HomeMy WebLinkAboutWPO201300071 Correspondence 2013-11-21 „imp,
I3ALZFP
AND ASSOCIATES INC
. !
REFLECTING TOMORROW
December 13, 2013
County of Albemarle
401 McIntire Road
Charlottesville, VA 22902
RE: Response to Comments
Collins Medical Center
Balzer Project No: S0900017
County Project No: WP02013-71
This letter serves as our written responses to the County comments on the subject project:
Engineering—Max Greene
1. Sediment trap has been replaced with mud trap. Wet storage is not within building
improvements.
2. Per discussions, this is adequate.
3. Noted& Revised.
4. Per discussions, all necessary calcs are in SWM Plan.
5. Detail added to C8.
6. No longer necessary. All work is within easement.
7. Full plan set has been provided.
8. SCC and pipe have been modified to minimize exposure.
Stormwater Plan—Prior approved stormwater plan has been resubmitted for approval.
Sincerely,
BALZER AND ASSOCIATES, INC.
Ray Burkholder, PLA
Senior Vice President- Engineering
PLANNERS • ARCHITECTS ' ENGINEERS ' SURVEYORS
ROANOKE 'RICHMOND 'NEW RIVER VALLEY'SHENANDOAH VALLEY
1561 Commerce Road,Suite 401 'Verona,Virginia 24482 ' (540)248-3220 FAX(540)248-3221