HomeMy WebLinkAboutSUB201600092 Bond 2022-12-12D.W R l l.,e :
Dnle aeceieeU'
i
Fee P.,
Inlw.4rc Fw M Iw Program Admini.nwror ,1%q,-n\ !
BOND INSPECTION REQUEST
APPROVED PLAN #: 5019 zot- QOy1 La I t - a7
PROJECT NAME (including Phase #): Ao4w 'k AbAwjA, 5u� t. Z A
(As listed on the approved plan) I
OM 61D r 017
This form is used to request a reduction or release of a bond. A fee is required for each inspection. Please
check the appropriate box below for the requested inspection(s). Fees includes 4% Technology Fee.
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
❑ VSMPNESCP Erosion Control, Stormwater Management and/or Mitigation per
Water Protection Ordinance sections 17-207 & 17-208 $294.32
❑ Reduction ❑ Release
Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14-435 & 14438 $307.84
KReduction ❑ Release
Water & Sewer bond per Subdivision Ordinance section 14435 $307.84
Xteduction ❑ Release �----
❑ Site Development Performance bond (Incomplete Site Work & Landscaping)
❑ Reduction (site work only) ❑ Release / [' (�
TOTAL FEES P1 , 6
$344.24
Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville,
VA 22902, Attention: Management Analyst — Phone 434-296-5832; Fax 434-972-4126. All roads and
stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esmts,
certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures).
Bonds will not be reduced or released without record drawings and inspection documentation per the state
requirements and County's published procedures. A minimum 20% of the original posting is held until
acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is
part of the bonded site work, a request for reduction should only be made once all landscaping is complete.
If all required documentation is not received within 30 days of receipt of this request, this application shall be
deemed incomplete and shall be rejected. If rejected, a new application, supporting documentation and fee will
be required. Applications may be withdrawn for a full refund within 30 days of receipt.
If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner.
Please provide contact information.
EMAIL: SOS f�cV'tL GICc,SSIG GG✓I.L
OR REGULAR MAIL ADDRESS:
Revised 7/15/2014. 7120/2015, 11/3/2015, W14/2017, 1/28/2020. 7/1/2021
Internal ke (1 v
Dale Rtteived:
Fee Pei
Received hy:
/make: Pnrw act Prvgn . Admis awr
BOND INSPECTION REQUEST
APPROVED PLAN#: 602 %Q( 4' (p0g2
PROJECT NAME (including Phase #): AJ04*(. Y"i—
(As listed on the approved plan) / .(_ 38 — 6
This form is used to request a reduction or release of a bond. A fee is required for each inspection. Please
check the appropriate box below for the requested inspection(s). Fees includes 4% Technology Fee.
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
❑ VSMP/VESCP Erosion Control, Stormwater Management and/or Mitigation per
Water Protection Ordinance sections 17-207 & 17-208 $294.32
o Reduction ❑ Release
Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14-435 & 14438 $307.84
Reduction ❑ Release
Water & Sewer bond per Subdivision Ordinance section 14435 $307.84
Reduction ❑ Release
❑ Site Development Performance bond (Incomplete Site Work & Landscaping) $344.24
o Reduction (site work only) ❑ Release TOTAL FEES l r 66
Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville,
VA 22902, Attention: Management Analyst — Phone 434-296-5832; Fax 434-972-4126. All roads and
stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esmts,
certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures).
Bonds will not be reduced or released without record drawings and inspection documentation per the state
requirements and County's published procedures. A minimum 20% of the original posting is held until
acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is
part of the bonded site work, a request for reduction should only be made once all landscaping is complete.
If all required documentation is not received within 30 days of receipt of this request, this application shall be
deemed incomplete and shall be rejected. If rejected, a new application, supporting documentation and fee will
be required. Applications may be withdrawn for a full refund within 30 days of receipt.
If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner.
Please provide contact information.
EMAIL: �aV.c�C� JOIJ 1 A c! i/L— G (QSS(G G2
OR REGULAR MAIL ADDRESS:
O-PO IMiZdVZL, 2 -7 2
Print Name Date
Reviud 7/15/2014, 72012015. 11130015, 8/14/2017. 1/28/2020. 7112021
Internal Use Onl/y +++��� �f
Date ltmeived:: `-' wit wl'i:;fy
Fee Paitl1Or "J Y y
Received by: WO
Intake: Forward m Program Admininraeg,
!!�� BOND INSPECTION REQUEST
APPROVED PLAN #: S t- 5 inl Ik - /YX3Cl7 / A 7 < / 7 r 7
PROJECT NAME (including Phase #): A.43*1 It rrj1h/�6 5tt4 ,5� � I G
(As listed on the approved plan) Lo43 1,7- 3 7
This form is used to request a reduction or release of a bond. A fee is required for each inspection. Please
check the appropriate box below for the requested inspection(s). Fees includes 4% Technology Fee.
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
❑ VSMPNESCP Erosion Control, Stormwater Management and/or Mitigation per
Water Protection Ordinance sections 17-207 & 17-208 $294.32
❑ Reduction ❑ Release
Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14-435 & 14-438 $307.84
eduction ❑ Release
Water & Sewer bond per Subdivision Ordinance section 14-435 $307.84
TOTAL FEES I Se 68
$344.24
Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville,
VA 22902, Attention: Management Analyst —Phone 434-296-5832; Fax 434-972-4126. All roads and
stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esmts,
certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures).
Bonds will not be reduced or released without record drawings and inspection documentation per the state
requirements and County's published procedures. A minimum 20% of the original posting is held until
acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is
part of the bonded site work, a request for reduction should only be made once all landscaping is complete.
If all required documentation is not received within 30 days of receipt of this request, this application shall be
deemed incomplete and shall be rejected. If rejected, a new application, supporting documentation and fee will
be required. Applications may be withdrawn for a full refund within 30 days of receipt.
If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner.
Please provide contact information.
EMAIL: GCGLV lA CIP J dy'�G 'i NL "' Q9:&5SC C . Lc^M-
OR REGULAR MAIL ADDRESS:
Signature of Owner/Developer
DihJO wTlq"ZL � Zz
Print Name Date
Revised 7/15/2014, 7/20/2015, 11/3/2015, 8/14/2017, 1/28/2020, 7/1/2021
Inlernol lice Only. �q
Dale I ved• G
Fee Paid: ^
Received by: I,N`.l\
/nwA, F.,e.,d m 14nyna, AlininGlraror
3
+e
BOND INSPECTION REQUEST
APPROVED PLAN #: `S is gal (j - 9 Z LOTS 1' //
PROJECT NAME (including Phase #): A -,Au AQ 1 y,:L 5A S e44%G1,. ! --D
(As listed on the approved planLh 1— I r
This form is used to request a reduction or release of a bond. A fee is required for each inspection. Please
check the appropriate box below for the requested inspection(s). Fees includes 4% Technology Fee.
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
❑ VSMP/VESCP Erosion Control, Stormwater Management and/or Mitigation per
Water Protection Ordinance sections 17-207 & 17-208 $294.32
❑ Reduction ❑ Release
LX Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14-435 & 14-438 $307.84
��,y111 eduction ❑ Release
IA Water & Sewer bond per Subdivision Ordinance section 14-435 $307.84
eduction ❑ Release
❑ Site Ilevelopment Performance bond (Incomplete Site Work & Landscaping) $344.24
❑ Reduction (site work only) ❑ Release TOTAL FEES 1 b 8
Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville,
VA 22902, Attention: Management Analyst — Phone 434-296-5832; Fax 434-9724126. All roads and
stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esmts,
certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures).
Bonds will not be reduced or released without record drawings and inspection documentation per the state
requirements and County's published procedures. A minimum 20% of the original posting is held until
acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is
part of the bonded site work, a request for reduction should only be made once all landscaping is complete.
If all required documentation is not received within 30 days of receipt of this request, this application shall be
deemed incomplete and shall be rejected. If rejected, a new application, supporting documentation and fee will
be required. Applications may be withdrawn for a full refund within 30 days of receipt.
If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner.
Please provide contact information.
EMAIL: AW-t & -A124A - GL&•.S4- GcuJ
OR REGULAR MAIL ADDRESS:
_ lit t-�fltg U Z 7 2-Z.
Print Name Date
Reviwd 7/152014, 7202015, 11132015. 8/142017, 128/2020. 7112021
Internal Use Onl
Dale Received: -� '�
Fee Paid:(
Received by:
/nmkr: Forward to Program Administrator
BOND INSPECTION REQUEST
F.VJ41XIINallUWA041
-3
PROJECT NAME (including Phase ft A]-*, Pot Ji, � 5et✓3Nu- 10
(As listed on the approved plan) A t L;�t I" 3
This form is used to request a reduction or release of a bond. A fee is required for each inspection. Please
check the appropriate box below for the requested inspection(s). Fees includes 4% Technology Fee.
Inspections for the purposes of bond reduction or release will require a separate fee for each bond.
❑ VSMPNESCP Erosion Control, Stormwater Management and/or Mitigation per
Water Protection Ordinance sections 17-207 & 17-208 $294.32
❑ Reduction ❑ Release
Subdivision (roads, drainage, etc.) per Subdivision Ordinance sections 14435 & 14-438 $307.84
eduction ❑ Release
Waterewer bond per Subdivision Ordinance section 14-435 $307.84
)(Reduction ❑ Release
❑ Site Development Performance bond (Incomplete Site Work & Landscaping) $344.24
❑ Reduction (site work only) ❑ Release
TOTAL FEES
Submit requests to: Department of Community Development, 401 McIntire Road, North Wing, Charlottesville,
VA 22902, Attention: Management Analyst — Phone 434-296-5832; Fax 434-9724126. All roads and
stormwater facilities will require construction record drawings, inspection reports, videos/photos, plats/esmts,
certifications, and completion processes through VDOT or DEQ (refer to County acceptance procedures).
Bonds will not be reduced or released without record drawings and inspection documentation per the state
requirements and County's published procedures. A minimum 20% of the original posting is held until
acceptance of all bonded improvements. For Site Development Performance bonds, if landscape installation is
part of the bonded site work, a request for reduction should only be made once all landscaping is complete.
If all required documentation is not received within 30 days of receipt of this request, this application shall be
deemed incomplete and shall be rejected. If rejected, a new application, supporting documentation and fee will
be required. Applications may be withdrawn for a full refund within 30 days of receipt.
If this is a reduction request, the revised estimate will be prepared by the plan reviewer and sent to the owner.
Please provide contact information. EMAIL: j DGIV Sou 1 Y1 rY� v Laf-s t �. C Ci✓�/1
OR REGULAR MAIL ADDRESS:
Signature of Owner/Developer
Print Name
2 ZZ
Date
Revised 7/15/2014, 7/20/2015, 11/3/2015, 8/14/2017, 1/28/2020, 7/1/2021