Loading...
HomeMy WebLinkAboutSDP201300011 Correspondence 2013-02-05 Johnathan Newberry From: Scott Collins [scott@collins-engineering.com] Sent: Wednesday, April 30, 2014 11:39 AM To: Johnathan Newberry; Adam Long Subject: Re: SDP-2013-00011 Rutherfoord Hotel Great! Thanks 1T On Apr 30, 2014,at 11:29 AM,Johnathan Newberry<inewberrvPalbemarle.org>wrote: I have received approval from Jeremy. Yes, please go ahead and submit signature copies. Thanks. From: Scott Collins [mailto:scott(acollins-engineering.com] Sent: Wednesday, April 30, 2014 11:12 AM To: Johnathan Newberry Cc: Adam Long Subject: RE: SDP-2013-00011 Rutherfoord Hotel JT- You should be receiving from Jeremy Lynn within the hour the ACSA approval letter for the Rutherfoord hotel. Can I go ahead and submit the 6 signature sets of the plans for you to start signing this afternoon, once you receive the email notification from Jeremy Lynn? Thanks. Scott From:Johnathan Newberry [mailto:jnewberry @albemarle.org] Sent:Wednesday, April 02, 2014 9:59 AM To:Scott Collins Subject: RE:SDP-2013-00011 Rutherfoord Hotel FYI: The BOS approved the variation request this morning. From: Scott Collins [mail to:scottCa�collins-engineering.com] Sent: Wednesday, March 26, 2014 1:57 PM To: Johnathan Newberry Subject: RE: SDP-2013-00011 Rutherfoord Hotel IT- Thanks. I have attached the latest (final)version. Some minor tweaks, but the heights did not change. This is more for your records so you have the final elevations, but the elevations and heights between the two have not changed. Thanks for getting it on the agenda, we are anxious to have this approval done. Also, attached is the approval letter on the W°C from Glenn. I believe that we wit. have A:5A,shortly, they have approved the plans, but we are wrapping up some utility dedications on the Lodge property, that they are trying to get corpiete prior to issuing approval on the Rutherfoord note:. This is should be cleaned up by next weer, c.-:out re same t.-v, u,e , perova: from 3';. Tnx. Scott From:Johnathan Newberry [mailto:inewberry @albemarle.org] Sent: Monday, March 24, 2014 6:14 PM To:Scott Collins Subject: RE:SDP-2013-00011 Rutherfoord Hotel Attached is the variation going on next week's consent agenda. I had not seen the revised elevations that were submitted to the ARB,so initially the executive summary used the 2-19-13 architectural drawings provided with the original variation request. Are the ones shown in Attachment B the latest version? As far as signing goes, I could be missing something, but I don't believe ACSA has forwarded their approval. Do you have any indication of their approval? How about from Engineering? Michael Koslow's last comment was that"site plan comments had been addressed, but an approved WPO plan was required." I have not heard from Glenn on whether or not the WPO plan is approved. From: Scott Collins [mailto:scottCahcollins-engineering.com] Sent: Monday, March 24, 2014 1:04 PM To: Johnathan Newberry Subject: RE: SDP-2013-00011 Rutherfoord Hotel J.T.- With this approval, it looks like we are pretty much there for final approval on the project and signing of the plans. Can you confirm this. Also, can you please confirm that we are on the consent agenda for next Wednesday BOS meeting. Thx. Scott From:Austin, Nathran. (VDOT) [mailto:Nathran.Austin @vdot.virginia.gov] Sent:Thursday, March 20, 2014 7:30 AM To:Johnathan Newberry Cc:Adam Long;Scott Collins Subject:SDP-2013-00011 Rutherfoord Hotel Troy Austin, P.E. Area Land Use Engineer Virginia Department of Transportation Land Development—South Culpeper District P.O. Box 1017 Troy,VA 22974 Phone: (434) 589-5871 Fax: (434) 589-3967 0 C / / \ f Ck . / 0.2 ƒ / f ao 0. c - 3 / § k % a) o = > = •-0 k k / M 2 c k k k C o 4-' \ 0 et \ O. $ < _ \ 0 q U 0 a) 2 ® ƒ CD / 7 3 = a 2 ƒ cc c \ of 0 0 tm # E-J as N•••• $$ 0 S / / 2 \ C ,- / /. ƒ C ) e mo 4 • � S 0 d 3 _ k/ > /% - § 2 E ® Eza ° % E / �ft - 7r. 7� � 2 = 0 a_ _ - § a) o- - af = / $ / 2 ± / k / // \ ? 2 k / § 7 § ƒ \ § - / e � /± ƒ 2 .0 a £ 2 ® / :,...c., 0 W a . 2 m ® / E / c Z / / / f � � 0 � � » / _ % \ £ a a . - t s 0 ) _ \ Q [ / § V ± ? 2 k / \ / « s ~■ r . E 2 rc _ % 2 % R \ E 2 7 / = o CC - - / E / 2 « « & e o = S 6 m y S a _ - - E \ 2 \ - § \ / \ b 0 / V) ) 8 E ¢ \ / ' ® / S 7 E E E E 5 / \ § co e U a / 6 C. 2 e O C g Q Q = = > c Johnathan Newberry From: Johnathan Newberry Sent: Friday, March 22, 2013 5:50 PM To: 'DavidHilliard @lodgeatoldtrail.com' Cc: 'ElizabethA.Campbell @vdh.virginia.gov'; Margaret Maliszewski; Scott Collins Subject: FW: Old Trail Village Block 2B (SDP201300011) Attachments: ARB info.pdf David, I wanted to provide you with an update to this application. No members of the public attended the SRC meeting yesterday. I saw on the news that the Crozet Community Advisory Council learned about it recently. It seemed like it was well-received. Here are few things to consider as we move forward: 1. My plan is to put the variation request on the April 10th Consent Agenda for the Board of Supervisors. I'm confirming that date with the County Exec's office. 2. For ARB approval, you'll need to submit an application for a County-wide Certificate of Appropriateness (found here). I've attached the design criteria that will apply for this project and a review schedule. There is a submittal date this coming Monday, March 25th. I've shared the elevations you provided with our ARB Design Planner, Margaret Maliszewski. You can contact her with any additional questions at 434-296-5832, ext. 3276. 3. Please contact Archer Campbell at the Health Department to discuss permits related to the restaurant and the hotel. Her email is ElizabethA.Campbell @vdh.virginia.gov Let me know if you have any questions. Thanks, 1.T. Newberry Planner County of Albemarle, Planning Division 434-296-5832, ext. 3270 From: Campbell, Elizabeth (VDH) [mailto:ElizabethA.Campbelk vdh.virginia.gov] Sent: Friday, March 22, 2013 5:11 PM To: Johnathan Newberry Subject: RE: Old Trail Village Block 2B (SDP201300011) Hey JT, Found the email. Yes,the operator/owner will need to submit a plan review application and annual permit application for both the restaurant and hotel. On average, these reviews take the department 2 weeks to process. Operator can pick up applications at our office on Rose Hill Drive or download from our website at: www.tihd.org He can go to the environmental health section at that site and download both applications. We can then send plan review approval to your building dept.to release the building permit to the operator. Let me know if you have any further questions, Archer E. Archer Campbell, BEDS EH Consultant, Food Environmental Health Program Thomas Jefferson Health District 1138 Rose Hill Drive P.O. Box 7546 Charlottesville. Virginia 22906 Phone: 434.972-6219 Fax: 434-972-4310 From: Kirtley, Joshua (VDH) Sent: Wednesday, March 20, 2013 6:45 PM To: Johnathan Newberry Cc: Myers, Eric (VDH); Campbell, Elizabeth (VDH) Subject: RE: Old Trail Village Block 2B (SDP201300011) J.T: Thanks for your email. Hope you've been doing well. I agree that we'll have the opportunity to comment during the building permit review. Please make a note in the file that the applicant should contact the health department and schedule a preliminary conference to discuss the permitting and design requirements for the facility before the BP is issued. That would just ensure that they're on the right track from a construction and process point of view. If there are design changes with the structure regarding hand sinks, electrical connections, etc,then they could be made on the plan before construction begins. I have copied Eric Myers and Archer Campbell on this email so that they're in the loop. Have a good evening, Josh Josh KirtleyI Environmental Health Specialist, Senior Thomas Jefferson Health District 'Albemarle County, Virginia 1138 Rose Hill Drive I Charlottesville, VA 22903 434-972-6288 2 Napo- • COUNTY-WIDE CERTIFICATE OF APPROPRIATENESS Structures located 750' or more from an Entrance Corridor, where the structure is no more than 5 stories tall DESIGN CRITERIA - Height If impact of topography would result - in structure appearing taller than 5 • •stories,the proposal will be forwarded to the ARB. • Mass The wall plane must vary every 150';projections should have a minimum depth of 10'. Roof form If false parapets,gables,pediments The depth of the roof element or feature or similar features are used,the should suggest a functional interior depth,overall size,and proportion of space below. the feature must be coordinated with the architecture of the overall building.. • Colors Earth tones in the range of:brown, Use of bright white is limited to trim gray,green,clay,yellow. and decorative elements;nontraditional, muted earth tones may be appropriate for accent colors. Planting EC planting guidelines 28—32 apply. Screening Any mechanical equipment 5'-10' Planting alone may be considered based tall should be a dark color or on size and location of the accessory screened with plantings. elements,if the size and spacing of plant material would provide full screening within 5 years. Mechanical equipment taller than 10' should be screened with a fence or wall. Walls and/or fencing should be used See criteria for fences. to screen:loading areas,service areas,refuse areas,storage areas,and above-ground utilities. Location Buildings need not be oriented parallel to the EC street. Blank walls Blank walls require relief. Planting alone may be appropriate instead of architectural detailing. • *awe New' 2013 Submission and Review Schedule Architectural Review Board Deadline for Filing (3 P.M.) Architectural Review Board Meeting (If necessary) Monday Monday . Jan 07 „ . , .. i:44! x. s :M:j.,* , Mar 04 Feb 04 Mar 18 atediCTINeFelAt9WARK,..-....,...,a:i • Apr 01 Mar 04 Apr 15 • Mar 25 May 06 Apr 08 May 20 Apr 22 Jun 03 May 06 Jun 17 May 20 Jul 01 • Jun 03 Jul 15 Jun 24 Aug 05 Jul 08 Aug 19 • Jul 22 PailitaiWliie'Se/310.31112MUMM Aug 05 Sep 16 Aug 26 Oct 07 Sep 09 Oct 21 • Sep 23 Nov 04 Oct 07 Nov 18 Oct 21 Dec 02 Nov 04 Dec 16 Nov 25 • Jan 06 Dec 09 °.... p µ.. P, ;k '.mtY ++4+431:•:.{Y^`U-&�:.Y°. Y '3f§.. _yt'(C:s.3�r.� a, �uW w ` nn i.w� .:, i •. K €a 3<< Feb- :2:0-14Nati itirti;: Dec 23 a�_.�.r.�,:........�......p.�s;:...... ..,_.._..,.4��-.�._........�.�::�._.-...,., Bold Italics means that the submittal day or meeting date is different because of a holiday. vow' wr` 44,OF AL o VI�'I1I111' U � wal 5, `IRGI1�t� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road,Room 227 Charlottesville,Virginia 22902-4596 Phone(434)296-5832 Fax(434)972-4126 March 20,2013 David Hilliard Rutherfoord Hospitality,LLC 330 Claremont Lane Crozet,VA 22932 RE: SDP201300011 Old Trail Village Block 2B—Major Site Plan Amendment The Site Review Committee has reviewed the development proposal referenced above. The Agent for the Board of Supervisors is recommending conditional approval. Final approval can be granted once all of the comments for the following divisions of the Department of Community Development and other agencies are addressed, including: Albemarle County Division of Current Development(Planner) Albemarle County Division of Current Development(Engineer) Albemarle County Division of Inspections(Building Official) Albemarle County Architectural Review Board Albemarle County Fire and Rescue Rivanna Water and Sewer Authority Albemarle County Service Authority(ACSA) Virginia Department of Transportation(VDOT) Albemarle County Zoning Division(will forward upon receipt) Please make the revisions that have been identified as necessary for approval by the Site Review Committee and submit 8 copies to me for review. In accord with the provisions of Section 32.4.3.5 of Chapter 18 of the Code if the developer fails to submit a revised final site plan to address all of the requirements within six(6)months after the date of this letter the application shall be deemed to have been voluntarily withdrawn by the developer. If you have any questions about the comments please feel free to contact me. Sincerely, a, 1 r, c ax'' xrF 4 . i15wrCr . , ' ..a r =.( Y J.T.Newberry Planner tJ r County of Albemarle Department of Community Development ) Phone: (434)296-5832 Ext 3270 jewberry a.albemarle.org C CC: Scott Collins ?-e 200 Garrett Street, Suite K Charlottesville,VA 22902 Jennifer Durrer From: Jennifer Durrer Sent: Tuesday, February 05, 2013 9:00 AM To: 'scott@collins-engineering.com' Subject: Old Trail, Block 2B- Rutherfoord Hotal Attachments: im3511_20130205_224026.pdf Scott, Attached is a copy of the application for Old Trail Block 2B - Rutherfoord Hotel. We received the 16 copies for the initial site plan, but did not receive the additional 6 copies that are needed for ARB approval, if it's with the entrance corridor. If you can please have those dropped off today before 11am, that would be great. Thank you, Jennifer Durrer Intake Specialist II Community Development 401 McIntire Road Charlottesville, Va. JdurrerPalbemarle.org Original Message From: CDDim35110albemarle.org [mailto:CDDim35110albemarle.org] Sent: Tuesday, February 05, 2013 10:40 PM To: Jennifer Durrer Subject: Scanned image from CDD-IM3511-01 CDD DEVICE NAME: CDD-IM3511-01 DEVICE MODEL: im3511 LOCATION: CDD Central Ops FILE FORMAT: PDF MMR(G4) RESOLUTION: 300dpi x 300dpi Attached file is scanned image in PDF format. This file can be read by Adobe Acrobat Reader. The reader can be downloaded from the following URL: http://www.adobe.com/ 1