comments for SDP201300064 Church of Our Savior—final site plan.They requested a small
change to the emergency access area, see below.
Christopher P.Perez j Senior Planner
Department of Community Development 1Counn, of Albemarle.Virginia
401 Mclntire Road Charlottesville.VA 22902
434.296.5832 ext.3443
From: Robbie Gilmer
Sent: Monday, April 07, 2014 4:50 PM
To: Christopher Perez
Subject: RE: SDP201300064 Church of Our Savior—final site plan
Chris,
Sorry for the delay it's been a rough winter for us at fire rescue.
I have put my comments in City View and copied them in this email. If you have any questions let me know.
Based on plans dated 3/14/14
1. The emergency access gate from School House Lane Shall have a sign No Parking Fire Lane.
Thank you,
Robert Gilmer
Assist. Fire Marshal
Albemarle County Fire Rescue
460 StageCoach Road
Charlottesville,Va.22901
Office 434-296-5833
Cell 434-531-6606
From: Christopher Perez
Sent: Monday, April 07, 2014 12:21 PM
To: Robbie Gilmer
Subject: SDP201300064 Church of Our Savior—final site plan
1
SDP201300064 Church of Our Savior—final site plan
I am checking on the status of your review of the above mentioned plan(which was sent to you on 3-21-14). I
plan to send my comments out by COB today. If you have completed your review and have your comments
completed please send them to me for inclusion in my letter. Otherwise whenever you complete them, I'll
forward your comments to the applicant.
Thanks
Christopher P.Perez Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road I Charlottesville.VA 22902
434.296.5832 ext.3443
2
Christopher Perez
From: Christopher Perez
Sent: Monday, April 21, 2014 3:42 PM
To: 'Alan Franklin'
Subject: RE: SDP201300064 Church of Our Savior—final site plan
Alan,
Engineering has completed their review of SDP201300064 Church of Our Savior—final site plan.They have no
objection.
You now have all comments from all reviewers. ACSA has stated that they are working directly with the you/the
applicant.
Once you have ACSA's approval, RWSA's approval,VDOT's approval, and Fire and Rescue's approval please provide them
to me and we can approve this site plan once the WPO bonds are posted.
Thanks
Christopher P. Perez!Senior Planner
Department of Community Development!County of Albemarle.Virginia
401 Mclntire Road l Charlottesville,VA 22902
434.296.5832 ext.3443
From: Christopher Perez
Sent: Monday, April 07, 2014 5:15 PM
To: 'Alan Franklin'
Subject: FW: SDP201300064 Church of Our Savior—final site plan
Alan,
Below is Fire and Rescue's comments for SDP201300064 Church of Our Savior—final site plan.They requested a small
change to the emergency access area, see below.
Christopher P. Perez Senior Planner
Department of Community Development 1County of Albemarle.Virginia
401 McIntire Road l Charlottesville,VA 22902
434.296.5832 ext.3443
From: Robbie Gilmer
Sent: Monday, April 07, 2014 4:50 PM
To: Christopher Perez
Subject: RE: SDP201300064 Church of Our Savior—final site plan
Chris,
Sorry for the delay it's been a rough winter for us at fire rescue.
I have put my comments in City View and copied them in this email. If you have any questions let me know.
Based on plans dated 3/14/14
1
Nome -goo-
1. The emergency access gate from School House Lane Shall have a sign No Parking Fire Lane.
Thank you,
Robert Gilmer
Assist. Fire Marshal
Albemarle County Fire Rescue
460 StageCoach Road
Charlottesville,Va. 22901
Office 434-296-5833
Cell 434-531-6606
From: Christopher Perez
Sent: Monday, April 07, 2014 12:21 PM
To: Robbie Gilmer
Subject: SDP201300064 Church of Our Savior—final site plan
SDP201300064 Church of Our Savior—final site plan
I am checking on the status of your review of the above mentioned plan(which was sent to you on 3-21-14). I
plan to send my comments out by COB today. If you have completed your review and have your comments
completed please send them to me for inclusion in my letter. Otherwise whenever you complete them, I'll
forward your comments to the applicant.
Thanks
't ante>phe t'. Pere. Senior Planner
Department of Community Development 1County of Albemarle,Virginia
401 Mclntire Road(Charlottesville,VA 22902
434.296.5832 ext.3443
2
waterstreetstud io
March 18, 2014
Mr. Christopher Perez
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: SDP201300064 Church of Our Saviour
Pursuant to your letter dated February 21, 2014, this memorandum addresses the comments pertaining
to the submittal of the Final Site Plan. Our responses are listed in order with the numbering system similar
to that which was employed in your comments.
,PI ping Division (Christopher Perez) rj GopiC 5
The deed book and page reference for the combination of TMP 61-144 and 61-146D has been
added to the cover and all other plan sheets. We were unable to figure out what the new parcel
number is if any different than TMP 61-144.
•✓2 The existing entrance and access aisle from Huntington Road is now dimensioned on the plans.
See the proposed barrier solution on Sheet 3. ..,i. ky c\prww-i tt•K/'4-«,(-,,-why; j .
4. he existing and proposed parking spaces have been numbered on the plans. The correct number of
N•7 - existing + proposed paved parking spaces is 67. Sheet 1 has been corrected.
A/5/ Overflow gravel parking areas have been labeled on plan sheets.
' 6 - The Site Data was revised to reflect the ZMA2012-6 with Proffers.
✓7// The SDP#has been updated on all sheets.
v8. he Site Data, WaiverNariation information has been corrected as suggested.
/The conservation checklist has been signed and added to the plans sheets. Protective fencing has
also been added.
✓10. The Plant Schedule has been corrected for the Canada Serviceberry size.
"111. The Plant Schedule has been corrected for the Liquidambar styriciflua canopy value.
12. The LS/LR discrepancy has been corrected.
Engineering Division (Max Greene)
1. The limits of gravel removal for conversion to turf has been better delineated on the Site Plan and the
WPO Plan.
2. An updated note certifying the existing topography shown on the plans has been added to Sheet 2.
3. See response#1.
Fire and Rescue(Robbie Gilmer)
1. The proposed barrier to Rio School Lane should be reviewed by Fire and Rescue.
VDOT(Troy Austin)
1. A sight line exhibit has been added to Sheet 2.
2. See the proposed barrier solution on Sheet 3.
3. The ITE Trip Generation table has been added to Sheet 1.
RWSA(Victoria Fort)
1. The RWSA General Water and Sewer Notes have been added to Sheet 5.
2. 18"vertical separation is called for on the profiles where proposed utilities cross the existing RWSA
30"water line. Test pits were dug in the vicinity of the crossings to determine that the existing water
line had approximately 4' of cover.
3. Mountable curb has been specified in the locations requested.
4. The location and depth of the 30' RWSA waterline is now shown on Storm Drain 'A' profile.
n1 3`d street se char'uttes, ,c, , rg1n,a ?ra^z 434 295 8177 t warersPeerstud o ,et
. vie
• low
ACSA(Alex Morrison)
1. The sanitary sewer lateral is now proposed as 6" gravity to the existing manhole adjacent to the
Huntington Road.
2. The water meter will need to increase to a 1" meter. It will be located in close proximity to the existing
meter off of Rio Road. The existing meter and service will be removed back to the main and the new
water service will be connected to the water main in Rio Road.
3. Three plan sets are being submitted to Victoria Fort at RWSA separately.
We trust that the attached plans, narratives and responses will adequately address your comments to
begin the final site plan approval. Please do not hesitate to call if you have any questions or comments.
Sincerely,
Alan PE .
Cc: Geoff Kilmer
111 3`d street se c1,3,1orlesvl!le, vir9 n;z 22902 434.295 8177 t waterstreetudio.OPr
New- Not
Christopher Perez
From: Christopher Perez
Sent: Friday, February 21, 2014 3:49 PM
To: 'Alan Franklin'
Cc: 'geoff @photoworksgroup.com'
Subject: SDP201300064-Church of our Savior-final site plan
Attachments: CD1_Church of Our Saviour_FINAL Site Plan Comments 2-21-14.pdf; Conservation Plan
Checklist.doc; RWSA General Notes.doc
Alan,
Attached is the comment letter for Church of our Saviour SDP201300064 - final site plan.
For your convenience I have provided a word doc of RWSA's general notes so you may copy and paste them
into your plan set.
Also for your convenience I have provided a word doc of the conservation plan checklist which is the subject of
comment#9. Please include a signed copy of this in your plan set.
If you have any questions,please give me a call or send me an email. Notably I will be out of the office from
Feb 24th—Feb 28th and will not be available. I shall return on Monday, March 3rd
Christopher P. Perez Senior Planner
Department of Community Development(County of Albemarle,Virginia
401 McIntire Road l Charlottesville,VA 22902
434.296.5832 ext.3443
1
Nn. `✓
. s'
waterstreetstudio
December 12, 2013
Mr. Christopher Perez
County of Albemarle
Department of Community Development
401 McIntire Road
Charlottesville, VA 22902
RE: SDP201200049 Church of Our Saviour
Pursuant to your letter dated August 30, 2013, this memorandum addresses the comments pertaining to
the submittal of the Final Site Plan. Our responses are listed in order with the numbering system similar to
that which was employed in your comments.
Planning Division (Christopher Perez)
1. Please find the attached Final Site Plan for your review.
2. A landscape plan is included in the Final Site Plan set.
3. A lighting/photometric plan is included in the Final Site Plan set.
4. We believe that a Boundary Line Adjustment Plat, separately by others, was submitted to address
this concern.
5. The parking schedule was revised per your request.
6. The Site Data was revised to reflect the split zoning and the approved Special Use Permit w/
condition.
7. All proposed site work that was to occur off-site has been removed from this site plan and will not be
pursued in the future.
8. Negotiations with VDOT and off-site neighbors failed. An acceptable plan for improving Rio School
Lane and commercial entrance could not be agreed upon so those improvements have been
removed from the plan.
9. The 20' buffer disturbance waiver was approved by the BOS on 10/09/13.
10. The 20' buffer to residential has been more clearly depicted and labeled.
11. The critical slope waiver was approved by the BOS on 10/09/13.
12. Rio School Lane has been labeled on the plans.
13. Building square footage discrepancy has been corrected.
14. The improvements in question have been removed from the proposed site plan.
15. The Land Use Breakdown table has been corrected to address this comment.
16. The improvements in question have been removed from the proposed site plan.
17. See previous response.
18. See previous response.
Engineering Division (Max Greene)
1. An Erosion and Sediment Control Plan, application and fee is included with this submittal.
2. Stormwater calculations included in the E & S Plan indicate that no SWM is required.
3. At this point there are no proposed SWM facilities that require easements.
4. The proposed improvements that would require road plans and VDOT approval have been removed
from consideration for the Final Site Plan.
5. The parking space in question has been corrected and dimensioned.
6. The attached Final Site Plan intends to meet the requirements of the County Code.
7. The proposed improvements that would require road plans and VDOT approval have been removed
from consideration for the Final Site Plan.
ARB (Margaret M.)
1. ARB submittals and review are proceeding separately but concurrently with the site plan.
111 3'd street se charlol.tesville, virgin a 22902 434.295 8177 t waterstreetstudi0 net
Noe
Fire and Rescue (Robbie Gilmer)
1. The proposed annex building is flanked by two existing fire hydrants approximately 250'from the
building in either direction. The existing fire hydrants are fed by the 30" RWSA waterline. The
attached ACSA test flow data shows the available pressures and flow to be quite high.
2. Through correspondence with ACSA, and in light of the information in previous comment response,
we were informed that an new fire hydrant would not be required with this site plan.
VDOT(Troy Austin)
1. Due to difficulty with neighbor negotiations, the proposed improvements to Rio School Lane and the
existing commercial entrance have been removed from consideration for the Final Site Plan. We do
not believe there are now any VDOT issues to be resolved with this plan.
ACSA(Alex Morrison)
1. Three plan sets are being submitted to ACSA separately.
2. Three plan sets are being submitted to Victoria Fort at RWSA separately.
3. Per our previous correspondence, the new fire hydrant is not going to be required. See Fire and
Rescue comment response.
4. The detail for the force main connection to the existing manhole is shown in the plans.
5. No action required.
6. The existing building to be removed was served by a septic system. It's approximate location has
been shown on the plans.
7. What we believe to be the location of the existing water meter and service serving the existing
building to be removed is now shown on the plans.
We trust that the attached plans, narratives and responses will adequately address your comments to
begin the final site plan approval. Please do not hesitate to call if you have any questions or comments.
Sincerely,
Alan Franklin, PE
Cc: Geoff Kilmer
•