Loading...
HomeMy WebLinkAboutWPO201300060 Correspondence 2013-08-22 Brian Mitchell From: Glenn Brooks[GBROOKS @albemarle.org] Sent: Monday, August 26, 2013 3:34 PM To: Brian Mitchell Cc: Kenny Thacker; Ana Kilmer Subject: Nissan erosion control plan (WPO201300060) Brian, This plan is approvable. However,this submittal is only for the erosion control plan,and it has changed slightly since the original approval (WP0201100074). Please provide four copies of the erosion and sediment control plan only. Please remove all other sheets which are not the erosion and sediment control plan,and keep a title sheet which can be used to reference on the bond agreements. Please provide an original seal and signature,with a current date,on each plan. Thank you. Glenn Brooks,P.E. County Engineer Albemarle County A (.INfIJJNO, ELOt C(-AA13'0.B?d 1