Loading...
HomeMy WebLinkAboutWPO201300022 Correspondence 2013-03-27 Nome ,taie s 00gO�s 44ti0 ' Dominion 172 South Pantops Drive g,� I. Engineering Charlottesville, VA 22911 c...%\ / 434.979.8121 (p) 434.979.1681 (f) *ems s DominionEng.com July 22, 2013 Mr. Max Greene Albemarle County Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 RE: Whittington- Comment-Response Letter— WPO 2013-00022 Dear Max, Thanks for meeting with me on July 11, 2013 to discuss your comments on the referenced erosion and sediment control plan. Below please find our responses to your comments. ENGINEERING COMMENTS 1. Remove internal limits of clearing. RESPONSE: We have removed the internal limits of clearing and internal erosion control measures as appropriate. 2. Expand limits of clearing for installation of sanitary sewer extension. RESPONSE: We have widened the sewer limits by 10 feet for a total limits of clearing of 30 feet. Based on the depth of sewer,this amount of clearing will be adequate for the installation. 3. Add sediment trap near lots 78 and 79. RESPONSE: A sediment trap has been added. 4. Provide Adequate Channels RESPONSE: As discussed at our July 11, 2013 meeting, an adequate channel analysis was reviewed and approved with the previous WPO submissions. We trust the above adequately addresses your comments. Please let me know if you have any questions or require additional information. Very truly yours, , Michae o lers, P.E., C.F.M. Attachments Cc: Alex Perez, Stanley Martin Homes Page 1 of 1