Loading...
HomeMy WebLinkAboutWPO201400063 Correspondence 2014-07-07 AiFIZ BLACKWELL ENGINEERING, PLC 566 E.MARKET STREET • HARRISONBURG,VIRGINIA 22801 • (540)432-9555 FAX(540)434-7604 Transmittal Letter Dept. of Community Development T. Basil Finnegan To: Attn: Max Greene From: Company: County of Albemarle Date: September 9,2014 401 McIntire Road Address: Pages: See below Charlottesville,VA 22902 New Hope Community Church Job Name: WPO 2014 00063 Job Number: 2167 Second Submittal—Additional Prints • Plans r Specs r Report r Proposal ✓ Letter r Calculations r Invoice r Other Items: 1. Storm ater Manage a ent Plan — 2 sets For Your: Pi Approval r Use r Information r Distribution r Signature l✓ Review r Records 1 Per your request Comments: Cc: Michael Henderson— New Hope Church Sent Via: ✓ US Mail r Delivery l✓ Overnight r Email r Fax r Pick up r Other CIVIL ENGINEERS SPECIALIZING IN LAND DEVELOPMENT, ENVIRONMENTAL NEEDS AND CONSTRUCTION MANAGEMENT SERVING COMMERCIAL, INDUSTRIAL AND MUNICIPAL CLIENTS Max Greene From: Max Greene Sent: Wednesday, August 27, 2014 1:21 PM To: 'Basil Finnegan' Subject: RE: New Hope Church-WP0201400063 (BE#2167) Basil, The plans appear to address the State Minimum Requirements for Approval. But we do not have a complete set of plans. Also, do you have a copy of the 2014 VSMP permit from the State? I think if you send 2 complete sets of the plans to me I can approve them once we have all the State permit information. Thanks, Max From: Basil Finnegan [mailto:basilblackwellengineering.com] Sent: Monday, August 18, 2014 10:03 AM To: Max Greene Subject: New Hope Church - WP0201400063 (BE# 2167) Max, Clarity needed on the VSMP Application Completion Check reviewed by Glenn Brooks. Line D - Erosion and Sediment Control Plan- temporary and permanent controls in such detail to be reasonably adequate [Which controls need more detail?] Line G - Stormwater Pollution Prevention Plan- Qualified personnel identified. Operator, Persons to sign inspection reports [We think the SWPPP was signed by the Owner. Does the Operator for each measure need to be assigned to address this comment?] Line I-Requested Variations or Exceptions if applicable-SSF, MMT, etc. [The "Modified Rock Check Dam for l' Deep Ditches" and "Bioretention Basin-Energy Dissipator/Separator" are the only two items that I think Glenn is referring to. Is this correct?] Regards, T. Basil"Tinne,gan Senior Designer Blackwell Engineering, PLC 540-432-9555 (Office) 540-434-7604 (Fax) www.blackwellengineering.com 1 Nwe Glenn Brooks From: Glenn Brooks Sent: Thursday, July 10, 2014 1:49 PM To: 'mike2848 @gmail.com'; 'basil @blackwellengineering.com' Cc: Max Greene Subject: New Hope chruch application, WPO201400063 Attachments: NewHopeChruch_Eng_VSMP_Completeness_Check.pdf Gentlemen, Your application was incomplete. Please find attached our completeness review. Albemarle is now a VSMP authority, and we are required to implement all state VSMP requirements and the General VPDES permit. These changes were effective on July 1St Thank you, Glenn Brooks,P.E. County Engineer Albemarle County 1